{{#Wiki_filter:FENOC FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 N. State Route 2 Oak Harbor, Ohio 43449 September 30, 2011 L-1 1-257 10 CFR 54.21(b)ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
{{#Wiki_filter:FENOC                                                                                 Davis-Besse Nuclear Power Station 5501 N. State Route 2 FirstEnergyNuclear Operating Company                                                            Oak Harbor,Ohio 43449 September 30, 2011 L-1 1-257                                                   10 CFR 54.21(b)
ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001


==SUBJECT:==
==SUBJECT:==
Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License Number NPF-3 License Renewal Application Amendment No. 18 -Annual Update (TAC No. ME4640)By letter dated August 27, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102450565), FirstEnergy Nuclear Operating Company (FENOC) submitted an application pursuant to Title 10 of the Code of Federal Regulations, Part 54 for renewal of Operating License NPF-3 for the Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS). Each year following submittal of a license renewal application (LRA) and at least 3 months before scheduled completion of the NRC review, 10 CFR 54.21(b) requires an amendment to the renewal application to be submitted identifying any change to the current licensing basis (CLB) of the facility that materially affects the contents of the license renewal application, including the Final Safety Analysis Report (FSAR) supplement.
 
The Attachment provides a summary of the CLB changes that materially affect the LRA.The Enclosure provides Amendment No. 18 (Annual Update) to the DBNPS LRA required by 10 CFR 54.21(b).There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Clifford I. Custer, Fleet License Renewal Project Manager, at 724-682-7139.
Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License Number NPF-3 License Renewal Application Amendment No. 18 - Annual Update (TAC No. ME4640)
I declare under penalty of perjury that the foregoing is true and correct. Executed on September 30, 2011.Sincerely, Kendall W.Director, Site Performance Improvement 40q Davis-Besse Nuclear Power Station, Unit No. 1 L-1 1-257 Page 2  
By letter dated August 27, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102450565), FirstEnergy Nuclear Operating Company (FENOC) submitted an application pursuant to Title 10 of the Code of Federal Regulations, Part 54 for renewal of Operating License NPF-3 for the Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS). Each year following submittal of a license renewal application (LRA) and at least 3 months before scheduled completion of the NRC review, 10 CFR 54.21(b) requires an amendment to the renewal application to be submitted identifying any change to the current licensing basis (CLB) of the facility that materially affects the contents of the license renewal application, including the Final Safety Analysis Report (FSAR) supplement.
The Attachment provides a summary of the CLB changes that materially affect the LRA.
The Enclosure provides Amendment No. 18 (Annual Update) to the DBNPS LRA required by 10 CFR 54.21(b).
There are no regulatory commitments contained in this letter. Ifthere are any questions or if additional information is required, please contact Mr. Clifford I. Custer, Fleet License Renewal Project Manager, at 724-682-7139.
I declare under penalty of perjury that the foregoing is true and correct. Executed on September 30, 2011.
Sincerely, Kendall W.
40q Director, Site Performance Improvement
 
Davis-Besse Nuclear Power Station, Unit No. 1 L-1 1-257 Page 2


==Attachment:==
==Attachment:==
Line 31: Line 40:
==Enclosure:==
==Enclosure:==


Amendment No. 18 (Annual Update) to the DBNPS License Renewal Application cc: NRC DLR Project Manager NRC Region III Administrator cc: w/o Attachment or Enclosure NRC DLR Director NRR DORL Project Manager NRC Resident Inspector Utility Radiological Safety Board Attachment L-1 1-257 Current Licensing Basis (CLB) Changes that Materially Affect the Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS), License Renewal Application (LRA)Page 1 of 2 One structure was removed and three new permanent structures were constructed in support of a steam generator replacement project scheduled for the Cycle 18 refueling outage in 2014." Wet Wash Facility [removed]" Containment Access Facility* Old Steam Generator Storage Facility" Steam Generator Replacement Warehouse The Containment Access Facility is a new four-story office building located south of and immediately adjacent to the Auxiliary Building.
Amendment No. 18 (Annual Update) to the DBNPS License Renewal Application cc:   NRC DLR Project Manager NRC Region III Administrator cc:   w/o Attachment or Enclosure NRC DLR Director NRR DORL Project Manager NRC Resident Inspector Utility Radiological Safety Board
The Wet Wash Facility was removed and the Containment Access Facility constructed at the same location.The building houses engineering and administrative staff offices, and provides an access control entry point into the Auxiliary Building Radiologically Controlled Area.The nonsafety-related Containment Access Facility is a Seismic Class II structure designed not to collapse onto safety-related structures in a way that could prevent the safety-related structures from performing their safety functions, which meets the 10 CFR 54.4(a)(2) scoping criteria.
 
LRA Table 2-3, "License Renewal Scoping Results for Structures," is revised to show the removal of the Wet Wash Facility, and the new Containment Access Facility within the scope of license renewal. LRA Section 2.4, "Scoping and Screening Results: Structures," is revised to include a new subsection to provide the scoping and screening results for the Containment Access Facility.
Attachment L-1 1-257 Current Licensing Basis (CLB) Changes that Materially Affect the Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS),
LRA Section 3.5, "Aging Management of Containment, Structures, and Component Supports," is revised to include a new subsection and table to provide the aging management review results for the Containment Access Facility.The Old Steam Generator Storage Facility, located outside the Protected Area, provides long-term storage for the steam generators and reactor head when they are retired from service, and is not within the scope of license renewal. The Steam Generator Replacement Warehouse, located outside the Protected Area, provides storage for spare parts, and is not within the scope of license renewal.LRA Table 2-3 is revised to disposition these two new structures.
License Renewal Application (LRA)
Page 1 of 2 One structure was removed and three new permanent structures were constructed in support of a steam generator replacement project scheduled for the Cycle 18 refueling outage in 2014.
    "     Wet Wash Facility [removed]
    "     Containment Access Facility
* Old Steam Generator Storage Facility
    "     Steam Generator Replacement Warehouse The Containment Access Facility is a new four-story office building located south of and immediately adjacent to the Auxiliary Building. The Wet Wash Facility was removed and the Containment Access Facility constructed at the same location.
The building houses engineering and administrative staff offices, and provides an access control entry point into the Auxiliary Building Radiologically Controlled Area.
The nonsafety-related Containment Access Facility is a Seismic Class II structure designed not to collapse onto safety-related structures in a way that could prevent the safety-related structures from performing their safety functions, which meets the 10 CFR 54.4(a)(2) scoping criteria. LRA Table 2-3, "License Renewal Scoping Results for Structures," is revised to show the removal of the Wet Wash Facility, and the new Containment Access Facility within the scope of license renewal. LRA Section 2.4, "Scoping and Screening Results: Structures," is revised to include a new subsection to provide the scoping and screening results for the Containment Access Facility. LRA Section 3.5, "Aging Management of Containment, Structures, and Component Supports," is revised to include a new subsection and table to provide the aging management review results for the Containment Access Facility.
The Old Steam Generator Storage Facility, located outside the Protected Area, provides long-term storage for the steam generators and reactor head when they are retired from service, and is not within the scope of license renewal. The Steam Generator Replacement Warehouse, located outside the Protected Area, provides storage for spare parts, and is not within the scope of license renewal.
LRA Table 2-3 is revised to disposition these two new structures.
See the Enclosure to this letter for the changes to the DBNPS LRA.
 
Attachment L-1 1-257 Page 2 of 2
: 2. The Personnel Shop Facility (including the attached Elevated Walkway) has been re-analyzed and determined to be a Seismic Class II structure designed not to collapse onto safety-related structures in a way that could prevent the safety-related structures from performing their safety functions, which meets the 10 CFR 54.4(a)(2) scoping criteria. Previously, the Personnel Shop Facility was considered as not in-scope for license renewal because the structure houses offices and shop facilities and is located adjacent to the nonsafety-related Turbine Building, so no safety-related structures would be impacted should the Personnel Shop Facility fail. However, during design reviews of the new Containment Access Facility constructed near the Personnel Shop Facility, a question was raised regarding the potential impact to the nearby safety-related auxiliary feedwater turbine exhaust structure and the component cooling water room ventilation inlets should either structure fail during a seismic event. A seismic analysis of the Personnel Shop Facility based on its proximity to the safety-related auxiliary feedwater turbine exhaust structure and the component cooling water room ventilation inlets could not be located; the issue was entered into the FENOC Corrective Action Program and resolved with a new seismic analysis.
LRA Table 2-3, "License Renewal Scoping Results for Structures," is revised to show the Personnel Shop Facility within the scope of license renewal. LRA Section 2.4, "Scoping and Screening Results: Structures," is revised to include a new subsection to provide the scoping and screening results for the Personnel Shop Facility. LRA Section 3.5, "Aging Management of Containment, Structures, and Component Supports," is revised to include a new subsection and table to provide the aging management review results for the Personnel Shop Facility.
See the Enclosure to this letter for the changes to the DBNPS LRA.
See the Enclosure to this letter for the changes to the DBNPS LRA.
Attachment L-1 1-257 Page 2 of 2 2. The Personnel Shop Facility (including the attached Elevated Walkway) has been re-analyzed and determined to be a Seismic Class II structure designed not to collapse onto safety-related structures in a way that could prevent the safety-related structures from performing their safety functions, which meets the 10 CFR 54.4(a)(2) scoping criteria.
 
