|
|
Line 38: |
Line 38: |
| I am Senior Vice President of Public Service Electric and Gas Company, and as such, I find the matters set forth in our letter dated July 24, 1987 , concerning Facility Operating License DPR-70 and DPR-75 for Salem Generating Station, is true to the best of my knowledge, information and belief * | | I am Senior Vice President of Public Service Electric and Gas Company, and as such, I find the matters set forth in our letter dated July 24, 1987 , concerning Facility Operating License DPR-70 and DPR-75 for Salem Generating Station, is true to the best of my knowledge, information and belief * |
| .thi,~' | | .thi,~' |
| s*u.'bs*.***c***;;z | | s*u.'bs*.***c***;;z rH;*.e****a* |
| ', ! ,*:' '
| |
| rH;*.e****a* | |
| */)fl .adn. daysw0 ofr~~o~b"efore | | */)fl .adn. daysw0 ofr~~o~b"efore |
| _<! -~ 1 me 19 8 7 | | _<! -~ 1 me 19 8 7 |
| .. .
| |
| .L£rM1ea:,; Jr~ | | .L£rM1ea:,; Jr~ |
| - I\fotary Public of New Jersey A~~NewJemY ODDI My CommiSSiOO Elpires Mardi 14, 1990 My Commission expires on | | - I\fotary Public of New Jersey A~~NewJemY ODDI My CommiSSiOO Elpires Mardi 14, 1990 My Commission expires on |
Similar Documents at Salem |
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML18107A4991999-08-25025 August 1999 Application for Amends to Licenses DPR-70 & DPR-75,proposing to Authorize Licensee to Perform Single Cell Charging of Connected Cells in Operable Class 1E Batteries ML18107A5141999-08-25025 August 1999 Suppl to 971114 Application for Amends to Licenses DPR-70 & DPR-75,deleting Footnotes Added as one-time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Unit 2 ML18107A4631999-07-29029 July 1999 Application for Amends to Licenses DPR-70 & DPR-75,replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4581999-07-23023 July 1999 Application for Amends to Licenses DPR-70 & DPR-75 to Change TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4221999-07-0202 July 1999 Application for Amends to Licenses DPR-70 & DPR-75 to Relocate TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to Ufsar,Iaw GL 95-10 ML18107A3771999-06-10010 June 1999 Application for Amends to Licenses DPR-70 & DPR-75,modifying TS 3/4.6.1, Containment Integrity, by Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3571999-06-0404 June 1999 Application for Amends to Licenses DPR-70,DPR-75 & NPF-57 Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New,Affiliated Nuclear Generating Company, PSEG Nuclear Llc.Proprietary Encls Withheld ML18107A2081999-04-14014 April 1999 Application for Amends to Licenses DPR-70 & DPR-75,revising TS 3/4.9.12, Fhvas, to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,Per NUREG-1431. Page 4 of 4 in Attachment 2 of Incoming Submittal Omitted ML18106B1571999-03-31031 March 1999 Suppl to 990115 Application for Amend to License DPR-70, Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0621999-02-0808 February 1999 Application for Amends to Licenses DPR-70 & DPR-75, Respectively.Proposed Amend Modifies ECCS Subsystems Surveillance Requirement 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0501999-02-0202 February 1999 Application for Amends to Licenses DPR-70 & DPR-75,revising Max Permissible Enrichment of Stored New Fuel Described in TS Section 5.6.1.1.Rept Entitled, Criticality Analysis of Salem Units 1 & 2 Fresh Fuel Racks, Encl ML18106B0221999-01-15015 January 1999 Application for Amend to License DPR-70,proposing one-time Changes to Certain Unit 1 TS Surveillance Requirements for Fuel Cycle 13,currently Scheduled to Begin on 990918 ML18106A9161998-10-12012 October 1998 Application for Amend to License DPR-75,requesting one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10.Basis for Requested Changes,Analysis Supporting No Significant Hazards Determination & Marked Up TS Pages,Encl ML18106A8921998-09-29029 September 1998 Application for Amends to Licenses DPR-72 & DPR-75,modifying TS 3/4.9.4 to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8761998-09-17017 September 1998 Application for Amends to Licenses DPR-70 & DPR-75,modifying TSs 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8351998-08-12012 August 1998 Application for Amends to Licenses DPR-70 & DPR-75,modifying TS for Containment Air Locks for Salem Units 1 & 2 ML18106A7911998-07-30030 July 1998 Application for Amends to Licenses DPR-70 & DPR-75,revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Following Phrase ML18106A4271998-03-26026 March 1998 Application for Amend to License DPR-70,changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A4221998-03-26026 March 1998 Application for Amends to Licenses DPR-70 & DPR-75, Respectively,Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A2521998-01-0808 January 1998 Supplemental Application for Amends to Licenses DPR-70 & DPR-75,respectively Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2111997-12-15015 December 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising TS to Adopt Option B of 10CFR50,App J,For Type B & C Testing & Modifying Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1941997-12-11011 December 1997 Application for Amend to License DPR-70,requesting one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6771997-11-14014 November 1997 Application for Amends to Licenses DPR-70 & DPR-75,providing TS Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6731997-11-14014 November 1997 Application for Amends to Licenses DPR-70 & DPR-75, Correcting Editorial & Administrative Errors in Ts,Which Existed Since Initial Issuance ML18102B6611997-11-0404 November 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising TS 3/4.8.1 Re EDG & Deleting SR 4.8.1.1.2.d.1,calling for Diesels to Be Subjected to Insp Based on Vendor Recommendations ML18102B6571997-11-0404 November 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6371997-10-29029 October 1997 Application for Amend to License DPR-75,revising TS 3/4.4.6, Steam Generators, Making One Time Change to Unit 2 SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6411997-10-29029 October 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising SR 4.8.1.1.2.d.2 Proposed in Util 960925 Submittal Re EDG Testing ML18102B6471997-10-24024 October 1997 Application for Amends to Licenses DPR-70 & DPR-75,modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6441997-10-24024 October 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6291997-10-21021 October 1997 Application for Amends to Licenses DPR-70 & DPR-75,extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers in Closed Position ML18102B6181997-10-14014 October 1997 Application for Amend to License DPR-70,modifying Pressure Isolation Valve Lco,Lco Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 ML18102B6061997-10-0606 October 1997 Application for Amend to License DPR-70,changing TS for LCOs 3.1.3.1, Movable Control Assemblies & 3.1.3.2.1, Position Indication Sys. ML18102B5551997-08-27027 August 1997 Application for Amends to Licenses DPR-70 & DPR-75,providing Revised TS Bases Pages for TS 3.7.3, CCW Sys, to State That CCW Pumps Required to Be Operable to Meet LCO ML18102B5281997-08-19019 August 1997 Application for Amend to License DPR-75,providing Addl Operational Flexibility to Allow Orderly Resumption of Startup & Preclude Unwarranted Power Transients at Plant Unit 2 ML18102B5321997-08-18018 August 1997 Application for Amend to License DPR-75,incorporating Plant Computer (P-250) Into TS Bases for Movable Control Assemblies ML18102B4871997-08-0101 August 1997 Application for Amends to Licenses DPR-70 & DPR-75,rewording TS Section 4.2.1 to State That Util Will Adhere to Section 7 Incidental Take Statement Approved by Natl Marine Fisheries Svc ML18102B3041997-05-14014 May 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising SR 4.7.6.1.d.1 to Indicate That Specified Acceptable Filter Dp Is to Be Measured Across Filter Housing & to Reflecting Filter Dp Acceptance Value of Greater than 2.70 Wg ML18102B2611997-05-0101 May 1997 Suppl Info to Util 970211 Application for Amends to Licenses DPR-70 & DPR-75,revising TS for Chilled Water Sys - Auxiliary Bldg Subsystem.Ref to Radiation Monitoring Signal Removed from Bases Section ML18102B2581997-05-0101 May 1997 Application for Amend to License DPR-75,revising TS Section 3/4.7.7 to Reflect Extended Allowed Outage Times & Creating New TS Section 3/4.7.11 to Address Importance of Switchgear & Penetration Area Ventilation Sys ML18102B0071997-04-30030 April 1997 Application for Amends to Licenses DPR-40,DPR-56,DPR-70 & DPR-75,requesting Consent of NRC for Indirect Transfer of Control of Interest in Plants That Will Occur Under Proposed Merger ML18102B2511997-04-28028 April 1997 Submits Suppl to 970131 & 0314 Applications for Amends to Licenses