{{#Wiki_filter:ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2GTS*AOV101 Equipment Class: (7) Fluid-Operated Valves Equipment | {{#Wiki_filter:ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: 2GTS*AOV101 Equipment Class: (7) Fluid-Operated Valves Equipment | |||
== | == Description:== | ||
Description:== | PRIMARY CONTAINMENT PURGE ISOLATION VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 319.00 ft, ALL Manufacturer/Model: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable C-165 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2GTS*AOV101 Equipment Class: (7) Fluid-Operated Valves Equipment | |||
== | == Description:== | ||
Description:== | PRIMARY CONTAINMENT PURGE ISOLATION VALVE | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects | |||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
C-166 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: -JN U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2GTS*AOV101 Equipment Class: (7) Fluid-Operated Valves Equipment | |||
== | == Description:== | ||
Description:== | PRIMARY CONTAINMENT PURGE ISOLATION VALVE Comments Evaluated by: -- George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-167 | ||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2GTS*AOV101 Equipment Class: (7) Fluid-Operated Valves Equipment | |||
== | == Description:== | ||
Description:== | PRIMARY CONTAINMENT PURGE ISOLATION VALVE IMG_0641 C-168 | ||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: E N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2GTS*AOV2A Equipment Class: (7) Fluid-Operated Valves Equipment | |||
== | == Description:== | ||
Description:== | BUTTERFLY OR TRICENTRIC V Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SG, 266.00 ft, ALL Manufacturer/Model: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-169 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: UN Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2GTS*AOV2A Equipment Class: (7) Fluid-Operated Valves Equipment | |||
== | == Description:== | ||
Description:== | BUTTERFLY OR TRICENTRIC V | ||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-170 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [] N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2GTS*AOV2A Equipment Class: (7) Fluid-Operated Valves Pni linmant r'acr~rintinn" BUTTERFLY OR TRICENTRIC V C-171 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y JN-] U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2HVK*CHL1A Equipment Class: (11) Chillers Equipment | |||
CONTROL BUILDING CHILLED WATER CHILLER.Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): | == Description:== | ||
CCL, 261.00 ft, Area 05 Manufacturer/Model: | CONTROL BUILDING CHILLED WATER CHILLER. | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): CCL, 261.00 ft, Area 05 Manufacturer/Model: | ||
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)? | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
DRW 12177-EC-58ET-4 REV4 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)? | |||
24 bolts -pattern not specified on Drwg 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | DRW 12177-EC-58ET-4 REV4 | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
24 bolts - pattern not specified on Drwg | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-172 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y LNjj U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2HVK*CHL1A Equipment Class: (11) Chillers Equipment | |||
CONTROL BUILDING CHILLED WATER CHILLER.7. Are soft targets free from impact by nearby equipment or structures? | == Description:== | ||
CONTROL BUILDING CHILLED WATER CHILLER. | |||
Chain hanging off upper elevation can impact panel (wI controls). | : 7. Are soft targets free from impact by nearby equipment or structures? Yes | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and No masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free of No potentially adverse seismic interaction effects?Other Adverse Conditions | Chain hanging off upper elevation can impact panel (wI controls). - | ||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | Addressed in CR# 2012-009019. | ||
Comments Some oil leakage underneaty chiller. Loose insulation. | : 9. Do attached lines have adequate flexibility to avoid damage? Yes | ||
Some surface rusting on parts of chiller.Evaluated by: -George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-173 | : 10. Based on the above seismic interaction evaluations, is equipment free of No potentially adverse seismic interaction effects? | ||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Some oil leakage underneaty chiller. Loose insulation. Some surface rusting on parts of chiller. | |||
Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-173 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y FN-] U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2HVK*CHLIA Equipment Class: (11) Chillers CONTROL BUILDING CHILLED WATER CHILLER. | |||
C-174 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y FN-] U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2HVK*CHL1A Equipment Class: (11) Chillers CONTROL BUILDING CHILLED WATER CHILLER. | |||
C-175 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y NI-1 U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2HVK*CHL1A Equipment Class: (11) Chillers CONTROL BUILDING CHILLED WATER CHILLER. | |||
C-176 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2HVP*MOD1C Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== | == Description:== | ||
Description:== | MOTOR OPERATED DAMPER Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): DG, 279.00 ft, ALL Manufacturer/Model: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable C-177 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2HVP*MOD1C Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
MOTOR OPERATED DAMPER | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects | |||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
C-178 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2HVP*MODlC Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
MOTOR OPERATED DAMPER | == Description:== | ||
MOTOR OPERATED DAMPER Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos 0061 C-179 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: F-Y N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2HVP*MOD6C Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
MOTOR OPERATED DAMPER | == Description:== | ||
MOTOR OPERATED DAMPER Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): DG, 280.00 ft, ALL Manufacturer/Model: | |||
: | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% IS0o of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-180 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2HVP*MOD6C Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
MOTOR OPERATED DAMPER | == Description:== | ||
MOTOR OPERATED DAMPER | |||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: - George G Thomas Date: 08/23/12 JJ_ t Neda Stoeva 08/23/12 Photos C-181 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2HVP*MOD6C Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
MOTOR OPERATED DAMPER IMG_0066 C-182 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2HVP*TIS13A Equipment Class: (19) Temperature Sensors INDICATING TEMPERATURE TEMPERATURE SWITCH, 2EGS*G1 CONT Equipment | |||
RM TEMP | == Description:== | ||
RM TEMP Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): DG, 265.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
: | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-183 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2HVP*TIS13A Equipment Class: (19) Temperature Sensors INDICATING TEMPERATURE TEMPERATURE SWITCH, 2EGS*G1 CONT Equipment | |||
== Description:== | |||
RM TEMP | |||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
: | Other Adverse Conditions | ||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
: | Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-184 | ||
: | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2HVP*TIS13A Equipment Class: (19) Temperature Sensors INDICATING TEMPERATURE TEMPERATURE SWITCH, 2EGS*G1 CONT nn" PM TPRMD C-185 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2HVR*UC401F Equipment Class: (10) Air Handlers Equipment | |||
== Description:== | == Description:== | ||
RHR PUMP RM F-UNIT CLR Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): ABN, 176.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)? | |||
DRW 12177-EC30AC-6 & 12177-EC30AB-7 | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes Surface corrosion on some of the anchorbolts. To arrestfurtherdegradation CR-2012-006822. | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-186 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2HVR*UC401F Equipment Class: (10) Air Handlers Equipment | |||
== | == Description:== | ||
Description:== | RHR PUMP RM F-UNIT CLR | ||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: George G Thomas Date: 08/23/12 kJ 4* " Neda Stoeva 08/23/12 Photos C-187 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2HVR*UC401F Equipment Class: (10) Air Handlers ipment | |||
== | == Description:== | ||
Description:== | RHR PUMP RM F-UNIT CLR C-188 | ||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2HVR*UC403A Equipment Class: (10) Air Handlers Equipment | |||
== | == Description:== | ||
Description:== | HPCS PUMP RM UNIT CLR Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 176.00 ft, ALL Manufacturer/Model: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchoracie | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes Some corrosion on anchorbolts. Groutpad chipped off in the back, but judged acceptable.Loose debris by the back wall. To arrestfurther bolt degradationCR-2012-006809 was issued. | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-189 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2HVR*UC403A Equipment Class: (10) Air Handlers Equipment | |||
== | == Description:== | ||
Description:== | HPCS PUMP RM UNIT CLR | ||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Loose debris by the back wall. | |||
Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-190 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [ N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2HVR*UC403A Equipment Class: (10) Air Handlers Equipment | |||
== | == Description:== | ||
Description:== | HPCS PUMP RM UNIT C C-191 | ||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2HVR*UC403A Equipment Class: (10) Air Handlers Equipment | |||
== | == Description:== | ||
Description:== | HPCS PUMP RM UNIT CLR IMG_0167 IMG_0168 IMG_0169 IMG_0170 IMG_0171 IMG_0172 C-192 | ||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [-Y] N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21AS*SOV164 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== | == Description:== | ||
Description:== | ADS HEADER A N2 SUPPLY OUTSIDE AUTOMATIC ISOLATION VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 294.00 ft, ALL Manufacturer/Model: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-193 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21AS*SOV164 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== | == Description:== | ||
Description:== | ADS HEADER A N2 SUPPLY OUTSIDE AUTOMATIC ISOLATION VALVE | ||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-194 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21AS*SOV164 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== | == Description:== | ||
Description:== | ADS HEADER A N2 SUPPLY OUTSIDE AUTOMATIC ISOLATION VALVE C-195 | ||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: E N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21AS*SOVX181 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
ADS HEADER A PRESSURE,SOLENOID OPERATED VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 294.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchoraqe | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-196 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21AS*SOVX181 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== | == Description:== | ||
Description:== | ADS HEADER A PRESSURE,SOLENOID OPERATED VALVE | ||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-197 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21AS*SOVX181 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves ipment | |||
== | == Description:== | ||
Description:== | ADS HEADER A PRESSURESOLENOID OPERATED VALVE C-198 | ||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: E N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21AS*TK4 Equipment Class: (21) Tanks and Heat Exchangers Equipment | |||
== | == Description:== | ||
Description:== | ADS ACCUM AIR RECEIVER Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 289.00 ft, ALL Manufacturer/Model: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additiohal space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)? | |||
DRW 12177-EC-33R-3 & 0003200106001 | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-199 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: UN Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21AS*TK4 Equipment Class: (21) Tanks and Heat Exchangers Equipment | |||
== | == Description:== | ||
Description:== | ADS ACCUM AIR RECEIVER | ||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-200 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21AS*TK4 Equipment Class: (21) Tanks and Heat Exchar Equipment | |||
== | == Description:== | ||
Description:== | ADS ACCUM AIR RECEIVE IMtI.,UOIW Status: M N U C-201 | ||
ATTACHMENT 3 WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21CS*MOV120 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== | == Description:== | ||
Description:== | RCIC STEAM SUPPLY VALVE TO TURB Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 188.00 ft, ALL Manufacturer/Model: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects | |||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes C-202 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21CS*MOV120 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== | == Description:== | ||
Description:== | RCIC STEAM SUPPLY VALVE TO TURB | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-203 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21CS*MOV120 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== | == Description:== | ||