Previously, the Personnel Shop Facility was considered as not in-scope for license renewal because the structure houses offices and shop facilities and is located adjacent to the nonsafety-related Turbine Building, so no safety-related structures would be impacted should the Personnel Shop Facility fail. However, during design reviews of the new Containment Access Facility constructed near the Personnel Shop Facility, a question was raised regarding the potential impact to the nearby safety-related auxiliary feedwater turbine exhaust structure and the component cooling water room ventilation inlets should either structure fail during a seismic event. A seismic analysis of the Personnel Shop Facility based on its proximity to the safety-related auxiliary feedwater turbine exhaust structure and the component cooling water room ventilation inlets could not be located; the issue was entered into the FENOC Corrective Action Program and resolved with a new seismic analysis.LRA Table 2-3, "License Renewal Scoping Results for Structures," is revised to show the Personnel Shop Facility within the scope of license renewal. LRA Section 2.4, "Scoping and Screening Results: Structures," is revised to include a new subsection to provide the scoping and screening results for the Personnel Shop Facility.
Enclosure Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS)
LRA Section 3.5, "Aging Management of Containment, Structures, and Component Supports," is revised to include a new subsection and table to provide the aging management review results for the Personnel Shop Facility.See the Enclosure to this letter for the changes to the DBNPS LRA.
Letter L-11-257 Amendment No. 18 (Annual Update) to the DBNPS License Renewal Application Page 1 of 16 License Renewal Application Sections Affected Table of Contents          Section 2.4.15 Table 2.2-3                Table 2.4-15 Section 2.4                Section 3.5.1 Section 2.4.7              Section 3.5.2 Table 2.4-7                Section 3.5.2.1.14 Section 2.4.14            Table 3.5.2-7 Table 2.4-14              Table 3.5.2-14 The Enclosure identifies the change to the License Renewal Application (LRA) by Affected LRA Section, LRA Page No., and Affected Paragraph and Sentence. The count for the affected paragraph, sentence, bullet, etc. starts at the beginning of the affected Section or at the top of the affected page, as appropriate. Below each section the reason for the change is identified, and the sentence affected is printed in italics with deleted text #ned-eu and added text underlined.
Enclosure Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS)Letter L-11-257 Amendment No. 18 (Annual Update) to the DBNPS License Renewal Application Page 1 of 16 License Renewal Application Sections Affected Table of Contents Table 2.2-3 Section 2.4 Section 2.4.7 Table 2.4-7 Section 2.4.14 Table 2.4-14 Section 2.4.15 Table 2.4-15 Section 3.5.1 Section 3.5.2 Section 3.5.2.1.14 Table 3.5.2-7 Table 3.5.2-14 The Enclosure identifies the change to the License Renewal Application (LRA) by Affected LRA Section, LRA Page No., and Affected Paragraph and Sentence.
 
The count for the affected paragraph, sentence, bullet, etc. starts at the beginning of the affected Section or at the top of the affected page, as appropriate.
Enclosure L-1 1-257 Page 2 of 16 Affected LRA Section      LRA Page No.                      Affected Paragraph and Sentence Table of Contents         Page vi                            New rows New sections are added to the LRA Table of Contents, to read as follows:
Below each section the reason for the change is identified, and the sentence affected is printed in italics with deleted text #ned-eu and added text underlined.
TABLE OF CONTENTS 2.4.14 CONTAINMENTACCESs FACILITY- SEISMIC CLASS// ...........................                           2.4-52 2.4.15 PERSONNEL SHOP FACILITY (INCLUDING ELEVATED WALKWAY) -
Enclosure L-1 1-257 Page 2 of 16 Affected LRA Section LRA Page No. Affected Paragraph and Sentence Table of Contents Page vi New rows New sections are added to the LRA Table of Contents, to read as follows: TABLE OF CONTENTS 2.4.14 CONTAINMENTACCESs FACILITY-SEISMIC CLASS// ...........................
SEISMIC CLASS II .............................................................................. 2.4-52 TABLES Table 2.4-14      ContainmentAccess Facility Components Subiect to Aging Management Review ................                                 2.4-52 Table 2.4-15      PersonnelShop Facility(includinq Elevated Walkway)
2.4-52 2.4.15 PERSONNEL SHOP FACILITY (INCLUDING ELEVATED WALKWAY) -SEISM IC C LASS II ..............................................................................
Components Subiect to Aging Management Review ................ 2.4-52 Table 3.5.2-14    Aginq Management Review Results - ContainmentAccess Facilityand PersonnelShop Facility(including Elevated Walkwa v) .................................................................................. 3.5-165
2.4-52 TABLES Table 2.4-14 Containment Access Facility Components Subiect to Aging Management Review ................
 
2.4-52 Table 2.4-15 Personnel Shop Facility (includinq Elevated Walkway)Components Subiect to Aging Management Review ................
Enclosure L-11-257 Page 3 of 16 Affected LRA Section        LRA Page No.       Affected Paragraph and Sentence Table 2.2-3                  Page 2.2-7          5 Rows (3 new and 2 existing) thru 2.2-14 Based on the removal, new construction or reclassification of five site structures, LRA Table 2.2-3, "License Renewal Scoping Results for Structures," is revised to read as follows:
2.4-52 Table 3.5.2-14 Aginq Management Review Results -Containment Access Facility and Personnel Shop Facility (including Elevated W alkw a v) ..................................................................................
Table 2.2-3 License Renewal Scoping Results for Structures Structure Name                    In-Scope            Screening Results / Section ContainmentAccess Facility            Yes                          2.4.14 Old Steam Generator                            Provideststorage space fors1team Storage Facilit                      No      =generatorsand reactor head [when retired from servcel .           .
3.5-165 Enclosure L-11-257 Page 3 of 16 Affected LRA Section LRA Page No.Page 2.2-7 thru 2.2-14 Affected Paragraph and Sentence 5 Rows (3 new and 2 existing)Table 2.2-3 Based on the removal, new construction or reclassification of five site structures, LRA Table 2.2-3, "License Renewal Scoping Results for Structures," is revised to read as follows: Table 2.2-3 License Renewal Scoping Results for Structures Structure Name In-Scope Screening Results / Section Containment Access Facility Yes 2.4.14 Old Steam Generator Provideststorage space fors1team Storage Facilit No =generators and reactor head [when retired from servcel ..Personnel Shop Facility Yes 2.4.15 (including Elevated Walkway) -Ne- Ho1s Offi.... .. and' Shop f9acilitis Steam Generator No P i re of ... .: arts Replacement Warehouse No Provides storage of spare p W"t ,ash Fac,.;t, -Ne- Co.n.tai.
Personnel Shop Facility              Yes                          2.4.15 (including Elevated Walkway)        -Ne-      Ho1s Offi....
F.'contanintion
                                                          .. and'Shop f9acilitis Steam Generator                      No      P i          re ...of        arts
..uipr.no Enclosure L-1 1-257 Page 4 of 16 Affected LRA Section LRA Page No. Affected Paragraph and Sentence 2.4 Page 2.4-2 4 th Paragraph, 2 New Bullets (Sections)
                                                                              .   :
Two new bullets (new sections) are added to the end of the fourth paragraph, the bulleted list of structures in the scope of license renewal, in LRA Section 2.4,"Scoping and Screening Results: Structures," to address the construction of the new Containment Access Facility and the Personnel Shop Facility (including Elevated Walkway) addition to scope, to read as follows: The structures in the scope of license renewal are the: " Containment Access Facility (Section 2.4.14)* Personnel Shop Facility (including Elevated Walkway) (Section 2.4.15)Structural components for in-scope structures are addressed in the structure reviews (Sections 2.4.1 through 2.4.12, 2.4.14 and 2.4.15).
Replacement Warehouse                No      Provides storage of spare p W"t ,ash F.'contanintion Fac,.;t,                  -Ne-      Co.n.tai.                 .. uipr.no
Enclosure L-1 1-257 Page 5 of 16 Affected LRA Section LRA Page No.Pages 2.4-27 and 2.4-28 Affected Paragraph and Sentence 2.4.7, and Table 2.4-7 Structure Description, both paragraphs; Table 2.4-7, 2 rows LRA Section 2.4.7, "Personnel Shop Facility Passageway (Missile Shield Area) -Seismic Class I," is revised to adjust the Structure Description and Table 2.4-7,"Personnel Shop Facility Passageway (Missile Shield Area) Components Subject to Aging Management Review," is revised to account for the addition of the Personnel Shop Facility (including Elevated Walkway) to the scope of license renewal, and read as follows: 2.4.7 PERSONNEL SHOP FACILITY PASSAGEWAY (MISSILE SHIELD AREA) -SEISMIC CLASS I Structure Description A Seismic Class I reinforced concrete passageway entry interface with the Auxiliary Building Radiologically Controlled Ret44ed Area (RRA) at elevation 603'- 0" provides tornado missile protection to two Auxiliary Building doors.niy the Ame ISI nield porton of me ,'erscnne, 5nop .-ady Passageway i*wh4the scope of ilcanse renewal. The rera n podtions ef the PerFsoep Shop F-acilty are not within tho Scope Of ficenso r-newal.Table 2.4-7 Personnel Shop Facility Passageway (Missile Shield Area)Components Subject to Aging Management Review Component Type Intended Function Component__Type_ (as defined in Table 2.0-1)Metal Roof Decking SSR SNS Enclosure L-1 1-257 Page 6 of 16 Affected LRA Section LRA Page No. Affected Paragraph and Sentence 2.4.14, and Page 2.4-52 New Section Table 2.4-14 New LRA Section 2.4.14, "Containment Access Facility -Seismic Class I1," is added to address the construction of the new Containment Access Facility, and reads as follows: 2 4M CoNTAINMENTAccESS FACILITY-SE/SM/c CLASSII Structure Description The Containment Access Facility is a four-story Seismic Class II building located adiacent to the south wall of the Auxiliary Building and the west wall of the Personnel Shop Facility Missile Shield Area. The building houses engineering and administrative staff offices, and provides an access control entry point into the Auxiliary Building Radiologically Controlled Area. The Containment Access Facility is a steel framed buildinq with exterior walls of steel siding above the first story. The first story has a combination of concrete masonry units exterior walls and exterior walls of steel siding.The Containment Access Facility is founded on grade walls with seismic ties and caisson piles that extend to bedrock. The ground floor is a concrete slab. The second, third and fourth floors are reinforced concrete slabs on metal decking.The Containment Access Facility has an insulated metal deck roof covered with an elastomeric membrane.The Containment Access Facility is desiqned so that the collapse of the buildinq in a seismic event will not prevent the function of any safety-related systems, structures or components.
 
