ML17033B024

From kanterella
Jump to navigation Jump to search
Qualifications P. Allister Burt General Superintendent - Nuclear Generation Niagara Mohawk Power Corporation
ML17033B024
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 02/02/2017
From:
Niagara Mohawk Power Corp
To:
US Atomic Energy Commission (AEC)
References
Download: ML17033B024 (4)


Text

QUALIFICATIONS P. ALLISTER BURT GENERAL SUPERINTENDENT - NUCLEAR GENERATION NIAGARAMOHAWKPOWER CORPORATION My name is P. Allister Burt.

My business address is Niagara 2

Mohawk Power Corporation, Nine Mile Point Nuclear Station, Post Office Box 32, Lycoming, New York. I am presently General Superintendent of 4

Nuclear Generation far the Niagara Mohawk Power Corporation.

In this capacity, I am in charge of the overall operation of both the Nine Mile 6

Point and James A. FitzPatrick Nuclear Power Plants.

Previous to this 7

assignment, I was Station Superintendent of the Nine Mile Point Nuclear 8

Station.

9 I attended the University of Buffalo from 1939 to 1947, receiving a 10 13 14 15 18 certificate in engineering.

Since then, I have taken courses in Nuclear Technology, Basic Radiological Health and Industrial Management.

Until 1949, I held various positions at Niagara Mohawk's C. R.

Huntley Generating Station, including the position of Assistant Results Superintendent.

From 1949 to 1963 I was Station Superintendent for Niagara Mohawk's Dunkirk Steam Station, a 624 Mw steam plant.

During this time, I was responsible for the start-up of all four units at the Station.

From 1963 to 1967, I was assigned to the Project Engineering Department of Niagara Mohawk, where I participated in the design of the Nine Mile Point Nuclear Plant, assembled personnel for the plant, and

sg 4

~

Page Two P. Allister Burt 20 planned and organized the training program for start-up and operation.

23 During 1965 and 1966 I received eight months of on-the-job training at Big Rock Point and ZVZSR.

'rom 1967 to 1972, I was Superintendent of the Nine Mile Point 24 Nuclear Plant.

I had the primary responsibility..for bringing that plant 25 from the construction phase to'full power operation, and now have identical 26 responsibility for the James A. FitzPatrick Nuclear Plant.

In addition, I I

27 participated in the design review for the FitzPatrick Plant, as I am now 28 doing fo'r Nine Mile Point Unit 2.

29 I am a Licensed Professional Engineer in the State of New York.

80 I hold a Reactor Operators License from the Atomic Energy Commission.

4