ML17033B024

From kanterella
Jump to navigation Jump to search
Qualifications P. Allister Burt General Superintendent - Nuclear Generation Niagara Mohawk Power Corporation
ML17033B024
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 02/02/2017
From:
Niagara Mohawk Power Corp
To:
US Atomic Energy Commission (AEC)
References
Download: ML17033B024 (4)


Text

QUALIFICATIONS P. ALLISTER BURT GENERAL SUPERINTENDENT - NUCLEAR GENERATION NIAGARA MOHAWK POWER CORPORATION My name is P. Allister Burt. My business address is Niagara 2 Mohawk Power Corporation, Nine Mile Point Nuclear Station, Post Office Box 32, Lycoming, New York. I am presently General Superintendent of 4 Nuclear Generation far the Niagara Mohawk Power Corporation. In this capacity, I am in charge of the overall operation of both the Nine Mile 6 Point and James A. FitzPatrick Nuclear Power Plants. Previous to this 7 assignment, I was Station Superintendent of the Nine Mile Point Nuclear 8 Station.

9 I attended the University of Buffalo from 1939 to 1947, receiving a 10 certificate in engineering. Since then, I have taken courses in Nuclear Technology, Basic Radiological Health and Industrial Management.

Until 1949, I held various positions at Niagara Mohawk's C. R.

13 Huntley Generating Station, including the position of Assistant Results 14 Superintendent. From 1949 to 1963 I was Station Superintendent for 15 Niagara Mohawk's Dunkirk Steam Station, a 624 Mw steam plant. During this time, I was responsible for the start-up of all four units at the Station.

From 1963 to 1967, I was assigned to the Project Engineering 18 Department of Niagara Mohawk, where I participated in the design of the Nine Mile Point Nuclear Plant, assembled personnel for the plant, and

4 sg

~

Page Two P. Allister Burt 20 planned and organized the training program for start-up and operation.

During 1965 and 1966 I received eight months of on-the-job training at Big Rock Point and ZVZSR.

to 1972, I was Superintendent of the Nine Mile Point

'rom 23 1967 24 Nuclear Plant. I had the primary responsibility..for bringing that plant 25 from the construction phase to'full power operation, and now have identical 26 responsibility for the James A. FitzPatrick Nuclear Plant. In addition, I I 27 participated in the design review for the FitzPatrick Plant, as I am now 28 doing fo'r Nine Mile Point Unit 2.

29 I am a Licensed Professional Engineer in the State of New York.

80 I hold a Reactor Operators License from the Atomic Energy Commission.

4