{{#Wiki_filter:N Nebraska Public Power District Always there when you need us NLS2013028 February 21, 2013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852  
{{#Wiki_filter:N Nebraska Public Power District Always there when you need us NLS2013028 February 21, 2013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852


==Subject:==
==Subject:==
Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3 (TAC No ME7951)Cooper Nuclear Station, Docket No. 50-298, DPR-46  
Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3 (TAC No ME7951)
Cooper Nuclear Station, Docket No. 50-298, DPR-46


==References:==
==References:==
: 1. NRC letter to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54Wf Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident, dated March 12, 2012 2. NPPD Letter to NRC (NLS2012034), Nebraska Public Power District's 60-Day Response to the March 12, 2012, Information Request, Action Plan for Completing Emergency Communication and Staffing Assessments, dated May 9, 2012 3. NPPD Letter to NRC (NLS2012048), Nebraska Public Power District's 90-Day Response to the March 12, 2012, Information Request, Action Plan for Completing Emergency Communication and Staffing Assessments, dated June 7, 2012 4. NPPD Letter to NRC (NLS2012112), Nebraska Public Power District's Response to the March 12, 2012, Information Request Pursuant to 10 CFR 50.5469 Regarding Recommendation 9.3 for Completing Emergency Communication Assessments, dated October 31, 2012 5. NRC letter to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status, Follow-up Letter on Technical Issues For Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3 (TAC NO. ME7951), dated January 23, 2013 COOPER NUCLEAR STATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone:
: 1. NRC letter to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status, Requestfor Information Pursuantto Title 10 of the Code of FederalRegulations 50.54Wf Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task ForceReview of Insightsfrom the Fukushima Dai-IchiAccident, dated March 12, 2012
(402) 825-3811 / Fax: (402) 825-5211 ,g www.nppd.com Pa, A NLS2013028 Page 2 of 3  
: 2. NPPD Letter to NRC (NLS2012034), Nebraska Public Power District's 60-Day Response to the March 12, 2012, InformationRequest, Action Plan for CompletingEmergency Communication and Staffing Assessments, dated May 9, 2012
: 3. NPPD Letter to NRC (NLS2012048), Nebraska Public Power District's 90-Day Response to the March 12, 2012, Information Request, Action Plan for Completing Emergency Communication and Staffing Assessments, dated June 7, 2012
: 4. NPPD Letter to NRC (NLS2012112), Nebraska Public Power District's Response to the March 12, 2012, Information Request Pursuantto 10 CFR 50.5469 Regarding Recommendation 9.3 for Completing Emergency CommunicationAssessments, dated October 31, 2012
: 5. NRC letter to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status, Follow-up Letter on Technical Issues For Resolution RegardingLicensee Communication Submittals Associated with Near-Term Task ForceRecommendation 9.3 (TAC NO. ME7951),
dated January 23, 2013 COOPER NUCLEAR STATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211                 ,g www.nppd.com                               Pa,   A
 
NLS2013028 Page 2 of 3


==Dear Sir or Madam:==
==Dear Sir or Madam:==
On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued a letter (Reference 1)entitled, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident.
 
Enclosure 5 of the letter contained specific requested actions and requested information associated with Recommendation 9.3 for Emergency Preparedness programs communications.
On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued a letter (Reference 1) entitled, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident. Enclosure 5 of the letter contained specific requested actions and requested information associated with Recommendation 9.3 for Emergency Preparedness programs communications. In accordance with 10 CFR 50.54, "Conditions of licenses," paragraph (f), addressees were requested to submit a written response to the information requests within 90 days or provide a response within 60 days of the date of the letter and describe the alternative course of action that it proposes to take.
In accordance with 10 CFR 50.54, "Conditions of licenses," paragraph (f), addressees were requested to submit a written response to the information requests within 90 days or provide a response within 60 days of the date of the letter and describe the alternative course of action that it proposes to take.Nebraska Public Power District (NPPD) responded within 60 days (Reference
Nebraska Public Power District (NPPD) responded within 60 days (Reference 2) proposing to take the alternative course of action for communications described in Attachment 1 of Reference
: 2) proposing to take the alternative course of action for communications described in Attachment 1 of Reference 2. NPPD implemented this alternate course of action with the submittal of Reference 3 (described interim/planned actions to enhance existing communications systems power supplies pending the communications assessment and completion of actions) and Reference 4 (summarized the results of the communications assessment and the potential enhancements).
: 2. NPPD implemented this alternate course of action with the submittal of Reference 3 (described interim/planned actions to enhance existing communications systems power supplies pending the communications assessment and completion of actions) and Reference 4 (summarized the results of the communications assessment and the potential enhancements).
The purpose of this letter is to respond to Reference 5, the NRC follow-up letter regarding technical issues to be resolved with Reference
The purpose of this letter is to respond to Reference 5, the NRC follow-up letter regarding technical issues to be resolved with Reference 4. Responses to the eight technical issues in Reference 5 are provided in Attachment 1. The communications assessment, originally provided in Reference 4, has been revised to reflect the responses in Attachment 1 and is found in . These responses are subject to change as a result of Diverse and Flexible Coping Strategies developments, advances in technology, and progress in the manner of addressing the need for these enhancements.
: 4. Responses to the eight technical issues in Reference 5 are provided in Attachment
: 1. The communications assessment, originally provided in Reference 4, has been revised to reflect the responses in Attachment 1 and is found in Attachment
: 2. These responses are subject to change as a result of Diverse and Flexible Coping Strategies developments, advances in technology, and progress in the manner of addressing the need for these enhancements.
There are no new commitments identified in this submittal.
There are no new commitments identified in this submittal.
If you have any questions concerning the content of this letter, please contact David Van Der Kamp, Licensing Manager, at (402) 825-2904.I declare under penalty of perjury that the foregoing is true and correct.Executed On 0Z-/ /7 /, 3 (Date)Sinc re sc,4r A. Limpia Vice President  
If you have any questions concerning the content of this letter, please contact David Van Der Kamp, Licensing Manager, at (402) 825-2904.
-Luclear and Chief Nuclear Officer/bk NLS2013028 Page 3 of 3 Attachments:
I declare under penalty of perjury that the foregoing is true and correct.
: 1. Cooper Nuclear Station Communications Assessment  
Executed On       0Z-//7   /, 3 (Date)
-Addressing Eight Technical Issues 2. Cooper Nuclear Station Communications Assessment, Revision 1 cc: Regional Administrator, w/attachments USNRC -Region IV Director, w/attachments USNRC -Office of Nuclear Reactor Regulation Cooper Project Manager, w/attachments USNRC -NRR Project Directorate IV-1 Senior Resident Inspector, w/attachments USNRC -CNS CNS Records, w/attachments NPG Distribution, w/o attachments NLS2013028 Attachment 1 Page 1 of 10 NLS2013028 ATTACHMENT 1 COOPER NUCLEAR STATION COMMUNICATIONS ASSESSMENT  
Sinc re sc,4r A. Limpia Vice President -Luclear and Chief Nuclear Officer
-ADDRESSING EIGHT TECHNICAL ISSUES NLS2013028 Attachment 1 Page 2 of 10 Attachment 1 Cooper Nuclear Station Communications Assessment  
/bk
-Addressing Eight Technical Issues The Nuclear Regulatory Commission's (NRC) eight generic technical issues regarding licensee's Communications Assessment submittals are shown in italics below. Nebraska Public Power District's (NPPD) responses are shown in block font. As a result of the responses to the technical issues, NPPD has revised the Cooper Nuclear Station (CNS)Communications Assessment, including providing a projected completion schedule for the enhancements identified in Table 11 of the Communications Assessment.
 
Generic Technical Issue 1: The staff identified that licensees need to discuss how the power for the equipment analyzed is expected to be available, and how the planned communications enhancements are expected to be maintained.
NLS2013028 Page 3 of 3 Attachments:   1. Cooper Nuclear Station Communications Assessment - Addressing Eight Technical Issues
The following areas were identified:
: 2. Cooper Nuclear Station Communications Assessment, Revision 1 cc:   Regional Administrator, w/attachments USNRC - Region IV Director, w/attachments USNRC - Office of Nuclear Reactor Regulation Cooper Project Manager, w/attachments USNRC - NRR Project Directorate IV-1 Senior Resident Inspector, w/attachments USNRC - CNS CNS Records, w/attachments NPG Distribution, w/o attachments
A. A detailed description of how power will be maintained for (1) planned or potential enhancements to the communication links and (2) existing equipment analyzed to be available.
 
: 1. The number of replacement batteries expected to be needed for a 24-hour duration, per the Nuclear Energy Institute (NEI) 12-01 "Guideline for Assessing Beyond Design Basis [sic] Accident Response Staffing and Communications Capabilities".
NLS2013028 Page 1 of 10 NLS2013028 ATTACHMENT 1 COOPER NUCLEAR STATION COMMUNICATIONS ASSESSMENT -
: 2. Generator availability to charge batteries without offsite equipment for a duration of 24 hours.3. A description of how ancillary equipment supports operations for a 24-hour duration (e.g,. adequacy offuel supplies for the generators; and the minimum number of battery chargers expected to be necessary).
ADDRESSING EIGHT TECHNICAL ISSUES
NPPD Response: Only two means to establish communications links were initially credited by NPPD in the CNS Communications Assessment; handheld radios (on-site communications) and satellite phones (off-site communications).
 
Subsequently, NPPD credited the plant Public Address/Paging system (Gaitronics) for use in making initial alert and notification of on-site personnel.
NLS2013028 Page 2 of 10 Attachment 1 Cooper Nuclear Station Communications Assessment -
This system is limited to four hours without taking manual actions.NPPD chose to ensure power to the credited portable communications links (handheld radios and satellite phones) is maintained by purchasing sufficient quantities of batteries to power these devices for 24 hours without any required charging.
Addressing Eight Technical Issues The Nuclear Regulatory Commission's (NRC) eight generic technical issues regarding licensee's Communications Assessment submittals are shown in italics below. Nebraska Public Power District's (NPPD) responses are shown in block font. As a result of the responses to the technical issues, NPPD has revised the Cooper Nuclear Station (CNS)
NPPD does not intend to utilize a generator for the first 24 hours. Details are provided below:
Communications Assessment, including providing a projected completion schedule for the enhancements identified in Table 11 of the Communications Assessment.
NLS2013028 Attachment I Page 3 of 10 Satellite phones: Three charged batteries are assigned to each satellite phone. These batteries are stored either in the phones (one each) or in chargers (two each) in the emergency response facility (ERF) inventories.
Generic Technical Issue 1:
Satellite phones are operationally tested quarterly and their batteries swapped into/out of a charger-conditioner.
The staff identified that licensees need to discuss how the powerfor the equipment analyzed is expected to be available,and how the planned communications enhancements are expected to be maintained.The following areaswere identified:
A. A detaileddescriptionof how power will be maintainedfor (1) planned or potential enhancements to the communication links and (2) existing equipment analyzed to be available.
: 1. The number of replacementbatteries expected to be neededfor a 24-hour duration,per the Nuclear Energy Institute (NEI) 12-01 "Guidelinefor Assessing Beyond Design Basis [sic] Accident Response Staffing and Communications Capabilities".
: 2. Generatoravailabilityto charge batteries without offsite equipmentfor a duration of 24 hours.
: 3. A descriptionof how ancillary equipment supports operationsfor a 24-hour duration (e.g,. adequacy offuel suppliesfor the generators;and the minimum number of battery chargersexpected to be necessary).
NPPD Response:
Only two means to establish communications links were initially credited by NPPD in the CNS Communications Assessment; handheld radios (on-site communications) and satellite phones (off-site communications). Subsequently, NPPD credited the plant Public Address/Paging system (Gaitronics) for use in making initial alert and notification of on-site personnel. This system is limited to four hours without taking manual actions.
NPPD chose to ensure power to the credited portable communications links (handheld radios and satellite phones) is maintained by purchasing sufficient quantities of batteries to power these devices for 24 hours without any required charging. NPPD does not intend to utilize a generator for the first 24 hours. Details are provided below:
 