The Containment Access Facility does not contain any in-scope components; therefore, the evaluation boundary for the Containment Access Facility includes only the major structural building systems (column and floor steel, bracing, concrete floor slabs, roof deck, fasteners and anchorages) required for overall structural integrity.
Enclosure L-1 1-257 Page 4 of 16 Affected LRA Section         LRA Page No.         Affected Paragraph and Sentence 2.4                          Page 2.4-2           4 th Paragraph, 2 New Bullets (Sections)
Due to the functional and structural similarities of the Containment Access Facility and the Personnel Shop Facility (includinq the Elevated Walkway), the structures are evaluated together in Table 3.5.2-14, "Aging Management Review Results -Containment Access Facility and Personnel Shop Facility (including Elevated Walkway)." Reason for Scope Determination The Seismic Category II Containment Access Facility is desiqned not to collapse onto safety-related structures in a way that could prevent the safety-related Enclosure L-1 1-257 Page 7 of 16 structures from performinq their safety functions.
Two new bullets (new sections) are added to the end of the fourth paragraph, the bulleted list of structures in the scope of license renewal, in LRA Section 2.4, "Scoping and Screening Results: Structures," to address the construction of the new Containment Access Facility and the Personnel Shop Facility (including Elevated Walkway) addition to scope, to read as follows:
Therefore, it meets the 10 CFR 54.4(a)(2) scoping criteria.USAR References The structural details of the Containment Access Facility are not described in the USAR.Components Subiect to AMR Table 2.4-14 lists the component types that require AMR and their intended functions.
The structures in the scope of license renewal are the:
The structural commodities for the Containment Access Facility are addressed in the bulk commodities evaluation in Section 2.4.13.Table 3.5.2-14, Acina Management Review Results -Containment Access Facility and Personnel Shop Facility (including Elevated Walkway), provides the results of the AMR.Table 2.4-14 Containment Access Facility Components Subject to Aging Managlement Review Component Type Intended Function (as defined in Table 2.0-1)Exterior Walls (above grade) SNS Foundation (including caissons and piers) SNS Metal Floor Deck SNS Metal Roof Decking SNS Metal Sidinq SNS Reinforced Concrete Floors SNS Structural Steel: Beams, Columns, Plates, and SNS Trusses Enclosure L-1 1-257 Page 8 of 16 Affected LRA Section LRA Page No. Affected Paragraph and Sentence 2.4.15, and Page 2.4-52 Entire Section Table 2.4-15 New LRA Section 2.4.15, "Personnel Shop Facility (including Elevated Walkway)-Seismic Class II," is added to address the seismic reanalysis of the Personnel Shop Facility and Elevated Walkway, and reads as follows: 2 4 f5 PERSONNEL SHOPEAcIL ITYYINVC UD/NG EzEvA TEDL WAzKWA Y) -SEISMIC CLASS/i Structure Description The Personnel Shop Facility is a Seismic Class II five-story structure which houses offices and shop facilities.
          " ContainmentAccess Facility(Section 2.4.14)
The Personnel Shop Facility is located south of the Turbine Building.
* Personnel Shop Facility (including Elevated Walkway) (Section 2.4.15)
The foundation consists of reinforced concrete caissons.The ground floor consists of a reinforced concrete slab on grade. The elevated floors consist of reinforced concrete overlying structural steel-supported metal deck. The roof consists of a metal deck, supported by structural framing steel.The superstructure consists of structural steel framing with reinforced concrete masonry unit exterior walls up to elevation 606'. and metal sidinq above that elevation.
Structural components for in-scope structures are addressed in the structure reviews (Sections 2.4.1 through 2.4.12, 2.4.14 and 2.4.15).
The Personnel Shop Facility Seismic Class II Elevated walkway connects the Personnel Shop Facility to the safety-related Personnel Shop Facility Passageway (Missile Shield Area) which allows access to the Auxiliary Building.The Personnel Shop Facility and Elevated Walkway are desiqned so that they will not collapse during a seismic event and prevent safety-related structures from performing their safety functions; therefore, the evaluation boundary of the Personnel Shop Facility and Elevated Walkway includes only the maior structural buildinq systems required for overall structural integrity.
 
Due to the functional and structural similarities of the Containment Access Facility and the Personnel Shop Facility (including the Elevated Walkway), the structures are evaluated together in Table 3.5.2-14, 'Aging Management Review Results -Containment Access Facility and Personnel Shop Facility (including Elevated Walkway)." Reason for Scope Determination The Seismic Class II Personnel Shop Facility (including Elevated Walkway) is desiqned not to collapse onto safety-related structures and thus not prevent the safety-related structures from performing their safety functions.
Enclosure L-1 1-257 Page 5 of 16 Affected LRA Section         LRA Page No.         Affected Paragraph and Sentence 2.4.7, and                  Pages 2.4-27        Structure Description, both paragraphs; Table 2.4-7                    and 2.4-28        Table 2.4-7, 2 rows LRA Section 2.4.7, "Personnel Shop Facility Passageway (Missile Shield Area) -
Therefore, it meets the 10 CFR 54.4(a)(2) scoping criteria.
Seismic Class I," is revised to adjust the Structure Description and Table 2.4-7, "Personnel Shop Facility Passageway (Missile Shield Area) Components Subject to Aging Management Review," is revised to account for the addition of the Personnel Shop Facility (including Elevated Walkway) to the scope of license renewal, and read as follows:
Enclosure L-1 1-257 Page 9 of 16 USAR References The structural details of the Personnel Shop Facility are not described in the USAR. The Personnel ShoD Facility is devicted in USAR Fidures 1.2-2 throuah 1.2-6, and 1.2-12.Components Subject to AMR Table 2.4-15 lists the component types that require AMR and their intended functions.
2.4.7      PERSONNEL SHOP FACILITY PASSAGEWAY (MISSILE SHIELD AREA) - SEISMIC CLASS I Structure Description A Seismic Class I reinforced concrete passageway entry interface with the Auxiliary Building Radiologically Controlled Ret44ed Area (RRA) at elevation 603'- 0" provides tornadomissile protection to two Auxiliary Building doors.
The structural commodities for the Personnel Shop Facility (includinq Elevated Walkway) are addressed in the bulk commodities evaluation in Section 2.4.13.Table 3.5.2-14.
niy the Ame ISI    nield porton of me ,'erscnne, 5nop .-ady Passageway i*
Aaina Manaaement Review Results -Containment Access Facility and Personnel Shop Facility (including Elevated Walkway), porovides the results of the AMR.Table 2.4-15 Personnel Shop Facility (including Elevated Walkway)Components Subject to Aging Management Review Component Type Intended Function (as defined in Table 2.0-1)Exterior Walls (above grade) SNS Foundation (includinq caissons and piers) SNS Metal Floor Deck SNS Metal Roof Decking SNS Metal Siding SNS Reinforced Concrete Floors SNS Structural Steel: Beams, Columns, Plates, and SNS Trusses Enclosure L-11-257 Page 10 of 16 Affected LRA Section LRA Page No.Affected Paraqraph and Sentence 3.5.1 Page 3.5-1 1 st Paragraph, 2 New Bullets (Sections)
wh4the scope of ilcanse renewal. The rera n podtions ef the PerFsoep Shop F-acilty are not within tho Scope Of ficenso r-newal.
Two new bullets (new sections) are added to the end of the bulleted list of structures in the scope of license renewal in LRA Section 3.5.1, "Introduction," to address the construction of the new Containment Access Facility and the Personnel Shop Facility (including Elevated Walkway) addition to scope, to read as follows: " Containment Access Facility (Section 2.4.14)" Personnel Shop Facility (including Elevated Walkway) (Section 2.4.15)Affected LRA Section LRA Page No.Affected Paragraph and Sentence 3.5.2 Page 3.5-2 1 st Paragraph, new Table A new Table is added to the end of the list of Tables at the beginning of LRA Section 3.5.2, "Results," to address the aging management review results for the new Containment Access Facility and the Personnel Shop Facility (including Elevated Walkway) addition to scope, to read as follows: Table 3.5.2-14 Aging Management Review Results -Containment Access Facility and Personnel Shoo Facility (includinq Elevated Walkway)
Table 2.4-7 Personnel Shop Facility Passageway (Missile Shield Area)
Enclosure L-1 1-257 Page 11 of 16 Affected LRA Section LRA Page No. Affected Paragraph and Sentence 3.5.2.1.14 Page 3.5-18 New Section New LRA Section 3.5.2.1.14, "Containment Access Facility and Personnel Shop Facility (including Elevated Walkway)," is added to the end of LRA Section 3.5.2.1, "Materials, Environments, Aging Effects Requiring Management, and Aging Management Programs," to address the aging management review results for the new Containment Access Facility and the Personnel Shop Facility (including Elevated Walkway) addition to scope, to read as follows: 3.5.2.1.14 Containment Access Facility and Personnel Shop Facility (including Elevated Walkway)Materials Containment Access Facility and Personnel Shop Facility (including Elevated Walkway) structural components subject to AMR are constructed of the following materials:
Components Subject to Aging Management Review Component Type                                        Intended Function Component__Type_                                      (as defined in Table 2.0-1)
* Carbon steel" Concrete* Concrete blocks" Galvanized steel Materials for bulk commodity components are addressed in Section 3.5.2.1.13.
Metal Roof Decking                                    SSR SNS
Environments Containment Access Facility and Personnel Shop Facility (including Elevated Walkway) structural components subject to AMR are exposed to the following environments: " Air-indoor" Air-outdoor" Soil Environments for bulk commodity components are addressed in Section 3.5.2.1.13.
 
