IR 05000456/2019011: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML19281D013
| number = ML19281D013
| issue date = 10/08/2019
| issue date = 10/08/2019
| title = Ltr 10/08/19 Braidwood Station, Units 1 and 2 - Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000456/2019011; 05000457/2019011 (DRS-I.Hafeez)
| title = Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000456/2019011; 05000457/2019011 (DRS-I.Hafeez)
| author name = Hafeez I
| author name = Hafeez I
| author affiliation = NRC/RGN-III/DRS/EB3
| author affiliation = NRC/RGN-III/DRS/EB3

Revision as of 02:38, 15 November 2019

Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000456/2019011; 05000457/2019011 (DRS-I.Hafeez)
ML19281D013
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 10/08/2019
From: Ijaz Hafeez
Engineering Branch 3
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2019011
Download: ML19281D013 (5)


Text

ber 8, 2019

SUBJECT:

BRAIDWOOD STATION, UNITS 1 AND 2INFORMATION REQUEST TO SUPPORT UPCOMING TEMPORARY INSTRUCTION 2515/194 INSPECTION; INSPECTION REPORT 05000456/2019011; 05000457/2019011

Dear Mr. Hanson:

This letter is to request information to support our inspection of the Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems (U.S. Nuclear Regulatory Commission (NRC)Bulletin 2012-01) beginning November 18, 2019, at your Braidwood Station. This inspection will be performed in accordance with the NRC Temporary Instruction 2515/194.

In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents requested for the inspection. Please provide this information prior to November 8, 2019. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspections. Insofar as possible, this information should be provided electronically to the lead inspector.

The lead inspector for this inspection is Mr. Ijaz Hafeez. We understand that our licensing contact for this inspection is Mr. Dan Mearhoff of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at 630-829-9843 or via e-mail at Ijaz.Hafeez@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Ijaz Hafeez, Reactor Engineer Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Enclosure:

Document Request for Temporary Instruction 2515/194 Inspection cc: Distribution via LISTSERV