NLS2013028 Attachment I Page 3 of 10 Satellite phones:
Three charged batteries are assigned to each satellite phone. These batteries are stored either in the phones (one each) or in chargers (two each) in the emergency response facility (ERF) inventories. Satellite phones are operationally tested quarterly and their batteries swapped into/out of a charger-conditioner.
Procedural guidance was developed to ensure programmatic maintenance is performed.
Procedural guidance was developed to ensure programmatic maintenance is performed.
A satellite phone with its associated three batteries will provide approximately 36 hours of communications (assumes 25% duty cycle and three hours of transmit battery life per battery; the minimum manufacturer's claim).Handheld Radios: In accordance with Federal Communications Commission requirements, new handheld radios (digital, narrow-band Motorola model XTS 2500) were purchased and deployed since the submittal of CNS' initial Communications Assessment.
A satellite phone with its associated three batteries will provide approximately 36 hours of communications (assumes 25% duty cycle and three hours of transmit battery life per battery; the minimum manufacturer's claim).
Credited handheld radios (26) are stored in charger-conditioners, thus their batteries will be fully charged at the onset of any emergency, including the assumed Local Severe External Event (LSEE).New battery components and better charger-conditioners have minimized the impact of battery 'memory' or over-charging of batteries.
Handheld Radios:
Battery capacity is now almost entirely dependent upon duty cycle (i.e., the amount of transmit time versus receive/standby time). One typical duty cycle used for rating battery capacity is 5/5/90; that is 5% transmit, 5% receive with audio, and 90% standby (receive without audio). CNS handheld radios are equipped with Impress Ni-MH FM batteries, model NTN9857. The manufacturer specifies these batteries as 2000 mAh and (assuming a 5/5/90 duty cycle) rates them to last 10 hours.Anecdotal evidence from CNS' Security force indicates that these batteries will last an entire 12 hour shift.When the installed battery of a radio is depleted, and if another radio with a charged battery is not available, additional power to these radios is provided via dry cell battery adapters and dry cell batteries.
In accordance with Federal Communications Commission requirements, new handheld radios (digital, narrow-band Motorola model XTS 2500) were purchased and deployed since the submittal of CNS' initial Communications Assessment. Credited handheld radios (26) are stored in charger-conditioners, thus their batteries will be fully charged at the onset of any emergency, including the assumed Local Severe External Event (LSEE).
One adapter for each credited radio was added to the Control Room and Technical Support Center/Operational Support Center (TSC/OSC) inventories, together with the minimum number of dry cell batteries with which they are to be loaded. Actual use (as well as known mAh capacity [4900 mAh] of these packs) has shown that these adapter packs provide over twice the capacity of the rechargeable Ni-MH FM batteries.
New battery components and better charger-conditioners have minimized the impact of battery 'memory' or over-charging of batteries. Battery capacity is now almost entirely dependent upon duty cycle (i.e., the amount of transmit time versus receive/standby time). One typical duty cycle used for rating battery capacity is 5/5/90; that is 5% transmit, 5% receive with audio, and 90% standby (receive without audio). CNS handheld radios are equipped with Impress Ni-MH FM batteries, model NTN9857. The manufacturer specifies these batteries as 2000 mAh and (assuming a 5/5/90 duty cycle) rates them to last 10 hours.
These dry cell battery adapters and batteries were added to the quarterly emergency inventory of the Control Room and TSC/OSC (Procedure 5.7.21, NLS2013028 Attachment 1 Page 4 of 10 Maintaining Emergency Preparedness  
Anecdotal evidence from CNS' Security force indicates that these batteries will last an entire 12 hour shift.
-Emergency Exercises, Drills, Tests, and Evaluations).
When the installed battery of a radio is depleted, and if another radio with a charged battery is not available, additional power to these radios is provided via dry cell battery adapters and dry cell batteries. One adapter for each credited radio was added to the Control Room and Technical Support Center/Operational Support Center (TSC/OSC) inventories, together with the minimum number of dry cell batteries with which they are to be loaded. Actual use (as well as known mAh capacity [4900 mAh] of these packs) has shown that these adapter packs provide over twice the capacity of the rechargeable Ni-MH FM batteries.
One rechargeable (installed) battery for each radio (10 hours), plus one dry cell adapter each (approximately 20 hours), at a duty cycle of 5/5/90, equals approximately 30 hours of overall battery capacity.
These dry cell battery adapters and batteries were added to the quarterly emergency inventory of the Control Room and TSC/OSC (Procedure 5.7.21,
Per Nuclear Energy Institute (NEI) 12-01, after 24 hours it may be assumed that offsite sources of batteries are available.
 
Therefore, the combination of installed rechargeable batteries and subsequent use of dry cell battery adapter packs and available dry cell batteries is assumed to provide power to handheld radios for an indefinite period of time.Generic Technical Issue 2: The use and function of the planned enhancements for the improvement of communications.
NLS2013028 Page 4 of 10 Maintaining Emergency Preparedness - Emergency Exercises, Drills, Tests, and Evaluations).
One rechargeable (installed) battery for each radio (10 hours), plus one dry cell adapter each (approximately 20 hours), at a duty cycle of 5/5/90, equals approximately 30 hours of overall battery capacity. Per Nuclear Energy Institute (NEI) 12-01, after 24 hours it may be assumed that offsite sources of batteries are available. Therefore, the combination of installed rechargeable batteries and subsequent use of dry cell battery adapter packs and available dry cell batteries is assumed to provide power to handheld radios for an indefinite period of time.
Generic Technical Issue 2:
The use andfunction of the planned enhancementsfor the improvement of communications.
A. A description of the use of the planned enhancements.
A. A description of the use of the planned enhancements.
: 1. A discussion of whether each planned enhancement identified is only to be used for maintaining the communication link identified, or if it is expected to be shared among other communication links.2. A general description of the planned enhancement and how the equipment will be integrated.
: 1. A discussion of whether each planned enhancement identified is only to be usedfor maintainingthe communication link identified, or if it is expected to be sharedamong other communication links.
: 3. The title and general description of the procedure that will be developed and used by plant personnel to describe protocols for shared usage of communication capabilities.
: 2. A generaldescriptionof the planned enhancement and how the equipment will be integrated.
NPPD Response: NPPD did not credit any shared communications resources.
: 3. The title andgeneral descriptionof the procedure that will be developed and used by plantpersonnel to describeprotocolsfor shared usage of communication capabilities.
Each identified communications link is supplied by its own satellite phone or radio, with sufficient battery power (assuming a certain duty cycle) for a minimum of 24 hours. NPPD will not be implementing shared usage; therefore, a procedure is not required.Generic Technical Issue 3: The protection of the new equipment purchased as a planned enhancement as well as the protection of existing communications equipment analyzed as being available.
NPPD Response:
A. A discussion of how the existing equipment analyzed to be available and enhancements to these communication links as well as associated ancillary equipment will be stored in a manner that is protective from a large scale natural event.
NPPD did not credit any shared communications resources. Each identified communications link is supplied by its own satellite phone or radio, with sufficient battery power (assuming a certain duty cycle) for a minimum of 24 hours. NPPD will not be implementing shared usage; therefore, a procedure is not required.
NLS2013028 Attachment 1 Page 5 of 10 1. A description ofpre-identified areas that are considered protective for existing equipment and whether new equipment will be stored in a similar location.
Generic Technical Issue 3:
The title and brief description of a procedure for new communications equipment storage is acceptable, if this procedure is planned to be developed in the future; or a statement that this will be completed in alignment with NRC order EA-12-049.
The protection of the new equipment purchasedas a planned enhancement as well as the protection of existing communications equipment analyzed as being available.
: 2. Equipment stored offsite, should have an analysis of duration to set-up this equipment for use.3. The analysis demonstrates that the existing equipment that is expected to be available will be functional.
A. A discussion of how the existing equipment analyzed to be available and enhancements to these communication links as well as associatedancillary equipment will be stored in a manner that is protectivefrom a large scale natural event.
NPPD Response: Credited portable communications equipment (satellite phones and handheld radios) is located in areas deemed protected from both seismic and flooding.
 
Radios are stored in two locations.
NLS2013028 Page 5 of 10
The first location is the Alternate Shutdown cabinet adjacent to the Control Room on elevation 932' of the Control Building.
: 1. A description ofpre-identifiedareas that are consideredprotectivefor existing equipment and whether new equipment will be stored in a similar location. The title and briefdescriptionof a procedurefor new communications equipment storage is acceptable, if this procedureis planned to be developed in the future; or a statement that this will be completed in alignment with NRC orderEA-12-049.
This building is a seismic Class I structure.
: 2. Equipment stored offsite, should have an analysis of duration to set-up this equipmentfor use.
The second location is the TSC/OSC. This combined facility is located within the Administration Building on elevation 903'6". One wall of the TSC/OSC is a shared exterior wall of the Reactor Building (seismic Class I). The remaining walls are substantial, poured high-density concrete designed to provide radiological shielding for the TSC/OSC, and therefore provide a seismically robust structure.
: 3. The analysis demonstrates that the existing equipment that is expected to be available will be functional.
The elevation is above the site design basis flood level.Credited radios are stored in charger-conditioners.
NPPD Response:
These are located on cabinet shelves or on countertops, but are not secured. This equipment is lightweight but is not expected to experience interactions with or from adjacent materials.
Credited portable communications equipment (satellite phones and handheld radios) is located in areas deemed protected from both seismic and flooding. Radios are stored in two locations. The first location is the Alternate Shutdown cabinet adjacent to the Control Room on elevation 932' of the Control Building. This building is a seismic Class I structure. The second location is the TSC/OSC. This combined facility is located within the Administration Building on elevation 903'6". One wall of the TSC/OSC is a shared exterior wall of the Reactor Building (seismic Class I). The remaining walls are substantial, poured high-density concrete designed to provide radiological shielding for the TSC/OSC, and therefore provide a seismically robust structure. The elevation is above the site design basis flood level.
These radios meet the applicable Military Specifications 810, C, D, E, and F. Therefore, these radios are not expected to receive damage even if they did fall off the shelves or countertops.
Credited radios are stored in charger-conditioners. These are located on cabinet shelves or on countertops, but are not secured. This equipment is lightweight but is not expected to experience interactions with or from adjacent materials. These radios meet the applicable Military Specifications 810, C, D, E, and F. Therefore, these radios are not expected to receive damage even if they did fall off the shelves or countertops.
Credited satellite phones are stored in PelicanTM protective cases in several locations; the Control Room, TSC/OSC, Emergency Operations Facility (EOF) (offsite), and Joint Information Center (JIC) (offsite).
Credited satellite phones are stored in PelicanTM protective cases in several locations; the Control Room, TSC/OSC, Emergency Operations Facility (EOF) (offsite), and Joint Information Center (JIC) (offsite). The Control Room and TSC/OSC are as described above; therefore, the equipment is protected from seismic and flooding. The EOF and JIC are located approximately 11 miles from the site in Auburn, Nebraska. The satellite phones and batteries/chargers for these facilities are located in a steel cabinet. The building housing the EOF/JIC is cement block, is not near any bodies of water, and therefore is judged to protect the equipment from seismic and flooding.
The Control Room and TSC/OSC are as described above; therefore, the equipment is protected from seismic and flooding.
Credited radios and satellite phones are inventoried and tested periodically. This has been incorporated into Procedure 5.7.21 (Maintaining Emergency Preparedness -
The EOF and JIC are located approximately 11 miles from the site in Auburn, Nebraska.
Emergency Exercises, Drills, Tests, and Evaluations), and Emergency Preparedness Department Guide (EPDG) #2 (Quarterly Satellite Phone Test and Battery Swap and Monthly Testing 2-Way Radios).
The satellite phones and batteries/chargers for these facilities are located in a steel cabinet. The building housing the EOF/JIC is cement block, is not near any bodies of water, and therefore is judged to protect the equipment from seismic and flooding.Credited radios and satellite phones are inventoried and tested periodically.
 
This has been incorporated into Procedure 5.7.21 (Maintaining Emergency Preparedness  
NLS2013028 Page 6 of 10 Any additional batteries purchased as enhancements for radio repeaters will be installed adjacent to the existing batteries and therefore will have the same protection as discussed in Sections 4.13.1 through 4.13.5 of the assessment report.
-Emergency Exercises, Drills, Tests, and Evaluations), and Emergency Preparedness Department Guide (EPDG) #2 (Quarterly Satellite Phone Test and Battery Swap and Monthly Testing 2-Way Radios).
No equipment to be used on-site is to be stored off-site.
NLS2013028 Attachment 1 Page 6 of 10 Any additional batteries purchased as enhancements for radio repeaters will be installed adjacent to the existing batteries and therefore will have the same protection as discussed in Sections 4.13.1 through 4.13.5 of the assessment report.No equipment to be used on-site is to be stored off-site.Generic Technical Issue 4: The programmatic controls for the use of the new equipment purchased as a planned enhancement.
Generic Technical Issue 4:
A. A description ofplannedproceduralization and training for the use of these planned enhancements.
The programmaticcontrolsfor the use of the new equipment purchasedas a planned enhancement.
It is acceptable to provide the title and description of a new procedure for communications equipment.
A. A descriptionofplannedproceduralizationand trainingfor the use of these planned enhancements. It is acceptable to provide the title and descriptionof a new procedurefor communications equipment.
: 1. A description of any credited manual actions and their procedures.
: 1. A description of any credited manual actions and theirprocedures.
: 2. A description of any maintenance for this equipment, including operability testing.3. A description ofperiodic inventory checks.4. A description ofplanned staff training.NPPD Response: No additional training is planned for the use of handheld radios or satellite phones.Operations, Maintenance, Radiological Protection, Chemistry, and Security personnel are familiar with the operation of handheld radios. Non-Security personnel on-shift are typically on the Emergency Response Organization (ERO) and perform in periodic drills or exercises where radios are used for communications.
: 2. A description of any maintenancefor this equipment, including operability testing.
Security personnel use identical radios daily. Although the radio model has changed, the operation has not. Satellite phone operation is identical to the operation of a standard cellular phone. Instructions are included in the storage cases. Emergency response telephone numbers are pre-programmed into satellite phones.Instructions on the use of emergency communications systems are contained in Procedure 5.7COMMUN (Communications).
: 3. A description ofperiodic inventory checks.
This procedure is required reading, per Training Procedure TPP-101, for all ERO positions (except JIC positions), for both initial and re-qualification training.No manual action is required for the long-term use of these communications devices with the exception of swapping batteries.
: 4. A description ofplanned staff training.
Illustrated instructions for loading the radio dry cell battery adapters with batteries are stored with the adapters/dry cell batteries.
NPPD Response:
Procedure 5.7.21 (Maintaining Emergency Preparedness  
No additional training is planned for the use of handheld radios or satellite phones.
-Emergency Exercises, Drills, Tests, and Evaluations) describes the inventory of this equipment.
Operations, Maintenance, Radiological Protection, Chemistry, and Security personnel are familiar with the operation of handheld radios. Non-Security personnel on-shift are typically on the Emergency Response Organization (ERO) and perform in periodic drills or exercises where radios are used for communications. Security personnel use identical radios daily. Although the radio model has changed, the operation has not. Satellite phone operation is identical to the operation of a standard cellular phone. Instructions are included in the storage cases. Emergency response telephone numbers are pre-programmed into satellite phones.
EPDG #2 (Quarterly NLS2013028 Attachment 1 Page 7 of 10 Satellite Phone Test and Battery Swap and Monthly Testing 2-Way Radios) establishes detailed guidance for periodically testing the radios and satellite phones and swapping out their batteries.
Instructions on the use of emergency communications systems are contained in Procedure 5.7COMMUN (Communications). This procedure is required reading, per Training Procedure TPP-101, for all ERO positions (except JIC positions), for both initial and re-qualification training.
Generic Technical Issue 5: A discussion on what assumptions are used as part of the Communications Assessment.
No manual action is required for the long-term use of these communications devices with the exception of swapping batteries. Illustrated instructions for loading the radio dry cell battery adapters with batteries are stored with the adapters/dry cell batteries.
A. A description of the assumptions used for the submitted Communications Assessment Summary, and technical justification for any differences from the assumptions within NEI 12-01, Sections 2.2 "Assumptions Common to Both Assessments" and 2.4 "Assumptions For Communications Assessments
Procedure 5.7.21 (Maintaining Emergency Preparedness - Emergency Exercises, Drills, Tests, and Evaluations) describes the inventory of this equipment. EPDG #2 (Quarterly
".NPPD Response: NPPD took no exceptions to the assumptions of NEI 12-01. Initially, NPPD assumed that no installed communications equipment remained operable.Although limited site access was allowed to be assumed per NEI 12-01 after six hours, NPPD also did not rely upon this assumption.
 