Description:== | RCIC STEAM SUPPLY VALVE TO TURB IMG_0212 C-204 | ||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: EI N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21CS*MOV126 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
ICS TO RPV OUTSIDE REMOTE MANUAL ISOLATION VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 292.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-205 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21CS*MOV126 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
ICS TO RPV OUTSIDE REMOTE MANUAL ISOLATION VALVE | |||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: " George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-206 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21CS*MOV126 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves ipment | |||
== Description:== | == Description:== | ||
ICS TO RPV OUTSIDE REMOTE MANUAL ISOLATION VALVE IM~iUt014 IMUi Ut01 Status: M N U C-207 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21CS*MOV129 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves MOTOR OPERATED VALVE FOR PUMP SUCT FROM CNDS STORAGE Equipment | |||
== | == Description:== | ||
Description:== | TANK Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): ABN, 242.00 ft, ALL Manufacturer/Model: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects | |||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes C-208 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21CS*MOV129 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves MOTOR OPERATED VALVE FOR PUMP SUCT FROM CNDS STORAGE Equipment | |||
== Description:== | |||
TANK | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-209 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21CS*MOV129 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves MOTOR OPERATED VALVE FOR PUMP SUCT FROM CNDS STORAGE m.nf rflizrrintinn" TANK C-210 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: r] N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21CS*MOV150 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves 21CS*T1 TURB THROT MOTOR OPERATED VALVE; SUPPLIED W/EQP Equipment | |||
== | == Description:== | ||
Description:== | 21CS*T1 Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 184.00 ft, Area 41 Manufacturer/Model: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-21Il | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21CS*MOV150 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves 21CS*T1 TURB THROT MOTOR OPERATED VALVE; SUPPLIED W/EQP Equipment | |||
== | == Description:== | ||
Description:== | 21CS*T1 | ||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-212 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21CS*MOV150 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves 21CS*T1 TURB THROT MOTOR OPERATED VALVE; SUPPLIED W/EQP rnAnt IplArrintinn" 9IrC*T1 C-213 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U U-Y Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21CS*P1 Equipment Class: (5) Horizontal Pumps Equipment | |||
RCIC PUMP; TURBINE SHAFT DRIVEN Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): | == Description:== | ||
SC, 175.00 ft, ALL Manufacturer/Model: | RCIC PUMP; TURBINE SHAFT DRIVEN Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 175.00 ft, ALL Manufacturer/Model: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)? | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)? | |||
DRW 12177-EC-30AC-6 | DRW 12177-EC-30AC-6 | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes | : 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-214 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21CS*P1 Equipment Class: (5) Horizontal Pumps Equipment | |||
RCIC PUMP; TURBINE SHAFT DRIVEN 7. Are soft targets free from impact by nearby equipment or structures? | == Description:== | ||
RCIC PUMP; TURBINE SHAFT DRIVEN | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?Other Adverse Conditions | : 7. Are soft targets free from impact by nearby equipment or structures? Yes | ||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | : 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | ||
Comments Evaluated by: -George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-215 | : 9. Do attached lines have adequate flexibility to avoid damage? Yes | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-215 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21CS*P1 Equipment Class: (5) Horizontal Pumps Einuinm*nt 21CS*P1 (5) 1nfa-rintinn" RCIC PUMP; TURBINE SHAFT DRIVEN IM[-i [ I*l I-* | |||
C-216 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21CS*P1 Equipment Class: (5) Horizontal Pumps Equipment | |||
== | == Description:== | ||
Description:== | RCIC PUMP; TURBINE SHAFT DRIVEN IMG_0207 C-217 | ||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: EI N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21CS*PCV115 Equipment Class: (7) Fluid-Operated Valves Equipment | |||
== | == Description:== | ||
Description:== | LUBE OIL CLR PRESS CONT V Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 186.00 ft, ALL Manufacturer/Model: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-218 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21CS*PCV115 Equipment Class: (7) Fluid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
LUBE OIL CLR PRESS CONT V | |||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-219 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 21CS*PCV115 Equipment Class: (7) Fluid-Operated Valves ipment | |||
== | == Description:== | ||
Description:== | LUBE OIL CLR PRESS CONT V C-220 | ||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RDS*AOV124 Equipment Class: (7) Fluid-Operated Valves Equipment | |||
== | == Description:== | ||
Description:== | SCRAM DISCHARGE VOLUME VENT - AUTOMATIC Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 283.00 ft, ALL Manufacturer/Model: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% N10 of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-221 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [-Y N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RDS*AOV124 Equipment Class: (7) Fluid-Operated Valves Equipment | |||
== | == Description:== | ||
Description:== | SCRAM DISCHARGE VOLUME VENT - AUTOMATIC | ||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-222 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RDS*AOV124 Equipment Class: (7) Fluid-Operated Valves Enuinment Descrintion: SCRAM DISCHARGE VOLUh C-223 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RDS*AOV124 Equipment Class: (7) Fluid-Operated Valves Equipment | |||
SCRAM DISCHARGE VOLUME | == Description:== | ||
SCRAM DISCHARGE VOLUME VENT - AUTOMATIC IMG_0466 IMG_0467 C-224 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RDS*AOV130 Equipment Class: (7) Fluid-Operated Valves Equipment | |||
SCRAM DISCHARGE VOLUME DRAIN -AUTOMATIC | == Description:== | ||
SCRAM DISCHARGE VOLUME DRAIN - AUTOMATIC Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 240.00 ft, ALL Manufacturer/Model: | |||
: | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-225 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RDS*AOV130 Equipment Class: (7) Fluid-Operated Valves Equipment | |||
== Description:== | |||
SCRAM DISCHARGE VOLUME DRAIN - AUTOMATIC | |||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: | : 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | ||
: | Other Adverse Conditions | ||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
: | Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-226 | ||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RDS*AOV130 Equipment Class: (7) Fluid-Operated Valves inmnt fMace.rintinn SCRAM DISCHARGE VOLUME DRAIN - AUTOMATIC C-227 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RDS*SOV139 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves "DUAL SOLENOID OPERATED VALVE (3-WAY REDUNDANT SCRAM PILOT VALVE ON Equipment | |||
== | == Description:== | ||
Description:== | 2RDS*HCU0219)" | ||
Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 261.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% 40 of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-228 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RDS*SOV139 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves "DUAL SOLENOID OPERATED VALVE (3-WAY REDUNDANT SCRAM PILOT VALVE ON Equipment | |||
== | == Description:== | ||
Description:== | 2RDS*HCU0219)" | ||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-229 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RDS*SOV139 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves "DUAL SOLENOID OPERATED VALVE (3-WAY REDUNDANT SCRAM PILOT VALVE ON IPnr inmganf Flgharrnfienn. ýPrvqt*w-rif* IN,71a C-230 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RDS*SOV158 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
ALTERNATE ROD INSERTION VALVE, SOLENOID OPERATED VALVE | == Description:== | ||
ALTERNATE ROD INSERTION VALVE, SOLENOID OPERATED VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 261.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes Anchored on a rack to the floor in a Christmas tree configuration | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-231 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: T N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RDS*SOV158 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
ALTERNATE ROD INSERTION VALVE, SOLENOID OPERATED VALVE | |||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: | : 9. Do attached lines have adequate flexibility to avoid damage? Yes | ||
: | : 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | ||
Other Adverse Conditions | |||
: | : 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | ||
Comments Evaluated by: " George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-232 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RDS*SOV158 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
ALTERNATE ROD INSERTION VALVE, SOLENOID OPERATED VALVE C-233 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*E1A Equipment Class: (21) Tanks and Heat Exchangers Equipment | |||
HEAT EXCHANGER | == Description:== | ||
HEAT EXCHANGER Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): ABN, 198.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-234 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*E1A Equipment Class: (21) Tanks and Heat Exchangers Equipment | |||
== Description:== | |||
HEAT EXCHANGER | |||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: | : 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | ||
: | Other Adverse Conditions | ||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
: | Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-235 | ||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: --Y- N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*EIA Equipment Class: (21) Tanks and Heat Exchangers Fn1iinm~n+ Facrrinfinn- WIAT IrYCI, Inn MI'1i 1 | |||
-1 11% | |||
C-236 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*E1A Equipment Class: (21) Tanks and Heat Exchangers Equipment | |||
== | == Description:== | ||
Description:== | HEAT EXCHANGER IMG_0917 IMG_0918 C-237 | ||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*EIA Equipment Class: (21) Tanks and Heat Exchangers Fnmminmanf flwrrintinn- HFAT FXCrHAN(rFR C-238 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y-] N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*FV38A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
RHR | == Description:== | ||
RHR LOOP A TEST RETURN TO SUPPR POOL COOLING Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 206.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)? | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | : 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | : 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | : 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-239 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: UN Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*FV38A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
RHR | == Description:== | ||
RHR LOOP A TEST RETURN TO SUPPR POOL COOLING | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?Other Adverse Conditions | : 7. Are soft targets free from impact by nearby equipment or structures? Yes | ||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | : 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | ||
Comments Evaluated by: -George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C- | : 9. Do attached lines have adequate flexibility to avoid damage? Yes | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: .- George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-240 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*FV38A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
RHR | == Description:== | ||
RHR LOOP A TEST RETURN TO SUPPR POOL COOLING C-241 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*MOV115 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== | == Description:== | ||
Description:== | RHR SERVICE WATER CROSS TIE, MOTOR OPERATED GATE VALVE. | ||
Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): ABS, 181.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
: | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-242 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*MOV115 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== | == Description:== | ||
Description:== | RHR SERVICE WATER CROSS TIE, MOTOR OPERATED GATE VALVE. | ||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-243 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*MOV115 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== | == Description:== | ||
Description:== | RHR SERVICE WATER CROSS TIE, MOTOR OPERATED GATE VALVE. | ||
IMW,3_U14t C-244 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: I-I N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*MOV12A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== | == Description:== | ||
Description:== | "A" RHR HEAT EXCHANGER DISCHARGE VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): ABN, 181.00 ft, ALL Manufacturer/Model: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-245 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*MOV12A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== | == Description:== | ||
