{{#Wiki_filter:Guidance for COL Applicants on Design Implementation of Digital Instrumentation and Control Systems in Nuclear Power Plants ,*pIR Regret 00 NEI 04-01 Public Meeting April 7, 2005 Attachment 3 | {{#Wiki_filter:Guidance for COL Applicants on Design Implementation of Digital Instrumentation and Control Systems in Nuclear Power Plants | ||
Implementation of DACIITAAC* To confirm that the as-built computer-based plant instrumentation and control systems (I&C systems) conforms to the certified design, the design acceptance criteria (DAC) is verified as part of the l&C system ITAAC.* The COL applicant is to develop the procedures and test programs necessary to demonstrate that the requirements for the ITAAC for DAC are met during the digital system design implementation. | ,*pIR Regret 00 NEI 04-01 Public Meeting April 7, 2005 Attachment 3 | ||
Implementation of DACIITAAC | |||
* To confirm that the as-built computer-based plant instrumentation and control systems (I&C systems) conforms to the certified design, the design acceptance criteria (DAC) is verified as part of the l&C system ITAAC. | |||
* The COL applicant is to develop the procedures and test programs necessary to demonstrate that the requirements for the ITAAC for DAC are met during the digital system design implementation. | |||
* The ITAAC will be performed by the COL applicant and reviewed by the NRC throughout the system lifecycle including implementation, installation and operation. | * The ITAAC will be performed by the COL applicant and reviewed by the NRC throughout the system lifecycle including implementation, installation and operation. | ||
The applicant and NRC will establish agreed upon review points in the system design development process. See Figures land 2 for system and software lifecycle stages.Through the system design activities, system requirements are allocated to components and give rise to hardware and software requirements. | The applicant and NRC will establish agreed upon review points in the system design development process. See Figures land 2 for system and software lifecycle stages. | ||
Software development activities proceed in parallel with hardware development and become integrated with hardware activities during the system validation stage. Software is validated against software requirements, integrated with hardware, and the complete system is validated against system requirements. | Through the system design activities, system requirements are allocated to components and give rise to hardware and software requirements. Software development activities proceed in parallel with hardware development and become integrated with hardware activities during the system validation stage. Software is validated against software requirements, integrated with hardware, and the complete system is validated against system requirements. | ||
2 knsMce with'S Syste n | 2 | ||
knsMce with Interace with Environmental | |||
___________ | 'S Syste Reviews n 4 Ousl~ifation Review | ||
--__________ | - Interface with ouary Assurance Review DOl O | ||
--if Software Management Men Software Development Men Software GA Plan integration Plan Instloation plan Mantenance plan Training plan Operations Men Software | *4 DOGP.O~ | ||
& | Renewal 0- .4 CL N OUCL Amendments ___ | ||
&Test Report CM Instalaton Report | '< Topical Rapods | ||
*The so** at OUVIL amendment av topical reviews is vaille. | |||
Fligure 7A.02. Relationship lietwee Development UW Cyde Stages, Review Type, and SRP Sectons 3 | |||
Figure 2: Software Life Cycle Lie Pbannng Requirements Design Actities Implementation Integration Valdtidon Instation Operatons & | |||
Cyceb Activites Actities Activibes Activities Activities Activities Maintenance Activity Acbvities Groups | |||