Credited portable communications links have been enhanced to provide for 24 hour capability without manual operator actions (except battery swap) and without any off-site resources.
NLS2013028 Page 7 of 10 Satellite Phone Test and Battery Swap and Monthly Testing 2-Way Radios) establishes detailed guidance for periodically testing the radios and satellite phones and swapping out their batteries.
No AC power source (normal, backup, or emergency) is depended upon.After determining that an exhaustive sweep of the CNS Protected Area was not feasible within 30 minutes, NPPD re-assessed the survivability of the installed plant Public Address/Paging system (Gaitronics).
Generic Technical Issue 5:
This assessment concluded that there is justification for believing that this system would both survive a severe event and remain operable for an adequate time period to perform its communications function.This system is powered from the No Break Power Panel (a non-AC source), its critical components are housed in seismic Class I structures, above the design basis flood levels, with no manual actions required for operation under LSEE/Extended Loss of AC Power conditions.
A discussion on what assumptions are used as part of the Communications Assessment.
Therefore, crediting this system does not take exception to the assumptions of NEI 12-01.Generic Technical Issue 6: How plant personnel will be notified in the event of a large scale natural event that causes a loss ofall AC power.A. A description and title of the procedure for emergency notification of essentially all plant staff within 30 minutes [ifapplicable to the licensee Emergency Plan].
A. A description of the assumptions usedfor the submitted Communications Assessment Summary, and technicaljustificationfor any differences from the assumptions within NEI 12-01, Sections 2.2 "Assumptions Common to Both Assessments" and 2.4 "Assumptions For CommunicationsAssessments ".
NLS2013028 Attachment 1 Page 8 of 10 B. A description and title ofprocedure for notification of emergency response organization staff (i.e., self activation)
NPPD Response:
[if applicable].
NPPD took no exceptions to the assumptions of NEI 12-01. Initially, NPPD assumed that no installed communications equipment remained operable.
NPPD Response: The normal means for alerting and notifying on-site personnel of a declared emergency is to sound an alarm and make an announcement using the plant Public Address/Paging system (Gaitronics).
Although limited site access was allowed to be assumed per NEI 12-01 after six hours, NPPD also did not rely upon this assumption. Credited portable communications links have been enhanced to provide for 24 hour capability without manual operator actions (except battery swap) and without any off-site resources. No AC power source (normal, backup, or emergency) is depended upon.
In the initial Communications Assessment this system was not credited as being operable.
After determining that an exhaustive sweep of the CNS Protected Area was not feasible within 30 minutes, NPPD re-assessed the survivability of the installed plant Public Address/Paging system (Gaitronics). This assessment concluded that there is justification for believing that this system would both survive a severe event and remain operable for an adequate time period to perform its communications function.
NPPD re-assessed the survivability of this system. This system is not powered from AC sources, its critical components are housed in seismic Class I structures, above the design basis flood levels, with no manual actions required for operation.
This system is powered from the No Break Power Panel (a non-AC source), its critical components are housed in seismic Class I structures, above the design basis flood levels, with no manual actions required for operation under LSEE/Extended Loss of AC Power conditions. Therefore, crediting this system does not take exception to the assumptions of NEI 12-01.
Therefore, this system is now credited for alert and notification of on-site personnel.
Generic Technical Issue 6:
How plant personnel will be notified in the event of a large scale naturalevent that causes a loss ofall AC power.
A. A description and title of the procedurefor emergency notification of essentiallyall plant staff within 30 minutes [ifapplicableto the licensee Emergency Plan].
 
NLS2013028 Page 8 of 10 B. A description and title ofprocedurefor notification of emergency response organizationstaff (i.e., self activation) [if applicable].
NPPD Response:
The normal means for alerting and notifying on-site personnel of a declared emergency is to sound an alarm and make an announcement using the plant Public Address/Paging system (Gaitronics). In the initial Communications Assessment this system was not credited as being operable. NPPD re-assessed the survivability of this system. This system is not powered from AC sources, its critical components are housed in seismic Class I structures, above the design basis flood levels, with no manual actions required for operation. Therefore, this system is now credited for alert and notification of on-site personnel.
If it is determined portions of this paging system are impaired, alternate methods for alerting and notifying on-site personnel are proceduralized in Procedure 5.7.10 (Personnel Assembly and Accountability) and Security Procedure 3.14 (Non-Security Emergencies).
If it is determined portions of this paging system are impaired, alternate methods for alerting and notifying on-site personnel are proceduralized in Procedure 5.7.10 (Personnel Assembly and Accountability) and Security Procedure 3.14 (Non-Security Emergencies).
NPPD has instructed off-site ERO personnel that upon becoming aware of a large-scale localized event (which presumably would result in a declaration of an emergency and activation of the ERO) combined with a lack of notification and inability to contact the site to automatically report to their assigned ERFs once assuring the safety of their families.
NPPD has instructed off-site ERO personnel that upon becoming aware of a large-scale localized event (which presumably would result in a declaration of an emergency and activation of the ERO) combined with a lack of notification and inability to contact the site to automatically report to their assigned ERFs once assuring the safety of their families. Procedure 0-EP-01 (Emergency Response Organization Responsibilities) was revised to include this direction. Training Program Procedure TPP-101 was revised to require ERO personnel to review this procedure as a part of their initial ERO and annual re-qualification training.
Procedure 0-EP-01 (Emergency Response Organization Responsibilities) was revised to include this direction.
In addition, this procedure informs the ERO that if conditions are such that the site cannot be accessed, two staging areas have been designated, one on each side of the Missouri River to which personnel may report. Arrangement for logistical support (transport and helicopter landing areas) of ERO personnel from these staging areas to the site is captured by Letters of Agreement.
Training Program Procedure TPP-101 was revised to require ERO personnel to review this procedure as a part of their initial ERO and annual re-qualification training.In addition, this procedure informs the ERO that if conditions are such that the site cannot be accessed, two staging areas have been designated, one on each side of the Missouri River to which personnel may report. Arrangement for logistical support (transport and helicopter landing areas) of ERO personnel from these staging areas to the site is captured by Letters of Agreement.
Generic Technical Issue 7:
Generic Technical Issue 7: How communications will be maintained during the period offinal implementation of the communications enhancements:
How communications will be maintained during the period offinal implementation of the communications enhancements:
A. Identification and description of the interim actions that will be in place to bridge the gap until all final mitigation strategies being proceduralized are implemented.
A. Identification and description of the interim actions that will be in place to bridge the gap until allfinal mitigationstrategiesbeing proceduralizedare implemented. This also includes equipment protection.
This also includes equipment protection.
 
NLS2013028 Attachment 1 Page 9 of 10 NPPD Response: With the completion of enhancements related to providing 24 hour battery power to handheld radios and satellite phones, and fully incorporating programmatic support of these devices into plant procedures, NPPD has assured that all required communications links can be maintained under LSEE/Station Blackout conditions.
NLS2013028 Page 9 of 10 NPPD Response:
Physical changes related to these on-site enhancements were completed in 2012. Associated implementing procedure changes were approved and in place in February 2013.These communications links will initially be limited. Satellite phones will only work outdoors, and handheld radios may not be fully supported by high-power repeaters.
With the completion of enhancements related to providing 24 hour battery power to handheld radios and satellite phones, and fully incorporating programmatic support of these devices into plant procedures, NPPD has assured that all required communications links can be maintained under LSEE/Station Blackout conditions. Physical changes related to these on-site enhancements were completed in 2012. Associated implementing procedure changes were approved and in place in February 2013.
These communications links will initially be limited. Satellite phones will only work outdoors, and handheld radios may not be fully supported by high-power repeaters.
Relaying of messages may be necessary.
Relaying of messages may be necessary.
Enhancements were identified to evaluate options and select method(s) to support indoor (remote) access to satellite-based communications and evaluate and assure that batteries supporting a minimum of two installed radio systems (repeaters) are sized to provide adequate (24 hours) capacity.
Enhancements were identified to evaluate options and select method(s) to support indoor (remote) access to satellite-based communications and evaluate and assure that batteries supporting a minimum of two installed radio systems (repeaters) are sized to provide adequate (24 hours) capacity. The full implementation of these enhancements will facilitate satellite communications indoors (Control Room, TSC/OSC, EOF and Offsite Response Organizations) and provide long-term (24 hour minimum) power to a minimum of two radio repeater(s).
The full implementation of these enhancements will facilitate satellite communications indoors (Control Room, TSC/OSC, EOF and Offsite Response Organizations) and provide long-term (24 hour minimum) power to a minimum of two radio repeater(s).
Generic Technical Issue 8:
Generic Technical Issue 8: Descriptions are needed regarding how communications will be maintained with the on-site and in-plant response teams and offsite response organizations if their communication links are not expected to be available.
Descriptionsare needed regardinghow communications will be maintainedwith the on-site and in-plantresponse teams and offsite response organizationsif their communication links are not expected to be available.
A. A timeline for when the evaluation for site specific improvements for on-site and in-plant response teams will be completed.
A. A timeline for when the evaluationfor site specific improvementsfor on-site and in-plant response teams will be completed.
B. A discussion of the enhancements that are planned for the offsite response organization communication links.NPPD Response: The minimum numbers of communications links to on-site and in-plant teams will be continuously maintained using handheld radios. As discussed in the response to Technical Issue 1, NPPD has provided power to these portable radios for greater than 24 hours with no manual actions required, except changing batteries.
B. A discussion of the enhancements that are plannedfor the offsite response organizationcommunication links.
The minimum numbers of communications links to offsite response organizations will be maintained using satellite phones. NPPD has two State (Nebraska and Missouri) and three County (Nemaha, Richardson, and Atchison) contact points to 'local' offsite response organizations (ORO). Per the assumptions of NEI 12-01, communications infrastructure outside a 25 mile radius may be assumed to remain intact. Both State NLS2013028 Attachment 1 Page 10 of 10 contact points are beyond this 25 mile radius therefore NPPD assumes that contact, via satellite phone on our end only, remains a viable means of contacting these two OROs.The same assumption is applied to all other agencies outside this 25 mile radius (e.g., NRC [Headquarters and Region], United States Geological Survey, Army Corps of Engineers, NEI, and Institute of Nuclear Power Operations).
NPPD Response:
An enhancement in the CNS Communications Assessment was identified to ensure that all primary OROs have satellite communications capabilities.
The minimum numbers of communications links to on-site and in-plant teams will be continuously maintained using handheld radios. As discussed in the response to Technical Issue 1, NPPD has provided power to these portable radios for greater than 24 hours with no manual actions required, except changing batteries.
Three extra satellite phones (beyond the required 13 identified links in the Communications Assessment) have been purchased and will be assigned to OROs within the 25 mile radius.
The minimum numbers of communications links to offsite response organizations will be maintained using satellite phones. NPPD has two State (Nebraska and Missouri) and three County (Nemaha, Richardson, and Atchison) contact points to 'local' offsite response organizations (ORO). Per the assumptions of NEI 12-01, communications infrastructure outside a 25 mile radius may be assumed to remain intact. Both State
NLS2013028 Attachment 2 Page I of 37 NLS2013028 ATTACHMENT 2 COOPER NUCLEAR STATION COMMUNICATIONS ASSESSMENT REVISION I NLS2013028 Attachment 2 Page 2 of 37 1. Executive Summary The purpose of this report is to document the performance of a Nuclear Regulatory Commission (NRC) requested assessment of the current communications systems and equipment used at the Cooper Nuclear Station (CNS) site during an emergency event as defined by Nuclear Energy Institute (NEI) 12-01, "Guideline for Assessing Beyond Design Basis Accident Response Staffing and Communications Capabilities." Power supplies for the existing communications equipment credited have been assessed to determine power availability during a prolonged Station Blackout (SBO) event.The beyond design basis events assumed in this assessment introduce conditions that could render a significant portion of existing installed site communications capabilities inoperable.
 