DPR-70 & DPR-75,revising TS on Pressurizer Power Operated Relief Valves.Suppl Issued to State That Conclusion of NSHC Remains Valid ML18102B0221997-04-25025 April 1997 Application for Amends to Licenses DPR-70 & DPR-75, Eliminating Flow Path from RHR Sys to RCS Hot Legs as Specified in LCO 3.5.2.c.2 ML18102A9791997-04-11011 April 1997 Application for Amends to Licenses DPR-70 & DPR-75, Increasing Cw Flow to 2550 Gpm for 31 Day Surveillance Fans Started & Operated in Low Speed ML18102A8951997-03-0404 March 1997 Application for Amends to Licenses DPR-70 & DPR-75,modifying ECCS Surveillance Test Acceptance Criteria for Centrifugal Charging & SI Pumps ML18102A8491997-02-11011 February 1997 Application for Amends to Licenses DPR-70 & DPR-75, Requesting Addition of New TS 3/4.7.10, Chilled Water Sys ML18102A8361997-01-31031 January 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising TS 3/4.4.3 to Ensure That Automatic Capability of Power Operated Relief Valve to Relieve Pressure Is Maintained When Valves Are Isolated by Closure of Block Valves ML18102A8021997-01-31031 January 1997 Application for Amends to Licenses DPR-70 & DPR-75, Requesting Rev to TS Re Containment Systems Air Temp to Ensure Representative Average Air Temp Is Measured ML18102A7861997-01-23023 January 1997 Application for Amend to License DPR-75,revising TS Bases 3/4.3.3.1 Re Radiation Monitoring Instrumentation Channel 2R41 ML18102A7361997-01-0707 January 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising Eighteen Month Surveillance Performed to Measure RCS Total Flow Rate to Account for Necessary Plant Conditions for Performing Test in Mode 1 & Current Extended Plant Outages 1999-08-25
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML18107A4991999-08-25025 August 1999 Application for Amends to Licenses DPR-70 & DPR-75,proposing to Authorize Licensee to Perform Single Cell Charging of Connected Cells in Operable Class 1E Batteries ML18107A5141999-08-25025 August 1999 Suppl to 971114 Application for Amends to Licenses DPR-70 & DPR-75,deleting Footnotes Added as one-time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Unit 2 ML18107A4631999-07-29029 July 1999 Application for Amends to Licenses DPR-70 & DPR-75,replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4581999-07-23023 July 1999 Application for Amends to Licenses DPR-70 & DPR-75 to Change TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4221999-07-0202 July 1999 Application for Amends to Licenses DPR-70 & DPR-75 to Relocate TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to Ufsar,Iaw GL 95-10 ML18107A3771999-06-10010 June 1999 Application for Amends to Licenses DPR-70 & DPR-75,modifying TS 3/4.6.1, Containment Integrity, by Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3571999-06-0404 June 1999 Application for Amends to Licenses DPR-70,DPR-75 & NPF-57 Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New,Affiliated Nuclear Generating Company, PSEG Nuclear Llc.Proprietary Encls Withheld ML18107A2081999-04-14014 April 1999 Application for Amends to Licenses DPR-70 & DPR-75,revising TS 3/4.9.12, Fhvas, to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,Per NUREG-1431. Page 4 of 4 in Attachment 2 of Incoming Submittal Omitted ML18106B1571999-03-31031 March 1999 Suppl to 990115 Application for Amend to License DPR-70, Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0621999-02-0808 February 1999 Application for Amends to Licenses DPR-70 & DPR-75, Respectively.Proposed Amend Modifies ECCS Subsystems Surveillance Requirement 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0501999-02-0202 February 1999 Application for Amends to Licenses DPR-70 & DPR-75,revising Max Permissible Enrichment of Stored New Fuel Described in TS Section 5.6.1.1.Rept Entitled, Criticality Analysis of Salem Units 1 & 2 Fresh Fuel Racks, Encl ML18106B0221999-01-15015 January 1999 Application for Amend to License DPR-70,proposing one-time Changes to Certain Unit 1 TS Surveillance Requirements for Fuel Cycle 13,currently Scheduled to Begin on 990918 ML18106A9161998-10-12012 October 1998 Application for Amend to License DPR-75,requesting one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10.Basis for Requested Changes,Analysis Supporting No Significant Hazards Determination & Marked Up TS Pages,Encl ML18106A8921998-09-29029 September 1998 Application for Amends