|
|
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 December 7,2011 Mr. William Jefferson, Jr. Vice President Carolina Power & Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 7,2011 Mr. William Jefferson, Jr. |
| | Vice President Carolina Power & Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 -WITHDRAWAL OF AN AMENDMENT REQUEST FOR EXTENSION OF REFUELING WATER STORAGE TANK ALLOWED OUTAGE TIME (TAC NO. ME7039) | | SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - WITHDRAWAL OF AN AMENDMENT REQUEST FOR EXTENSION OF REFUELING WATER STORAGE TANK ALLOWED OUTAGE TIME (TAC NO. ME7039) |
|
| |
|
| ==Dear Mr. Jefferson:== | | ==Dear Mr. Jefferson:== |
|
| |
|
| By letter dated September 2, 2011 (Agencywide Documents Access and Management System Accession No. ML11255A128), you applied for an amendment to Appendix A, Technical Specifications (TS) of Renewed Facility License No. NPF-63 for the Shearon Harris Nuclear Power Plant, Unit 1. The proposed change would have revised the TS to extend the TS 3.1.2.6, "Borated Water Sources-Operating," Action b allowed outage time for restoring an inoperable refueling water storage tank (RWST) to operable status from 1 hour to 7 days; and to extend the TS 3.5.4, "Refueling Water Storage Tank," action for restoring an inoperable RWST to operable status from 1 hour to 7 days when performing purification in Modes 1 -4. Subsequently, by letter dated October 27,2011, you withdrew the amendment request. The purpose of this letter is to advise that the above-cited application is being treated as withdrawn. | | By letter dated September 2, 2011 (Agencywide Documents Access and Management System Accession No. ML11255A128), you applied for an amendment to Appendix A, Technical Specifications (TS) of Renewed Facility License No. NPF-63 for the Shearon Harris Nuclear Power Plant, Unit 1. The proposed change would have revised the TS to extend the TS 3.1.2.6, "Borated Water Sources- Operating," Action b allowed outage time for restoring an inoperable refueling water storage tank (RWST) to operable status from 1 hour to 7 days; and to extend the TS 3.5.4, "Refueling Water Storage Tank," action for restoring an inoperable RWST to operable status from 1 hour to 7 days when performing purification in Modes 1 - 4. Subsequently, by letter dated October 27,2011, you withdrew the amendment request. |
| Notice of consideration of issuance of the proposed amendment had not been published in the Federal Register. | | The purpose of this letter is to advise that the above-cited application is being treated as withdrawn. Notice of consideration of issuance of the proposed amendment had not been published in the Federal Register. |
| Please feel free to contact me at 301-415-2020 or bye-mail to Brenda.Mozafari@nrc.gov if you have any questions. | | Please feel free to contact me at 301-415-2020 or bye-mail to Brenda.Mozafari@nrc.gov if you have any questions. |
| Sincerely, IRA by EBrown forI Brenda Mozafari, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400 cc: Distribution via Listserv December 7, 2011 Mr. William Jefferson, Jr. Vice President Carolina Power &Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 -WITHDRAWAL OF AN AMENDMENT REQUEST FOR EXTENSION OF REFUELING WATER STORAGE TANK ALLOWED OUTAGE TIME (TAC NO. ME7039) | | Sincerely, IRA by EBrown forI Brenda Mozafari, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400 cc: Distribution via Listserv |
|
| |
|
| ==Dear Mr. Jefferson:==
| | '.. ML11301A034 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC LPL2-21PM NAME BMozafari CSoia DBroaddus BMozafari (EBrown for) |
| | | DATE 11/16/11 11/15/11 12106111 12/07/11}} |
| By letter dated September 2, 2011 (Agencywide Documents Access and Management System Accession No. ML11255A128), you applied for an amendment to Appendix A, Technical Specifications (TS) of Renewed Facility License No. NPF-63 for the Shearon Harris Nuclear Power Plant, Unit 1. The proposed change would have revised the TS to extend the TS 3.1.2.6, "Borated Water Sources-Operating," Action b allowed outage time for restoring an inoperable refueling water storage tank (RWST) to operable status from 1 hour to 7 days; and to extend the TS 3.5.4, "Refueling Water Storage Tank," action for restoring an inoperable RWST to operable status from 1 hour to 7 days when performing purification in Modes 1 -4. Subsequently, by letter dated October 27,2011, you withdrew the amendment request. The purpose of this letter is to advise that the above-cited application is being treated as withdrawn.
| |
| Notice of consideration of issuance of the proposed amendment had not been published in the Federal Register.
| |
| Please feel free to contact me at 301-415-2020 or bye-mail to Brenda.Mozafari@nrc.gov if you have any questions.