The assessment identifies proposed enhancements to maintain the minimum communications capabilities for responding to emergency events, as well as enhancements to improve the survivability of currently installed communications systems (see Table 11). These enhancements include:* Addition of extra batteries and chargers in support of extended use of handheld satellite phones* Addition of dry-cell type battery packs in support of extended use of portable radios (walkie-talkies) 0 Evaluation of options to support indoor (remote) access to satellite-based communications
NLS2013028 Page 10 of 10 contact points are beyond this 25 mile radius therefore NPPD assumes that contact, via satellite phone on our end only, remains a viable means of contacting these two OROs.
* Correction of identified issues related to potential seismic interaction concerns* Evaluation and probable enhancement of battery-based power to critical communications systems 2. Methodology This report is based on the recommended criteria from NEI 12-01, for use in identifying enhancements that will ensure the availability of critical communications capabilities during an extended loss of AC power, including evaluation of power sources for communications equipment.
The same assumption is applied to all other agencies outside this 25 mile radius (e.g.,
This approach provided the flexibility to accommodate specific site needs while, at the same time, ensuring consistency with industry-developed standards, and NRC regulations and guidance.The assessment focused first on the communication systems to be credited.
NRC [Headquarters and Region], United States Geological Survey, Army Corps of Engineers, NEI, and Institute of Nuclear Power Operations).
These required communication links were assumed to be established via satellite phones (offsite) and the use of the existing site handheld radios (onsite).
An enhancement in the CNS Communications Assessment was identified to ensure that all primary OROs have satellite communications capabilities. Three extra satellite phones (beyond the required 13 identified links in the Communications Assessment) have been purchased and will be assigned to OROs within the 25 mile radius.
Existing installed communications were initially assumed to be inoperable and therefore were not credited in this assessment.
 
However, walkdowns to evaluate both portable and installed equipment, locations, and function were performed.
NLS2013028 Page I of 37 NLS2013028 ATTACHMENT 2 COOPER NUCLEAR STATION COMMUNICATIONS ASSESSMENT REVISION I
Subsequent to the 2012 submission of the CNS Communications Assessment, Nebraska Public Power (NPPD) performed an evaluation of the installed plant Public Address/Page system (Gaitronics).
 
The evaluation concluded that the Gaitronics system is adequately protected from seismic and flooding hazards, and is powered from the No Break Power Panel (a non-AC based source). Therefore, NPPD now credits this NLS2013028 Attachment 2 I Page3 of 37 communications system for initial alerting and notification of onsite personnel.
NLS2013028 Page 2 of 37
This system's primary (DC) power supply will not (unless augmented) last beyond four hours. However, alerting and notifying onsite personnel will take place at the beginning of an emergency; therefore, this capacity is deemed adequate to perform the function.
: 1. Executive Summary The purpose of this report is to document the performance of a Nuclear Regulatory Commission (NRC) requested assessment of the current communications systems and equipment used at the Cooper Nuclear Station (CNS) site during an emergency event as defined by Nuclear Energy Institute (NEI) 12-01, "Guideline for Assessing Beyond Design Basis Accident Response Staffing and Communications Capabilities." Power supplies for the existing communications equipment credited have been assessed to determine power availability during a prolonged Station Blackout (SBO) event.
See Section 4.2.Enhancements identified from the assessment will be further developed as implementation progresses.
The beyond design basis events assumed in this assessment introduce conditions that could render a significant portion of existing installed site communications capabilities inoperable. The assessment identifies proposed enhancements to maintain the minimum communications capabilities for responding to emergency events, as well as enhancements to improve the survivability of currently installed communications systems (see Table 11). These enhancements include:
Alternate approaches will be utilized if prudent (e.g., alternate/new technology, improved capability, cost savings, etc.).3. Assumptions (Derived from NEI 12-01)0 Extended loss of AC power event* Successful plant shutdown* No hostile action* 6 hours post event -no site access* 6 -24 hours post event -limited site access* 24+ hours post event -access restored to near normal status* Installed sources of AC power not available* Non-essential loads from DC battery sources are stripped per station procedures
* Addition of extra batteries and chargers in support of extended use of handheld satellite phones
* Installed inverters and battery chargers remain available provided they are protected from external events* Onsite diesel fuel oil is available provided it is stored in a protected manner from external events* Portable equipment may be used provided it is stored onsite and protected from seismic, wind, and flooding events. Includes portable AC and DC power sources 0 Onsite communications infrastructure remains available provided it is protected from seismic, wind, and flooding events 0 Offsite communications infrastructure is inoperable out to 25 miles* Communications equipment located at an offsite response facility and supplied from a backup power source is assumed to be functional
* Addition of dry-cell type battery packs in support of extended use of portable radios (walkie-talkies) 0 Evaluation of options to support indoor (remote) access to satellite-based communications
* Correction of identified issues related to potential seismic interaction concerns
* Evaluation and probable enhancement of battery-based power to critical communications systems
: 2. Methodology This report is based on the recommended criteria from NEI 12-01, for use in identifying enhancements that will ensure the availability of critical communications capabilities during an extended loss of AC power, including evaluation of power sources for communications equipment. This approach provided the flexibility to accommodate specific site needs while, at the same time, ensuring consistency with industry-developed standards, and NRC regulations and guidance.
The assessment focused first on the communication systems to be credited. These required communication links were assumed to be established via satellite phones (offsite) and the use of the existing site handheld radios (onsite). Existing installed communications were initially assumed to be inoperable and therefore were not credited in this assessment. However, walkdowns to evaluate both portable and installed equipment, locations, and function were performed. Subsequent to the 2012 submission of the CNS Communications Assessment, Nebraska Public Power (NPPD) performed an evaluation of the installed plant Public Address/Page system (Gaitronics). The evaluation concluded that the Gaitronics system is adequately protected from seismic and flooding hazards, and is powered from the No Break Power Panel (a non-AC based source). Therefore, NPPD now credits this
 
NLS2013028 Attachment 2 I Page3 of 37 communications system for initial alerting and notification of onsite personnel. This system's primary (DC) power supply will not (unless augmented) last beyond four hours. However, alerting and notifying onsite personnel will take place at the beginning of an emergency; therefore, this capacity is deemed adequate to perform the function. See Section 4.2.
Enhancements identified from the assessment will be further developed as implementation progresses. Alternate approaches will be utilized if prudent (e.g.,
alternate/new technology, improved capability, cost savings, etc.).
: 3. Assumptions (Derived from NEI 12-01) 0   Extended loss of AC power event
* Successful plant shutdown
* No hostile action
* 6 hours post event - no site access
* 6 - 24 hours post event - limited site access
* 24+ hours post event - access restored to near normal status
* Installed sources of AC power not available
* Non-essential loads from DC battery sources are stripped per station procedures
* Installed inverters and battery chargers remain available provided they are protected from external events
* Onsite diesel fuel oil is available provided it is stored in a protected manner from external events
* Portable equipment may be used provided it is stored onsite and protected from seismic, wind, and flooding events. Includes portable AC and DC power sources 0   Onsite communications infrastructure remains available provided it is protected from seismic, wind, and flooding events 0   Offsite communications infrastructure is inoperable out to 25 miles
* Communications equipment located at an offsite response facility and supplied from a backup power source is assumed to be functional
: 4. Communications During an Extended Loss of AC Power NEI 12-01 Section 4, "Communications During an Extended Loss of AC Power" provides the basis for the following assessment.
: 4. Communications During an Extended Loss of AC Power NEI 12-01 Section 4, "Communications During an Extended Loss of AC Power" provides the basis for the following assessment.
4.1 Required Emergency Communication Capabilities (NEI 12-01 Section 4.1)NPPD has reviewed the minimum required communications links and has determined the method of communications (i.e., radio or satellite phone) to be credited for each defined link and the overall number of satellite phones and radios needed (see Table 10). NPPD determined that some additional satellite phones or radios may be required, at the Offsite Response Organization (ORO) end, to establish the required links with OROs. Area for enhancement (see Table 11, item#3).
4.1 Required Emergency Communication Capabilities (NEI 12-01 Section 4.1)
NLS2013028 Attachment 2 Page 4 of 37 NPPD recognizes that portable satellite telephones do not work indoors. Their antennas must have a clear direct view of the sky. Therefore, portable satellite phones have to be taken outdoors to establish the required communications link(s). This is not considered adequate for the long term.These same communications links must be established from within the boundaries of areas within the plant which are very difficult to modify. Making penetrations to route antenna coaxial cable may require design changes, habitability considerations, regulatory reviews, and the revision of supporting documentation.
NPPD has reviewed the minimum required communications links and has determined the method of communications (i.e., radio or satellite phone) to be credited for each defined link and the overall number of satellite phones and radios needed (see Table 10). NPPD determined that some additional satellite phones or radios may be required, at the Offsite Response Organization (ORO) end, to establish the required links with OROs. Area for enhancement (see Table 11, item
NPPD will evaluate options and select method(s) to support indoor (remote)access to satellite-based communications.
      #3).
Area for enhancement (see Table 11, item #4).4.2 Plant Paging (Announcement)
 
System (NEI 12-01 Section 4.2)NEI 12-01 Section 4.2 requires notification of the plant staff at the onset of the event. The CNS plant paging system provides public address capability over a large portion of the site. The system was not initially credited as available for notification of plant personnel.
NLS2013028 Page 4 of 37 NPPD recognizes that portable satellite telephones do not work indoors. Their antennas must have a clear direct view of the sky. Therefore, portable satellite phones have to be taken outdoors to establish the required communications link(s). This is not considered adequate for the long term.
Alternative measures now used for inoperable paging coverage areas were assessed for use site-wide.
These same communications links must be established from within the boundaries of areas within the plant which are very difficult to modify. Making penetrations to route antenna coaxial cable may require design changes, habitability considerations, regulatory reviews, and the revision of supporting documentation.
Area for enhancement (see Table 11, item #6).The assessment directed by the enhancement determined that alternate measures used for alerting and notifying limited areas of inoperable Public Address/Page system (Gaitronics) are not feasible for the entire Protected Area. Therefore, NPPD performed a more detailed evaluation of the installed Gaitronics system. The evaluation concluded that the Gaitronics system is adequately protected from seismic and flooding hazards, and will have adequate non-AC based power to perform the communications task of alerting and notifying onsite personnel of an emergency.
NPPD will evaluate options and select method(s) to support indoor (remote) access to satellite-based communications. Area for enhancement (see Table 11, item #4).
NPPD now credits this communications system for that task only. This system's primary (DC) power supply (unless augmented) may not last beyond four hours. The four hour capacity is deemed adequate to perform the alert and notification function.
4.2 Plant Paging (Announcement) System (NEI 12-01 Section 4.2)
NEI 12-01, Section 4.1.2.1, requires only that this system be powered from a battery-backed source. Once initial directions have been communicated to onsite personnel, NEI 12-01 allows this communications system to be removed from service to extend critical battery capacity.4.3 Communications Equipment at ORO Facilities (NEI 12-01 Section 4.3)Per NEI 12-01, "Some communications capability should be available at the ORO facilities that normally receive licensee notifications of an emergency declaration or a Protective Action Recommendation." NPPD assessed capabilities at their ORO facilities.
NEI 12-01 Section 4.2 requires notification of the plant staff at the onset of the event. The CNS plant paging system provides public address capability over a large portion of the site. The system was not initially credited as available for notification of plant personnel. Alternative measures now used for inoperable paging coverage areas were assessed for use site-wide. Area for enhancement (see Table 11, item #6).
All five ORO facilities (Nebraska State Patrol, Nemaha County Sheriff, Richardson County Sheriff, Missouri State Patrol, and Atchison County 911 Center) have backup power. Additional communication capabilities (i.e., satellite phones) are recommended at some of these facilities.
The assessment directed by the enhancement determined that alternate measures used for alerting and notifying limited areas of inoperable Public Address/Page system (Gaitronics) are not feasible for the entire Protected Area. Therefore, NPPD performed a more detailed evaluation of the installed Gaitronics system. The evaluation concluded that the Gaitronics system is adequately protected from seismic and flooding hazards, and will have adequate non-AC based power to perform the communications task of alerting and notifying onsite personnel of an emergency. NPPD now credits this communications system for that task only. This system's primary (DC) power supply (unless augmented) may not last beyond four hours. The four hour capacity is deemed adequate to perform the alert and notification function. NEI 12-01, Section 4.1.2.1, requires only that this system be powered from a battery-backed source. Once initial directions have been communicated to onsite personnel, NEI 12-01 allows this communications system to be removed from service to extend critical battery capacity.
Area for enhancement (see Table 11, item #3).
4.3 Communications Equipment at ORO Facilities (NEI 12-01 Section 4.3)
NLS2013028 Attachment 2 Page 5 of 37 Per the assumptions of NEI 12-01, it may be assumed that communications infrastructure outside a 25 mile radius remains intact. Both State contact points are beyond this 25 mile radius; therefore, NPPD assumes that contact, via satellite phone on our end, remains a viable means of contacting these two OROs. NPPD will ensure that OROs within the 25 mile radius of the CNS have installed satellite phone capability.
Per NEI 12-01, "Some communications capability should be available at the ORO facilities that normally receive licensee notifications of an emergency declaration or a Protective Action Recommendation." NPPD assessed capabilities at their ORO facilities. All five ORO facilities (Nebraska State Patrol, Nemaha County Sheriff, Richardson County Sheriff, Missouri State Patrol, and Atchison County 911 Center) have backup power. Additional communication capabilities (i.e., satellite phones) are recommended at some of these facilities. Area for enhancement (see Table 11, item #3).
Area for enhancement (see Table 11, item #9).4.4 Notification of the Emergency Response Organization (ERO) (NEI 12-01 Section 4.4)NEI 12-01 offers two potential options to promote timely staff augmentation by the ERO. CNS will ensure that "ERO members are trained to automatically respond to their assigned facilities or a designated staging area when made aware of a wide area loss-of-grid (e.g., by direct observation, media reports, word-of-mouth, etc.)." This expectation has been established with the ERO. This expectation will also be included in annual ERO requalification training.
 