to Licenses DPR-72 & DPR-75,modifying TS 3/4.9.4 to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8761998-09-17017 September 1998 Application for Amends to Licenses DPR-70 & DPR-75,modifying TSs 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8351998-08-12012 August 1998 Application for Amends to Licenses DPR-70 & DPR-75,modifying TS for Containment Air Locks for Salem Units 1 & 2 ML18106A7911998-07-30030 July 1998 Application for Amends to Licenses DPR-70 & DPR-75,revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Following Phrase ML18106A4271998-03-26026 March 1998 Application for Amend to License DPR-70,changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A4221998-03-26026 March 1998 Application for Amends to Licenses DPR-70 & DPR-75, Respectively,Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A2521998-01-0808 January 1998 Supplemental Application for Amends to Licenses DPR-70 & DPR-75,respectively Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2111997-12-15015 December 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising TS to Adopt Option B of 10CFR50,App J,For Type B & C Testing & Modifying Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1941997-12-11011 December 1997 Application for Amend to License DPR-70,requesting one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6771997-11-14014 November 1997 Application for Amends to Licenses DPR-70 & DPR-75,providing TS Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6731997-11-14014 November 1997 Application for Amends to Licenses DPR-70 & DPR-75, Correcting Editorial & Administrative Errors in Ts,Which Existed Since Initial Issuance ML18102B6611997-11-0404 November 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising TS 3/4.8.1 Re EDG & Deleting SR 4.8.1.1.2.d.1,calling for Diesels to Be Subjected to Insp Based on Vendor Recommendations ML18102B6571997-11-0404 November 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6371997-10-29029 October 1997 Application for Amend to License DPR-75,revising TS 3/4.4.6, Steam Generators, Making One Time Change to Unit 2 SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6411997-10-29029 October 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising SR 4.8.1.1.2.d.2 Proposed in Util 960925 Submittal Re EDG Testing ML18102B6471997-10-24024 October 1997 Application for Amends to Licenses DPR-70 & DPR-75,modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6441997-10-24024 October 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6291997-10-21021 October 1997 Application for Amends to Licenses DPR-70 & DPR-75,extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers in Closed Position ML18102B6181997-10-14014 October 1997 Application for Amend to License DPR-70,modifying Pressure Isolation Valve Lco,Lco Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 ML18102B6061997-10-0606 October 1997 Application for Amend to License DPR-70,changing TS for LCOs 3.1.3.1, Movable Control Assemblies & 3.1.3.2.1, Position Indication Sys. ML18102B5551997-08-27027 August 1997 Application for Amends to Licenses DPR-70 & DPR-75,providing Revised TS Bases Pages for TS 3.7.3, CCW Sys, to State That CCW Pumps Required to Be Operable to Meet LCO ML18102B5281997-08-19019 August 1997 Application for Amend to License DPR-75,providing Addl Operational Flexibility to Allow Orderly Resumption of Startup & Preclude Unwarranted Power Transients at Plant Unit 2 ML18102B5321997-08-18018 August 1997 Application for Amend to License DPR-75,incorporating Plant Computer (P-250) Into TS Bases for Movable Control Assemblies ML18102B4871997-08-0101 August 1997 Application for Amends to Licenses DPR-70 & DPR-75,rewording TS Section 4.2.1 to State That Util Will Adhere to Section 7 Incidental Take Statement Approved by Natl Marine Fisheries Svc ML20148K0841997-06-0404 June 1997 Amends 194 & 177 to Licenses DPR-70 & DPR-75,respectively, Changing TSs 3.4.3 & 3.4.5, Relief Valves, to Ensure That Automatic Capability of PORVs to Relieve Pressure Is Maintained When Valves Are Isolated ML18102B3041997-05-14014 May 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising SR 4.7.6.1.d.1 to Indicate That Specified Acceptable Filter Dp Is to Be Measured Across Filter Housing & to Reflecting Filter Dp Acceptance Value of Greater than 2.70 Wg ML18102B2611997-05-0101 May 1997 Suppl Info to Util 