3.5.2.1.13.
Enclosure L-1 1-257 Page 6 of 16 Affected LRA Section          LRA Page No.        Affected Paragraph and Sentence 2.4.14, and                   Page 2.4-52        New Section Table 2.4-14 New LRA Section 2.4.14, "Containment Access Facility - Seismic Class I1," is added to address the construction of the new Containment Access Facility, and reads as follows:
Enclosure L-1 1-257 Page 12 of 16 Aging Effects Requiring Management The following aginq effects associated with the Containment Access Facility and Personnel Shop Facility (including Elevated Walkway) structural components require management: " Change in material properties
2 4M        CoNTAINMENTAccESS FACILITY- SE/SM/c CLASSII Structure Description The ContainmentAccess Facility is a four-story Seismic Class II building located adiacent to the south wall of the Auxiliary Building and the west wall of the Personnel Shop Facility Missile Shield Area. The building houses engineering and administrative staff offices, and provides an access control entry point into the Auxiliary Building Radiologically Controlled Area. The Containment Access Facility is a steel framed buildinq with exterior walls of steel siding above the first story. The first story has a combination of concrete masonry units exterior walls and exterior walls of steel siding.
* Cracking* Loss of material Aginq effects requiring management for bulk commodity components are addressed in Section 3.5.2.1.13.
The ContainmentAccess Facilityis founded on grade walls with seismic ties and caisson piles that extend to bedrock. The ground floor is a concrete slab. The second, third and fourth floors are reinforced concrete slabs on metal decking.
Aging Management Programs The following programs are credited for managing the effects of aging on the Containment Access Facility and Personnel Shop Facility (including Elevated Walkway) structural components: " Masonry Wafl Inspection" Structures Monitoring Program Aging management programs for bulk commodity components are addressed in Section 3.5.2.1.13.
The Containment Access Facility has an insulated metal deck roof covered with an elastomericmembrane.
Enclosure L-11-257 Page 13 of 16 Affected LRA Section LRA Page No.Page 3.5-100 Affected Paragraph and Sentence Table 3.5.2-7 Rows 2, 3 and 4 Rows 2, 3 and 4 of LRA Table 3.5.2-7, "Aging Management Review Results -Personnel Shop Facility Passageway (Missile Shield Area)," are revised to address changes due to the Personnel Shop Facility (including Elevated Walkway) addition to scope, and now read as follows: Table 3.5.2-7 Aging Management Review Results -Personnel Shop Facility Passageway (Missile Shield Area)Aging Effect I Aging NUREG-Row Component Intended Material Environment Requiring Management 1801, Table 1 Notes No. Type Function' Management MaProgram Volume Item Mngmt Por 2 Item 2 Metal Roof SSR Galvanized Air-indoor None None I11.B4-5 3.5.1-58 C Decking s Steel Not used I StFUtUr68 3 A"eAMee, ,!.A. 2 3.5.1425 A Not used G 1=968 ! Ski .. 25; s teel Air- mate ial A94 -2°-qv,__ _ _ _ _ _ _ _ __;
The ContainmentAccess Facility is desiqned so that the collapse of the buildinq in a seismic event will not prevent the function of any safety-related systems, structures or components. The ContainmentAccess Facilitydoes not contain any in-scope components; therefore, the evaluation boundary for the Containment Access Facility includes only the major structuralbuilding systems (column and floor steel, bracing, concrete floor slabs, roof deck, fasteners and anchorages) required for overall structural integrity. Due to the functional and structural similarities of the Containment Access Facility and the Personnel Shop Facility (includinq the Elevated Walkway), the structures are evaluated together in Table 3.5.2-14, "Aging Management Review Results - Containment Access Facility and Personnel Shop Facility (including Elevated Walkway)."
Enclosure L-1 1-257 Page 14 of 16 Affected LRA Section LRA Page No.Page 3.5-165 Affected Paragraph and Sentence Table 3.5.2-14 New Table New LRA Table 3.5.2-14, "Aging Management Review Results -Containment Access Facility and Personnel Shop Facility (including Elevated Walkway)," is added to the end of the tables subsection of LRA Section 3.5.2, "Results," to address the aging management review results for the new Containment Access Facility and the Personnel Shop Facility (including Elevated Walkway) addition to scope, to read as follows: Table 3.5.2-14 Acgingy Managcement Review Results -Containment Access Facility and Personnel Shop Facility (includinq Elevated Walkway)A-ging Effect Aging NUREG-Row Component Intended Maeil Eniomn cluiinc Mfeta nagmn 1801, Table 1 Noe No. Type Function' Material Environment Remuirin Manaogement Volume Item_ _ Management Program 2 Item Metal Floor Carbon A Loss of Structures 1 ec SNS Sel Air-indoor mtraMotrng III.A3-12
Reason for Scope Determination The Seismic CategoryII ContainmentAccess Facility is desiqned not to collapse onto safety-related structures in a way that could prevent the safety-related
: 3. 5.1-25 A-Deck Steel material Monitoring MDeckingt Ro Galvanized Air-indoor None None 1I1.B4-5 3.5.1-58 C MetakRofSN Steel Carbon Loss of Structures 3 Metal Siding SNS Steel Air-indoor material Monitoring II1A312 3.5.1-25 A Carbon Loss of Structures 4 Metal Siding SNS Steel Air-outdoor material Monitoring III.A3-12 3.5.1-25 A Enclosure L-1 1-257 Page 15 of 16 Table 3.5.2-14 Aginq Management Review Results -Containment Access Facility and Personnel Shop Facility includin Elevated Walkway)Row Componet Intended TAging Effect A1i8ng NUREG-Row Component Intend Material Environment Reguirina Management 18m Table 1 Notes Management Program 2 Item Structural Steel: Beams, SNS Carbon Air-indoor Loss of Structures III.A3-12 3.5.1-25 A Columns, Steel material Monitorin Plates, and Trusses Exterior Concrete Masonry Wall 6 Walls (above SNS Blocks Air-outdoor Crakging InsIection lll.A3-11 3.5.1-43 A grade)Foundation 7 (including SNS Concrete Soil Loss of Structures 111.A3-4 3.5.1-31 A caissons and material Monitoring piers)Loss of Foundation material (including SNS Concrete Soil Structures 111.A3-5 3.5.1-31 A 8 caissons and Change in Monitoring piers) material properties Foundation Changein (including SNS Concrete Soil material Structures III.A3-7 3.5.1-32 A caissons and Monitoring 0509 D. r)properties Reinforced Structures A 3 10 Concrete SNS Concrete Air-indoor None Strur N/A N/A 0 Floors Monitoring 0501 Reinforced Loss of tructures 11 Concrete SNS Concrete Soil material Monitorin III.A3-4 3.5.1-31 A Floors Enclosure L-1 1-257 Page 16 of 16 Table 3.5.2-14 Aging Management Review Results -Containment Access Facility and Personnel Shop Facility (including Elevated Walkway)Aging Effect Ag~ing NUREG-Row Component Intended Material Environment Requiring Management An1801. Table 1 Notes No. Type Function M Management Pro-gram Volume Item M a__ _ 2 Item Loss of Reinforced material 12 Concrete SNS Concrete Soil Change MonitorutrQ III.A3-5 3.5.1-31 A material properties Reinforced Change in Structures A, 13 Concrete SNS Concrete Soil material I.A3-7 3.5.1-32 0509 Floors propertiesM 1 Refer to Table 2.0-1 for intended function descriptions.}}
 