Area for enhancement (see Table 11, item #7).Instructions for ERO personnel to report to their Emergency Response Facility (or an alternate staging area) have been communicated.
NLS2013028 Page 5 of 37 Per the assumptions of NEI 12-01, it may be assumed that communications infrastructure outside a 25 mile radius remains intact. Both State contact points are beyond this 25 mile radius; therefore, NPPD assumes that contact, via satellite phone on our end, remains a viable means of contacting these two OROs. NPPD will ensure that OROs within the 25 mile radius of the CNS have installed satellite phone capability. Area for enhancement (see Table 11, item #9).
These instructions have also been incorporated into Procedure 0-EP-01, Emergency Response Organization Responsibilities.
4.4 Notification of the Emergency Response Organization (ERO) (NEI 12-01 Section 4.4)
This procedure is required reading for all ERO positions for both initial and annual re-qualification training.
NEI 12-01 offers two potential options to promote timely staff augmentation by the ERO. CNS will ensure that "ERO members are trained to automatically respond to their assigned facilities or a designated staging area when made aware of a wide area loss-of-grid (e.g., by direct observation, media reports, word-of-mouth, etc.)."
All actions associated with this area for enhancement have been completed.
This expectation has been established with the ERO. This expectation will also be included in annual ERO requalification training. Area for enhancement (see Table 11, item #7).
4.5 Equipment Location Requirements (NEI 12-01 Section 4.5)Communication equipment to be used or considered operable, "...should be in a location and maintained in a manner that maximizes survivability following a beyond design basis external event. In particular, the location or manner should reasonably preclude wetting from flooding or impact damage from a seismic event." The communication links as defined by NEI 12-01 will be established using satellite phones and handheld radios. Assessments were performed, including walkdowns, of the existing installed radio equipment.
Instructions for ERO personnel to report to their Emergency Response Facility (or an alternate staging area) have been communicated. These instructions have also been incorporated into Procedure 0-EP-01, Emergency Response Organization Responsibilities. This procedure is required reading for all ERO positions for both initial and annual re-qualification training. All actions associated with this area for enhancement have been completed.
Enhancements have been identified associated with installed equipment's support/mounting as well as potential impact from adjacent equipment and/or stored material.
4.5 Equipment Location Requirements (NEI 12-01 Section 4.5)
One issue associated with wetting from flooding was identified related to the Communications Tower enclosure.
Communication equipment to be used or considered operable, "...should be in a location and maintained in a manner that maximizes survivability following a beyond design basis external event. In particular, the location or manner should reasonably preclude wetting from flooding or impact damage from a seismic event." The communication links as defined by NEI 12-01 will be established using satellite phones and handheld radios. Assessments were performed, including walkdowns, of the existing installed radio equipment. Enhancements have been identified associated with installed equipment's support/mounting as well as potential impact from adjacent equipment and/or stored material. One issue associated with wetting from flooding was identified related to the Communications Tower enclosure. See Sections 4.13.2 for details. Area for enhancement (see Table 11, item #1).
See Sections 4.13.2 for details. Area for enhancement (see Table 11, item #1).All seismic interaction and housekeeping issues identified in the initial Communications Assessment have been corrected.
All seismic interaction and housekeeping issues identified in the initial Communications Assessment have been corrected. NPPD continues to evaluate potential enhancements related to the location of installed communications equipment. All credited communications (satellite phones and handheld radios) are stored in locations which provide reasonable protection from seismic and flooding hazards.
NPPD continues to evaluate potential enhancements related to the location of installed communications equipment.
 
All credited communications (satellite phones and handheld radios)are stored in locations which provide reasonable protection from seismic and flooding hazards.
NLS2013028 Attachment 2 I Page6 of 37 4.6 Performance Characteristics (NEI 12-01 Section 4.6)
NLS2013028 Attachment 2 I Page6 of 37 4.6 Performance Characteristics (NEI 12-01 Section 4.6)The performance characteristics as identified in this section of NEI 12-01 require that communication pathways (e.g., radio channels, satellite phones) designated to support multiple functions must be analyzed to demonstrate that they can simultaneously support both functions.
The performance characteristics as identified in this section of NEI 12-01 require that communication pathways (e.g., radio channels, satellite phones) designated to support multiple functions must be analyzed to demonstrate that they can simultaneously support both functions. NPPD assessed capabilities on a radio channel by channel and satellite phone device basis and did not identify any instances where a single communication pathway was assigned to support multiple functions. No further action is required.
NPPD assessed capabilities on a radio channel by channel and satellite phone device basis and did not identify any instances where a single communication pathway was assigned to support multiple functions.
4.7 Other Assessment Considerations (NEI 12-01 Section 4.7)
No further action is required.4.7 Other Assessment Considerations (NEI 12-01 Section 4.7)Enhancements (physical and programmatic) are recommended to ensure considerations, as identified in this section of NEI 12-01, are met. Provisions for portable backup power sources and batteries for battery operated equipment need to be established.
Enhancements (physical and programmatic) are recommended to ensure considerations, as identified in this section of NEI 12-01, are met. Provisions for portable backup power sources and batteries for battery operated equipment need to be established. Area for enhancement (see Table 11, item #5).
Area for enhancement (see Table 11, item #5).NPPD has provided the physical and programmatic means to power credited communications devices (satellite phones and handheld radios) for a minimum of 24 hours without the need for manual actions, except changing batteries.
NPPD has provided the physical and programmatic means to power credited communications devices (satellite phones and handheld radios) for a minimum of 24 hours without the need for manual actions, except changing batteries.
However, these devices are limited. Radios have poor coverage without repeaters, and portable satellite phones work only outdoors.
However, these devices are limited. Radios have poor coverage without repeaters, and portable satellite phones work only outdoors. Enhancements (Table 11, items #2, #4, and #9) will address these limitations. Upon full implementation of all enhancements, NPPD will have indoor satellite capability and expand the battery capacity of at least two installed radio repeaters to a minimum of 24 hours.
Enhancements (Table 11, items #2, #4, and #9) will address these limitations.
4.8 Quality and Maintenance-Related Requirements (NEI 12-01 Section 4.8)
Upon full implementation of all enhancements, NPPD will have indoor satellite capability and expand the battery capacity of at least two installed radio repeaters to a minimum of 24 hours.4.8 Quality and Maintenance-Related Requirements (NEI 12-01 Section 4.8)The requirements identified in this section of NEI 12-01 need to be incorporated into the program for ensuring the credited equipment is maintained in a manner that maximizes survivability.
The requirements identified in this section of NEI 12-01 need to be incorporated into the program for ensuring the credited equipment is maintained in a manner that maximizes survivability. Programmatic controls need to be established to ensure that equipment remains available and operable. This may include documenting inventories and adding preventive maintenance for periodic testing of the satellite phones and chargers. Area for enhancement (see Table 11, item #7).
Programmatic controls need to be established to ensure that equipment remains available and operable.
Programmatic controls for the credited communications equipment were fully incorporated into plant procedures. As additional enhancements are completed, appropriate programmatic controls for those enhancements will be incorporated into processes and procedures.
This may include documenting inventories and adding preventive maintenance for periodic testing of the satellite phones and chargers.
4.9 National Communications System (NCS) Services (NEI 12-01 Section 4.9)
Area for enhancement (see Table 11, item #7).Programmatic controls for the credited communications equipment were fully incorporated into plant procedures.
NPPD assessed the NCS services. NPPD recommends that additional Government Emergency Telecommunications Service (GETS) access cards be acquired for key CNS site positions or Emergency Response Facilities (ERFs).
As additional enhancements are completed, appropriate programmatic controls for those enhancements will be incorporated into processes and procedures.
Area for enhancement (see Table 11, item #8).
4.9 National Communications System (NCS) Services (NEI 12-01 Section 4.9)NPPD assessed the NCS services.
 
NPPD recommends that additional Government Emergency Telecommunications Service (GETS) access cards be acquired for key CNS site positions or Emergency Response Facilities (ERFs).Area for enhancement (see Table 11, item #8).
NLS2013028 Page 7 of 37 Additional GETS cards were distributed and a process to inventory the cards to ensure that they work was implemented. This area for enhancement is complete.
NLS2013028 Attachment 2 Page 7 of 37 Additional GETS cards were distributed and a process to inventory the cards to ensure that they work was implemented.
4.10 Communication Provider Emergency Services (NEI 12-01 Section 4.10)
This area for enhancement is complete.4.10 Communication Provider Emergency Services (NEI 12-01 Section 4.10)NPPD contacted the major communications service providers for CNS (Verizon and AT&T). Neither company has a separate emergency services priority other than government telecommunications service priority.
NPPD contacted the major communications service providers for CNS (Verizon and AT&T). Neither company has a separate emergency services priority other than government telecommunications service priority. No further action is recommended.
No further action is recommended.
4.11 Personnel Training (NEI 12-01 Section 4.11)
4.11 Personnel Training (NEI 12-01 Section 4.11)The requirements identified in this section of NEI 12-01 are recommended to be incorporated into the CNS Emergency Planning program. NPPD will evaluate existing training to determine if the adequacy and periodicity of training is sufficient.
The requirements identified in this section of NEI 12-01 are recommended to be incorporated into the CNS Emergency Planning program. NPPD will evaluate existing training to determine if the adequacy and periodicity of training is sufficient. Area for enhancement (see Table 11, item #7).
Area for enhancement (see Table 11, item #7).4.12 Emergency Plan (E-Plan) Identified Systems Overview and Assumptions The following sections summarize the communications systems discussed in the CNS E-Plan.The E-Plan Section 7.3 notes that communications may be provided by different means (telephone system, plant paging system, alternate intercom, FM radio, and sound power). For the purposes of this assessment, the communications capabilities in E-Plan Section 7.3 were assumed to be successfully met only if they were judged to be continuously available for 24 hours after the loss of onsite and offsite AC power. The majority of the installed emergency preparedness (EP) communication systems have been assumed (by this assessment) to have deficiencies which would prevent their survival in the beyond design basis external event.However, the assumptions underlying this assessment were conservative.
4.12 Emergency Plan (E-Plan) Identified Systems Overview and Assumptions The following sections summarize the communications systems discussed in the CNS E-Plan.
Although the assessment identified areas for enhancement, it also established that the communications systems at CNS are well designed, installed, and maintained.
The E-Plan Section 7.3 notes that communications may be provided by different means (telephone system, plant paging system, alternate intercom, FM radio, and sound power). For the purposes of this assessment, the communications capabilities in E-Plan Section 7.3 were assumed to be successfully met only if they were judged to be continuously available for 24 hours after the loss of onsite and offsite AC power. The majority of the installed emergency preparedness (EP) communication systems have been assumed (by this assessment) to have deficiencies which would prevent their survival in the beyond design basis external event.
They are diverse both in their locations, their primary and backup power sources, and their supporting infrastructures.
However, the assumptions underlying this assessment were conservative.
NPPD feels confident that by making the enhancements identified by this assessment, these same communications systems may be more likely to survive a beyond design basis event. See Sections 4.13.1 -4.13.5 for details concerning proposed enhancements.
Although the assessment identified areas for enhancement, it also established that the communications systems at CNS are well designed, installed, and maintained. They are diverse both in their locations, their primary and backup power sources, and their supporting infrastructures. NPPD feels confident that by making the enhancements identified by this assessment, these same communications systems may be more likely to survive a beyond design basis event. See Sections 4.13.1 - 4.13.5 for details concerning proposed enhancements.
4.13 Equipment Locations and Capabilities The communications function, radio reception/transmission equipment, and protection of each location from seismic, wind, and flooding are discussed below.Specifically, the capacity of the equipment in its current configuration was evaluated as to its ability to withstand the identified external hazards. These hazards include seismic, flooding, and high winds. The structural evaluation was NLS2013028 Attachment 2 Page 8 of 37 based on engineering judgment developed by a consensus of two engineers experienced in structural design and construction.
4.13 Equipment Locations and Capabilities The communications function, radio reception/transmission equipment, and protection of each location from seismic, wind, and flooding are discussed below.
Specifically, the capacity of the equipment in its current configuration was evaluated as to its ability to withstand the identified external hazards. These hazards include seismic, flooding, and high winds. The structural evaluation was
 
