ML062150064: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:SYNOPSIS This investigation was initiated by the U.S. Nuclear Regulatory Commission ( )Office of Invstgaios , .I3(RI), on January 8,2004, to determine whether a violated a technical specification required plant " procedure and/or NRC regii ations on September 22, 2002, by manually closing a valve to isolate'a steam leak without the required approval and/or knowledge of the control room staff.Based upon evidence developed during this investigation, 01 found that the 4I0vas not a member of the on shift operations crew in the control room on September 22, 2002, when he/she manually closed the valve in question.
{{#Wiki_filter:SYNOPSIS This investigation was initiated by the U.S. Nuclear Regulatory Commission (             )Office of Invstgaios           ,
However, 01 did not substantiate that the Wf illfully violated the technical specification required plant procedure or NRC regulations/
                        *deliberAtey    .I3(RI), on January 8,2004, violated      to determine a technical       whetherrequired specification   a      plant         "
requirements when he/she closed the valve.Information in this record was deleted in accordance with the Freedom of Information Act, exemptions "7 C NOT PUBLIC DISCLOSURE WIT T APPROVAL OF FIELD OFFICE CTOR, OFFICE OF INVESTI ONS, REGION I Case ..No .1-04-0 I 1%Case No. 1-2004-002 I}}
procedure and/or NRC regii ations on September 22, 2002, by manually closing a valve to isolate' a steam leak without the required approval and/or knowledge of the control room staff.
Based upon evidence developed during this investigation, 01 found that the 4I0vas not a member of the on shift operations crew in the control room on September 22, 2002, when he/she manually closed the valve in question. However, 01 did not substantiate that the Wf             illfully violated the technical specification required plant procedure or NRC regulations/ requirements when he/she closed the valve.
Information in this record was deleted in accordance with the Freedom of Information Act, exemptions "7 C 1%
NOT       PUBLIC DISCLOSURE WIT                   T APPROVAL OF FIELD OFFICE               CTOR, OFFICE OF INVESTI                   ONS, REGION I Case No 1-04-0...                                  I Case No. 1-2004-002                                 I}}

Latest revision as of 16:35, 23 November 2019

Synopsis, OI Case 1-2004-002
ML062150064
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 08/02/2006
From:
NRC Region 1
To:
References
FOIA/PA-2005-0194
Download: ML062150064 (1)


Text

SYNOPSIS This investigation was initiated by the U.S. Nuclear Regulatory Commission ( )Office of Invstgaios ,

  • deliberAtey .I3(RI), on January 8,2004, violated to determine a technical whetherrequired specification a plant "

procedure and/or NRC regii ations on September 22, 2002, by manually closing a valve to isolate' a steam leak without the required approval and/or knowledge of the control room staff.

Based upon evidence developed during this investigation, 01 found that the 4I0vas not a member of the on shift operations crew in the control room on September 22, 2002, when he/she manually closed the valve in question. However, 01 did not substantiate that the Wf illfully violated the technical specification required plant procedure or NRC regulations/ requirements when he/she closed the valve.

Information in this record was deleted in accordance with the Freedom of Information Act, exemptions "7 C 1%

NOT PUBLIC DISCLOSURE WIT T APPROVAL OF FIELD OFFICE CTOR, OFFICE OF INVESTI ONS, REGION I Case No 1-04-0... I Case No. 1-2004-002 I