Description:== | "A" RHR HEAT EXCHANGER DISCHARGE VALVE | ||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Scaffolding installed adjacent to MO V12A but very well secured Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-246 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*MOV12A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== | == Description:== | ||
Description:== | "A" RHR HEAT EXCHANGER DISCHARGE VALVE C-247 | ||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*MOVI 2A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Fnliinmant I'aw-rintinn* "A" RHR HEAT EXCHANGER DISCHARGE VALVE C-248 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*MOV15A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves CONTAINMENT SPRAY TO DRYWELL OUTSIDE REMOTE MANUAL Equipment | |||
== Description:== | |||
SC, | ISOLATION VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 294.00 ft, ALL Manufacturer/Model: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)? | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | : 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | : 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | ||
: 4. ' Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | : 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-249 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*MOV15A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves CONTAINMENT SPRAY TO DRYWELL OUTSIDE REMOTE MANUAL Equipment | |||
== Description:== | |||
ISOLATION VALVE | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?Other Adverse Conditions | : 7. Are soft targets free from impact by nearby equipment or structures? Yes | ||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | : 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | ||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: George G Thomas Date: 08/23/12 C4 Neda Stoeva 08/23/12 Photos C-250 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*MOV15A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves CONTAINMENT SPRAY TO DRYWELL OUTSIDE REMOTE MANUAL inn- IR0I ATION VAI VP C-251 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*MOV15A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves CONTAINMENT SPRAY TO DRYWELL OUTSIDE REMOTE MANUAL Equipment | |||
== Description:== | == Description:== | ||
ISOLATION VALVE IMG_0569 IMG_0570 C-252 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*MOV1A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves RHS PUMP P1A SUCTION OUTSIDE REMOTE MANUAL ISOLATION Equipment | |||
== | == Description:== | ||
Description:== | VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 195.00 ft, ALL Manufacturer/Model: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% I 0o of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-253 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*MOV1A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves RHS PUMP PlA SUCTION OUTSIDE REMOTE MANUAL ISOLATION Equipment | |||
== | == Description:== | ||
Description:== | VALVE | ||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: . George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-254 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*MOV1A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves RHS PUMP PIA SUCTION OUTSIDE REMOTE MANUAL ISOLATION Fmjinmnnt f1l.rrintinn" VAI VF C-255 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*MOV4B Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
RHR | == Description:== | ||
RHR A MIN FLOW BYPASS, MOTOR OPERATED GATE VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 202.00 ft, ALL Manufacturer/Model: | |||
: | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-256 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: V N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*MOV4B Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
RHR | == Description:== | ||
RHR A MIN FLOW BYPASS, MOTOR OPERATED GATE VALVE | |||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Light fixture may swing into the top of the operatorof valve but would not be damaging Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-257 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*MOV4B Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves ipment | |||
RHR | == Description:== | ||
RHR A MIN FLOW BYPASS, MOTOR OPERATED GATE VALVE C-258 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*MOV4B Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
RHR | == Description:== | ||
RHR A MIN FLOW BYPASS, MOTOR OPERATED GATE VALVE C-259 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*MOV8A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
RHR H.E. | == Description:== | ||
RHR H.E. ElA INLET BYPASS MOTOR OPERATED VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): ABN, 181.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% IN0o of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-260 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*MOV8A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
RHR H.E. | == Description:== | ||
RHR H.E. ElA INLET BYPASS MOTOR OPERATED VALVE | |||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-261 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*MOV8A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
RHR H.E. EIA INLET BYPASS MOTOR OPERATED VALVE C-262 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*MOV9A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
RHR H.E. A SHELL SIDE INL MOTOR OPERATED BUTTERFLY VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): ABN, 201.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchoraqe | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-263 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [ N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*MOV9A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
RHR H.E. A SHELL SIDE INL MOTOR OPERATED BUTTERFLY VALVE | |||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-264 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*MOV9A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
RHR H.E. A SHELL SIDE INL MOTOR OPERATED BUTTERFLY VALVE C-265 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*MOV9A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
RHR H.E. A SHELL SIDE INL MOTOR OPERATED BUTTERFLY VALVE IMG_0928 C-266 | |||
: | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*P1A Equipment Class: (6) Vertical Pumps INCLUDES ALL ASSOCIATED RHR PUMPS, AUX, BWR, ELEC (VERT Equipment | |||
== Description:== | |||
MTD) ELECTRIC MOTORS, GENERAL G.E. DESIGNATOR E12-C002A Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): ABN, 175.00 ft, Area 16 Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Additional space is provided at the end of this checklist for documenting other comments. | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)? | : 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)? | ||
DRW 2C-5271D | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes | : 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | : 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-267 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [-] N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*P1A Equipment Class: (6) Vertical Pumps INCLUDES ALL ASSOCIATED RHR PUMPS, AUX, BWR, ELEC (VERT Equipment | |||
== Description:== | |||
MTD) ELECTRIC MOTORS, GENERAL G.E. DESIGNATOR E12-CO02A | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?Other Adverse Conditions | : 7. Are soft targets free from impact by nearby equipment or structures? Yes | ||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | : 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | ||
Comments Evaluated | : 9. Do attached lines have adequate flexibility to avoid damage? Yes | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: George G Thomas Date: 08/23/12 K- Neda Stoeva 08/23/12 Photos C-268 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2RHS*P1A Equipment Class: (6) Vertical Pumps INCLUDES ALL ASSOCIATED RHR PUMPS, AUX, BWR, ELEC (VERT Equipment | |||
== Description:== | |||
MTD) ELECTRIC MOTORS, GENERAL G.E. DESIGNATOR E12-CO02A IMG_0278 C-269 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: E-I N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SCM*PNL103A Equipment Class: (14) Distribution Panels Equipment | |||
== Description:== | |||
120/240V AC DIST PNL Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): CRR, 288.00 ft, Area 08 Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)? | |||
DRWNMP2 EE-550K REV5 | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-270 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SCM*PNL103A Equipment Class: (14) Distribution Panels Equipment | |||
== Description:== | |||
120/240V AC DIST PNL | |||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: | : 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | ||
Comments Evaluated by: George G Thomas Date: 08/23/12 E" M' Neda Stoeva 08/23/12 Photos C-271 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SCM*PNL1 03A Equipment Class: (14) Distribution Panels i:ni iinma=nf nIzat-rinfinn-120/240V AC DIST PNL IM(,. I]/1-" I111*14 [1/ 1 _4 IMG_0714 C-272 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SCM*PNL103A Equipment Class: (14) Distribution Panels EauiDment DescriDtion: 120/240V AC DIST PNL C-273 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SLS*P1A Equipment Class: (5) Horizontal Pumps Equipment | |||
== Description:== | |||
STANDBY LIQUID CONTROL PUMP PlA Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 289.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchoracqe | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-274 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SLS*P1A Equipment Class: (5) Horizontal Pumps Equipment | |||
== Description:== | |||
STANDBY LIQUID CONTROL PUMP PlA | |||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated-by: - George G Thomas Date: 08/23/12 K.- Neda Stoeva 08/23/12 Photos C-275 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment.ID No.: 2SLS*P1A Equipment Class: (5) Horizontal Pumps Equipment | |||
== Description:== | |||
STANDBY LIQUID CONTROL PUMP P1A IM[i- I [I-%mM C-276 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SLS*P1A Equipment Class: (5) Horizontal Pumps Equipment | |||
== Description:== | |||
STANDBY LIQUID CONTROL PUMP PlA IMG_0603 C-277 | |||
: | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: EY] N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SLS*TK1 Equipment Class: (21) Tanks and Heat Exchangers Equipment | |||
== Description:== | |||
STORAGE TANK FOR STANDBY LIQUID CONTROL SYSTEM Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 289.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-278 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SLS*TK1 Equipment Class: (21) Tanks and Heat Exchangers Equipment | |||
== Description:== | |||
STORAGE TANK FOR STANDBY LIQUID CONTROL SYSTEM | |||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: | : 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | ||
: | Other Adverse Conditions | ||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
: | Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-279 | ||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M-I N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SLS*TK1 Equipment Class: (21) Tanks and Heat Exchangers Equipment | |||
== Description:== | |||
STORAGE TANK FOR STANDBY LIQUID CONTROL SYSTEM IM, UvUou C-280 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: T N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SLS*TK1 Equipment Class: (21) Tanks and Heat Exchangers Equipment | |||
== Description:== | |||
STORAGE TANK FOR STANDBY LIQUID CONTROL SYSTEM IMG_0612 C-281 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: EIII N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SLS*VEX3A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
SC, | SLS EXPLOSIVE VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 296.00 ft, ALL Manufacturer/Model: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)? | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | : 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | : 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | : 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-282 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SLS*VEX3A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
SLS EXPLOSIVE VALVE | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?Other Adverse Conditions | : 7. Are soft targets free from impact by nearby equipment or structures? Yes | ||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | : 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | ||
Comments | : 9. Do attached lines have adequate flexibility to avoid damage? Yes | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-283 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SLS*VEX3A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
SLS EXPLOSIVE VALVE C-284 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: E N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*AOV22A Equipment Class: (7) Fluid-Operated Valves Equipment | |||
== Description:== | |||
ABN, | AIR OPERATED VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): ABN, 186.00 ft, ALL Manufacturer/Model: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)? | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | : 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | : 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | : 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-285 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*AOV22A Equipment Class: (7) Fluid-Operated Valves Equipment | |||
== Description:== | |||
AIR OPERATED VALVE | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?Other Adverse Conditions | : 7. Are soft targets free from impact by nearby equipment or structures? Yes | ||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | : 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | ||
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C- | : 9. Do attached lines have adequate flexibility to avoid damage? Yes | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-286 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*AOV22A Equipment Class: (7) Fluid-Operated Valves Equipment | |||