NLS2013028 Page 8 of 37 based on engineering judgment developed by a consensus of two engineers experienced in structural design and construction.
The maximum probable flood elevation is 903'. Because no EP communications equipment, except for the Communications Tower and equipment enclosure (refer to Section 4.13.2 for further explanation), exists below this elevation, most EP communications equipment is not at risk of flooding due to a design basis flooding event. See Section 4.13.2 for further information.
The maximum probable flood elevation is 903'. Because no EP communications equipment, except for the Communications Tower and equipment enclosure (refer to Section 4.13.2 for further explanation), exists below this elevation, most EP communications equipment is not at risk of flooding due to a design basis flooding event. See Section 4.13.2 for further information.
The sections below provide more detail of the area walkdowns and their potential configuration concerns that could present challenges to communications systems in the event one or more of the identified environmental hazards occur.4.13.1 Elevated Release Point (ERP) Tower and Equipment Location and General Description EP communications equipment is located inside the ERP Tower communications enclosure.
The sections below provide more detail of the area walkdowns and their potential configuration concerns that could present challenges to communications systems in the event one or more of the identified environmental hazards occur.
The ERP Tower is located inside the Protected Area (PA) southeast of the Reactor Building and is 325' tall. The communications enclosure is a pre-fabricated trailer-like structure constructed of a metal frame covered with fiberglass panels. This enclosure is attached to the ERP Tower structural steel members, at an elevation of approximately 920' mean sea level (MSL).Equipment  
4.13.1 Elevated Release Point (ERP) Tower and Equipment Location and General Description EP communications equipment is located inside the ERP Tower communications enclosure. The ERP Tower is located inside the Protected Area (PA) southeast of the Reactor Building and is 325' tall. The communications enclosure is a pre-fabricated trailer-like structure constructed of a metal frame covered with fiberglass panels. This enclosure is attached to the ERP Tower structural steel members, at an elevation of approximately 920' mean sea level (MSL).
& Functionality Radio System Base #1 Repeater is located in the ERP Tower communications enclosure.
Equipment & Functionality Radio System Base #1 Repeater is located in the ERP Tower communications enclosure. The radio system for Base #1 is comprised of a narrow-band UHF transciever, connected to receive and transmit antennas mounted near the top of the ERP Tower. Base #1 radio provides repeater coverage to portable radios (walkie-talkies) and mobile units at the plant site and the Emergency Operations Facility (EOF),
The radio system for Base #1 is comprised of a narrow-band UHF transciever, connected to receive and transmit antennas mounted near the top of the ERP Tower. Base #1 radio provides repeater coverage to portable radios (walkie-talkies) and mobile units at the plant site and the Emergency Operations Facility (EOF), located in Auburn, Nebraska (approximately 11 miles to the west). This radio equipment is also hardwired to desksets and consoles at various locations at CNS and the EOF. A simplified block diagram shows interconnections for Radio System Base #1. See Figure 1.Power 120V AC power to the Base #1 radio system is supplied from a lighting panel LP-ERP (Shack) Comm Box. This panel gets AC power from switchboard MSB located in the Machine Shop via step down transformer EE-XFMR-LPERP (Shack). Switchboard MSB gets its feed from non-essential 480V switchgear 1 B via switchboard MSA.This panel is also permanently wired to an outside emergency generator receptacle via transfer switch CC-SW-LPERP (Shack).A battery charger for Base #1 is now integrated into the radio unit itself. There is a bank of batteries to power the radio in the event of loss of AC power. The backup battery NLS2013028 Attachment 2 I Page9 of 37 I bank will be evaluated to assure that it provides adequate (24 hour) power. Area for enhancement (see Table 11, item #2).Structural Assessment The ERP Tower communications enclosure, attached to the ERP Tower at approximately 920' elevation, provides reasonable assurance that the EP communications equipment is protected during a flooding event, as defined in NEI 12-01.The communications enclosure has been designed (per the manufacturer) to withstand 3 second bursts of 100 mph wind. The ERP Tower itself is described by the Updated Safety Analysis Report (USAR) as being designed in accordance with Class 1 seismic loadings and includes a dynamic analysis.
located in Auburn, Nebraska (approximately 11 miles to the west). This radio equipment is also hardwired to desksets and consoles at various locations at CNS and the EOF. A simplified block diagram shows interconnections for Radio System Base #1. See Figure 1.
This does not include tornadic winds as this structure is not required for safe shutdown.
Power 120V AC power to the Base #1 radio system is supplied from a lighting panel LP-ERP (Shack) Comm Box. This panel gets AC power from switchboard MSB located in the Machine Shop via step down transformer EE-XFMR-LPERP (Shack). Switchboard MSB gets its feed from non-essential 480V switchgear 1B via switchboard MSA.
Therefore, the ERP Tower and communications enclosure itself (notwithstanding the communications rack itself)provides reasonable assurance that the EP communications equipment is protected during a seismic or wind event, as defined in NEI 12-01.Communication Equipment and Racks Seismic Protection  
This panel is also permanently wired to an outside emergency generator receptacle via transfer switch CC-SW-LPERP (Shack).
-Enhancement identified.
A battery charger for Base #1 is now integrated into the radio unit itself. There is a bank of batteries to power the radio in the event of loss of AC power. The backup battery
See Table 11, item #1." Anchorages o The rack that supports the Radio Repeater (Base #1) is anchored to the floor but is unsupported at the free (upper) end. The free end of this rack may require a brace. An additional evaluation is required.o Some electrical equipment is missing hardware that fastens it to the rack.For example, the two batteries located on the bottom shelf of the Radio Repeater rack are not attached to the shelf.* Spatial Interactions o Adjacent to the rack is an unanchored box fan and an unanchored metal stand. These items should be removed or anchored.* Housekeeping o There are several miscellaneous items in the room that should be removed.o The entire room needs to be cleaned up. Box fans and unused chairs should be removed.Flood Protection  
 
-ACCEPTABLE High Winds Protection  
NLS2013028 Attachment 2 I Page9 of 37 I bank will be evaluated to assure that it provides adequate (24 hour) power. Area for enhancement (see Table 11, item #2).
-ACCEPTABLE NLS2013028 Attachment 2 Page 10 of 37 Antennas Seismic Protection  
Structural Assessment The ERP Tower communications enclosure, attached to the ERP Tower at approximately 920' elevation, provides reasonable assurance that the EP communications equipment is protected during a flooding event, as defined in NEI 12-01.
-ACCEPTABLE
The communications enclosure has been designed (per the manufacturer) to withstand 3 second bursts of 100 mph wind. The ERP Tower itself is described by the Updated Safety Analysis Report (USAR) as being designed in accordance with Class 1 seismic loadings and includes a dynamic analysis. This does not include tornadic winds as this structure is not required for safe shutdown. Therefore, the ERP Tower and communications enclosure itself (notwithstanding the communications rack itself) provides reasonable assurance that the EP communications equipment is protected during a seismic or wind event, as defined in NEI 12-01.
* Anchorages o No concerns* Spatial Interactions o No concerns* Housekeeping o No concerns Flood Protection  
Communication Equipment and Racks Seismic Protection - Enhancement identified. See Table 11, item #1.
-ACCEPTABLE High Winds Protection  
      " Anchorages o The rack that supports the Radio Repeater (Base #1) is anchored to the floor but is unsupported at the free (upper) end. The free end of this rack may require a brace. An additional evaluation is required.
-ACCEPTABLE 4.13.2 Communications Tower Following submittal of the initial Communications Assessment, NPPD installed and commissioned a new Meteorological (MET) tower. The old MET tower was re-designated as the Communications Tower. The Communications Tower, and its enclosure, continue to house and support all the same communications systems, although the narrow-banding modification made changes to the specific equipment itself. All meteorological equipment was removed from the Communications Tower following final acceptance of the new MET tower.Location and General Description EP communications equipment is located outside the PA in an enclosure adjacent to the Communications Tower. This enclosure is a pre-fabricated trailer-like structure constructed of a metal frame covered by fiberglass panels that rests on an at-grade concrete slab. The Communications Tower is a 100-meter commercial radio tower.The tower is heavily guyed with substantial guy anchors and the tower base is anchored to the concrete slab.Equipment  
o Some electrical equipment is missing hardware that fastens it to the rack.
& Functionality Radio System Base #2 repeater is located in the Communications Tower equipment enclosure.
For example, the two batteries located on the bottom shelf of the Radio Repeater rack are not attached to the shelf.
The Radio System Base #2 is comprised of a UHF transceiver and is connected to a directional antenna mounted at 50' on the tower. The Base #2 directional antenna is pointed toward the power block. Base #2 is intended to be the primary repeater for coverage using portable radios (walkie-talkies) and mobile units at the plant site. Control points for Base #2 are located at various locations at CNS and the EOF. A simplified block diagram shows interconnections for Radio System Base #2.See Figure 2.A Low-Band (VHF) radio system transceiver is located in the Communications Tower and equipment enclosure.
* Spatial Interactions o Adjacent to the rack is an unanchored box fan and an unanchored metal stand. These items should be removed or anchored.
The Low-Band antenna is installed near the top of the Communications Tower.
* Housekeeping o There are several miscellaneous items in the room that should be removed.
NLS2013028 Attachment 2 Page I Iof 37 Low-Band control points are located at various locations at CNS and the EOF in Auburn, Nebraska.
o The entire room needs to be cleaned up. Box fans and unused chairs should be removed.
A simplified block diagram shows interconnections for Radio System (Low-Band). See Figure 3.Power 120V AC power to the radio system equipment is supplied from a local power panel Ml-PNL-100M.
Flood Protection - ACCEPTABLE High Winds Protection - ACCEPTABLE
Panel MI-PNL-100M gets primary power from 480V AC switchboard EE-SWBD-NLDC via step-down transformer MI-XFMR-100M.
 
Alternate power is supplied from critical bus MCC-L via an ASCO 7000 transfer switch MI-SW-100M (Trans).There is a 48VDC charger with backup batteries installed in the Communications Tower equipment enclosure.
NLS2013028 Page 10 of 37 Antennas Seismic Protection - ACCEPTABLE
It supplies 48VDC to the DC bus and charges the backup batteries.
* Anchorages o No concerns
The charger provides power to the Base #2 repeater, a Hot-Standby Siren repeater, and a 48VDC to 12VDC converter.
* Spatial Interactions o No concerns
The 48VDC to 12VDC converter provides power to the Low-Band Radio. Battery life will be evaluated to ensure adequate capacity.
* Housekeeping o No concerns Flood Protection - ACCEPTABLE High Winds Protection - ACCEPTABLE 4.13.2 Communications Tower Following submittal of the initial Communications Assessment, NPPD installed and commissioned a new Meteorological (MET) tower. The old MET tower was re-designated as the Communications Tower. The Communications Tower, and its enclosure, continue to house and support all the same communications systems, although the narrow-banding modification made changes to the specific equipment itself. All meteorological equipment was removed from the Communications Tower following final acceptance of the new MET tower.
Area for enhancement (see Table 11, item #2).Structural Assessment The Communications Tower equipment enclosure is similar to the ERP Tower communications enclosure, and is bolted to a supporting concrete slab a few feet from the Communications Tower. The tower and enclosure are located on the non-river side of the Missouri River protective dike at an elevation higher than the surrounding ground, but lower than the nominal top of levee elevation of 902'. Therefore, if the protective dike was breached, and the surrounding area flooded to a level of several feet, there is a potential for the enclosure to be flooded.CNS experienced near-design flooding in 2011, and previously in 1993. In both cases the protective levee north of the plant failed on the Missouri side, and caused flooding into the 4-5 mile wide River basin.The Communications Tower (and enclosure) is one of the locations/equipment listed in CNS Emergency Procedure 5.1 FLOOD to consider when protecting the site from the effects of flooding.
Location and General Description EP communications equipment is located outside the PA in an enclosure adjacent to the Communications Tower. This enclosure is a pre-fabricated trailer-like structure constructed of a metal frame covered by fiberglass panels that rests on an at-grade concrete slab. The Communications Tower is a 100-meter commercial radio tower.
In 2011, the Communications Tower was sandbagged.
The tower is heavily guyed with substantial guy anchors and the tower base is anchored to the concrete slab.
A portable gas-powered pump was staged on the inside of the sandbagged area to facilitate pumping out any in-leakage or precipitation accumulation.
Equipment & Functionality Radio System Base #2 repeater is located in the Communications Tower equipment enclosure. The Radio System Base #2 is comprised of a UHF transceiver and is connected to a directional antenna mounted at 50' on the tower. The Base #2 directional antenna is pointed toward the power block. Base #2 is intended to be the primary repeater for coverage using portable radios (walkie-talkies) and mobile units at the plant site. Control points for Base #2 are located at various locations at CNS and the EOF. A simplified block diagram shows interconnections for Radio System Base #2.
It was not needed.River level increases gradually and predictably if due to precipitation.
See Figure 2.
The USAR describes the most critical acute flooding event to be the failure of a major flood control dam; either the Oahe or Fort Randall dam. The closer of the two is almost 350 miles upstream from the CNS site. The waters released by failure of this dam would require at least three days to reach the CNS site. This would be ample time for protective measures to be taken to protect this equipment.
A Low-Band (VHF) radio system transceiver is located in the Communications Tower and equipment enclosure. The Low-Band antenna is installed near the top of the Communications Tower.
 