970211 Application for Amends to Licenses DPR-70 & DPR-75,revising TS for Chilled Water Sys - Auxiliary Bldg Subsystem.Ref to Radiation Monitoring Signal Removed from Bases Section ML18102B2581997-05-0101 May 1997 Application for Amend to License DPR-75,revising TS Section 3/4.7.7 to Reflect Extended Allowed Outage Times & Creating New TS Section 3/4.7.11 to Address Importance of Switchgear & Penetration Area Ventilation Sys ML18102B0071997-04-30030 April 1997 Application for Amends to Licenses DPR-40,DPR-56,DPR-70 & DPR-75,requesting Consent of NRC for Indirect Transfer of Control of Interest in Plants That Will Occur Under Proposed Merger ML18102B2511997-04-28028 April 1997 Submits Suppl to 970131 & 0314 Applications for Amends to Licenses DPR-70 & DPR-75,revising TS on Pressurizer Power Operated Relief Valves.Suppl Issued to State That Conclusion of NSHC Remains Valid ML18102B0221997-04-25025 April 1997 Application for Amends to Licenses DPR-70 & DPR-75, Eliminating Flow Path from RHR Sys to RCS Hot Legs as Specified in LCO 3.5.2.c.2 ML18102A9791997-04-11011 April 1997 Application for Amends to Licenses DPR-70 & DPR-75, Increasing Cw Flow to 2550 Gpm for 31 Day Surveillance Fans Started & Operated in Low Speed ML18102A8951997-03-0404 March 1997 Application for Amends to Licenses DPR-70 & DPR-75,modifying ECCS Surveillance Test Acceptance Criteria for Centrifugal Charging & SI Pumps ML18102A8491997-02-11011 February 1997 Application for Amends to Licenses DPR-70 & DPR-75, Requesting Addition of New TS 3/4.7.10, Chilled Water Sys ML18102A8361997-01-31031 January 1997 Application for Amends to Licenses DPR-70 & DPR-75,revising TS 3/4.4.3 to Ensure That Automatic Capability of Power Operated Relief Valve to Relieve Pressure Is Maintained When Valves Are Isolated by Closure of Block Valves ML18102A8021997-01-31031 January 1997 Application for Amends to Licenses DPR-70 & DPR-75, Requesting Rev to TS Re Containment Systems Air Temp to Ensure Representative Average Air Temp Is Measured ML18102A7861997-01-23023 January 1997 Application for Amend to License DPR-75,revising TS Bases 3/4.3.3.1 Re Radiation Monitoring Instrumentation Channel 2R41 1999-08-25
[Table view] |
Text
Public Service Electric and Gas Company Corbin A. McNeil!, Jr. Public Service Electric and Gas Company P.O. Box236, Hancocks Bridge, NJ 08038 609 339-4800 Senior Vice President -
Nuclear July 24, 1987 NLR-N87138 LCR 87-11 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
REQUEST FOR LICENSE AMENDMENT FACILITY OPERATING LICENSE DPR-70 AND DPR-75 SALEM GENERATING STATION - UNIT NOS. 1 AND 2 In accordance with the Atomic Energy Act of 1954, as amended, and the regulations thereunder, we hereby transmit our request for amendment and our analyses of the changes to Facility Operating Licenses DPR-70 and DPR-75 for the Salem Generating Station Unit Nos. 1 and 2, respectively.
The amendment request consists of changing the Reactor Coolant Pump Breaker Position Trip logic from a 1 out of 4 reactor trip logic above 36% (permissive P-8) to a 2 out of 4 reactor trip logic above power level 11% (P-7 permissive). This change will remove a potential source of single failure unit trips and provide a reduction in challenges to the Reactor Protection System. This modification is provided as a standard feature or as a retrofit for all Westinghouse PWR units. Note that Technical Specification pages 3/4 3-7 for both Salem Unit 1 and 2 included in this submittal were also affected by a previous submittal (LCR 87-09 dated July 2, 1987). The pages submitted in this document include the previously requested changes as well as those change requested by this submittal. These modifications are currently scheduled for installation during the Unit 1 Cycle 7 outage (October 1987) and for the Unit 2 Cycle 4 outage (April 1988). Therefore, approval by October 1987 is requested.
Enclosed is a check in the amount of $150.00 as required by 10CFR 170.21.
Pursuant to the requirements of 10CFR50.91, a copy of this request for amendment has been sent to the State of New Jersey as indicated below. This submittal consists of one (1) signed original and thirty-seven (37) copies. ~
( . 8708030377 870724 . l\oo\ )~ \ 1 ~\
PDR P
ADOCi~ 05000272 PDR r '\~'\ it ,iij
Document Control Desk 2 July 24, 1987 Should there by any questions regarding this matter, please feel free to contact us.