== Description:== | |||
AIR OPERATED VALVE C-287 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*MOV15A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
MOTOR OPERATED GATE VALVE TO UC403A Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 197.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | : 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | : 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | : 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-288 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*MOV15A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
MOTOR OPERATED GATE VALVE TO UC403A | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?Other Adverse Conditions | : 7. Are soft targets free from impact by nearby equipment or structures? Yes | ||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | : 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | ||
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C- | : 9. Do attached lines have adequate flexibility to avoid damage? Yes | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Surface rust identified below operator near bottom of valve; however, not a potential seismic issue. | |||
Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-289 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*MOV15A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
MOTOR OPERATED GATE VALVE TO UC403A C-290 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: I-Y N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*MOV19A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
BUTTERFLY VALVE | == Description:== | ||
MTR OPER BUTTERFLY VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): ABN, 219.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Additional space is provided at the end of this checklist for documenting other comments. | Anchorage | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable | : 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | : 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | : 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | : 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-291 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*MOV19A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
BUTTERFLY VALVE | == Description:== | ||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?Other Adverse Conditions | MTR OPER BUTTERFLY VALVE | ||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | : 7. Are soft targets free from impact by nearby equipment or structures? Yes | ||
Comments Evaluated by: George G Thomas Date: 08/23/12 | : 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | ||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-292 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M-I N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*MOV19A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
BUTTERFLY VALVE | == Description:== | ||
MTR OPER BUTTERFLY VALVE C-293 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*MOV33A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
SWP TO RHR HTX OUTLET VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): ABN, 181.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)? | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% IS0o of SWEL items requiring such verification)? | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | : 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | : 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | : 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-294 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*MOV33A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
SWP TO RHR HTX OUTLET VALVE | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?Other Adverse Conditions | : 7. Are soft targets free from impact by nearby equipment or structures? Yes | ||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | : 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | ||
Comments Evaluated by: | : 9. Do attached lines have adequate flexibility to avoid damage? Yes | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-295 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*MOV33A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
SWP TO RHR HTX OUTLET VALVE Status: M N U C-296 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*MOV3A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
BUTTERFLY VALVE -MOTOR Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): | == Description:== | ||
BUTTERFLY VALVE - MOTOR OPER Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SW, 265.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Additional space is provided at the end of this checklist for documenting other comments. | Anchoraqe | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable | : 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | : 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | ||
Not Applicable | : 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | : 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects | |||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes C-297 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: T N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*MOV3A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
BUTTERFLY VALVE -MOTOR | == Description:== | ||
BUTTERFLY VALVE - MOTOR OPER | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?Other Adverse Conditions | : 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | ||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | : 9. Do attached lines have adequate flexibility to avoid damage? Yes | ||
Comments Evaluated by: | : 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | ||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: George G Thomas Date: 08/23/12 K,- Neda Stoeva 08/23/12 Photos C-298 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*MOV3A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
BUTTERFLY VALVE - MOTOR OPER IMG_0118 C-299 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*MOV5OA Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
MTR OPER BUTTERFLY VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SW, 265.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-300 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*MOV50A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
MTR OPER BUTTERFLY VALVE | |||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-301 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*MOV50A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== | == Description:== | ||
Description:== | MTR OPER BUTTERFLY VALVE IMJU1 zz C-302 | ||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: rY N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*MOV599 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== | == Description:== | ||
Description:== | BUTTERFLY VALVE - MOTOR Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): PT, 255.00 ft, Area 40 Manufacturer/Model: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable Minor surface rust | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-303 | |||
SWP FR CLR 2EGS*EG1-MOTOR OPERATED VALVE 7. Are soft targets free from impact by nearby equipment or structures? | ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: 2SWP*MOV599 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
BUTTERFLY VALVE - MOTOR | |||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-304 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*MOV599 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves ipment | |||
== Description:== | |||
BUTTERFLY VALVE - MOTOR C-305 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*MOV66A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
SWP FR CLR 2EGS*EG1-MOTOR OPERATED VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): DG, 271.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-306 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*MOV66A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
SWP FR CLR 2EGS*EG1-MOTOR OPERATED VALVE | |||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
Insulation close to Junction box 318 but acceptable by inspection | Insulation close to Junction box 318 but acceptable by inspection | ||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?Other Adverse Conditions | : 9. Do attached lines have adequate flexibility to avoid damage? Yes | ||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | : 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | ||
Comments Evaluated by: -George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-307 | Other Adverse Conditions | ||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-307 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*MOV66A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
SWP FR CLR 2EGS*EG1-MOTOR OPERATED VALVE C-308 | == Description:== | ||
SWP FR CLR 2EGS*EG1-MOTOR OPERATED VALVE C-308 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: f N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*MOV90A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
SWP TO RHR HTX INLET VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): | == Description:== | ||
ABN, 180.00 ft, ALL Manufacturer/Model: | SWP TO RHR HTX INLET VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): ABN, 180.00 ft, ALL Manufacturer/Model: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | Anchorage | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable | : 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | : 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | : 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | : 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-309 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*MOV90A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
SWP TO RHR HTX INLET VALVE 7. Are soft targets free from impact by nearby equipment or structures? | == Description:== | ||
SWP TO RHR HTX INLET VALVE | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?Other Adverse Conditions | : 7. Are soft targets free from impact by nearby equipment or structures? Yes | ||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | : 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | ||
Comments Evaluated by: -George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-310 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2SWP*MOV90A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves pment | : 9. Do attached lines have adequate flexibility to avoid damage? Yes | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-310 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*MOV90A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves pment | |||
== Description:== | == Description:== | ||
SWP TO RHR HTX INLET VALVE C-311 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: E N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*P1A Equipment Class: (5) Horizontal Pumps Equipment | |||
== | == Description:== | ||
Description:== | SERVICE WATER PUMP Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SW, 224.00 ft, Area 13 Manufacturer/Model: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)? | |||
EC-014A & EC-014Z | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-312 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:-- N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*P1A Equipment Class: (5) Horizontal Pumps Equipment | |||
N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2SWP*P1A Equipment Class: (5) Horizontal Pumps Equipment | |||
== | == Description:== | ||
Description:== | SERVICE WATER PUMP | ||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Spalled concrete near 2nd anchorbolt on the nght side of base. Not judged to be a seismic concern. | |||
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-313 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*PIA Equipment Class: (5) Horizontal Pumps ipment | |||
== Description:== | == Description:== | ||
SERVICE WATER PUMP C-314 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*P1A Equipment Class: (5) Horizontal Pumps Equipment | |||
== | == Description:== | ||
Description:== | SERVICE WATER PUMP IMG_0078 IMG_0079 IMG_0080 IMG_0081 C-315 | ||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*STR4A Equipment Class: (0) Other Equipment | |||
== | == Description:== | ||
Description:== | SELF CLEAN STRAINER AND MOTOR Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SW, 261.00 ft, ALL Manufacturer/Model: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
SELF CLEAN STRAINER AND MOTOR Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): | Anchorage | ||
SW, 261.00 ft, ALL Manufacturer/Model: | : 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)? | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | |||
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)? | |||
DRW 0005410051001C | DRW 0005410051001C | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation? | : 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes | ||
Surface rust should be cleaned and re-evaluated by owner for bolts seismic integrity. | : 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes Surface rust should be cleaned and re-evaluated by owner for bolts seismic integrity. Furtherbolt degradationto be arrestedby issuance of CR-2012-006770. | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | : 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-316 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*STR4A Equipment Class: (0) Other Equipment | |||
SELF CLEAN STRAINER AND MOTOR 7. Are soft targets free from impact by nearby equipment or structures? | == Description:== | ||
SELF CLEAN STRAINER AND MOTOR | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?Other Adverse Conditions | : 7. Are soft targets free from impact by nearby equipment or structures? Yes | ||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | : 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | ||
Comments Evaluated by: " George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-317 | : 9. Do attached lines have adequate flexibility to avoid damage? Yes | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: " George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-317 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*STR4A Equipment Class: (0) Other Equipment | |||