Enclosure L-1 1-257 Page 7 of 16 structures from performinq their safety functions. Therefore, it meets the 10 CFR 54.4(a)(2) scoping criteria.
USAR References The structuraldetails of the Containment Access Facility are not described in the USAR.
Components Subiect to AMR Table 2.4-14 lists the component types that require AMR and their intended functions.
The structuralcommodities for the ContainmentAccess Facility are addressedin the bulk commodities evaluation in Section 2.4.13.
Table 3.5.2-14, Acina Management Review Results - Containment Access Facility and Personnel Shop Facility (including Elevated Walkway), provides the results of the AMR.
Table 2.4-14 ContainmentAccess Facility Components Subject to Aging Managlement Review Component Type                                    Intended Function (as defined in Table 2.0-1)
Exterior Walls (above grade)                      SNS Foundation (including caissons and piers)          SNS Metal Floor Deck                                  SNS Metal Roof Decking                                SNS Metal Sidinq                                      SNS Reinforced Concrete Floors                        SNS Structural Steel: Beams, Columns, Plates,and      SNS Trusses
 
Enclosure L-1 1-257 Page 8 of 16 Affected LRA Section        LRA Page No.        Affected Paragraph and Sentence 2.4.15, and                  Page 2.4-52        Entire Section Table 2.4-15 New LRA Section 2.4.15, "Personnel Shop Facility (including Elevated Walkway)
      - Seismic Class II," is added to address the seismic reanalysis of the Personnel Shop Facility and Elevated Walkway, and reads as follows:
2 4 f5      PERSONNEL SHOPEAcIL ITYYINVC UD/NGEzEvA TEDL WAzKWA Y) -
SEISMIC CLASS/i Structure Description The Personnel Shop Facility is a Seismic Class II five-story structure which houses offices and shop facilities. The Personnel Shop Facility is located south of the Turbine Building. The foundation consists of reinforced concrete caissons.
The ground floor consists of a reinforced concrete slab on grade. The elevated floors consist of reinforced concrete overlying structural steel-supported metal deck. The roof consists of a metal deck, supported by structural framing steel.
The superstructure consists of structural steel framing with reinforced concrete masonry unit exterior walls up to elevation 606'. and metal sidinq above that elevation. The Personnel Shop Facility Seismic Class II Elevated walkway connects the Personnel Shop Facility to the safety-related Personnel Shop Facility Passageway (Missile Shield Area) which allows access to the Auxiliary Building.
The Personnel Shop Facility and Elevated Walkway are desiqned so that they will not collapse during a seismic event and prevent safety-related structures from performing their safety functions; therefore, the evaluation boundary of the PersonnelShop Facility and Elevated Walkway includes only the maior structural buildinq systems requiredfor overall structuralintegrity. Due to the functional and structuralsimilarities of the ContainmentAccess Facility and the Personnel Shop Facility (including the Elevated Walkway), the structures are evaluated together in Table 3.5.2-14, 'Aging Management Review Results - Containment Access Facilityand PersonnelShop Facility (including Elevated Walkway)."
Reason for Scope Determination The Seismic Class II Personnel Shop Facility (including Elevated Walkway) is desiqned not to collapse onto safety-related structures and thus not prevent the safety-related structures from performing their safety functions. Therefore, it meets the 10 CFR 54.4(a)(2) scoping criteria.
 
Enclosure L-1 1-257 Page 9 of 16 USAR References The structural details of the Personnel Shop Facility are not described in the USAR. The Personnel ShoD Facility is devicted in USAR Fidures 1.2-2 throuah 1.2-6, and 1.2-12.
Components Subject to AMR Table 2.4-15 lists the component types that require AMR and their intended functions.
The structural commodities for the Personnel Shop Facility (includinq Elevated Walkway) are addressedin the bulk commodities evaluation in Section 2.4.13.
Table 3.5.2-14. Aaina Manaaement Review Results - Containment Access Facility and Personnel Shop Facility (including Elevated Walkway), porovides the results of the AMR.
Table 2.4-15 PersonnelShop Facility(including Elevated Walkway)
Components Subject to Aging Management Review Component Type                                    Intended Function (as defined in Table 2.0-1)
Exterior Walls (above grade)                      SNS Foundation (includinq caissons and piers)          SNS Metal Floor Deck                                  SNS Metal Roof Decking                                SNS Metal Siding                                      SNS Reinforced Concrete Floors                        SNS Structural Steel: Beams, Columns, Plates,and       SNS Trusses
 
Enclosure L-11-257 Page 10 of 16 Affected LRA Section        LRA Page No.         Affected Paraqraph and Sentence 3.5.1                      Page 3.5-1          1 st Paragraph, 2 New Bullets (Sections)
Two new bullets (new sections) are added to the end of the bulleted list of structures in the scope of license renewal in LRA Section 3.5.1, "Introduction," to address the construction of the new Containment Access Facility and the Personnel Shop Facility (including Elevated Walkway) addition to scope, to read as follows:
          " ContainmentAccess Facility(Section 2.4.14)
          " PersonnelShop Facility (including Elevated Walkway) (Section 2.4.15)
Affected LRA Section        LRA Page No.        Affected Paragraph and Sentence 3.5.2                      Page 3.5-2          1 st Paragraph, new Table A new Table is added to the end of the list of Tables at the beginning of LRA Section 3.5.2, "Results," to address the aging management review results for the new Containment Access Facility and the Personnel Shop Facility (including Elevated Walkway) addition to scope, to read as follows:
Table 3.5.2-14 Aging Management Review Results - ContainmentAccess Facility and Personnel Shoo Facility(includinq Elevated Walkway)
 
Enclosure L-1 1-257 Page 11 of 16 Affected LRA Section        LRA Page No.        Affected Paragraph and Sentence 3.5.2.1.14                  Page 3.5-18        New Section New LRA Section 3.5.2.1.14, "Containment Access Facility and Personnel Shop Facility (including Elevated Walkway)," is added to the end of LRA Section 3.5.2.1, "Materials, Environments, Aging Effects Requiring Management, and Aging Management Programs," to address the aging management review results for the new Containment Access Facility and the Personnel Shop Facility (including Elevated Walkway) addition to scope, to read as follows:
3.5.2.1.14      ContainmentAccess Facility and PersonnelShop Facility (including Elevated Walkway)
Materials Containment Access Facility and Personnel Shop Facility (including Elevated Walkway) structural components subject to AMR are constructed of the following materials:
* Carbon steel
          " Concrete
* Concrete blocks
          "  Galvanized steel Materialsfor bulk commodity components are addressedin Section 3.5.2.1.13.
Environments Containment Access Facility and Personnel Shop Facility (including Elevated Walkway) structural components subject to AMR are exposed to the following environments:
          " Air-indoor
          " Air-outdoor
          " Soil Environments 3.5.2.1.13.       for bulk commodity components are addressed in Section 3.5.2.1.13.
 
Enclosure L-1 1-257 Page 12 of 16 Aging Effects Requiring Management The following aginq effects associated with the ContainmentAccess Facility and Personnel Shop Facility (including Elevated Walkway) structural components require management:
          "  Change in materialproperties
* Cracking
* Loss of material Aginq effects requiring management for bulk commodity components are addressedin Section 3.5.2.1.13.
Aging Management Programs The following programs are credited for managing the effects of aging on the Containment Access Facility and Personnel Shop Facility (including Elevated Walkway) structuralcomponents:
          " Masonry Wafl Inspection
          " Structures Monitoring Program Aging management programs for bulk commodity components are addressed in Section 3.5.2.1.13.
 
Enclosure L-11-257 Page 13 of 16 Affected LRA Section      LRA Page No.       Affected Paragraph and Sentence Table 3.5.2-7              Page 3.5-100      Rows 2, 3 and 4 Rows 2, 3 and 4 of LRA Table 3.5.2-7, "Aging Management Review Results - Personnel Shop Facility Passageway (Missile Shield Area)," are revised to address changes due to the Personnel Shop Facility (including Elevated Walkway) addition to scope, and now read as follows:
Table 3.5.2-7    Aging Management Review Results - Personnel Shop Facility Passageway (Missile Shield Area)
Row  Component      Intended    Material  Environment    Aging  Effect Requiring I          Aging Management NUREG-1801,        Table 1      Notes No.      Type      Function'                              Management          MaProgram    Volume            Item MngmtPor          2 Item 2    Metal Roof Decking      sSSR        Galvanized Steel      Air-indoor    None            None              I11.B4-5      3.5.1-58      C Not used                                            I              StFUtUr68 A"eAMee, 3                                          ,!.A.                                            2     3.5.1425      A Not used                  G                          1=968            Ski            !                .. 25
            ;        s            teel      Air-         mate ial                                    -2              A94
_                  °-qv,__
_        _  _  _        _        _    __;
 
Enclosure L-1 1-257 Page 14 of 16 Affected LRA Section          LRA Page No.      Affected Paragraph and Sentence Table 3.5.2-14                Page 3.5-165      New Table New LRA Table 3.5.2-14, "Aging Management Review Results - Containment Access Facility and Personnel Shop Facility (including Elevated Walkway)," is added to the end of the tables subsection of LRA Section 3.5.2, "Results,"
to address the aging management review results for the new Containment Access Facility and the Personnel Shop Facility (including Elevated Walkway) addition to scope, to read as follows:
Table 3.5.2-14      Acgingy ManagcementReview Results - ContainmentAccess Facilityand PersonnelShop Facility (includinq Elevated Walkway)
Row    Component        Intended    Maeil    Eniomn          cluiinc Effect A-ging          MfetaAging nagmn    NUREG-1801,  Table 1    Noe No.       Type          Function'  Material  Environment    Remuirin        Manaogement    Volume    Item
_    _                            Management          Program        2 Item ec Floor Metal 1 - Deck                  SNS      Carbon Sel        A Air-indoor      Loss of mtraMotrng      Structures  III.A3-12 3. 5.1-25 A Steel                    material        Monitoring MDeckingt Ro                  Galvanized  Air-indoor        None              None      1I1.B4-5 3.5.1-58  C MetakRofSN                      Steel 3    Metal Siding        SNS      Carbon Steel    Air-indoor      Loss of material        Structures Monitoring    II1A312  3.5.1-25  A Carbon                      Loss of        Structures  III.A3-12 3.5.1-25  A 4    Metal Siding        SNS        Steel     Air-outdoor      material      Monitoring
 