| |
| Sincerely, IRA by EBrown forI Brenda Mozafari, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400 cc: Distribution via Listserv Distribution:
| |
| PUBLIC Lp12-2 R/F RidsNrrDorlLpl2-2 RidsOgcRp RidsNrrDorlDpr RidsNrrLACSola RidsNrrPMShearonHarris RidsRgn2MailCenter RidsAcrsAcnw
| |
| _MaiICTR ADAMS Accession No'.. ML11301A034 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC LPL2-21PM NAME BMozafari CSoia DBroaddus BMozafari (EBrown for) DATE 11/16/11 11/15/11 12106111 12/07/11 OFFICIAL RECORD COPY}}
| |
Letter Sequence Withdrawal |
---|
|
|
|
|
---|
Category:Letter
MONTHYEARIR 05000400/20240112024-09-10010 September 2024 NRC Inspection Report 05000400/2024011 IR 05000400/20240052024-08-26026 August 2024 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400-2024005) Rev 1 ML24059A4252024-08-14014 August 2024 Issuance of Amendment No. 202 Regarding Alignment of Certain Technical Specifications with Improved Standard Technical Specifications ML24213A0522024-08-0202 August 2024 Issuance of Amendment No. 201 to Extend Completion Time of Inoperable Reactor Coolant System Accumulator Using Consolidated Line Item Improvement Process ML24212A3412024-07-31031 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000400/20240022024-07-29029 July 2024 – Integrated Inspection Report 05000400/2024002 ML24170A7312024-07-29029 July 2024 – Exemption from the Requirements of 10 CFR 50.55a(H)(2) Using the Risk-Informed Process for Evaluations Letter ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000400/20243022024-06-27027 June 2024 – NRC Operator Licensing Examination Approval 05000400/2024302 IR 05000400/20244012024-06-25025 June 2024 – Security Baseline Inspection Report05000400/2024401 ML24162A1372024-06-24024 June 2024 – Regulatory Audit Summary Related to the Review of Exemption Request from Certain Requirements in 10 CFR 50.55a(h)(2)(EPID L-2024-LLE-00040) ML24136A1382024-05-20020 May 2024 – Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000400/2024011) and Request for Information (RFI) ML24116A2592024-05-14014 May 2024 Staff Evaluation Related to Aging Management Plan and Inspection Plan for Reactor Vessel Internals ML24127A1592024-05-0808 May 2024 – Notification of Licensed Operator Initial Examination 05000400/2024302 IR 05000400/20240012024-05-0505 May 2024 Integrated Inspection Report 05000400/2024001 ML24100A0912024-04-10010 April 2024 Operator License Examination Report ML24058A2462024-03-18018 March 2024 – Supplemental Information Needed for Using the Risk-Informed Process for Evaluations for the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) IR 05000400/20230062024-02-28028 February 2024 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2023006 ML24032A2632024-02-23023 February 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0044 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000400/20243012024-02-21021 February 2024 – NRC Operator Licensing Examination Approval 05000400/2024301 IR 05000400/20230042024-01-30030 January 2024 Integrated Inspection Report 05000400/2023004 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230032023-11-0909 November 2023 Integrated Inspection Report 05000400/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23234A1702023-10-0303 October 2023 Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230052023-08-23023 August 2023 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400/2023005) ML23234A2542023-08-22022 August 2023 RQ Inspection Notification Letter IR 05000400/20234022023-07-26026 July 2023 Security Baseline Inspection Report 05000400/2023402 IR 05000400/20230022023-07-24024 July 2023 Integrated Inspection Report 05000400/2023002 IR 05000400/20234402023-07-17017 July 2023 Special Inspection Report 05000400/2023440 and Preliminary Greater than Green Finding and Apparent Violation Cover Letter IR 05000400/20230012023-05-10010 May 2023 Integrated Inspection Report 05000400 2023001 IR 05000400/20234042023-05-0404 May 2023 Cyber Security Inspection Report 05000400/2023404 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23118A1392023-04-28028 April 2023 Submittal of Updated Final Safety Analysis Report (Amendment 65), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes IR 05000400/20234032023-04-0505 April 2023 Security Baseline Inspection Report 05000400/2023403 IR 05000400/20230102023-03-15015 March 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000400/2023010 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000400/20220062023-03-0101 March 2023 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2022006 ML23033A5272023-02-0808 February 2023 Correction of Typographical Errors Incurred During Issuance of License Amendment No. 196 IR 05000400/20220042023-02-0707 February 2023 Integrated Inspection Report 05000400/2022004 ML23020A1252023-01-23023 January 2023 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000400/2023403) ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000400/20220032022-11-10010 November 2022 Integrated Inspection Report 05000400/2022003 IR 05000400/20223012022-11-0202 November 2022 NRC Operator License Examination Report 05000400/2022301 ML22271A6202022-09-29029 September 2022 Notification of Shearon Harris Nuclear Power Plant Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000400/2023010 ML22258A1262022-09-14014 September 2022 NRC Operator Licensing Examination Approval 05000400/2022301 ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition 2024-09-10
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 7,2011 Mr. William Jefferson, Jr.
Vice President Carolina Power & Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - WITHDRAWAL OF AN AMENDMENT REQUEST FOR EXTENSION OF REFUELING WATER STORAGE TANK ALLOWED OUTAGE TIME (TAC NO. ME7039)
Dear Mr. Jefferson:
By letter dated September 2, 2011 (Agencywide Documents Access and Management System Accession No. ML11255A128), you applied for an amendment to Appendix A, Technical Specifications (TS) of Renewed Facility License No. NPF-63 for the Shearon Harris Nuclear Power Plant, Unit 1. The proposed change would have revised the TS to extend the TS 3.1.2.6, "Borated Water Sources- Operating," Action b allowed outage time for restoring an inoperable refueling water storage tank (RWST) to operable status from 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to 7 days; and to extend the TS 3.5.4, "Refueling Water Storage Tank," action for restoring an inoperable RWST to operable status from 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to 7 days when performing purification in Modes 1 - 4. Subsequently, by letter dated October 27,2011, you withdrew the amendment request.
The purpose of this letter is to advise that the above-cited application is being treated as withdrawn. Notice of consideration of issuance of the proposed amendment had not been published in the Federal Register.
Please feel free to contact me at 301-415-2020 or bye-mail to Brenda.Mozafari@nrc.gov if you have any questions.
Sincerely, IRA by EBrown forI Brenda Mozafari, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400 cc: Distribution via Listserv
'.. ML11301A034 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC LPL2-21PM NAME BMozafari CSoia DBroaddus BMozafari (EBrown for)
DATE 11/16/11 11/15/11 12106111 12/07/11