| {{#Wiki_filter:Palisades Nuclear Plant Operated by Nuclear Management Company, LLC June 21,2006 10 CFR 50.46 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Annual Report of Channes in Emernencv Core Coolina Svstem Models Nuclear Management Company, LLC (NMC), is submitting the annual report of changes in the emergency core cooling system (ECCS) models for the Palisades Nuclear Plant. The report is submitted in accordance with 10 CFR 50a46(a)(3)(ii). | | {{#Wiki_filter:Palisades Nuclear Plant Operated by Nuclear Management Company, LLC June 21,2006 10 CFR 50.46 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Annual Report of Channes in Emernencv Core Coolina Svstem Models Nuclear Management Company, LLC (NMC), is submitting the annual report of changes in the emergency core cooling system (ECCS) models for the Palisades Nuclear Plant. |
| There was a significant temperature change (greater than 50 degrees) subsequent to November 14, 2005, for the large break loss of coolant accident (LBLOCA). A 30-day report was submitted on March 14, 2006, as required. Enclosure 1 contains the LBLOCA peak cladding temperature summary. | | The report is submitted in accordance with 10 CFR 50a46(a)(3)(ii). |
| There was a slight peak cladding temperature change | | There was a significant temperature change (greater than 50 degrees) subsequent to November 14, 2005, for the large break loss of coolant accident (LBLOCA). A 30-day report was submitted on March 14, 2006, as required. Enclosure 1 contains the LBLOCA peak cladding temperature summary. There was a slight peak cladding temperature change (-2 degrees) for the small break loss of coolant accident (SBLOCA) subsequent to November 14,2005. Enclosure 2 contains the SBLOCA peak cladding temperature summary. This report covers the period from November 15, 2005, through June 21, 2006. |
| (-2 degrees) for the small break loss of coolant accident (SBLOCA) subsequent to November 14,2005. Enclosure 2 contains the SBLOCA peak cladding temperature summary. | | Summarv of Commitments This letter contains no new commitments and no revisions to existinn commitments. |
| This report covers the period from November 15, 2005, through June 21, 2006. | | Paul A. Harden |
| Summarv of Commitments This letter contains no new commitments and no revisions to existinn commitments. . Paul A. Harden ----..,.- | | . ----..,.- *CC_ |
| *CC_ Site Vice President, Palisades | | Site Vice President, Palisades ~ u c l e aPlant r Nuclear Management Company, LLC Enclosures (2) |
| ~uclear Plant Nuclear Management Company, LLC Enclosures (2) | | CC Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC 27780 Blue Star Memorial Highway Covert, Michigan 49043-9530 Telephone: 269.764.2000 |
| CC Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC 27780 Blue Star Memorial Highway Covert, Michigan 49043-9530 Telephone: | | |
| 269.764.2000 ENCLOSURE 1 LARGE BREAK LOSS OF COOLANT ACCIDENT PEAK CLADDING TEMPERATURE | | ENCLOSURE 1 LARGE BREAK LOSS OF COOLANT ACCIDENT PEAK CLADDING TEMPERATURE |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| Page 1 of 1 PCT (Last Acceptable Model Results) 10 CFR 50.46 Changes CR 9266 Error In Break Loop SG Exit Junction Inertia CR 9429 Error In Fast Flux Input To RODEX2 PCT (2001 Annual Report) 10 CFR 50.46 Changes CR 91 56 Error In TOODEE2 Clad Thermal Expansion CR 8674 RFPAC V&V Findings From CDUP PCT (2002 Annual Report)
| | |
| PCT (2003 Annual Report) | | APCT("F) PCT("F) |
| PCT (2004 Annual Report) PCT (2005 Annual Report) 10 CFR 50.46 Changes CR 2005-4791 Large Break LOCA Containment Heat Sink Modeling Inputs CR 2006-585 Incorrect ICECON Heat Structure Input for Palisades Appendix K LBLOCA PCT (2006 Annual Report) | | PCT (Last Acceptable Model Results) 1929 10 CFR 50.46 Changes CR 9266 Error In Break Loop SG Exit Junction Inertia +1 CR 9429 Error In Fast Flux Input To RODEX2 +4 PCT (2001 Annual Report) 1934 10 CFR 50.46 Changes CR 9156 Error In TOODEE2 Clad Thermal Expansion -1 CR 8674 RFPAC V&V Findings From CDUP +28 PCT (2002 Annual Report) 1961 PCT (2003 Annual Report) 1961 PCT (2004 Annual Report) 1961 PCT (2005 Annual Report) 1961 10 CFR 50.46 Changes CR 2005-4791 Large Break LOCA Containment Heat Sink -5 1956 Modeling Inputs CR 2006-585 Incorrect ICECON Heat Structure Input for -41 1915 Palisades Appendix K LBLOCA PCT (2006 Annual Report) 1915 Page 1 of 1 |