Enclosure L-1 1-257 Page 15 of 16 Table 3.5.2-14  Aginq ManagementReview Results - ContainmentAccess Facilityand Row Row Componet Component Intended Intend PersonnelShop Facility Material  Environment TAging includin Elevated Walkway)
Effect Reguirina A1i8ng Management NUREG-18m    Table 1   Notes Management      Program      2 Item Structural Steel:
Beams,              SNS    Carbon    Air-indoor      Loss of      Structures  III.A3-12 3.5.1-25 A Columns,                    Steel                    material      Monitorin Plates,and Trusses Exterior                  Concrete                                Masonry Wall 6    Walls (above      SNS    Blocks    Air-outdoor      Crakging      InsIection  lll.A3-11 3.5.1-43 A grade)
Foundation 7    (including          SNS  Concrete      Soil        Loss of      Structures  111.A3-4 3.5.1-31 A caissons and                                          material      Monitoring piers)
Loss of Foundation                                            material (including         SNS  Concrete      Soil                      Structures  111.A3-5 3.5.1-31 A 8    caissons and                                         Change in      Monitoring piers)                                                material properties Foundation                                          Changein (including          SNS  Concrete      Soil        material      Structures  III.A3-7 3.5.1-32 A caissons  and                                                      Monitoring                    0509 D. r)properties Reinforced                                                          Structures      A    3 10    Concrete            SNS  Concrete    Air-indoor       None         Strur          N/A    N/A    0 Floors                                                              Monitoring                    0501 Reinforced                                            Loss of        tructures 11    Concrete            SNS  Concrete      Soil        material      Monitorin    III.A3-4 3.5.1-31 A Floors
 
Enclosure L-1 1-257 Page 16 of 16 Table 3.5.2-14           Aging Management Review Results - ContainmentAccess Facilityand Personnel Shop Facility(includingElevated Walkway)
Aging Effect     Ag~ing   NUREG-Row     Component       Intended       Material     Environment Requiring   Management An1801.             Table 1   Notes No.       Type         Function         M                       Management       Pro-gram   Volume     Item M a__     _                 2 Item Loss of Reinforced                                                   material 12   Concrete             SNS         Concrete         Soil   Change         MonitorutrQ III.A3-5 3.5.1-31 A material properties Reinforced                                                 Change in     Structures                     A, 13   Concrete             SNS         Concrete         Soil     material                   I.A3-7 3.5.1-32 0509 Floors                                                     propertiesM 1 Refer to Table 2.0-1 for intended function descriptions.}}

Latest revision as of 14:54, 12 November 2019

License Renewal Application Amendment No. 18 - Annual Update
ML11276A078
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/30/2011
From: Byrd K
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-11-257
Download: ML11276A078 (20)


Text

FENOC Davis-Besse Nuclear Power Station 5501 N. State Route 2 FirstEnergyNuclear Operating Company Oak Harbor,Ohio 43449 September 30, 2011 L-1 1-257 10 CFR 54.21(b)

ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License Number NPF-3 License Renewal Application Amendment No. 18 - Annual Update (TAC No. ME4640)

By letter dated August 27, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102450565), FirstEnergy Nuclear Operating Company (FENOC) submitted an application pursuant to Title 10 of the Code of Federal Regulations, Part 54 for renewal of Operating License NPF-3 for the Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS). Each year following submittal of a license renewal application (LRA) and at least 3 months before scheduled completion of the NRC review, 10 CFR 54.21(b) requires an amendment to the renewal application to be submitted identifying any change to the current licensing basis (CLB) of the facility that materially affects the contents of the license renewal application, including the Final Safety Analysis Report (FSAR) supplement.

The Attachment provides a summary of the CLB changes that materially affect the LRA.

The Enclosure provides Amendment No. 18 (Annual Update) to the DBNPS LRA required by 10 CFR 54.21(b).

There are no regulatory commitments contained in this letter. Ifthere are any questions or if additional information is required, please contact Mr. Clifford I. Custer, Fleet License Renewal Project Manager, at 724-682-7139.

I declare under penalty of perjury that the foregoing is true and correct. Executed on September 30, 2011.

Sincerely, Kendall W.

40q Director, Site Performance Improvement

Davis-Besse Nuclear Power Station, Unit No. 1 L-1 1-257 Page 2

Attachment:

Current Licensing Basis (CLB) Changes that Materially Affect the Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS), License Renewal Application (LRA)

Enclosure:

Amendment No. 18 (Annual Update) to the DBNPS License Renewal Application cc: NRC DLR Project Manager NRC Region III Administrator cc: w/o Attachment or Enclosure NRC DLR Director NRR DORL Project Manager NRC Resident Inspector Utility Radiological Safety Board

Attachment L-1 1-257 Current Licensing Basis (CLB) Changes that Materially Affect the Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS),

License Renewal Application (LRA)

Page 1 of 2 One structure was removed and three new permanent structures were constructed in support of a steam generator replacement project scheduled for the Cycle 18 refueling outage in 2014.

" Wet Wash Facility [removed]

" Containment Access Facility

" Steam Generator Replacement Warehouse The Containment Access Facility is a new four-story office building located south of and immediately adjacent to the Auxiliary Building. The Wet Wash Facility was removed and the Containment Access Facility constructed at the same location.

The building houses engineering and administrative staff offices, and provides an access control entry point into the Auxiliary Building Radiologically Controlled Area.

The nonsafety-related Containment Access Facility is a Seismic Class II structure designed not to collapse onto safety-related structures in a way that could prevent the safety-related structures from performing their safety functions, which meets the 10 CFR 54.4(a)(2) scoping criteria. LRA Table 2-3, "License Renewal Scoping Results for Structures," is revised to show the removal of the Wet Wash Facility, and the new Containment Access Facility within the scope of license renewal. LRA Section 2.4, "Scoping and Screening Results: Structures," is revised to include a new subsection to provide the scoping and screening results for the Containment Access Facility. LRA Section 3.5, "Aging Management of Containment, Structures, and Component Supports," is revised to include a new subsection and table to provide the aging management review results for the Containment Access Facility.

The Old Steam Generator Storage Facility, located outside the Protected Area, provides long-term storage for the steam generators and reactor head when they are retired from service, and is not within the scope of license renewal. The Steam Generator Replacement Warehouse, located outside the Protected Area, provides storage for spare parts, and is not within the scope of license renewal.

LRA Table 2-3 is revised to disposition these two new structures.

See the Enclosure to this letter for the changes to the DBNPS LRA.

Attachment L-1 1-257 Page 2 of 2

2. The Personnel Shop Facility (including the attached Elevated Walkway) has been re-analyzed and determined to be a Seismic Class II structure designed not to collapse onto safety-related structures in a way that could prevent the safety-related structures from performing their safety functions, which meets the 10 CFR 54.4(a)(2) scoping criteria. Previously, the Personnel Shop Facility was considered as not in-scope for license renewal because the structure houses offices and shop facilities and is located adjacent to the nonsafety-related Turbine Building, so no safety-related structures would be impacted should the Personnel Shop Facility fail. However, during design reviews of the new Containment Access Facility constructed near the Personnel Shop Facility, a question was raised regarding the potential impact to the nearby safety-related auxiliary feedwater turbine exhaust structure and the component cooling water room ventilation inlets should either structure fail during a seismic event. A seismic analysis of the Personnel Shop Facility based on its proximity to the safety-related auxiliary feedwater turbine exhaust structure and the component cooling water room ventilation inlets could not be located; the issue was entered into the FENOC Corrective Action Program and resolved with a new seismic analysis.

LRA Table 2-3, "License Renewal Scoping Results for Structures," is revised to show the Personnel Shop Facility within the scope of license renewal. LRA Section 2.4, "Scoping and Screening Results: Structures," is revised to include a new subsection to provide the scoping and screening results for the Personnel Shop Facility. LRA Section 3.5, "Aging Management of Containment, Structures, and Component Supports," is revised to include a new subsection and table to provide the aging management review results for the Personnel Shop Facility.

See the Enclosure to this letter for the changes to the DBNPS LRA.

Enclosure Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS)

Letter L-11-257 Amendment No. 18 (Annual Update) to the DBNPS License Renewal Application Page 1 of 16 License Renewal Application Sections Affected Table of Contents Section 2.4.15 Table 2.2-3 Table 2.4-15 Section 2.4 Section 3.5.1 Section 2.4.7 Section 3.5.2 Table 2.4-7 Section 3.5.2.1.14 Section 2.4.14 Table 3.5.2-7 Table 2.4-14 Table 3.5.2-14 The Enclosure identifies the change to the License Renewal Application (LRA) by Affected LRA Section, LRA Page No., and Affected Paragraph and Sentence. The count for the affected paragraph, sentence, bullet, etc. starts at the beginning of the affected Section or at the top of the affected page, as appropriate. Below each section the reason for the change is identified, and the sentence affected is printed in italics with deleted text #ned-eu and added text underlined.

