Category:Letter
MONTHYEARML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23348A3712023-12-14014 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report (05000416/2024011) and Request for Information ML23340A2222023-12-13013 December 2023 Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000416/20234032023-11-13013 November 2023 Security Baseline Inspection Report 05000416/2023403 Cover Letter ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000416/20230032023-11-0808 November 2023 Integrated Inspection Report 05000416/2023003 ML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23270B1892023-09-27027 September 2023 Evacuation Time Estimate Study ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23240A3952023-08-28028 August 2023 Reply to a Notice of Violation; EA-23-019 IR 05000416/20230052023-08-21021 August 2023 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005) ML23226A1002023-08-18018 August 2023 Regulatory Audit in Support of License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69 IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 IR 05000416/20234042023-08-0707 August 2023 Material Control and Accounting Program Inspection Report 05000416/2023404 IR 05000416/20230912023-07-28028 July 2023 Final Significance Determination of a Green Finding and Notice of Violation; NRC Inspection Report 05000416/2023091 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23166B0712023-06-15015 June 2023 Reply to Notice of Violation EA-22-104 and EA-22-115 ML23166B0662023-06-15015 June 2023 Response to NRC Integrated Inspection Report 05000416/2023001 ML23159A2302023-06-0808 June 2023 Response to Request for Additional Information Concerning Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23122A1632023-05-18018 May 2023 NRC Inspection Report 05000416/2023090 and Preliminary White Finding IR 05000416/20234022023-05-17017 May 2023 Security Baseline Inspection Report 05000416/2023402 ML23110A8002023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000416/20230012023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23117A0422023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23110A0552023-04-20020 April 2023 Annual Radiological Environmental Operating Report (AREOR) ML23103A1022023-04-13013 April 2023 Annual Report of Individual Monitoring - NRC Form 5 for 2022 Per 10 CFR 20.2206 ML23102A1482023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23079A2772023-03-21021 March 2023 U.S. Nuclear Regulatory Commission Presentation at the May 1, 2023, Port Gibson City Council Meeting ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc IR 05000416/20230112023-03-0808 March 2023 Design Basis Assurance Inspection Report 05000416/2023011 2024-01-31
[Table view] Category:License-Operator
MONTHYEARIR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23102A1482023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML22342B2592022-10-14014 October 2022 10 Post Examination Analysis ML22342B2602022-10-14014 October 2022 10 Public Forms ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21342A2702021-12-0808 December 2021 GG-2022-10 Corp Notification Ltr - Cco, Grand Gulf Nuclear Station - Notification of NRC Initial Operator Licensing Examination 05000416/2022301 ML21349A1562021-10-25025 October 2021 GG-2021-10 Public Forms ML21333A2532021-10-25025 October 2021 GG-2021-10 Post Exam Analysis ML21280A0732021-10-0707 October 2021 NRC Initial Operator Licensing Examination Approval 05000416/2021301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21106A2842021-04-14014 April 2021 Generic Fundamentals Examination Results March 2021 ML21041A5352021-02-11011 February 2021 Notification of NRC Initial Operator Licensing Examination 05000416/2021301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20069C2262020-03-0909 March 2020 Notification of NRC Initial Operator Licensing Examination 05000416/2020302 ML20058J8102020-02-10010 February 2020 GG-2020-02 Post Examination Analysis