NLS2013028 Page I Iof 37 Low-Band control points are located at various locations at CNS and the EOF in Auburn, Nebraska. A simplified block diagram shows interconnections for Radio System (Low-Band). See Figure 3.
Power 120V AC power to the radio system equipment is supplied from a local power panel Ml-PNL-100M. Panel MI-PNL-100M gets primary power from 480V AC switchboard EE-SWBD-NLDC via step-down transformer MI-XFMR-100M. Alternate power is supplied from critical bus MCC-L via an ASCO 7000 transfer switch MI-SW-100M (Trans).
There is a 48VDC charger with backup batteries installed in the Communications Tower equipment enclosure. It supplies 48VDC to the DC bus and charges the backup batteries. The charger provides power to the Base #2 repeater, a Hot-Standby Siren repeater, and a 48VDC to 12VDC converter. The 48VDC to 12VDC converter provides power to the Low-Band Radio. Battery life will be evaluated to ensure adequate capacity. Area for enhancement (see Table 11, item #2).
Structural Assessment The Communications Tower equipment enclosure is similar to the ERP Tower communications enclosure, and is bolted to a supporting concrete slab a few feet from the Communications Tower. The tower and enclosure are located on the non-river side of the Missouri River protective dike at an elevation higher than the surrounding ground, but lower than the nominal top of levee elevation of 902'. Therefore, if the protective dike was breached, and the surrounding area flooded to a level of several feet, there is a potential for the enclosure to be flooded.
CNS experienced near-design flooding in 2011, and previously in 1993. In both cases the protective levee north of the plant failed on the Missouri side, and caused flooding into the 4-5 mile wide River basin.
The Communications Tower (and enclosure) is one of the locations/equipment listed in CNS Emergency Procedure 5.1 FLOOD to consider when protecting the site from the effects of flooding. In 2011, the Communications Tower was sandbagged. A portable gas-powered pump was staged on the inside of the sandbagged area to facilitate pumping out any in-leakage or precipitation accumulation. It was not needed.
River level increases gradually and predictably if due to precipitation. The USAR describes the most critical acute flooding event to be the failure of a major flood control dam; either the Oahe or Fort Randall dam. The closer of the two is almost 350 miles upstream from the CNS site. The waters released by failure of this dam would require at least three days to reach the CNS site. This would be ample time for protective measures to be taken to protect this equipment.
Because this equipment is located below the protective levee height, it is therefore assessed as 'questionable' that the EP communications equipment within the enclosure is protected during a severe flooding event, as defined in NEI 12-01.
Because this equipment is located below the protective levee height, it is therefore assessed as 'questionable' that the EP communications equipment within the enclosure is protected during a severe flooding event, as defined in NEI 12-01.
NLS2013028 Attachment 2 Page 12 of 37 The Communications Tower is designed for 90 mph wind with no ice buildup on the structure, or a 40 mph wind with %" ice buildup on the structure.
 
The tower structure provides reasonable assurance that it is protected during a high wind event, as defined in NEI 12-01. No seismic evaluation was performed on this tower.A metal stair case is lying on the ground approximately 3' from the tower base. The stair case is judged to have no adverse effect to the tower function during a seismic, wind, or flooding event. However it should be relocated away from the tower or secured.Communication Equipment and Racks Seismic Protection  
NLS2013028 Page 12 of 37 The Communications Tower is designed for 90 mph wind with no ice buildup on the structure, or a 40 mph wind with %" ice buildup on the structure. The tower structure provides reasonable assurance that it is protected during a high wind event, as defined in NEI 12-01. No seismic evaluation was performed on this tower.
-Enhancement identified.
A metal stair case is lying on the ground approximately 3' from the tower base. The stair case is judged to have no adverse effect to the tower function during a seismic, wind, or flooding event. However it should be relocated away from the tower or secured.
See Table 11, item #1." Anchorages o  
Communication Equipment and Racks Seismic Protection - Enhancement identified. See Table 11, item #1.
    "   Anchorages o
 
==Enclosure:==
The backup batteries are located on a metal stand housed in a small room attached to the enclosure. The metal stand is anchored to the floor but is unsupported at the upper end. The batteries should be fastened to the metal stand shelf and the upper end of the metal stand may require a brace. An additional evaluation is required. Outside the communications enclosure is a low profile transformer. The transformer anchorage could not be verified because of a build-up of silt. It is recommended that the silt be removed to inspect anchorage adequacy.
* Spatial Interactions o  


==Enclosure:==
==Enclosure:==
Inside the enclosure, adjacent to the equipment racks, are an unanchored pump and hoses, a 55-gallon trash barrel, and a metal tool box. These items should be removed or secured.
* Housekeeping o The entire room needs to be cleaned up. The portable pump, hoses, tool box and trash barrels should be removed.
Flood Protection - QUESTIONABLE High Winds Protection - ACCEPTABLE Antennas - Communications Tower Seismic Protection - ACCEPTABLE
* Anchorages o No concerns
* Spatial Interactions o No concerns
* Housekeeping o No concerns Flood Protection - ACCEPTABLE High Winds Protection - ACCEPTABLE


The backup batteries are located on a metal stand housed in a small room attached to the enclosure.
NLS2013028 Page 13 of 37 4.13.3 Emergency Operations Facility Location and General Description The EOF is one of several dedicated rooms within the NPPD Offsite Response Center, located in Auburn, Nebraska. The Offsite Response Center is one of several interconnected buildings making up part of the downtown district. It is a one-story commercial block building, with a partial basement.
The metal stand is anchored to the floor but is unsupported at the upper end. The batteries should be fastened to the metal stand shelf and the upper end of the metal stand may require a brace. An additional evaluation is required.
Equipment & Functionality The EOF communications equipment room (Telecom Room 117) contains the Base #1 and #2 link radio and a control circuit to the Low Band radio transceiver located at the site. The Base #1 and #2 link radio is connected to antennas mounted on the roof of the building. The Low Band radio console is connected via redundant telecom circuits to the Low Band radio base in the Communications Tower equipment enclosure at the site.
Outside the communications enclosure is a low profile transformer.
The telecom circuit is provided by a private fiber optic system with a backup leased TI.
The transformer anchorage could not be verified because of a build-up of silt. It is recommended that the silt be removed to inspect anchorage adequacy.* Spatial Interactions o
Desktop radio consoles are hardwired to their respective radio transceiver or Low Band control circuit. Wireless headsets are used by the EOF Director, EOF Radiological Control Manager, and the Health Physics Network (HPN) Bridge for offsite communications. There are three satellite phones in the EOF used to communicate with the plant, offsite agencies, and downwind survey field teams.
Power Primary power to the EOF (Offsite Response Center) is supplied from the local utility.
120V AC power supply to communications equipment is provided from distribution panel MBP through a 1OKVA, EATON model 10, System 9355-10, UPS. Backup power is supplied by a Diesel Generator (DG) via an auto-transfer switch. As an enhancement, the UPS batteries should be sized to provide adequate amp hour capacity as required.
Enhancement identified (see Table 11, item #2).
Structural Assessment The Offsite Response Center is a one-story commercial block building, with a partial basement. There are no streams or rivers nearby and the land slopes to the rear of the building providing sufficient runoff during rain storms. Therefore, the building structure provides reasonable assurance that the EP communications equipment is protected during a seismic, wind, or flooding event, as defined in NEI 12-01.
Antennas are attached to a robust steel structural member located on the roof. This provides reasonable assurance that the EP communications equipment is protected during a seismic, wind, or flooding event, as defined in NEI 12-01.
Diesel Generator Room Seismic Protection - Enhancement identified. See Table 11, item #1.


==Enclosure:==
NLS2013028 Page 14 of 37
    " Anchorages o No concerns
* Spatial Interactions o Fluorescent lights in the overhead could fall out of the light fixture and could be secured.
    " Housekeeping o Combustible materials such as a storage bin, trash barrel, vacuum cleaner, and mop are stored near the DG and should be removed.
Flood Protection - ACCEPTABLE High Winds Protection - ACCEPTABLE Telecom Room 117 Communications Equipment and Racks Seismic Protection - Enhancement identified. See Table 11, item #1.
    " Anchorages o Rack 1 is anchored to the floor but is unsupported at the free (upper) end. The free end of this rack may require an additional brace. An additional evaluation may be required. The Siren Encoder Radio and CNS base components are not attached to Rack 1 shelf.
o The nearby UPS is unanchored. This unit should be anchored.
* Spatial Interactions o No concerns
* Housekeeping o Telecom Room 117 could use a cleaning of papers, miscellaneous unused hardware, and other items.
Flood Protection - ACCEPTABLE High Winds Protection - ACCEPTABLE Antennas Seismic Protection - ACCEPTABLE
* Anchorages o No concerns
* Spatial Interactions o No concerns
* Housekeeping o No concerns Flood Protection - ACCEPTABLE High Winds Protection - ACCEPTABLE


Inside the enclosure, adjacent to the equipment racks, are an unanchored pump and hoses, a 55-gallon trash barrel, and a metal tool box. These items should be removed or secured.* Housekeeping o The entire room needs to be cleaned up. The portable pump, hoses, tool box and trash barrels should be removed.Flood Protection
NLS2013028 Page 15 of 37 4.13.4 Technical Support Center/Operational Support Center (TSC/OSC)
-QUESTIONABLE High Winds Protection
Location and General Description The TSC/OSC is located inside the PA on the ground floor of the Administration Building at 903' 6" elevation. The TSC and OSC exterior walls, floor and ceiling are constructed of reinforced concrete. Interior walls are similar to an office style environment.
-ACCEPTABLE Antennas -Communications Tower Seismic Protection
Equipment & Functionality The TSC contains several PBX-dependent communications bridges. If the site PBX is inoperable (as assumed by this assessment) these bridges would be unavailable. Other installed communications (Central Office lines, Alternate intercom, Sound power, Plant paging) were also initially assumed to be inoperable.
-ACCEPTABLE
The TSC/OSC inventory includes portable, handheld multi-channel radios which provide point-to-point onsite communications for the OSC and TSC. This includes in-plant operations, radiation protection, and maintenance/repair teams. This is the method credited by this assessment. Some relaying of messages may be required.
* Anchorages o No concerns* Spatial Interactions o No concerns* Housekeeping o No concerns Flood Protection
The TSC inventory also includes portable satellite telephones, providing communications between key TSC personnel and offsite response organizations.
-ACCEPTABLE High Winds Protection
Power Installed communication equipment located in the TSC and OSC is powered from lighting panel LP-TSC. Primary power to this panel is fed from the plant 12.5Kv system.
-ACCEPTABLE NLS2013028 Attachment 2 Page 13 of 37 4.13.3 Emergency Operations Facility Location and General Description The EOF is one of several dedicated rooms within the NPPD Offsite Response Center, located in Auburn, Nebraska.
On loss of the primary power source, power to panel LP-TSC may be transferred to an alternate power supply (MCC-CA). Backup power to MCC-CA comes from a station DG. During an SBO, the TSC and OSC will have no AC power available.
The Offsite Response Center is one of several interconnected buildings making up part of the downtown district.
It is a one-story commercial block building, with a partial basement.Equipment
& Functionality The EOF communications equipment room (Telecom Room 117) contains the Base #1 and #2 link radio and a control circuit to the Low Band radio transceiver located at the site. The Base #1 and #2 link radio is connected to antennas mounted on the roof of the building.
The Low Band radio console is connected via redundant telecom circuits to the Low Band radio base in the Communications Tower equipment enclosure at the site.The telecom circuit is provided by a private fiber optic system with a backup leased TI.Desktop radio consoles are hardwired to their respective radio transceiver or Low Band control circuit. Wireless headsets are used by the EOF Director, EOF Radiological Control Manager, and the Health Physics Network (HPN) Bridge for offsite communications.
There are three satellite phones in the EOF used to communicate with the plant, offsite agencies, and downwind survey field teams.Power Primary power to the EOF (Offsite Response Center) is supplied from the local utility.120V AC power supply to communications equipment is provided from distribution panel MBP through a 1OKVA, EATON model 10, System 9355-10, UPS. Backup power is supplied by a Diesel Generator (DG) via an auto-transfer switch. As an enhancement, the UPS batteries should be sized to provide adequate amp hour capacity as required.Enhancement identified (see Table 11, item #2).Structural Assessment The Offsite Response Center is a one-story commercial block building, with a partial basement.
There are no streams or rivers nearby and the land slopes to the rear of the building providing sufficient runoff during rain storms. Therefore, the building structure provides reasonable assurance that the EP communications equipment is protected during a seismic, wind, or flooding event, as defined in NEI 12-01.Antennas are attached to a robust steel structural member located on the roof. This provides reasonable assurance that the EP communications equipment is protected during a seismic, wind, or flooding event, as defined in NEI 12-01.Diesel Generator Room Seismic Protection
-Enhancement identified.
See Table 11, item #1.
NLS2013028 Attachment 2 Page 14 of 37" Anchorages o No concerns* Spatial Interactions o Fluorescent lights in the overhead could fall out of the light fixture and could be secured." Housekeeping o Combustible materials such as a storage bin, trash barrel, vacuum cleaner, and mop are stored near the DG and should be removed.Flood Protection
-ACCEPTABLE High Winds Protection
-ACCEPTABLE Telecom Room 117 Communications Equipment and Racks Seismic Protection
-Enhancement identified.
See Table 11, item #1." Anchorages o Rack 1 is anchored to the floor but is unsupported at the free (upper)end. The free end of this rack may require an additional brace. An additional evaluation may be required.
The Siren Encoder Radio and CNS base components are not attached to Rack 1 shelf.o The nearby UPS is unanchored.
This unit should be anchored.* Spatial Interactions o No concerns* Housekeeping o Telecom Room 117 could use a cleaning of papers, miscellaneous unused hardware, and other items.Flood Protection
-ACCEPTABLE High Winds Protection
-ACCEPTABLE Antennas Seismic Protection
-ACCEPTABLE
* Anchorages o No concerns* Spatial Interactions o No concerns* Housekeeping o No concerns Flood Protection
-ACCEPTABLE High Winds Protection
-ACCEPTABLE NLS2013028 Attachment 2 Page 15 of 37 4.13.4 Technical Support Center/Operational Support Center (TSC/OSC)Location and General Description The TSC/OSC is located inside the PA on the ground floor of the Administration Building at 903' 6" elevation.
The TSC and OSC exterior walls, floor and ceiling are constructed of reinforced concrete.
Interior walls are similar to an office style environment.
Equipment  
& Functionality The TSC contains several PBX-dependent communications bridges. If the site PBX is inoperable (as assumed by this assessment) these bridges would be unavailable.
Other installed communications (Central Office lines, Alternate intercom, Sound power, Plant paging) were also initially assumed to be inoperable.
The TSC/OSC inventory includes portable, handheld multi-channel radios which provide point-to-point onsite communications for the OSC and TSC. This includes in-plant operations, radiation protection, and maintenance/repair teams. This is the method credited by this assessment.
Some relaying of messages may be required.The TSC inventory also includes portable satellite telephones, providing communications between key TSC personnel and offsite response organizations.
Power Installed communication equipment located in the TSC and OSC is powered from lighting panel LP-TSC. Primary power to this panel is fed from the plant 12.5Kv system.On loss of the primary power source, power to panel LP-TSC may be transferred to an alternate power supply (MCC-CA).
Backup power to MCC-CA comes from a station DG. During an SBO, the TSC and OSC will have no AC power available.
Structural Assessment The desktop communication equipment and handheld radios with battery chargers are light weight, and would not ordinarily be affixed to a desk. Therefore from a structural perspective, this equipment is judged as acceptable.
Structural Assessment The desktop communication equipment and handheld radios with battery chargers are light weight, and would not ordinarily be affixed to a desk. Therefore from a structural perspective, this equipment is judged as acceptable.
The Administration Building is constructed of concrete and steel. The TSC and OSC are more substantial rooms within the Administration Building and meet regulatory requirements for Emergency Response Facilities (ERF). The Administration Building is built at elevation 903' 6" and has sufficient drainage.
The Administration Building is constructed of concrete and steel. The TSC and OSC are more substantial rooms within the Administration Building and meet regulatory requirements for Emergency Response Facilities (ERF). The Administration Building is built at elevation 903' 6" and has sufficient drainage. Therefore, the building structure provides reasonable assurance that the EP communications equipment is protected during a seismic, wind, or flooding event, as defined in NEI 12-01.
Therefore, the building structure provides reasonable assurance that the EP communications equipment is protected during a seismic, wind, or flooding event, as defined in NEI 12-01.
 