SELF CLEAN STRAINER AND MOTOR C-318 | == Description:== | ||
SELF CLEAN STRAINER AND MOTOR C-318 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: JN U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SWP*STR4A Equipment Class: (0) Other Equipment | |||
SELF CLEAN STRAINER AND MOTOR IMG_0116 C-319 | == Description:== | ||
SELF CLEAN STRAINER AND MOTOR IMG_0116 C-319 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y t-Njj U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2VBA*UPS2A Equipment Class: (16) Inverters UNINTERRUPTIBLE PWR SUPP INCLUDING REG Equipment | |||
TRANSFORMER&MANUAL BYPASS SWITCH Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): | == Description:== | ||
CSA, 261.00 ft, Area 04 Manufacturer/Model: | TRANSFORMER&MANUAL BYPASS SWITCH Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): CSA, 261.00 ft, Area 04 Manufacturer/Model: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)? | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)? | |||
DRW 12177-EE-38D-9 | DRW 12177-EE-38D-9 | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | : 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable All welds | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | : 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-320 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y F U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2VBA*UPS2A Equipment Class: (16) Inverters UNINTERRUPTIBLE PWR SUPP INCLUDING REG Equipment | |||
TRANSFORMER&MANUAL BYPASS SWITCH 7. Are soft targets free from impact by nearby equipment or structures? | == Description:== | ||
No | TRANSFORMER&MANUAL BYPASS SWITCH | ||
CR-2012-8947 was written to address mounted procedure binders.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and No masonry block walls not likely to collapse onto the equipment? | : 7. Are soft targets free from impact by nearby equipment or structures? No Procedurebindermounted on side of panel and may interfere with function of sensitive equipment. CR-2012-8947 was written to address mounted procedure binders. | ||
Light "S" hooks open on right most 2 lights above panel 2EHS*MCCI03C. | : 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and No masonry block walls not likely to collapse onto the equipment? | ||
CR-2012-008907 issued to address open S-Hook Issue.9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free of No potentially adverse seismic interaction effects?Other Adverse Conditions | Light "S"hooks open on right most 2 lights above panel 2EHS*MCCI03C. | ||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | CR-2012-008907 issued to address open S-Hook Issue. | ||
Comments Evaluated by: George G Thomas Date: 08/23/12 A I_ Neda Stoeva 08/23/12 Photos C-321 | : 9. Do attached lines have adequate flexibility to avoid damage? Yes | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of No potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: George G Thomas Date: 08/23/12 A I_ Neda Stoeva 08/23/12 Photos C-321 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y LN-] U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2VBA*UPS2A Equipment Class: (16) Inverters UNINTERRUPTIBLE PWR SUPP INCLUDING REG TRANSFORMER&MANUAL BYPASS SWITCH IMG_0862 C-322 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y FN] U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2VBA*UPS2A Equipment Class: (16) Inverters UNINTERRUPTIBLE PWR SUPP INCLUDING REG Equipment | |||
== | == Description:== | ||
Description:== | TRANSFORMER&MANUAL BYPASS SWITCH IMG_0863 C-323 | ||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2VBA*UPS2C Equipment Class: (16) Inverters Equipment | |||
== | == Description:== | ||
Description:== | RECTIFIER / INVERTER / STATIC SWITCH Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): CB, 237.00 ft, Area 01 Manufacturer/Model: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes Surface cracking but away from anchors | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-324 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2VBA*UPS2C Equipment Class: (16) Inverters Equipment | |||
== | == Description:== | ||
Description:== | RECTIFIER / INVERTER / STATIC SWITCH | ||
: 7. Are soft targets free from impact by nearby equipment or structures? Yes | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Panels not bolted together,could result in pounding/rattling. Further investigation indicatedthis was per design and panels did not contain relays. | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Floor surface cracks. | |||
Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-325 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2VBA*UPS2C Equipment Class: (16) Inverters rniminmmnfr War-rintin-n P CP.TIII: I IKI\I PTI=II/ | |||
I TATIe_ _WA/IT'I-. | |||
C-326 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2VBA*UPS2C Equipment Class: (16) Inverters Equipment | |||
== Description:== | |||
RECTIFIER INVERTER / STATIC SWITCH IMG_0790 IMG_0791 IMG_0792 C-327 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: 7 N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2VBS*PNL101A Equipment Class: (14) Distribution Panels Equipment | |||
== Description:== | |||
PANEL (120 VAC POWER DISTRIBUTION FROM 2VBA*UPS2A) | PANEL (120 VAC POWER DISTRIBUTION FROM 2VBA*UPS2A) | ||
Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): | Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): CTR, 288.00 ft, Area 07 Manufacturer/Model: | ||
CTR, 288.00 ft, Area 07 Manufacturer/Model: | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | Anchorage | ||
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)? | : 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation? | : 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | : 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | : 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-328 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2VBS*PNL101A Equipment Class: (14) Distribution Panels Equipment | |||
== Description:== | |||
PANEL (120 VAC POWER DISTRIBUTION FROM 2VBA*UPS2A) | PANEL (120 VAC POWER DISTRIBUTION FROM 2VBA*UPS2A) | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. Are soft targets free from impact by nearby equipment or structures? Yes | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?Other Adverse Conditions | : 9. Do attached lines have adequate flexibility to avoid damage? Yes | ||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | : 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | ||
Comments Hairline cracks in area around panel. Pictures with area Walk-By. Not judged to be a seismic issue.Evaluated by: 4NZ- George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-329 | Other Adverse Conditions | ||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Hairline cracks in area around panel. Pictures with area Walk-By. Not judged to be a seismic issue. | |||
Evaluated by: 4NZ- George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-329 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2VBS*PNL101A Equipment Class: (14) Distribution Panels Equipment | |||
== Description:== | |||
PANEL (120 VAC POWER DISTRIBUTION FROM 2VBA*UPS2A) | PANEL (120 VAC POWER DISTRIBUTION FROM 2VBA*UPS2A) | ||
IML,_U( 1 C-330 | IML,_U( 1 C-330 | ||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2VBS*PNL101A Equipment Class: (14) Distribution Panels Equipment | |||
== Description:== | |||
PANEL (120 VAC POWER DISTRIBUTION FROM 2VBA*UPS2A) | PANEL (120 VAC POWER DISTRIBUTION FROM 2VBA*UPS2A) | ||
IMLu_UtI C-331 | IMLu_UtI C-331 | ||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: T N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SFC*HV37A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
2SFC-HT EXCHGR XCONNECT HAND VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): | == Description:== | ||
SC, 232.00 ft, ALL Manufacturer/Model: | 2SFC-HT EXCHGR XCONNECT HAND VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 232.00 ft, ALL Manufacturer/Model: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)? | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | : 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | : 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | : 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-332 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SFC*HV37A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
2SFC-HT EXCHGR XCONNECT HAND VALVE 7. Are soft targets free from impact by nearby equipment or structures? | == Description:== | ||
2SFC-HT EXCHGR XCONNECT HAND VALVE | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?Other Adverse Conditions | : 7. Are soft targets free from impact by nearby equipment or structures? Yes | ||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | : 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | ||
Comments Evaluated by: " George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-333 | : 9. Do attached lines have adequate flexibility to avoid damage? Yes | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: " George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-333 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SFC*HV37A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
2SFC-HT EXCHGR XCONNECT HAND VALVE IMU | == Description:== | ||
2SFC-HT EXCHGR XCONNECT HAND VALVE IMU _U*O*U C-334 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: I-Y N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SFC*HV6B Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
CONTROL PANEL FOR 2HVC*CH11A Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): | == Description:== | ||
SC, 300.00 ft, ALL Manufacturer/Model: | CONTROL PANEL FOR 2HVC*CH11A Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 300.00 ft, ALL Manufacturer/Model: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Additional space is provided at the end of this checklist for documenting other comments.Anchoracqe | Anchoracqe | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)? | : 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)? | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable | |||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | : 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | : 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | : 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects C-335 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: *jN U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SFC*HV6B Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | |||
CONTROL PANEL FOR 2HVC*CH11A | CONTROL PANEL FOR 2HVC*CH11A | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. Are soft targets free from impact by nearby equipment or structures? Yes | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?Other Adverse Conditions | : 9. Do attached lines have adequate flexibility to avoid damage? Yes | ||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | : 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | ||
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-336 | Other Adverse Conditions | ||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-336 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:. N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SFC*HV6B Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
CONTROL PANEL FOR 2HVC*CH11A I"(- II; 1%'C-337 | == Description:== | ||
CONTROL PANEL FOR 2HVC*CH11A I"(- II; 1%' | |||
C-337 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SFC*HV6B Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
CONTROL PANEL FOR 2HVC*CH11A IMG_0902 IMG_0903 C-338 | == Description:== | ||
CONTROL PANEL FOR 2HVC*CH11A IMG_0902 IMG_0903 C-338 | |||
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: 2SFC*HV6B Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
CONTROL PANEL FOR 2HVC*CH11A IMfIfi I 54IMI IMl-I I1II44 IML-_UUlU C-339}} | == Description:== | ||
CONTROL PANEL FOR 2HVC*CH11A IMfIfi I 54IMI IMl-I I1II44 IML-_UUlU C-339}} |
Latest revision as of 17:57, 11 November 2019
ML12348A083 | |
Person / Time | |
---|---|
Site: | Nine Mile Point |
Issue date: | 11/27/2012 |
From: | Constellation Energy Nuclear Group, EDF Group |
To: | Office of Nuclear Reactor Regulation |
References | |
Download: ML12348A083 (175) | |
Text
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2GTS*AOV101 Equipment Class: (7) Fluid-Operated Valves Equipment
Description:
PRIMARY CONTAINMENT PURGE ISOLATION VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 319.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable C-165
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2GTS*AOV101 Equipment Class: (7) Fluid-Operated Valves Equipment
Description:
PRIMARY CONTAINMENT PURGE ISOLATION VALVE
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
C-166
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: -JN U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2GTS*AOV101 Equipment Class: (7) Fluid-Operated Valves Equipment
Description:
PRIMARY CONTAINMENT PURGE ISOLATION VALVE Comments Evaluated by: -- George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-167
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2GTS*AOV101 Equipment Class: (7) Fluid-Operated Valves Equipment
Description:
PRIMARY CONTAINMENT PURGE ISOLATION VALVE IMG_0641 C-168
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: E N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2GTS*AOV2A Equipment Class: (7) Fluid-Operated Valves Equipment
Description:
BUTTERFLY OR TRICENTRIC V Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SG, 266.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-169
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: UN Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2GTS*AOV2A Equipment Class: (7) Fluid-Operated Valves Equipment
Description:
BUTTERFLY OR TRICENTRIC V
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-170
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2GTS*AOV2A Equipment Class: (7) Fluid-Operated Valves Pni linmant r'acr~rintinn" BUTTERFLY OR TRICENTRIC V C-171
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y JN-] U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2HVK*CHL1A Equipment Class: (11) Chillers Equipment
Description:
CONTROL BUILDING CHILLED WATER CHILLER.
Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): CCL, 261.00 ft, Area 05 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
DRW 12177-EC-58ET-4 REV4
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
24 bolts - pattern not specified on Drwg
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-172
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y LNjj U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2HVK*CHL1A Equipment Class: (11) Chillers Equipment
Description:
CONTROL BUILDING CHILLED WATER CHILLER.
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and No masonry block walls not likely to collapse onto the equipment?
Chain hanging off upper elevation can impact panel (wI controls). -
Addressed in CR# 2012-009019.
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of No potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Some oil leakage underneaty chiller. Loose insulation. Some surface rusting on parts of chiller.
Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-173
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y FN-] U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2HVK*CHLIA Equipment Class: (11) Chillers CONTROL BUILDING CHILLED WATER CHILLER.
C-174
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y FN-] U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2HVK*CHL1A Equipment Class: (11) Chillers CONTROL BUILDING CHILLED WATER CHILLER.
C-175
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y NI-1 U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2HVK*CHL1A Equipment Class: (11) Chillers CONTROL BUILDING CHILLED WATER CHILLER.
C-176
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2HVP*MOD1C Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
MOTOR OPERATED DAMPER Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): DG, 279.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable C-177
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2HVP*MOD1C Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
MOTOR OPERATED DAMPER
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
C-178
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2HVP*MODlC Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
MOTOR OPERATED DAMPER Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos 0061 C-179
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: F-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2HVP*MOD6C Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
MOTOR OPERATED DAMPER Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): DG, 280.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% IS0o of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-180
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2HVP*MOD6C Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
MOTOR OPERATED DAMPER
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: - George G Thomas Date: 08/23/12 JJ_ t Neda Stoeva 08/23/12 Photos C-181
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2HVP*MOD6C Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
MOTOR OPERATED DAMPER IMG_0066 C-182
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2HVP*TIS13A Equipment Class: (19) Temperature Sensors INDICATING TEMPERATURE TEMPERATURE SWITCH, 2EGS*G1 CONT Equipment
Description:
RM TEMP Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): DG, 265.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-183
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2HVP*TIS13A Equipment Class: (19) Temperature Sensors INDICATING TEMPERATURE TEMPERATURE SWITCH, 2EGS*G1 CONT Equipment
Description:
RM TEMP
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-184
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2HVP*TIS13A Equipment Class: (19) Temperature Sensors INDICATING TEMPERATURE TEMPERATURE SWITCH, 2EGS*G1 CONT nn" PM TPRMD C-185
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2HVR*UC401F Equipment Class: (10) Air Handlers Equipment
Description:
RHR PUMP RM F-UNIT CLR Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): ABN, 176.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
DRW 12177-EC30AC-6 & 12177-EC30AB-7
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes Surface corrosion on some of the anchorbolts. To arrestfurtherdegradation CR-2012-006822.
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-186
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2HVR*UC401F Equipment Class: (10) Air Handlers Equipment
Description:
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 08/23/12 kJ 4* " Neda Stoeva 08/23/12 Photos C-187
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2HVR*UC401F Equipment Class: (10) Air Handlers ipment
Description:
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2HVR*UC403A Equipment Class: (10) Air Handlers Equipment
Description:
HPCS PUMP RM UNIT CLR Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 176.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoracie
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes Some corrosion on anchorbolts. Groutpad chipped off in the back, but judged acceptable.Loose debris by the back wall. To arrestfurther bolt degradationCR-2012-006809 was issued.
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-189
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2HVR*UC403A Equipment Class: (10) Air Handlers Equipment
Description:
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Loose debris by the back wall.
Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-190
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2HVR*UC403A Equipment Class: (10) Air Handlers Equipment
Description:
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2HVR*UC403A Equipment Class: (10) Air Handlers Equipment
Description:
HPCS PUMP RM UNIT CLR IMG_0167 IMG_0168 IMG_0169 IMG_0170 IMG_0171 IMG_0172 C-192
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [-Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21AS*SOV164 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
ADS HEADER A N2 SUPPLY OUTSIDE AUTOMATIC ISOLATION VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 294.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-193
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21AS*SOV164 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
ADS HEADER A N2 SUPPLY OUTSIDE AUTOMATIC ISOLATION VALVE
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-194
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21AS*SOV164 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
ADS HEADER A N2 SUPPLY OUTSIDE AUTOMATIC ISOLATION VALVE C-195
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: E N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21AS*SOVX181 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
ADS HEADER A PRESSURE,SOLENOID OPERATED VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 294.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoraqe
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-196
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21AS*SOVX181 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
ADS HEADER A PRESSURE,SOLENOID OPERATED VALVE
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-197
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21AS*SOVX181 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves ipment
Description:
ADS HEADER A PRESSURESOLENOID OPERATED VALVE C-198
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: E N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21AS*TK4 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
ADS ACCUM AIR RECEIVER Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 289.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additiohal space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
DRW 12177-EC-33R-3 & 0003200106001
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-199
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: UN Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21AS*TK4 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
ADS ACCUM AIR RECEIVER
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-200
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21AS*TK4 Equipment Class: (21) Tanks and Heat Exchar Equipment
Description:
ADS ACCUM AIR RECEIVE IMtI.,UOIW Status: M N U C-201
ATTACHMENT 3 WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21CS*MOV120 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RCIC STEAM SUPPLY VALVE TO TURB Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 188.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes C-202
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21CS*MOV120 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RCIC STEAM SUPPLY VALVE TO TURB
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-203
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21CS*MOV120 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RCIC STEAM SUPPLY VALVE TO TURB IMG_0212 C-204
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: EI N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21CS*MOV126 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
ICS TO RPV OUTSIDE REMOTE MANUAL ISOLATION VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 292.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-205
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21CS*MOV126 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
ICS TO RPV OUTSIDE REMOTE MANUAL ISOLATION VALVE
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: " George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-206
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21CS*MOV126 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves ipment
Description:
ICS TO RPV OUTSIDE REMOTE MANUAL ISOLATION VALVE IM~iUt014 IMUi Ut01 Status: M N U C-207
ATTACHMENT 3 WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21CS*MOV129 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves MOTOR OPERATED VALVE FOR PUMP SUCT FROM CNDS STORAGE Equipment
Description:
TANK Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): ABN, 242.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes C-208
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21CS*MOV129 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves MOTOR OPERATED VALVE FOR PUMP SUCT FROM CNDS STORAGE Equipment
Description:
TANK
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-209
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21CS*MOV129 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves MOTOR OPERATED VALVE FOR PUMP SUCT FROM CNDS STORAGE m.nf rflizrrintinn" TANK C-210
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: r] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21CS*MOV150 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves 21CS*T1 TURB THROT MOTOR OPERATED VALVE; SUPPLIED W/EQP Equipment
Description:
21CS*T1 Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 184.00 ft, Area 41 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-21Il
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21CS*MOV150 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves 21CS*T1 TURB THROT MOTOR OPERATED VALVE; SUPPLIED W/EQP Equipment
Description:
21CS*T1
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-212
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21CS*MOV150 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves 21CS*T1 TURB THROT MOTOR OPERATED VALVE; SUPPLIED W/EQP rnAnt IplArrintinn" 9IrC*T1 C-213
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U U-Y Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21CS*P1 Equipment Class: (5) Horizontal Pumps Equipment
Description:
RCIC PUMP; TURBINE SHAFT DRIVEN Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 175.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
DRW 12177-EC-30AC-6
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-214
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21CS*P1 Equipment Class: (5) Horizontal Pumps Equipment
Description:
RCIC PUMP; TURBINE SHAFT DRIVEN
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-215
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21CS*P1 Equipment Class: (5) Horizontal Pumps Einuinm*nt 21CS*P1 (5) 1nfa-rintinn" RCIC PUMP; TURBINE SHAFT DRIVEN IM[-i [ I*l I-*
C-216
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21CS*P1 Equipment Class: (5) Horizontal Pumps Equipment
Description:
RCIC PUMP; TURBINE SHAFT DRIVEN IMG_0207 C-217
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: EI N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21CS*PCV115 Equipment Class: (7) Fluid-Operated Valves Equipment
Description:
LUBE OIL CLR PRESS CONT V Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 186.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-218
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21CS*PCV115 Equipment Class: (7) Fluid-Operated Valves Equipment
Description:
LUBE OIL CLR PRESS CONT V
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-219
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21CS*PCV115 Equipment Class: (7) Fluid-Operated Valves ipment
Description:
LUBE OIL CLR PRESS CONT V C-220
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RDS*AOV124 Equipment Class: (7) Fluid-Operated Valves Equipment
Description:
SCRAM DISCHARGE VOLUME VENT - AUTOMATIC Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 283.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% N10 of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-221
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RDS*AOV124 Equipment Class: (7) Fluid-Operated Valves Equipment
Description:
SCRAM DISCHARGE VOLUME VENT - AUTOMATIC
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-222
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RDS*AOV124 Equipment Class: (7) Fluid-Operated Valves Enuinment Descrintion: SCRAM DISCHARGE VOLUh C-223
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RDS*AOV124 Equipment Class: (7) Fluid-Operated Valves Equipment
Description:
SCRAM DISCHARGE VOLUME VENT - AUTOMATIC IMG_0466 IMG_0467 C-224
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RDS*AOV130 Equipment Class: (7) Fluid-Operated Valves Equipment
Description:
SCRAM DISCHARGE VOLUME DRAIN - AUTOMATIC Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 240.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-225
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RDS*AOV130 Equipment Class: (7) Fluid-Operated Valves Equipment
Description:
SCRAM DISCHARGE VOLUME DRAIN - AUTOMATIC
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-226
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RDS*AOV130 Equipment Class: (7) Fluid-Operated Valves inmnt fMace.rintinn SCRAM DISCHARGE VOLUME DRAIN - AUTOMATIC C-227
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RDS*SOV139 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves "DUAL SOLENOID OPERATED VALVE (3-WAY REDUNDANT SCRAM PILOT VALVE ON Equipment
Description:
2RDS*HCU0219)"
Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 261.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% 40 of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-228
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RDS*SOV139 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves "DUAL SOLENOID OPERATED VALVE (3-WAY REDUNDANT SCRAM PILOT VALVE ON Equipment