| APCT("F) + 1 +4 -1 +28 41 PCT("F) 1929 1934 1961 1961 1961 1961 1956 1915 191 5 ENCLOSURE 2 SMALL BREAK LOSS OF COOLANT ACCIDENT PEAK CLADDING TEMPERATURE
| | |
| | ENCLOSURE 2 SMALL BREAK LOSS OF COOLANT ACCIDENT PEAK CLADDING TEMPERATURE |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| Page 1 of 1 PCT (Last Acceptable Model Results)
| | |
| PCT (2003 Annual Report) PCT (2004 Annual Report) PCT (2005 Annual Report) 10 CFR 50.46 Changes CR 2006-1 178-FA SBLOCA Core Exit Modeling PCT (2006 Annual Report) APCT (OF) -2 PCT (OF) 1465 1465 1465 1465 1463 1463}} | | APCT ( O F ) PCT (OF) |
| | PCT (Last Acceptable Model Results) 1465 PCT (2003 Annual Report) 1465 PCT (2004 Annual Report) 1465 PCT (2005 Annual Report) 1465 10 CFR 50.46 Changes CR 2006-1178-FA SBLOCA Core Exit Modeling -2 1463 PCT (2006 Annual Report) 1463 Page 1 of 1}} |
|
---|
Category:Annual Operating Report
MONTHYEARML22104A0782022-04-14014 April 2022 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G PNP 2021-022, 2020 Annual Non-Radiological Environmental Operating Report2021-04-27027 April 2021 2020 Annual Non-Radiological Environmental Operating Report PNP 2021-010, Annual Report of Changes in Emergency Core Cooling System Models2021-03-19019 March 2021 Annual Report of Changes in Emergency Core Cooling System Models PNP 2019-020, Submittal of Annual Report of Changes in Emergency Core Cooling System Models2019-04-0808 April 2019 Submittal of Annual Report of Changes in Emergency Core Cooling System Models ML19094B0782019-04-0303 April 2019 Entergy - Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G PNP 2018-021, Submittal of 2017 Annual Non-Radiological Environmental Operating Report2018-04-20020 April 2018 Submittal of 2017 Annual Non-Radiological Environmental Operating Report PNP 2018-022, Annual Report of Changes in Emergency Core Cooling System Models2018-04-0909 April 2018 Annual Report of Changes in Emergency Core Cooling System Models ML18347B2982018-04-0303 April 2018 1997 Annual Non-Radiological Environment Operating Report ML18347B2992018-04-0303 April 2018 1996 Annual Non-Radiological Environmental Operating Report PNP 2017-060, Report of Changes, Tests and Experiments and Summary of Commitment Changes2017-10-12012 October 2017 Report of Changes, Tests and Experiments and Summary of Commitment Changes PNP 2017-023, Annual Report of Changes in Emergency Core Cooling System Models2017-05-24024 May 2017 Annual Report of Changes in Emergency Core Cooling System Models PNP 2016-030, Annual Report of Changes in Emergency Core Cooling System Models2016-04-20020 April 2016 Annual Report of Changes in Emergency Core Cooling System Models PNP 2015-082, Report of Changes, Tests and Experiments and Summary of Commitment Changes2015-10-14014 October 2015 Report of Changes, Tests and Experiments and Summary of Commitment Changes CNRO-2014-00003, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2014-04-25025 April 2014 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G PNP 2013-042, Submittal of 2012 Annual Non-Radiological Environmental Operating Report2013-04-23023 April 2013 Submittal of 2012 Annual Non-Radiological Environmental Operating Report PNP 2013-031, Report of Changes in Emergency Core Cooling System Models2013-04-11011 April 2013 Report of Changes in Emergency Core Cooling System Models CNRO-2012-00003, Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G2012-04-30030 April 2012 Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G PNP 2011-036, Submittal of 2010 Annual Non-Radiological Environmental Operating Report2011-04-26026 April 2011 Submittal of 2010 Annual Non-Radiological Environmental Operating Report ML1011900842010-04-28028 April 2010 Submittal of 2009 Annual Non-radiological Environmental Operating Report ML0914002032009-05-20020 May 2009 Submittal of Annual Report of Changes in Emergency Core Cooling System Models and 30-Day Report for Large and Small Break LOCA ML0913406782009-05-14014 May 2009 Submittal of 2008 Radiological Environmental Operating Report ML1011600472009-04-29029 April 2009 2008 Annual Radioactive Effluent Release and Waste Disposal Report (Attached) ML0910602482009-04-15015 April 2009 Annual Non-Radiological Environmental Operating Report CNRO-2009-00006, Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G2009-04-13013 April 2009 Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G ML0810805412008-04-17017 April 2008 2007 Nonradiological Environmental Operating Report ML0809804222008-04-0707 April 2008 Generator Tube Inspection Report ML0617301082006-06-21021 June 2006 Annual Report of Changes in Emergency Core Cooling System Models ML0435102052004-12-0808 December 2004 Annual Report of Changes in Emergency Core Cooling System Models ML18347A5031995-09-11011 September 1995 1994 Annual Report of Facility Changes, Tests and Experiments. ML18347B1911986-04-15015 April 1986 1985 Radiological Environmental Monitoring Report 2022-04-14