Enclosure L-1 1-257 Page 2 of 16 Affected LRA Section LRA Page No. Affected Paragraph and Sentence Table of Contents Page vi New rows New sections are added to the LRA Table of Contents, to read as follows:

TABLE OF CONTENTS 2.4.14 CONTAINMENTACCESs FACILITY- SEISMIC CLASS// ........................... 2.4-52 2.4.15 PERSONNEL SHOP FACILITY (INCLUDING ELEVATED WALKWAY) -

SEISMIC CLASS II .............................................................................. 2.4-52 TABLES Table 2.4-14 ContainmentAccess Facility Components Subiect to Aging Management Review ................ 2.4-52 Table 2.4-15 PersonnelShop Facility(includinq Elevated Walkway)

Components Subiect to Aging Management Review ................ 2.4-52 Table 3.5.2-14 Aginq Management Review Results - ContainmentAccess Facilityand PersonnelShop Facility(including Elevated Walkwa v) .................................................................................. 3.5-165

Enclosure L-11-257 Page 3 of 16 Affected LRA Section LRA Page No. Affected Paragraph and Sentence Table 2.2-3 Page 2.2-7 5 Rows (3 new and 2 existing) thru 2.2-14 Based on the removal, new construction or reclassification of five site structures, LRA Table 2.2-3, "License Renewal Scoping Results for Structures," is revised to read as follows:

Table 2.2-3 License Renewal Scoping Results for Structures Structure Name In-Scope Screening Results / Section ContainmentAccess Facility Yes 2.4.14 Old Steam Generator Provideststorage space fors1team Storage Facilit No =generatorsand reactor head [when retired from servcel . .

Personnel Shop Facility Yes 2.4.15 (including Elevated Walkway) -Ne- Ho1s Offi....

.. and'Shop f9acilitis Steam Generator No P i re ...of arts

.  :

Replacement Warehouse No Provides storage of spare p W"t ,ash F.'contanintion Fac,.;t, -Ne- Co.n.tai. .. uipr.no

Enclosure L-1 1-257 Page 4 of 16 Affected LRA Section LRA Page No. Affected Paragraph and Sentence 2.4 Page 2.4-2 4 th Paragraph, 2 New Bullets (Sections)

Two new bullets (new sections) are added to the end of the fourth paragraph, the bulleted list of structures in the scope of license renewal, in LRA Section 2.4, "Scoping and Screening Results: Structures," to address the construction of the new Containment Access Facility and the Personnel Shop Facility (including Elevated Walkway) addition to scope, to read as follows:

The structures in the scope of license renewal are the:

" ContainmentAccess Facility(Section 2.4.14)

  • Personnel Shop Facility (including Elevated Walkway) (Section 2.4.15)

Structural components for in-scope structures are addressed in the structure reviews (Sections 2.4.1 through 2.4.12, 2.4.14 and 2.4.15).

Enclosure L-1 1-257 Page 5 of 16 Affected LRA Section LRA Page No. Affected Paragraph and Sentence 2.4.7, and Pages 2.4-27 Structure Description, both paragraphs; Table 2.4-7 and 2.4-28 Table 2.4-7, 2 rows LRA Section 2.4.7, "Personnel Shop Facility Passageway (Missile Shield Area) -

Seismic Class I," is revised to adjust the Structure Description and Table 2.4-7, "Personnel Shop Facility Passageway (Missile Shield Area) Components Subject to Aging Management Review," is revised to account for the addition of the Personnel Shop Facility (including Elevated Walkway) to the scope of license renewal, and read as follows:

2.4.7 PERSONNEL SHOP FACILITY PASSAGEWAY (MISSILE SHIELD AREA) - SEISMIC CLASS I Structure Description A Seismic Class I reinforced concrete passageway entry interface with the Auxiliary Building Radiologically Controlled Ret44ed Area (RRA) at elevation 603'- 0" provides tornadomissile protection to two Auxiliary Building doors.

niy the Ame ISI nield porton of me ,'erscnne, 5nop .-ady Passageway i*

wh4the scope of ilcanse renewal. The rera n podtions ef the PerFsoep Shop F-acilty are not within tho Scope Of ficenso r-newal.

Table 2.4-7 Personnel Shop Facility Passageway (Missile Shield Area)

Components Subject to Aging Management Review Component Type Intended Function Component__Type_ (as defined in Table 2.0-1)

Metal Roof Decking SSR SNS

Enclosure L-1 1-257 Page 6 of 16 Affected LRA Section LRA Page No. Affected Paragraph and Sentence 2.4.14, and Page 2.4-52 New Section Table 2.4-14 New LRA Section 2.4.14, "Containment Access Facility - Seismic Class I1," is added to address the construction of the new Containment Access Facility, and reads as follows:

2 4M CoNTAINMENTAccESS FACILITY- SE/SM/c CLASSII Structure Description The ContainmentAccess Facility is a four-story Seismic Class II building located adiacent to the south wall of the Auxiliary Building and the west wall of the Personnel Shop Facility Missile Shield Area. The building houses engineering and administrative staff offices, and provides an access control entry point into the Auxiliary Building Radiologically Controlled Area. The Containment Access Facility is a steel framed buildinq with exterior walls of steel siding above the first story. The first story has a combination of concrete masonry units exterior walls and exterior walls of steel siding.

The ContainmentAccess Facilityis founded on grade walls with seismic ties and caisson piles that extend to bedrock. The ground floor is a concrete slab. The second, third and fourth floors are reinforced concrete slabs on metal decking.

The Containment Access Facility has an insulated metal deck roof covered with an elastomericmembrane.

The ContainmentAccess Facility is desiqned so that the collapse of the buildinq in a seismic event will not prevent the function of any safety-related systems, structures or components. The ContainmentAccess Facilitydoes not contain any in-scope components; therefore, the evaluation boundary for the Containment Access Facility includes only the major structuralbuilding systems (column and floor steel, bracing, concrete floor slabs, roof deck, fasteners and anchorages) required for overall structural integrity. Due to the functional and structural similarities of the Containment Access Facility and the Personnel Shop Facility (includinq the Elevated Walkway), the structures are evaluated together in Table 3.5.2-14, "Aging Management Review Results - Containment Access Facility and Personnel Shop Facility (including Elevated Walkway)."

Reason for Scope Determination The Seismic CategoryII ContainmentAccess Facility is desiqned not to collapse onto safety-related structures in a way that could prevent the safety-related

Enclosure L-1 1-257 Page 7 of 16 structures from performinq their safety functions. Therefore, it meets the 10 CFR 54.4(a)(2) scoping criteria.

USAR References The structuraldetails of the Containment Access Facility are not described in the USAR.

Components Subiect to AMR Table 2.4-14 lists the component types that require AMR and their intended functions.

The structuralcommodities for the ContainmentAccess Facility are addressedin the bulk commodities evaluation in Section 2.4.13.

Table 3.5.2-14, Acina Management Review Results - Containment Access Facility and Personnel Shop Facility (including Elevated Walkway), provides the results of the AMR.

Table 2.4-14 ContainmentAccess Facility Components Subject to Aging Managlement Review Component Type Intended Function (as defined in Table 2.0-1)

Exterior Walls (above grade) SNS Foundation (including caissons and piers) SNS Metal Floor Deck SNS Metal Roof Decking SNS Metal Sidinq SNS Reinforced Concrete Floors SNS Structural Steel: Beams, Columns, Plates,and SNS Trusses

Enclosure L-1 1-257 Page 8 of 16 Affected LRA Section LRA Page No. Affected Paragraph and Sentence 2.4.15, and Page 2.4-52 Entire Section Table 2.4-15 New LRA Section 2.4.15, "Personnel Shop Facility (including Elevated Walkway)

- Seismic Class II," is added to address the seismic reanalysis of the Personnel Shop Facility and Elevated Walkway, and reads as follows:

2 4 f5 PERSONNEL SHOPEAcIL ITYYINVC UD/NGEzEvA TEDL WAzKWA Y) -

SEISMIC CLASS/i Structure Description The Personnel Shop Facility is a Seismic Class II five-story structure which houses offices and shop facilities. The Personnel Shop Facility is located south of the Turbine Building. The foundation consists of reinforced concrete caissons.

The ground floor consists of a reinforced concrete slab on grade. The elevated floors consist of reinforced concrete overlying structural steel-supported metal deck. The roof consists of a metal deck, supported by structural framing steel.

The superstructure consists of structural steel framing with reinforced concrete masonry unit exterior walls up to elevation 606'. and metal sidinq above that elevation. The Personnel Shop Facility Seismic Class II Elevated walkway connects the Personnel Shop Facility to the safety-related Personnel Shop Facility Passageway (Missile Shield Area) which allows access to the Auxiliary Building.

The Personnel Shop Facility and Elevated Walkway are desiqned so that they will not collapse during a seismic event and prevent safety-related structures from performing their safety functions; therefore, the evaluation boundary of the PersonnelShop Facility and Elevated Walkway includes only the maior structural buildinq systems requiredfor overall structuralintegrity. Due to the functional and structuralsimilarities of the ContainmentAccess Facility and the Personnel Shop Facility (including the Elevated Walkway), the structures are evaluated together in Table 3.5.2-14, 'Aging Management Review Results - Containment Access Facilityand PersonnelShop Facility (including Elevated Walkway)."

