IR 05000409/2009002: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:March 23, 2011  
{{#Wiki_filter:rch 23, 2011


Mr. W. General Manager Dairyland Power Cooperative 3200 East Avenue South P.O. Box 817 La Crosse, WI 54602-0817 SUBJECT: NRC INSPECTION REPORTS 072-00046/09-01(DNMS) AND 050-00409/09-02(DNMS) - LA CROSSE BOILING WATER REACTOR INDEPENDENT SPENT FUEL STORAGE INSTALLATION
==SUBJECT:==
NRC INSPECTION REPORTS 072-00046/09-01(DNMS) AND 050-00409/09-02(DNMS) - LA CROSSE BOILING WATER REACTOR INDEPENDENT SPENT FUEL STORAGE INSTALLATION


==Dear Mr. Berg:==
==Dear Mr. Berg:==
On March 4, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed its inspection of the dry cask storage pad construction activities at the shutdown La Crosse Boiling Water Reactor facility. The purpose of the inspection was to determine whether the dry cask storage pad design and construction activities were conducted safely and in accordance with NRC requirements and design specifications. At the conclusion of the inspection on March 4, 2011, during an exit teleconference, the NRC inspectors discussed the inspection results with members of your staff. The enclosed report presents the results of this inspection.
On March 4, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed its inspection of the dry cask storage pad construction activities at the shutdown La Crosse Boiling Water Reactor facility. The purpose of the inspection was to determine whether the dry cask storage pad design and construction activities were conducted safely and in accordance with NRC requirements and design specifications. At the conclusion of the inspection on March 4, 2011, during an exit teleconference, the NRC inspectors discussed the inspection results with members of your staff. The enclosed report presents the results of this inspection.


The inspection was an examination of the dry fuel storage pad construction activities as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. Specifically, the inspectors observed placement of structural fill, reinforcement, and concrete for the storage pad. The inspectors also performed an in-office review of structural calculations related to the storage pad and the haul path. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of selected examinations of procedures and representative records, observations of activities, and interviews with personnel.
The inspection was an examination of the dry fuel storage pad construction activities as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license. Specifically, the inspectors observed placement of structural fill, reinforcement, and concrete for the storage pad. The inspectors also performed an in-office review of structural calculations related to the storage pad and the haul path. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of selected examinations of procedures and representative records, observations of activities, and interviews with personnel.


Based on the results of these inspections, the inspectors did not identify any violations of NRC requirements.
Based on the results of these inspections, the inspectors did not identify any violations of NRC requirements.


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you may have regarding this inspection.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's
"Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you may have regarding this inspection.


Sincerely,
Sincerely,
/RA/ Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket Nos.: 72-046 and 50-409 License No.: DPR-45 Enclosure:
/RA/
NRC Inspection Reports 072-00046/09-01(DNMS) and 050-00409/09-02(DNMS)
Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket Nos.: 72-046 and 50-409 License No.: DPR-45 Enclosure:
NRC Inspection Reports 072-00046/09-01(DNMS)
and 050-00409/09-02(DNMS)
cc w/encl: M. Brasel, Plant Manager B. D. Burks, P.E., Director, Bureau of Field Operations J. Mettner, Chairman, Wisconsin Public Service Commission Spark Burmaster, Coulee Region Energy Coalition State Liaison Officer Chief, Radiation Protection Section, Division of Health, WI Department of Health and Social Services
cc w/encl: M. Brasel, Plant Manager B. D. Burks, P.E., Director, Bureau of Field Operations J. Mettner, Chairman, Wisconsin Public Service Commission Spark Burmaster, Coulee Region Energy Coalition State Liaison Officer Chief, Radiation Protection Section, Division of Health, WI Department of Health and Social Services
}}
}}

Latest revision as of 02:43, 13 November 2019

IR 07200046-09-01. IR 05000409-09-02, on 05/11 -14 2009 & 04/12 - 16 2010, 08 18 - 19 2010, 09/29/10 and 11/2310, 05/09 - 03/04 2011 for Dairyland Power Cooperative
ML110840398
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 03/23/2011
From: Christine Lipa
NRC/RGN-III/DNMS/DB
To: Berg W
Dairyland Power Cooperative
References
IR-09-001, IR-09-002
Download: ML110840398 (15)


Text

rch 23, 2011

SUBJECT:

NRC INSPECTION REPORTS 072-00046/09-01(DNMS) AND 050-00409/09-02(DNMS) - LA CROSSE BOILING WATER REACTOR INDEPENDENT SPENT FUEL STORAGE INSTALLATION

Dear Mr. Berg:

On March 4, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed its inspection of the dry cask storage pad construction activities at the shutdown La Crosse Boiling Water Reactor facility. The purpose of the inspection was to determine whether the dry cask storage pad design and construction activities were conducted safely and in accordance with NRC requirements and design specifications. At the conclusion of the inspection on March 4, 2011, during an exit teleconference, the NRC inspectors discussed the inspection results with members of your staff. The enclosed report presents the results of this inspection.

The inspection was an examination of the dry fuel storage pad construction activities as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license. Specifically, the inspectors observed placement of structural fill, reinforcement, and concrete for the storage pad. The inspectors also performed an in-office review of structural calculations related to the storage pad and the haul path. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of selected examinations of procedures and representative records, observations of activities, and interviews with personnel.

Based on the results of these inspections, the inspectors did not identify any violations of NRC requirements.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's

"Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you may have regarding this inspection.

Sincerely,

/RA/

Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket Nos.: 72-046 and 50-409 License No.: DPR-45 Enclosure:

NRC Inspection Reports 072-00046/09-01(DNMS)

and 050-00409/09-02(DNMS)

cc w/encl: M. Brasel, Plant Manager B. D. Burks, P.E., Director, Bureau of Field Operations J. Mettner, Chairman, Wisconsin Public Service Commission Spark Burmaster, Coulee Region Energy Coalition State Liaison Officer Chief, Radiation Protection Section, Division of Health, WI Department of Health and Social Services