ML20058H6182020-02-10010 February 2020 GG-2020-02 Draft Written Examination ML20058H6142020-02-10010 February 2020 GG-2020-02 Draft Operating Test ML20058H6152020-02-10010 February 2020 GG-2020-02 Draft Outlines ML20058H6172020-02-10010 February 2020 GG-2020-02 Draft Written Examination Comments ML20058H6112020-02-10010 February 2020 GG-2020-02 Draft Operating Test Comments ML20058H6242020-02-10010 February 2020 GG-2020-02 Final Written Examination ML20058H6222020-02-10010 February 2020 GG-2020-02 Final Outlines ML20058H6212020-02-10010 February 2020 GG-2020-02 Final Operating Test ML20058H6262020-02-10010 February 2020 GG-2020-02 Draft Outline Comments ML20058J8112020-02-10010 February 2020 GG-2020-02 Public Forms ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19128A1582019-05-0808 May 2019 Notification of NRC Initial Operator Licensing Examination 05000416/2020301 ML19045A3732019-02-12012 February 2019 March 2019 GFE Cover Letter Riv ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18116A2382018-04-26026 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations. ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18061A1652017-12-11011 December 2017 2017-12 Final Outlines ML18061A1722017-12-11011 December 2017 2017-12 Public Forms ML18050A0562017-12-11011 December 2017 2017-12 Post-Exam Analysis ML18050A0542017-12-11011 December 2017 2017-12 Final Written Exams ML18061A1702017-12-11011 December 2017 2017-12 Proposed Written Exam Comments ML18061A1672017-12-11011 December 2017 2017-12 Proposed Operating Tests ML18061A1712017-12-11011 December 2017 2017-12 Proposed Written Exams ML18050A0552017-12-11011 December 2017 2017-12 Final Operating Tests ML18061A1682017-12-11011 December 2017 2017-12 Proposed Outline Comments ML18061A1662017-12-11011 December 2017 2017-12 Proposed Operating Test Comments ML18061A1692017-12-11011 December 2017 2017-12 Proposed Outlines IR 05000416/20173022017-11-30030 November 2017 NRC Initial Operator Licensing Examination Approval 05000416/2017302 ML17135A4262017-05-12012 May 2017 Notification of NRC Initial Operator Licensing Examination 05000416/2017302 GNRO-2017/00031, NRC Form 536 Response to Regulatory Issue Summary 2017-032017-05-0404 May 2017 NRC Form 536 Response to Regulatory Issue Summary 2017-03 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16291A2602016-10-13013 October 2016 Notification of NRC Initial Operator Licensing Examination 05000416/2017301 ML16272A1472016-09-28028 September 2016 Generic Fundamentals Examination Results Sept 2016 GNRO-2016/00042, NRC Form 536 Response to Regulatory Issue Summary 2016-09, Grand Gulf Nuclear Station, Unit 12016-07-29029 July 2016 NRC Form 536 Response to Regulatory Issue Summary 2016-09, Grand Gulf Nuclear Station, Unit 1 2024-01-16
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23102A1482023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML22342B2602022-10-14014 October 2022 10 Public Forms ML22342B2592022-10-14014 October 2022 10 Post Examination Analysis ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21342A2702021-12-0808 December 2021 GG-2022-10 Corp Notification Ltr - Cco, Grand Gulf Nuclear Station - Notification of NRC Initial Operator Licensing Examination 05000416/2022301 ML21333A2532021-10-25025 October 2021 GG-2021-10 Post Exam Analysis ML21349A1562021-10-25025 October 2021 GG-2021-10 Public Forms ML21280A0732021-10-0707 October 2021 NRC Initial Operator Licensing Examination Approval 05000416/2021301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21041A5352021-02-11011 February 2021 Notification of NRC Initial Operator Licensing Examination 05000416/2021301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20069C2262020-03-0909 March 2020 Notification of NRC Initial Operator Licensing Examination 05000416/2020302 ML20058H6182020-02-10010 February 2020 GG-2020-02 Draft Written Examination ML20058H6242020-02-10010 February 2020 GG-2020-02 Final Written Examination