Sincerely, Attachment C Mr. D. c. Fischer USNRC Licensing Project Manager Mr. T. J. Kenny USNRC Senior Resident Inspector Mr. w. T. Russell, Administrator USNRC Region I Mr. D. M. Scott, Chief Bureau of Nuclear Engineering Department of Environmental Protection 380 Scotch Road Trenton, NJ 08628
Ref: LCR 87-11 STATE OF NEW JERSEY )
) SS.
COUNTY OF SALEM )
Corbin A. McNeill, Jr., being duly sworn according to law deposes and says:
I am Senior Vice President of Public Service Electric and Gas Company, and as such, I find the matters set forth in our letter dated July 24, 1987 , concerning Facility Operating License DPR-70 and DPR-75 for Salem Generating Station, is true to the best of my knowledge, information and belief *
.thi,~'
s*u.'bs*.***c***;;z rH;*.e****a*
- /)fl .adn. daysw0 ofr~~o~b"efore
_<! -~ 1 me 19 8 7
.L£rM1ea:,; Jr~
- I\fotary Public of New Jersey A~~NewJemY ODDI My CommiSSiOO Elpires Mardi 14, 1990 My Commission expires on
LICENSE CHANGE REQUEST DCR-1EC/2EC-2245 I. DESCRIPTION OF THE CHANGE Revise the Technical Specification Bases, Section 2.2.1 Limiting Safety System Settings, "Reactor Coolant Pump Breaker Position Trip", and Table 3.3-1, Reactor Trip System Instrumentation, Functional Unit 20 "Reactor Coolant Pump Breaker Position Trip" to change the (1/4) RCP breaker open position anticipatory reactor trip logic above power level P-8 into (2/4) RCP breaker open position reactor trip logic above power level P-7. (see Attachment 1) This modification removes a potential source of single failure unit trips and provides a reduction in challenges (e.g. spurious trips) to the Reactor Protection System. This modification is provided as a standard feature or as a retrofit option for all Westinghouse PWR units. All domestic Westinghouse PWR units supplied subsequent to Three Mile Island (TMI) incorporate this change.
II. REASON FOR THE CHANGE The (1/4) RCP breaker open position reactor trip is primarily an anticipatory trip. If an RCP breaker opens, the low flow reactor trip setpoint is typically reached two to three seconds after the RCP begins coasting down. Thus the RCP breaker open position logic will trip the reactor in anticipation of the low flow reactor trip. Low flow in any one of four reactor coolant loops above the P-8 power level setpoint (greater than or equal to 36% of rated thermal power) and low flow in any two of four reactor coolant loops between power levels P-7 (greater than or equal to 11%
of rated thermal power) and P-8 will trip the reactor.
The low flow reactor trip is blocked below power level P-7.
The existing RCP breaker open position reactor trip logic is identical to the low flow reactor trip logic (i.e. (1/4) above P-8, (2/4) between P-7 and P-8, blocked below P-7).
Licensee Event Report LER-85-022 dated November 6, 1985 describes the circumstances which led to the unit trip/Safety Injection Event at Salem, Unit 2 on October 7, 1985. In that instance, an RCP breaker open position reactor trip was actuated by deenergizing the corresponding "RCP breaker tripped" interposing relay in the SSPS logic cabinet when its Vital Instrument Bus power source experienced a momentary ground fault.
This same fault condition deenergized the steam line loops 22 and 23 pressure protection instrument loop power supplies which fulfilled the (2/4) permissive logic for actuation of the Safety Injection System.
This momentary fault on a single Vital Instrument Bus panelboard resulted in a Unit Trip/Safety Injection by the "simulated" opening of an RCP breaker.
The existing and proposed low flow and RCP breaker position reactor trip logic is respectively shown in Figures 1 and 2 of Attachment 2.
III. JUSTIFICATION FOR THE CHANGE The (1/4) RCP breaker open position reactor trip above power level P-8 is not required for safety but is instead provided as a redundant anticipatory trip for an impending loss of reactor coolant flow to enhance the overall reliability of the Reactor Protection System. In the event of a single loop loss of flow, the low flow reactor trip is the design protection.
The proposed change in Reactor Protection System logic modifies the (1/4) RCP breaker open position reactor trip above power level P-8 into (2/4) RCP breakers open above power level P-7 (i.e. two RCP breakers open will be required at all power levels above P-7 to initiate the RCP breaker position reactor trip). If a single RCP is coasting down, then a reactor trip will occur on low flow. UFSAR Section 15.3.4.1 shows that adequate protection is provided by the low flow reactor trip logic for low primary coolant flow in a single loop.