- ________ _________ ___________ -- __________ - - if Software Requirements Design Code Listings System Build Operations Management Specifications Specificatons Documentation Manuals Men ,Q:J Software Hardware & Instalaton Development Software Configuration Men Architecture Tables Software GA Plan integration Plan Instloation plan Mantenance Maintenance plan Manuals Training plan Tranfing Manuals Operations Men Software Requirements Design Safety Code Safety Integration ValWatfon Instabaton Change Safety Safety Plan Safety Analysis Analysis Safety Analysis Safety Safety Analysis Analysis Analysis Analysis Software V&V V&V Design V&V V&V V&V V&V V&V Change V&V Men Requirements Analysis Report Implementation Integration Vaidation & Vaidatfon & Report Analysis Analysis & Test Analysis & Test Test Report Test Report Report Report Report Software CM CM CM Design CM CM Integration CM CM CM Change PMn Requirements Report Implementation Report Vaidation Instalaton Report Analysis Report Report Report Report Note: A separate document is not required for each topic identified, however, project documentation should encompass al the topics. | |||
11 Mrocess I Atandn~g 11Il ig: ] Process 11 IIp netdn1 4}} |
Latest revision as of 00:31, 24 November 2019
ML050960503 | |
Person / Time | |
---|---|
Site: | Nuclear Energy Institute |
Issue date: | 04/07/2005 |
From: | Joseph Colaccino NRC/NRR/DRIP/RNRP |
To: | Nuclear Energy Institute |
Colaccino,Joseph,NRR/DRIP/RNRP,415-2753 | |
References | |
NEI 04-01 | |
Download: ML050960503 (4) | |
Text
Guidance for COL Applicants on Design Implementation of Digital Instrumentation and Control Systems in Nuclear Power Plants
,*pIR Regret 00 NEI 04-01 Public Meeting April 7, 2005 Attachment 3
Implementation of DACIITAAC
- To confirm that the as-built computer-based plant instrumentation and control systems (I&C systems) conforms to the certified design, the design acceptance criteria (DAC) is verified as part of the l&C system ITAAC.
- The COL applicant is to develop the procedures and test programs necessary to demonstrate that the requirements for the ITAAC for DAC are met during the digital system design implementation.
- The ITAAC will be performed by the COL applicant and reviewed by the NRC throughout the system lifecycle including implementation, installation and operation.
The applicant and NRC will establish agreed upon review points in the system design development process. See Figures land 2 for system and software lifecycle stages.
Through the system design activities, system requirements are allocated to components and give rise to hardware and software requirements. Software development activities proceed in parallel with hardware development and become integrated with hardware activities during the system validation stage. Software is validated against software requirements, integrated with hardware, and the complete system is validated against system requirements.
2
knsMce with Interace with Environmental
'S Syste Reviews n 4 Ousl~ifation Review
- Interface with ouary Assurance Review DOl O
- 4 DOGP.O~
Renewal 0- .4 CL N OUCL Amendments ___
'< Topical Rapods
- The so** at OUVIL amendment av topical reviews is vaille.
Fligure 7A.02. Relationship lietwee Development UW Cyde Stages, Review Type, and SRP Sectons 3
Figure 2: Software Life Cycle Lie Pbannng Requirements Design Actities Implementation Integration Valdtidon Instation Operatons &
Cyceb Activites Actities Activibes Activities Activities Activities Maintenance Activity Acbvities Groups
- ________ _________ ___________ -- __________ - - if Software Requirements Design Code Listings System Build Operations Management Specifications Specificatons Documentation Manuals Men ,Q:J Software Hardware & Instalaton Development Software Configuration Men Architecture Tables Software GA Plan integration Plan Instloation plan Mantenance Maintenance plan Manuals Training plan Tranfing Manuals Operations Men Software Requirements Design Safety Code Safety Integration ValWatfon Instabaton Change Safety Safety Plan Safety Analysis Analysis Safety Analysis Safety Safety Analysis Analysis Analysis Analysis Software V&V V&V Design V&V V&V V&V V&V V&V Change V&V Men Requirements Analysis Report Implementation Integration Vaidation & Vaidatfon & Report Analysis Analysis & Test Analysis & Test Test Report Test Report Report Report Report Software CM CM CM Design CM CM Integration CM CM CM Change PMn Requirements Report Implementation Report Vaidation Instalaton Report Analysis Report Report Report Report Note: A separate document is not required for each topic identified, however, project documentation should encompass al the topics.
11 Mrocess I Atandn~g 11Il ig: ] Process 11 IIp netdn1 4