ML20058H6172020-02-10010 February 2020 GG-2020-02 Draft Written Examination Comments ML20058H6142020-02-10010 February 2020 GG-2020-02 Draft Operating Test ML20058H6212020-02-10010 February 2020 GG-2020-02 Final Operating Test ML20058H6262020-02-10010 February 2020 GG-2020-02 Draft Outline Comments ML20058H6152020-02-10010 February 2020 GG-2020-02 Draft Outlines ML20058J8112020-02-10010 February 2020 GG-2020-02 Public Forms ML20058J8102020-02-10010 February 2020 GG-2020-02 Post Examination Analysis ML20058H6222020-02-10010 February 2020 GG-2020-02 Final Outlines ML20058H6112020-02-10010 February 2020 GG-2020-02 Draft Operating Test Comments ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19128A1582019-05-0808 May 2019 Notification of NRC Initial Operator Licensing Examination 05000416/2020301 ML18116A2382018-04-26026 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations. ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18061A1722017-12-11011 December 2017 2017-12 Public Forms ML18061A1672017-12-11011 December 2017 2017-12 Proposed Operating Tests ML18061A1712017-12-11011 December 2017 2017-12 Proposed Written Exams ML18061A1702017-12-11011 December 2017 2017-12 Proposed Written Exam Comments ML18061A1682017-12-11011 December 2017 2017-12 Proposed Outline Comments ML18061A1692017-12-11011 December 2017 2017-12 Proposed Outlines ML18050A0552017-12-11011 December 2017 2017-12 Final Operating Tests ML18050A0562017-12-11011 December 2017 2017-12 Post-Exam Analysis ML18050A0542017-12-11011 December 2017 2017-12 Final Written Exams ML18061A1652017-12-11011 December 2017 2017-12 Final Outlines ML18061A1662017-12-11011 December 2017 2017-12 Proposed Operating Test Comments ML17135A4262017-05-12012 May 2017 Notification of NRC Initial Operator Licensing Examination 05000416/2017302 GNRO-2017/00031, NRC Form 536 Response to Regulatory Issue Summary 2017-032017-05-0404 May 2017 NRC Form 536 Response to Regulatory Issue Summary 2017-03 ML16291A2602016-10-13013 October 2016 Notification of NRC Initial Operator Licensing Examination 05000416/2017301 ML16272A1472016-09-28028 September 2016 Generic Fundamentals Examination Results Sept 2016 GNRO-2016/00042, NRC Form 536 Response to Regulatory Issue Summary 2016-09, Grand Gulf Nuclear Station, Unit 12016-07-29029 July 2016 NRC Form 536 Response to Regulatory Issue Summary 2016-09, Grand Gulf Nuclear Station, Unit 1 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML16028A0202015-12-14014 December 2015 2015-12 Draft Op Tests ML16028A0212015-12-14014 December 2015 2015-12 Draft Op Test Comments ML16028A0222015-12-14014 December 2015 2015-12 Final Outlines ML16028A0242015-12-14014 December 2015 2015-12 Public Forms 2024-01-16
[Table view] |
See also: IR 05000416/2022301
Text
December 08, 2021
Mr. Robert Franssen, Site Vice President
Entergy Operations, Inc.
Grand Gulf Nuclear Station
P.O. Box 756
Port Gibson, MS 39150
SUBJECT: GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC INITIAL
OPERATOR LICENSING EXAMINATION 05000416/2022301
Dear Mr. Franssen:
In a telephone conversation on December 6, 2021 between Mr. S. Reeves, Lead Examination
Developer, and Mr. C. Osterholtz, chief examiner, arrangements were made for the
administration of operator licensing examinations at Grand Gulf Nuclear Station during the week
of October 10, 2022.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in Revision 12 to NUREG-1021, Operator Licensing Examination Standards for
Power Reactors. The NRCs regional office will discuss with your staff any changes that might
be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outlines and any updates to the written outlines by May 6, 2022. The written examination
outline was provided to your staff on December 6, 2021. The written examinations, operating
tests, and supporting reference materials identified in NUREG-1021, Examination Standard
(ES)-2.1, Preparing for Operator Licensing Initial Examinations, will be due by July 22, 2022.
Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 55.40(b)(3), an authorized
representative of the facility licensee shall approve the examinations and tests before they are
submitted to the NRC for review and approval. All materials shall be complete and ready to
use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Delays in
receiving the required materials, or the submittal of inadequate or incomplete materials, may
cause the examinations to be cancelled or rescheduled. In addition, your support for on-site
validation of the examinations is required during the week of September 12, 2022.
To conduct the requested written examinations and operating tests, your staff will need to
provide adequate space and accommodations and to make the simulation facility available on
the dates noted above. In accordance with ES 3.5, Administering Operating Tests, your staff
should retain the original simulator performance data (e.g., system pressures, temperatures,
and levels) generated during the dynamic operating tests until the NRC takes licensing action
on all the applications and any adjudicatory actions on any hearing demands are complete.
ES-1.2, Guidelines for Taking NRC Examinations, contains a number of NRC guidelines for
the written examinations and operating tests as they are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator waiver or excusal requests (if any) (Office of Management
and Budget (OMB) control number 3150 0090) at least 60 days before the first examination date
(if possible). Contact Mr. Osterholtz to determine the method for submission of the waiver or
excusal requests. Preliminary reactor operator and senior reactor operator license applications
(OMB control number 3150 0090) and medical certifications (OMB control number 3150 0024)
should be submitted at least 30 days before the first examination date. If the NRC does not
receive the preliminary applications at least 30 days before the examination date, a
postponement may be necessary. Final, signed applications certifying that all training has been
completed and requesting any waivers or excusals, as applicable, should be submitted at least
14 days before the first examination date.
Although the guidelines for waiver or excusal requests call for their receipt at least 30 days
before the first examination date (preliminary) and 14 days before the first examination date
(final), the requests should be submitted as early as possible in the process (see the 60-day
guideline above). Resolutions resulting from verbal inquiries by the facility licensee to the NRC
are not binding. Submittals addressing waivers or excusals, or both, should be in writing
(i.e., using NRC Form 398 or as directed when Mr. Osterholtz contacted to determine the
method for submission). The NRC will document its final decision on whether to grant a waiver
or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC
will not provide its decision until the final application is submitted to the agency.
Paperwork Reduction Act Statement
This letter contains information collection requirements that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved
by the OMB, approval number 3150-0018.
The burden to the public for these mandatory information collections is estimated to average
400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> per examination, including the time for reviewing instructions, searching existing data
sources, gathering and maintaining the data needed, and completing and reviewing the
information collections. Send comments regarding this information collection to the FOIA,
Library, and Information Collections Branch (T6-A10M), U.S. Nuclear Regulatory Commission,
Washington, DC 20555 0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the OMB
reviewer at: OMB Office of Information and Regulatory Affairs (3150-0018), Attn: Desk Officer
for the Nuclear Regulatory Commission, 725 17th Street, NW Washington, DC 20503; e-mail:
oirasubmission@omb.eop.gov.
Public Protection Notification
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless the document requesting or requiring the collection displays a currently
valid OMB control number.
In accordance with 10 CFR 2.390, Public inspections, exemptions, requests for withholding, a
copy of this letter and its enclosures will be available electronically for public inspection through the
NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is
accessible on the NRCs Web site at http://www.nrc.gov/reading-rm/adams.html.
Enclosure
Thank you for your cooperation in this matter. Mr. Reeves has been advised of the policies and
guidelines referenced in this letter. If you have any questions about the NRCs examination
procedures and guidelines, please contact me at 817-200-1269, or Heather Gepford, Chief,
Operations Branch at 817-200-1156.
Sincerely,
Clyde Osterholtz, Chief Examiner
Operations Branch
Division of Reactor Safety
Docket No. 50-416
License No. NPF-29
cc: Electronic Distribution for Grand Gulf
2
ML21342A270
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: CCO Yes No Publicly Available Sensitive NRC-002
OFFICE SOE: OB
NAME COsterholtz
SIGNATURE CCO
DATE 12/6/2021