[Table view] Category:Letter
MONTHYEARPNP 2024-014, Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances2024-10-0909 October 2024 Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances PNP 2024-037, Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-0202024-10-0404 October 2024 Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-020 ML24267A2962024-10-0101 October 2024 Summary of Conference Call Regarding Steam Generator Tube Inspections ML24263A1712024-09-20020 September 2024 Environmental Request for Additional Information ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24219A4202024-09-12012 September 2024 Change in Estimated Hours and Review Schedule for Licensing Actions Submitted to Support Resumption of Power Operations (Epids L-2023-LLE-0025, L-2023-LLM-0005, L-2023-LLA-0174, L-2024-LLA-0013, L-2024-LLA-0060, L-2024-LLA-0071) IR 05000255/20244022024-09-0606 September 2024 Public: Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2024402 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant IR 05000255/20240022024-08-0909 August 2024 NRC Inspection Report No. 05000255/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations ML24206A0572024-07-25025 July 2024 PRM-50-125 - Letter to Alan Blind; Docketing of Petition for Rulemaking and Sufficiency Review Status (10 CFR Part 50) PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-07-24024 July 2024 Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-031, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-07-18018 July 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000255/20240112024-07-15015 July 2024 Nuclear Plant - Restart Inspection Report 05000255/2024011 PNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24183A1382024-07-0202 July 2024 Tribal Letter - Lac Du Flambeau Band of Lake Superior Chippewa Indians ML24137A0142024-07-0202 July 2024 OEDO-24-00011 - 2.206 Petition for Misuse of Palisades Decommissioning Trust Fund (EPID L-2023-CRS-0008) - Letter ML24183A1492024-07-0101 July 2024 Tribal Letter - Pokagon Band of Potawatomi Indians ML24156A0222024-07-0101 July 2024 Initiation of Scoping Process to Prepare an Environmental Assessment for the Environmental Review of Holtec Decommissioning International, Llc’S Licensing and Regulatory Requests for Reauthorization of Power Operations at Palisades EPID L-2 ML24183A1552024-07-0101 July 2024 Tribal Letter - Red Lake Band of Chippewa Indians ML24183A1542024-07-0101 July 2024 Tribal Letter Red Cliff Band of Lake Superior Chippewa Indians ML24172A0032024-07-0101 July 2024 Letter to L. Powers, Mackinac Bands of Chippewa and Ottawa Indians Re Initiation of Scoping Process for Environ Review Holtec Decommissioning Intl, LLC Request for Reauthorization of Power Ops-Palisades ML24183A1332024-07-0101 July 2024 Tribal Letter-Forest County Potawatomi Community ML24183A1582024-07-0101 July 2024 Tribal Letter Sault Ste. Marie Tribe of Chippewa Indians ML24183A1302024-07-0101 July 2024 Tribal Letter-Chippewa Cree Indians of the Rocky Boys Reservation ML24183A1282024-07-0101 July 2024 Tribal letter-Bay Mills Indian Community ML24183A1532024-07-0101 July 2024 Tribal Letter Quechan Tribe of the Fort Yuma Indian Reservation ML24183A1572024-07-0101 July 2024 Tribal Letter - Saint Croix Chippewa Indians of Wisconsin ML24183A1462024-07-0101 July 2024 Tribal letter-Mille Lacs Band of Ojibwe ML24183A1422024-07-0101 July 2024 Tribal Letter-Little Traverse Bay Bands of Odawa Indians ML24183A1312024-07-0101 July 2024 Tribal Letter-Citizen Potawatomi Nation ML24163A0552024-07-0101 July 2024 Rebecca Held Knoche NOAA-Palisades-NOI to Conduct Scoping Process and Prepare an EA - EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24163A2392024-07-0101 July 2024 Sara Thompson, Michigan DNR-Palisades-NOI to Conduct Scoping Process and Prepare an EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24155A0102024-07-0101 July 2024 Quentin L. Messer Jr., Michigan Econ-Palisades-NOI to Conduct Scoping Process and Prep an EA-EPID No. L-2024-LNE-0003 Docket No.50-0255P ML24155A0032024-07-0101 July 2024 Kathy Kowal, Us EPA Region 5-Palisades-NOI to Cibdyct Scoping Process and Prepare an EA EPID L-2024-LNE-0003 ML24163A0832024-07-0101 July 2024 Ltr to R Schumaker SHPO Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24183A1342024-07-0101 July 2024 Tribal Letter-Grand Portage Band of Lake Superior Chippewa ML24183A1392024-07-0101 July 2024 Tribal Letter-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24183A1272024-07-0101 July 2024 Tribal Letter-Bad River Band of the Lake Superior Tribe of Chippewa ML24183A1412024-07-0101 July 2024 Tribal Letter-Little River Band of Ottawa Indians ML24163A1922024-07-0101 July 2024 Jeremy Rubio, Dept of Env, Great Lakes and Energy, Kalamazoo District-Palisades-NOI to Conduct Scoping Process and Prepare an EA EPID No. L-2024-LNE-0003 Docket No.50-0255 ML24183A1322024-07-0101 July 2024 Tribal Letter-Fond Du Lac Band of Lake Superior Chippewa ML24183A1592024-07-0101 July 2024 Tribal letter-Sokaogon Chippewa Community ML24163A0822024-07-0101 July 2024 Ltr to J Loichinger Achp Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24183A1252024-07-0101 July 2024 Letter to G. Gould, Swan Creek Black River Confederated Ojibwa-Init of Scoping Process for the Env Rev of Holtec Decommissioning Intl, LLC Request for Reauth of Power Ops at Palisades ML24183A1352024-07-0101 July 2024 Tribal Letter-Hannahville Indian Community ML24183A1442024-07-0101 July 2024 Tribal Letter - Menominee Indian Tribe of Wisconsin ML24183A1502024-07-0101 July 2024 Tribal Letter - Prarie Band Potawatomi Nation ML24183A1452024-07-0101 July 2024 Tribal Letter - Miami Tribe of Oklahoma 2024-09-06
[Table view] |
Text
Palisades Nuclear Plant Operated by Nuclear Management Company, LLC June 21,2006 10 CFR 50.46 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Annual Report of Channes in Emernencv Core Coolina Svstem Models Nuclear Management Company, LLC (NMC), is submitting the annual report of changes in the emergency core cooling system (ECCS) models for the Palisades Nuclear Plant.
The report is submitted in accordance with 10 CFR 50a46(a)(3)(ii).
There was a significant temperature change (greater than 50 degrees) subsequent to November 14, 2005, for the large break loss of coolant accident (LBLOCA). A 30-day report was submitted on March 14, 2006, as required. Enclosure 1 contains the LBLOCA peak cladding temperature summary. There was a slight peak cladding temperature change (-2 degrees) for the small break loss of coolant accident (SBLOCA) subsequent to November 14,2005. Enclosure 2 contains the SBLOCA peak cladding temperature summary. This report covers the period from November 15, 2005, through June 21, 2006.
Summarv of Commitments This letter contains no new commitments and no revisions to existinn commitments.
Paul A. Harden
. ----..,.- *CC_
Site Vice President, Palisades ~ u c l e aPlant r Nuclear Management Company, LLC Enclosures (2)
CC Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC 27780 Blue Star Memorial Highway Covert, Michigan 49043-9530 Telephone: 269.764.2000
ENCLOSURE 1 LARGE BREAK LOSS OF COOLANT ACCIDENT PEAK CLADDING TEMPERATURE
SUMMARY
APCT("F) PCT("F)
PCT (Last Acceptable Model Results) 1929 10 CFR 50.46 Changes CR 9266 Error In Break Loop SG Exit Junction Inertia +1 CR 9429 Error In Fast Flux Input To RODEX2 +4 PCT (2001 Annual Report) 1934 10 CFR 50.46 Changes CR 9156 Error In TOODEE2 Clad Thermal Expansion -1 CR 8674 RFPAC V&V Findings From CDUP +28 PCT (2002 Annual Report) 1961 PCT (2003 Annual Report) 1961 PCT (2004 Annual Report) 1961 PCT (2005 Annual Report) 1961 10 CFR 50.46 Changes CR 2005-4791 Large Break LOCA Containment Heat Sink -5 1956 Modeling Inputs CR 2006-585 Incorrect ICECON Heat Structure Input for -41 1915 Palisades Appendix K LBLOCA PCT (2006 Annual Report) 1915 Page 1 of 1
ENCLOSURE 2 SMALL BREAK LOSS OF COOLANT ACCIDENT PEAK CLADDING TEMPERATURE
SUMMARY
APCT ( O F ) PCT (OF)
PCT (Last Acceptable Model Results) 1465 PCT (2003 Annual Report) 1465 PCT (2004 Annual Report) 1465 PCT (2005 Annual Report) 1465 10 CFR 50.46 Changes CR 2006-1178-FA SBLOCA Core Exit Modeling -2 1463 PCT (2006 Annual Report) 1463 Page 1 of 1