Description:
2RDS*HCU0219)"
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-229
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RDS*SOV139 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves "DUAL SOLENOID OPERATED VALVE (3-WAY REDUNDANT SCRAM PILOT VALVE ON IPnr inmganf Flgharrnfienn. ýPrvqt*w-rif* IN,71a C-230
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RDS*SOV158 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
ALTERNATE ROD INSERTION VALVE, SOLENOID OPERATED VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 261.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes Anchored on a rack to the floor in a Christmas tree configuration
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-231
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: T N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RDS*SOV158 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
ALTERNATE ROD INSERTION VALVE, SOLENOID OPERATED VALVE
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: " George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-232
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RDS*SOV158 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
ALTERNATE ROD INSERTION VALVE, SOLENOID OPERATED VALVE C-233
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*E1A Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
HEAT EXCHANGER Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): ABN, 198.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-234
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*E1A Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
HEAT EXCHANGER
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-235
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: --Y- N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*EIA Equipment Class: (21) Tanks and Heat Exchangers Fn1iinm~n+ Facrrinfinn- WIAT IrYCI, Inn MI'1i 1
-1 11%
C-236
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*E1A Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
HEAT EXCHANGER IMG_0917 IMG_0918 C-237
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*EIA Equipment Class: (21) Tanks and Heat Exchangers Fnmminmanf flwrrintinn- HFAT FXCrHAN(rFR C-238
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*FV38A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RHR LOOP A TEST RETURN TO SUPPR POOL COOLING Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 206.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-239
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: UN Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*FV38A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RHR LOOP A TEST RETURN TO SUPPR POOL COOLING
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: .- George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-240
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*FV38A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RHR LOOP A TEST RETURN TO SUPPR POOL COOLING C-241
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*MOV115 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RHR SERVICE WATER CROSS TIE, MOTOR OPERATED GATE VALVE.
Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): ABS, 181.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-242
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*MOV115 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RHR SERVICE WATER CROSS TIE, MOTOR OPERATED GATE VALVE.
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-243
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*MOV115 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RHR SERVICE WATER CROSS TIE, MOTOR OPERATED GATE VALVE.
IMW,3_U14t C-244
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: I-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*MOV12A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
"A" RHR HEAT EXCHANGER DISCHARGE VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): ABN, 181.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-245
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*MOV12A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
"A" RHR HEAT EXCHANGER DISCHARGE VALVE
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Scaffolding installed adjacent to MO V12A but very well secured Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-246
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*MOV12A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
"A" RHR HEAT EXCHANGER DISCHARGE VALVE C-247
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*MOVI 2A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Fnliinmant I'aw-rintinn* "A" RHR HEAT EXCHANGER DISCHARGE VALVE C-248
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*MOV15A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves CONTAINMENT SPRAY TO DRYWELL OUTSIDE REMOTE MANUAL Equipment
Description:
ISOLATION VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 294.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. ' Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-249
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*MOV15A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves CONTAINMENT SPRAY TO DRYWELL OUTSIDE REMOTE MANUAL Equipment
Description:
ISOLATION VALVE
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 08/23/12 C4 Neda Stoeva 08/23/12 Photos C-250
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*MOV15A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves CONTAINMENT SPRAY TO DRYWELL OUTSIDE REMOTE MANUAL inn- IR0I ATION VAI VP C-251
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*MOV15A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves CONTAINMENT SPRAY TO DRYWELL OUTSIDE REMOTE MANUAL Equipment
Description:
ISOLATION VALVE IMG_0569 IMG_0570 C-252
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*MOV1A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves RHS PUMP P1A SUCTION OUTSIDE REMOTE MANUAL ISOLATION Equipment
Description:
VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 195.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% I 0o of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-253
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*MOV1A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves RHS PUMP PlA SUCTION OUTSIDE REMOTE MANUAL ISOLATION Equipment
Description:
VALVE
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: . George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-254
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*MOV1A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves RHS PUMP PIA SUCTION OUTSIDE REMOTE MANUAL ISOLATION Fmjinmnnt f1l.rrintinn" VAI VF C-255
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*MOV4B Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RHR A MIN FLOW BYPASS, MOTOR OPERATED GATE VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 202.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-256
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: V N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*MOV4B Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RHR A MIN FLOW BYPASS, MOTOR OPERATED GATE VALVE
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Light fixture may swing into the top of the operatorof valve but would not be damaging Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-257
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*MOV4B Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves ipment
Description:
RHR A MIN FLOW BYPASS, MOTOR OPERATED GATE VALVE C-258
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*MOV4B Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RHR A MIN FLOW BYPASS, MOTOR OPERATED GATE VALVE C-259
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*MOV8A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RHR H.E. ElA INLET BYPASS MOTOR OPERATED VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): ABN, 181.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% IN0o of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-260
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*MOV8A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RHR H.E. ElA INLET BYPASS MOTOR OPERATED VALVE
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-261
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*MOV8A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RHR H.E. EIA INLET BYPASS MOTOR OPERATED VALVE C-262
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*MOV9A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RHR H.E. A SHELL SIDE INL MOTOR OPERATED BUTTERFLY VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): ABN, 201.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoraqe
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-263
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*MOV9A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RHR H.E. A SHELL SIDE INL MOTOR OPERATED BUTTERFLY VALVE
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-264
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*MOV9A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RHR H.E. A SHELL SIDE INL MOTOR OPERATED BUTTERFLY VALVE C-265
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*MOV9A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RHR H.E. A SHELL SIDE INL MOTOR OPERATED BUTTERFLY VALVE IMG_0928 C-266
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*P1A Equipment Class: (6) Vertical Pumps INCLUDES ALL ASSOCIATED RHR PUMPS, AUX, BWR, ELEC (VERT Equipment
Description:
MTD) ELECTRIC MOTORS, GENERAL G.E. DESIGNATOR E12-C002A Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): ABN, 175.00 ft, Area 16 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
DRW 2C-5271D
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-267
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*P1A Equipment Class: (6) Vertical Pumps INCLUDES ALL ASSOCIATED RHR PUMPS, AUX, BWR, ELEC (VERT Equipment
Description:
MTD) ELECTRIC MOTORS, GENERAL G.E. DESIGNATOR E12-CO02A
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 08/23/12 K- Neda Stoeva 08/23/12 Photos C-268
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RHS*P1A Equipment Class: (6) Vertical Pumps INCLUDES ALL ASSOCIATED RHR PUMPS, AUX, BWR, ELEC (VERT Equipment
Description:
MTD) ELECTRIC MOTORS, GENERAL G.E. DESIGNATOR E12-CO02A IMG_0278 C-269
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: E-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SCM*PNL103A Equipment Class: (14) Distribution Panels Equipment
Description:
120/240V AC DIST PNL Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): CRR, 288.00 ft, Area 08 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
DRWNMP2 EE-550K REV5
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-270
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SCM*PNL103A Equipment Class: (14) Distribution Panels Equipment
Description:
120/240V AC DIST PNL
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 08/23/12 E" M' Neda Stoeva 08/23/12 Photos C-271
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SCM*PNL1 03A Equipment Class: (14) Distribution Panels i:ni iinma=nf nIzat-rinfinn-120/240V AC DIST PNL IM(,. I]/1-" I111*14 [1/ 1 _4 IMG_0714 C-272
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SCM*PNL103A Equipment Class: (14) Distribution Panels EauiDment DescriDtion: 120/240V AC DIST PNL C-273
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SLS*P1A Equipment Class: (5) Horizontal Pumps Equipment
Description:
STANDBY LIQUID CONTROL PUMP PlA Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 289.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoracqe
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-274
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SLS*P1A Equipment Class: (5) Horizontal Pumps Equipment
Description:
STANDBY LIQUID CONTROL PUMP PlA
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated-by: - George G Thomas Date: 08/23/12 K.- Neda Stoeva 08/23/12 Photos C-275
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment.ID No.: 2SLS*P1A Equipment Class: (5) Horizontal Pumps Equipment
Description:
STANDBY LIQUID CONTROL PUMP P1A IM[i- I [I-%mM C-276
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SLS*P1A Equipment Class: (5) Horizontal Pumps Equipment
Description:
STANDBY LIQUID CONTROL PUMP PlA IMG_0603 C-277
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: EY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SLS*TK1 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
STORAGE TANK FOR STANDBY LIQUID CONTROL SYSTEM Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 289.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-278
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SLS*TK1 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
STORAGE TANK FOR STANDBY LIQUID CONTROL SYSTEM
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-279
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SLS*TK1 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
STORAGE TANK FOR STANDBY LIQUID CONTROL SYSTEM IM, UvUou C-280
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: T N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SLS*TK1 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
STORAGE TANK FOR STANDBY LIQUID CONTROL SYSTEM IMG_0612 C-281
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: EIII N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SLS*VEX3A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SLS EXPLOSIVE VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 296.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-282
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SLS*VEX3A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SLS EXPLOSIVE VALVE
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-283
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SLS*VEX3A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SLS EXPLOSIVE VALVE C-284
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: E N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*AOV22A Equipment Class: (7) Fluid-Operated Valves Equipment
Description:
AIR OPERATED VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): ABN, 186.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-285
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*AOV22A Equipment Class: (7) Fluid-Operated Valves Equipment
Description:
AIR OPERATED VALVE
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-286
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*AOV22A Equipment Class: (7) Fluid-Operated Valves Equipment
Description:
AIR OPERATED VALVE C-287
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*MOV15A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
MOTOR OPERATED GATE VALVE TO UC403A Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 197.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-288
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*MOV15A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
MOTOR OPERATED GATE VALVE TO UC403A
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Surface rust identified below operator near bottom of valve; however, not a potential seismic issue.
Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-289
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*MOV15A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
MOTOR OPERATED GATE VALVE TO UC403A C-290
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: I-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*MOV19A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
MTR OPER BUTTERFLY VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): ABN, 219.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-291
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*MOV19A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
MTR OPER BUTTERFLY VALVE
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-292
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*MOV19A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
MTR OPER BUTTERFLY VALVE C-293
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*MOV33A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SWP TO RHR HTX OUTLET VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): ABN, 181.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% IS0o of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-294
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*MOV33A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SWP TO RHR HTX OUTLET VALVE
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-295
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*MOV33A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SWP TO RHR HTX OUTLET VALVE Status: M N U C-296
ATTACHMENT 3 WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*MOV3A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
BUTTERFLY VALVE - MOTOR OPER Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SW, 265.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoraqe
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes C-297
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: T N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*MOV3A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
BUTTERFLY VALVE - MOTOR OPER
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 08/23/12 K,- Neda Stoeva 08/23/12 Photos C-298
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*MOV3A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
BUTTERFLY VALVE - MOTOR OPER IMG_0118 C-299
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*MOV5OA Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
MTR OPER BUTTERFLY VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SW, 265.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-300
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*MOV50A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
MTR OPER BUTTERFLY VALVE
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-301
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*MOV50A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
MTR OPER BUTTERFLY VALVE IMJU1 zz C-302
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: rY N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*MOV599 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
BUTTERFLY VALVE - MOTOR Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): PT, 255.00 ft, Area 40 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable Minor surface rust
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-303
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*MOV599 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
BUTTERFLY VALVE - MOTOR
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-304
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*MOV599 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves ipment
Description:
BUTTERFLY VALVE - MOTOR C-305
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*MOV66A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SWP FR CLR 2EGS*EG1-MOTOR OPERATED VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): DG, 271.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-306
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*MOV66A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SWP FR CLR 2EGS*EG1-MOTOR OPERATED VALVE
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
Insulation close to Junction box 318 but acceptable by inspection
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-307
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*MOV66A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SWP FR CLR 2EGS*EG1-MOTOR OPERATED VALVE C-308
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: f N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*MOV90A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SWP TO RHR HTX INLET VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): ABN, 180.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-309
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*MOV90A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SWP TO RHR HTX INLET VALVE
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: - George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-310
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*MOV90A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves pment
Description:
SWP TO RHR HTX INLET VALVE C-311
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: E N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*P1A Equipment Class: (5) Horizontal Pumps Equipment
Description:
SERVICE WATER PUMP Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SW, 224.00 ft, Area 13 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
EC-014A & EC-014Z
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-312
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:-- N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*P1A Equipment Class: (5) Horizontal Pumps Equipment
Description:
SERVICE WATER PUMP
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Spalled concrete near 2nd anchorbolt on the nght side of base. Not judged to be a seismic concern.
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-313
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*PIA Equipment Class: (5) Horizontal Pumps ipment
Description:
SERVICE WATER PUMP C-314
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*P1A Equipment Class: (5) Horizontal Pumps Equipment
Description:
SERVICE WATER PUMP IMG_0078 IMG_0079 IMG_0080 IMG_0081 C-315
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*STR4A Equipment Class: (0) Other Equipment
Description:
SELF CLEAN STRAINER AND MOTOR Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SW, 261.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
DRW 0005410051001C
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes Surface rust should be cleaned and re-evaluated by owner for bolts seismic integrity. Furtherbolt degradationto be arrestedby issuance of CR-2012-006770.
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-316
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*STR4A Equipment Class: (0) Other Equipment
Description:
SELF CLEAN STRAINER AND MOTOR
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: " George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-317
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*STR4A Equipment Class: (0) Other Equipment
Description:
SELF CLEAN STRAINER AND MOTOR C-318
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: JN U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SWP*STR4A Equipment Class: (0) Other Equipment
Description:
SELF CLEAN STRAINER AND MOTOR IMG_0116 C-319
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y t-Njj U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2VBA*UPS2A Equipment Class: (16) Inverters UNINTERRUPTIBLE PWR SUPP INCLUDING REG Equipment
Description:
TRANSFORMER&MANUAL BYPASS SWITCH Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): CSA, 261.00 ft, Area 04 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
DRW 12177-EE-38D-9
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable All welds
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-320
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y F U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2VBA*UPS2A Equipment Class: (16) Inverters UNINTERRUPTIBLE PWR SUPP INCLUDING REG Equipment
Description:
TRANSFORMER&MANUAL BYPASS SWITCH
- 7. Are soft targets free from impact by nearby equipment or structures? No Procedurebindermounted on side of panel and may interfere with function of sensitive equipment. CR-2012-8947 was written to address mounted procedure binders.
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and No masonry block walls not likely to collapse onto the equipment?
Light "S"hooks open on right most 2 lights above panel 2EHS*MCCI03C.
CR-2012-008907 issued to address open S-Hook Issue.
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of No potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 08/23/12 A I_ Neda Stoeva 08/23/12 Photos C-321
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y LN-] U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2VBA*UPS2A Equipment Class: (16) Inverters UNINTERRUPTIBLE PWR SUPP INCLUDING REG TRANSFORMER&MANUAL BYPASS SWITCH IMG_0862 C-322
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y FN] U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2VBA*UPS2A Equipment Class: (16) Inverters UNINTERRUPTIBLE PWR SUPP INCLUDING REG Equipment
Description:
TRANSFORMER&MANUAL BYPASS SWITCH IMG_0863 C-323
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2VBA*UPS2C Equipment Class: (16) Inverters Equipment
Description:
RECTIFIER / INVERTER / STATIC SWITCH Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): CB, 237.00 ft, Area 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes Surface cracking but away from anchors
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-324
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2VBA*UPS2C Equipment Class: (16) Inverters Equipment
Description:
RECTIFIER / INVERTER / STATIC SWITCH
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Panels not bolted together,could result in pounding/rattling. Further investigation indicatedthis was per design and panels did not contain relays.
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Floor surface cracks.
Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-325
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2VBA*UPS2C Equipment Class: (16) Inverters rniminmmnfr War-rintin-n P CP.TIII: I IKI\I PTI=II/
I TATIe_ _WA/IT'I-.
C-326
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2VBA*UPS2C Equipment Class: (16) Inverters Equipment
Description:
RECTIFIER INVERTER / STATIC SWITCH IMG_0790 IMG_0791 IMG_0792 C-327
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: 7 N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2VBS*PNL101A Equipment Class: (14) Distribution Panels Equipment
Description:
PANEL (120 VAC POWER DISTRIBUTION FROM 2VBA*UPS2A)
Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): CTR, 288.00 ft, Area 07 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-328
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2VBS*PNL101A Equipment Class: (14) Distribution Panels Equipment
Description:
PANEL (120 VAC POWER DISTRIBUTION FROM 2VBA*UPS2A)
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Hairline cracks in area around panel. Pictures with area Walk-By. Not judged to be a seismic issue.
Evaluated by: 4NZ- George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-329
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2VBS*PNL101A Equipment Class: (14) Distribution Panels Equipment
Description:
PANEL (120 VAC POWER DISTRIBUTION FROM 2VBA*UPS2A)
IML,_U( 1 C-330
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2VBS*PNL101A Equipment Class: (14) Distribution Panels Equipment
Description:
PANEL (120 VAC POWER DISTRIBUTION FROM 2VBA*UPS2A)
IMLu_UtI C-331
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: T N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SFC*HV37A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
2SFC-HT EXCHGR XCONNECT HAND VALVE Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 232.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-332
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SFC*HV37A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
2SFC-HT EXCHGR XCONNECT HAND VALVE
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: " George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-333
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SFC*HV37A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
2SFC-HT EXCHGR XCONNECT HAND VALVE IMU _U*O*U C-334
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: I-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SFC*HV6B Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CONTROL PANEL FOR 2HVC*CH11A Project: Nine Mile 2 SWEL Location (Bldg, Elev, Room/Area): SC, 300.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoracqe
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-335
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: *jN U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SFC*HV6B Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CONTROL PANEL FOR 2HVC*CH11A
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 08/23/12 Neda Stoeva 08/23/12 Photos C-336
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:. N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SFC*HV6B Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CONTROL PANEL FOR 2HVC*CH11A I"(- II; 1%'
C-337
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SFC*HV6B Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CONTROL PANEL FOR 2HVC*CH11A IMG_0902 IMG_0903 C-338
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SFC*HV6B Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CONTROL PANEL FOR 2HVC*CH11A IMfIfi I 54IMI IMl-I I1II44 IML-_UUlU C-339