This latter logic is a backup to the RCP power supply bus undervoltage and underfrequency reactor trip logic. UFSAR Section 15.3.4.4 concludes that the minimum DNBR will remain above the limiting value of 1.30 during a transient in a loss of forced reactor coolant flow (one or more loops). The deletion of the (1/4) RCP breaker open position reactor trip above
power level P-8 affects only the coincidence logic of the Reactor Protection System and does not degrade its performance or conformance to system functional requirements. This change provides a reduction in challenges (e.g. spurious trips) to the Reactor Protection System while retaining diversity and redundancy of the Reactor Protection System for the loss of flow in a single loop.
IV. SIGNIFICANT HAZARDS CONSIDERATION A. The proposed changes to the Salem Technical Specifications do not significantly increase the probability or consequences of a previously evaluated accident. UFSAR Section 15.2.5, "Partial Loss of Forced Reactor Coolant Flow" describes the low primary coolant flow reactor trip as providing the required protection against a partial loss of coolant flow accident. Three redundant flow channels are provided in each loop for the low flow reactor trip. Above power level P-8, the loss of flow in any one loop, as sensed by two of the three channels will actuate the low flow reactor trip.
The existing (1/4) RCP breaker open position anticipatory reactor trip functions to backup the low flow reactor trip. This same analysis assumes a worst case scenario (e.g. four loops initially operating, two pumps coasting down). UFSAR Section 15.2.5.5 concludes that the DNBR will not decrease below the limiting balue of 1.30 at any time during such a transient thus the core safety limit is not breeched. The anticipatory time delay (e.g. the time difference between the initiations of an RCP breaker open position reactor trip and a low primary coolant flow reactor trip) is not significant since the original transient analysis is based on low primary coolant flow. Therefore, the UFSAR Section 15.2.5.5 "Conclusions" bounds the consequences of deleting the (1/4) RCP breaker open position anticipatory reactor trip above power level P-8 and hence the proposed modification does not increase the probability or consequences of this previously evaluated accident scenario.
B. The proposed changes to the Salem Technical Specifications do not create the possibility of a new or different kind of accident than any previously evaluated. In the event of a single loop loss of flow, the low primary coolant flow reactor trip is the design protection and it meets the design requirement of maintaining the minimum DNBR above the 1.30 limiting value. If credit is not taken for the low primary coolant flow reactor trip, then a reactor trip on either overtemperature or overpower Delta-T will terminate the accident before DNB occurs in the core (UFSAR Section 7.2.3.1). Westinghouse analysis indicates that the hot spot clad temperature (on the inner clad surface) will remain well below the melting point (reference Attachment 2). For all non-LOCA safety analyses, the logic change which results in the deletion of a reactor trip on a single RCP breaker open position above power level P-8 is acceptable since UFSAR Sections 15.2.5.5 and 15.3.4.4 "Conclusions" bound the consequences. The diversity and redundancy of the Reactor Protection System are maintained for a single loop loss of flow.
- c. The proposed changes to the Salem GS Technical Specifications do not involve a significant reduction in the margin of safety. The RCP breaker position reactor trip is modified to actuate on the opening of any two breakers above the P-7 interlock setpoint. This modification only affects the coincidence logic of the Solid State Protection System (SSPS). The existing (2/4) coincident reactor trip logic functions (e.g. the opening of an RCP breaker in any one loop coincident with low flow in a second loop or low flow in any two loops simultaneously) will remain unchanged. This specific modification has undergone Westinghouse analysis and review in accordance with the general requirements of 10CFR50 Appendix B and the specific requirements of IEEE-279-1971 and does not degrade either its performance or conformance to system design requirements. Two independent RCP breaker open position interlocks are provided to the SSPS logic cabinets to develop the RCP breaker position reactor trip logic (independent interlocks for trains "A" and "B"). The single failure criterion requirement for independence and redundancy of the (2/4) RCP breaker open position reactor trip above power level P-7 is not changed as a result of this modification thus UFSAR Section 7.2.2.2 "Design Basis for Protection Circuits" is
not changed and the existing margins of safety are retained. Based on the preceding discussions in IV. A, B and c, PSE&G concludes that the proposed change to the Salem Technical Specifications does not involve a significant hazards consideration.
(Reference Attachments 3 and 4).
fga6/23rjm