Reason for Scope Determination The Seismic Class II Personnel Shop Facility (including Elevated Walkway) is desiqned not to collapse onto safety-related structures and thus not prevent the safety-related structures from performing their safety functions. Therefore, it meets the 10 CFR 54.4(a)(2) scoping criteria.

Enclosure L-1 1-257 Page 9 of 16 USAR References The structural details of the Personnel Shop Facility are not described in the USAR. The Personnel ShoD Facility is devicted in USAR Fidures 1.2-2 throuah 1.2-6, and 1.2-12.

Components Subject to AMR Table 2.4-15 lists the component types that require AMR and their intended functions.

The structural commodities for the Personnel Shop Facility (includinq Elevated Walkway) are addressedin the bulk commodities evaluation in Section 2.4.13.

Table 3.5.2-14. Aaina Manaaement Review Results - Containment Access Facility and Personnel Shop Facility (including Elevated Walkway), porovides the results of the AMR.

Table 2.4-15 PersonnelShop Facility(including Elevated Walkway)

Components Subject to Aging Management Review Component Type Intended Function (as defined in Table 2.0-1)

Exterior Walls (above grade) SNS Foundation (includinq caissons and piers) SNS Metal Floor Deck SNS Metal Roof Decking SNS Metal Siding SNS Reinforced Concrete Floors SNS Structural Steel: Beams, Columns, Plates,and SNS Trusses

Enclosure L-11-257 Page 10 of 16 Affected LRA Section LRA Page No. Affected Paraqraph and Sentence 3.5.1 Page 3.5-1 1 st Paragraph, 2 New Bullets (Sections)

Two new bullets (new sections) are added to the end of the bulleted list of structures in the scope of license renewal in LRA Section 3.5.1, "Introduction," to address the construction of the new Containment Access Facility and the Personnel Shop Facility (including Elevated Walkway) addition to scope, to read as follows:

" ContainmentAccess Facility(Section 2.4.14)

" PersonnelShop Facility (including Elevated Walkway) (Section 2.4.15)

Affected LRA Section LRA Page No. Affected Paragraph and Sentence 3.5.2 Page 3.5-2 1 st Paragraph, new Table A new Table is added to the end of the list of Tables at the beginning of LRA Section 3.5.2, "Results," to address the aging management review results for the new Containment Access Facility and the Personnel Shop Facility (including Elevated Walkway) addition to scope, to read as follows:

Table 3.5.2-14 Aging Management Review Results - ContainmentAccess Facility and Personnel Shoo Facility(includinq Elevated Walkway)

Enclosure L-1 1-257 Page 11 of 16 Affected LRA Section LRA Page No. Affected Paragraph and Sentence 3.5.2.1.14 Page 3.5-18 New Section New LRA Section 3.5.2.1.14, "Containment Access Facility and Personnel Shop Facility (including Elevated Walkway)," is added to the end of LRA Section 3.5.2.1, "Materials, Environments, Aging Effects Requiring Management, and Aging Management Programs," to address the aging management review results for the new Containment Access Facility and the Personnel Shop Facility (including Elevated Walkway) addition to scope, to read as follows:

3.5.2.1.14 ContainmentAccess Facility and PersonnelShop Facility (including Elevated Walkway)

Materials Containment Access Facility and Personnel Shop Facility (including Elevated Walkway) structural components subject to AMR are constructed of the following materials:

" Concrete

  • Concrete blocks

" Galvanized steel Materialsfor bulk commodity components are addressedin Section 3.5.2.1.13.

Environments Containment Access Facility and Personnel Shop Facility (including Elevated Walkway) structural components subject to AMR are exposed to the following environments:

" Air-indoor

" Air-outdoor

" Soil Environments 3.5.2.1.13. for bulk commodity components are addressed in Section 3.5.2.1.13.

Enclosure L-1 1-257 Page 12 of 16 Aging Effects Requiring Management The following aginq effects associated with the ContainmentAccess Facility and Personnel Shop Facility (including Elevated Walkway) structural components require management:

" Change in materialproperties

  • Cracking
  • Loss of material Aginq effects requiring management for bulk commodity components are addressedin Section 3.5.2.1.13.

Aging Management Programs The following programs are credited for managing the effects of aging on the Containment Access Facility and Personnel Shop Facility (including Elevated Walkway) structuralcomponents:

" Masonry Wafl Inspection

" Structures Monitoring Program Aging management programs for bulk commodity components are addressed in Section 3.5.2.1.13.

Enclosure L-11-257 Page 13 of 16 Affected LRA Section LRA Page No. Affected Paragraph and Sentence Table 3.5.2-7 Page 3.5-100 Rows 2, 3 and 4 Rows 2, 3 and 4 of LRA Table 3.5.2-7, "Aging Management Review Results - Personnel Shop Facility Passageway (Missile Shield Area)," are revised to address changes due to the Personnel Shop Facility (including Elevated Walkway) addition to scope, and now read as follows:

Table 3.5.2-7 Aging Management Review Results - Personnel Shop Facility Passageway (Missile Shield Area)

Row Component Intended Material Environment Aging Effect Requiring I Aging Management NUREG-1801, Table 1 Notes No. Type Function' Management MaProgram Volume Item MngmtPor 2 Item 2 Metal Roof Decking sSSR Galvanized Steel Air-indoor None None I11.B4-5 3.5.1-58 C Not used I StFUtUr68 A"eAMee, 3 ,!.A. 2 3.5.1425 A Not used G 1=968 Ski  ! .. 25

s teel Air- mate ial -2 A94

_ °-qv,__

_ _ _ _ _ _ __;

Enclosure L-1 1-257 Page 14 of 16 Affected LRA Section LRA Page No. Affected Paragraph and Sentence Table 3.5.2-14 Page 3.5-165 New Table New LRA Table 3.5.2-14, "Aging Management Review Results - Containment Access Facility and Personnel Shop Facility (including Elevated Walkway)," is added to the end of the tables subsection of LRA Section 3.5.2, "Results,"

to address the aging management review results for the new Containment Access Facility and the Personnel Shop Facility (including Elevated Walkway) addition to scope, to read as follows:

Table 3.5.2-14 Acgingy ManagcementReview Results - ContainmentAccess Facilityand PersonnelShop Facility (includinq Elevated Walkway)

Row Component Intended Maeil Eniomn cluiinc Effect A-ging MfetaAging nagmn NUREG-1801, Table 1 Noe No. Type Function' Material Environment Remuirin Manaogement Volume Item

_ _ Management Program 2 Item ec Floor Metal 1 - Deck SNS Carbon Sel A Air-indoor Loss of mtraMotrng Structures III.A3-12 3. 5.1-25 A Steel material Monitoring MDeckingt Ro Galvanized Air-indoor None None 1I1.B4-5 3.5.1-58 C MetakRofSN Steel 3 Metal Siding SNS Carbon Steel Air-indoor Loss of material Structures Monitoring II1A312 3.5.1-25 A Carbon Loss of Structures III.A3-12 3.5.1-25 A 4 Metal Siding SNS Steel Air-outdoor material Monitoring

Enclosure L-1 1-257 Page 15 of 16 Table 3.5.2-14 Aginq ManagementReview Results - ContainmentAccess Facilityand Row Row Componet Component Intended Intend PersonnelShop Facility Material Environment TAging includin Elevated Walkway)

Effect Reguirina A1i8ng Management NUREG-18m Table 1 Notes Management Program 2 Item Structural Steel:

Beams, SNS Carbon Air-indoor Loss of Structures III.A3-12 3.5.1-25 A Columns, Steel material Monitorin Plates,and Trusses Exterior Concrete Masonry Wall 6 Walls (above SNS Blocks Air-outdoor Crakging InsIection lll.A3-11 3.5.1-43 A grade)

Foundation 7 (including SNS Concrete Soil Loss of Structures 111.A3-4 3.5.1-31 A caissons and material Monitoring piers)

Loss of Foundation material (including SNS Concrete Soil Structures 111.A3-5 3.5.1-31 A 8 caissons and Change in Monitoring piers) material properties Foundation Changein (including SNS Concrete Soil material Structures III.A3-7 3.5.1-32 A caissons and Monitoring 0509 D. r)properties Reinforced Structures A 3 10 Concrete SNS Concrete Air-indoor None Strur N/A N/A 0 Floors Monitoring 0501 Reinforced Loss of tructures 11 Concrete SNS Concrete Soil material Monitorin III.A3-4 3.5.1-31 A Floors

Enclosure L-1 1-257 Page 16 of 16 Table 3.5.2-14 Aging Management Review Results - ContainmentAccess Facilityand Personnel Shop Facility(includingElevated Walkway)

Aging Effect Ag~ing NUREG-Row Component Intended Material Environment Requiring Management An1801. Table 1 Notes No. Type Function M Management Pro-gram Volume Item M a__ _ 2 Item Loss of Reinforced material 12 Concrete SNS Concrete Soil Change MonitorutrQ III.A3-5 3.5.1-31 A material properties Reinforced Change in Structures A, 13 Concrete SNS Concrete Soil material I.A3-7 3.5.1-32 0509 Floors propertiesM 1 Refer to Table 2.0-1 for intended function descriptions.