NLS2013028 Attachment 2 I Page 16 of 37 TSC/OSC Seismic Protection  
NLS2013028 Attachment 2 I Page 16 of 37 TSC/OSC Seismic Protection - ACCEPTABLE
-ACCEPTABLE
* Anchorages o No concerns
* Anchorages o No concerns* Spatial Interactions o No concerns* Housekeeping o No concerns Flood Protection  
* Spatial Interactions o No concerns
-ACCEPTABLE High Winds Protection  
* Housekeeping o No concerns Flood Protection - ACCEPTABLE High Winds Protection - ACCEPTABLE 4.13.5 Central Alarm Station (CAS)
-ACCEPTABLE 4.13.5 Central Alarm Station (CAS)Location and General Description The CAS enclosure is located inside the PA interior to the Security Building, not exposed to the outside environment.
Location and General Description The CAS enclosure is located inside the PA interior to the Security Building, not exposed to the outside environment. The CAS enclosure itself is fabricated from plate steel with steel intermediate members. The CAS communications antenna is located outside and adjacent to the Communications Building.
The CAS enclosure itself is fabricated from plate steel with steel intermediate members. The CAS communications antenna is located outside and adjacent to the Communications Building.Equipment  
Equipment & Functionality Radio System Base #3 repeater is installed in a security equipment rack in the CAS enclosure. The radio system Base #3 repeater is a Motorola Quantar repeater, and is connected to an antenna on a tower adjacent to the north wall of the Communications Building. Additional details on these radios and their use is classified as Safeguards Information.
& Functionality Radio System Base #3 repeater is installed in a security equipment rack in the CAS enclosure.
Power The CAS radio base is powered from a critical MCC, with a UPS as a backup.
The radio system Base #3 repeater is a Motorola Quantar repeater, and is connected to an antenna on a tower adjacent to the north wall of the Communications Building.
Structural Assessment The CAS structure is an enclosure fabricated from plate steel and steel supporting members. This enclosure is internal to the Security Building at elevation 903' 6". The CAS enclosure provides reasonable assurance that the EP communications equipment is protected during a seismic, wind, or flooding event, as defined in NEI 12-01.
Additional details on these radios and their use is classified as Safeguards Information.
The antenna tower is anchored to a concrete slab and is laterally braced to the Security Building. A less than 1/16" wide crack exists in this slab; however this crack is outside the anchor bolt locations and is judged not to affect the anchor capacity or slab.
Power The CAS radio base is powered from a critical MCC, with a UPS as a backup.Structural Assessment The CAS structure is an enclosure fabricated from plate steel and steel supporting members. This enclosure is internal to the Security Building at elevation 903' 6". The CAS enclosure provides reasonable assurance that the EP communications equipment is protected during a seismic, wind, or flooding event, as defined in NEI 12-01.The antenna tower is anchored to a concrete slab and is laterally braced to the Security Building.
 
A less than 1/16" wide crack exists in this slab; however this crack is outside the anchor bolt locations and is judged not to affect the anchor capacity or slab.
NLS2013028 Page 17 of 37 The antenna structure provides reasonable assurance that the' EP communications equipment is protected during a seismic, wind, or flooding event, as defined in NEI 12-01.
NLS2013028 Attachment 2 Page 17 of 37 The antenna structure provides reasonable assurance that the' EP communications equipment is protected during a seismic, wind, or flooding event, as defined in NEI 12-01.Communication Equipment and Racks Seismic Protection  
Communication Equipment and Racks Seismic Protection - ACCEPTABLE
-ACCEPTABLE" Anchorages o No concerns* Spatial Interactions o No concerns* Housekeeping o No concerns Flood Protection  
    " Anchorages o No concerns
-ACCEPTABLE High Winds Protection  
* Spatial Interactions o No concerns
-ACCEPTABLE Antenna Seismic Protection  
* Housekeeping o No concerns Flood Protection - ACCEPTABLE High Winds Protection - ACCEPTABLE Antenna Seismic Protection - ACCEPTABLE
-ACCEPTABLE
* Anchorages o No concerns
* Anchorages o No concerns* Spatial Interactions o No concerns* Housekeeping o No concerns Flood Protection  
* Spatial Interactions o No concerns
-ACCEPTABLE High Winds Protection  
* Housekeeping o No concerns Flood Protection - ACCEPTABLE High Winds Protection - ACCEPTABLE
-ACCEPTABLE NLS2013028 Attachment 2 Page 18 of 37 Table 1: Offsite Response Organization Notifications to, and communications with, OROs [per 10 CFR 50 Appendix E.IV.D and E.9.a]Emergency Minimum Primary Primary Backup Backup Planned or Potential Response Communications Method Method Method(s)
 
Method(s)
NLS2013028 Page 18 of 37 Table 1: Offsite Response Organization Notifications to, and communications with, OROs [per 10 CFR 50 Appendix E.IV.D and E.9.a]
Enhancement Facility Links Described Available Described in Available Identified?
Emergency           Minimum             Primary       Primary         Backup             Backup   Planned or Potential Response           Communications       Method       Method         Method(s)         Method(s) Enhancement Facility           Links               Described     Available       Described in       Available Identified?
in Site Following site E-Plan Following E-Plan Assumed Assumed Large Scale LSEE?External Event (LSEE)?Control Room 1 per Control Room CNS State NO Two-Way FM NO YES (CR) for Communicator Notification Radio System Assure CR and OROs Telephone (High Band) have satellite System's telephone capability.
in Site       Following       site E-Plan       Following E-Plan       Assumed                           Assumed Large Scale                       LSEE?
dedicated line Technical 1 for Key TSC CNS State NO Two-Way FM NO YES Support Center Communicator Notification Radio System Assure TSC and Telephone (High Band) OROs have satellite System's telephone capability.
External Event (LSEE)?
dedicated line NLS2013028 Attachment 2 I Page 19 of 37 Emergency Minimum Primary Primary Backup Backup Planned or Potential Response Communications Method Method Method(s)
Control Room       1 per Control Room   CNS State     NO             Two-Way FM         NO       YES (CR)               for Communicator     Notification                 Radio System                 Assure CR and OROs Telephone                     (High Band)                 have satellite System's                                                   telephone capability.
Method(s)
dedicated line Technical           1 for Key TSC       CNS State     NO             Two-Way FM         NO       YES Support Center     Communicator         Notification                 Radio System                 Assure TSC and Telephone                     (High Band)                 OROs have satellite System's                                                   telephone capability.
Enhancement Facility Links Described Available Described in Available Identified?
dedicated line
in Site Following site E-Plan Following E-Plan Assumed Assumed Large Scale LSEE?External Event (LSEE)?Emergency 1 for Key EOF State NO Two-Way FM NO YES Operations Communicator Notification Radio System Assure EOF and Facility Telephone (High Band) OROs have satellite System's telephone capability.
 
dedicated line NLS2013028 Attachment 2 Page 20 of 37 Table 2: Nuclear Regulatory Commission Notifications to, and communications with, the NRC Headquarters Incident Response Center and the appropriate NRC Regional Office Operations Center [per 10 CFR 50 Appendix E.IV.D and E.9.d]Emergency Minimum Primary Primary Backup Backup Planned or Potential Response Communications Method Method Method(s)
NLS2013028 Attachment 2 I Page 19 of 37 Emergency     Minimum       Primary     Primary       Backup       Backup   Planned or Potential Response     Communications Method       Method         Method(s)   Method(s) Enhancement Facility     Links         Described   Available     Described in Available Identified?
Method(s)
in Site     Following     site E-Plan Following E-Plan       Assumed                     Assumed Large Scale                 LSEE?
Enhancement Facility Links Described in Available Described in Available Identified?
External Event (LSEE)?
Site E-Plan Following Site E-Plan Following Assumed Assumed LSEE? LSEE?Control Room 1 per Control ENS NO Plant NO YES -satellite phone Room for Dedicated Telephone Emergency Phone Line (PBX)Notification System (ENS)Communicator Technical 1 for ENS ENS NO PBX NO YES -satellite phone Support Center Communicator Dedicated Phone Line Location(s) 1 for HPN HPN NO PBX NO YES -satellite phone where HPN Communicator Dedicated communications Phone Line are performed (TSC, EOF)
Emergency     1 for Key EOF State       NO             Two-Way FM   NO       YES Operations   Communicator   Notification               Radio System           Assure EOF and Facility                     Telephone                   (High Band)           OROs have satellite System's                                           telephone capability.
NLS2013028 Attachment 2 I Page 21 of 37 Table 3: Licensee Emergency Response Facilities Communications between licensee emergency response facilities
dedicated line
[per 10 CFR 50 Appendix E.9.c. Additional links that support performance of critical response functions are also specified].
 
The minimum communications links to support this function are listed below by facility.
NLS2013028 Page 20 of 37 Table 2: Nuclear Regulatory Commission Notifications to, and communications with, the NRC Headquarters Incident Response Center and the appropriate NRC Regional Office Operations Center [per 10 CFR 50 Appendix E.IV.D and E.9.d]
For example, if the normally used telephone system cannot be restored to service, these links could rely upon some combination of radio, sound-powered, and satellite-based communications systems.Emergency Minimum Primary Primary Method Backup Backup Planned or Response Communications Method Available Method(s)
Emergency           Minimum             Primary       Primary           Backup           Backup           Planned or Potential Response           Communications     Method       Method             Method(s)       Method(s)         Enhancement Facility           Links               Described in Available         Described in   Available         Identified?
Method(s)
Site E-Plan   Following         Site E-Plan     Following Assumed                           Assumed LSEE?                               LSEE?
Potential Facility Links Described in Following Described in Available Enhancement Site E-Plan Assumed LSEE? Site E-Plan Following Identified?
Control Room       1 per Control       ENS           NO                 Plant           NO               YES - satellite phone Room for           Dedicated                       Telephone Emergency           Phone Line                       (PBX)
Assumed LSEE?Control Room 1 per Unit PBX NO Two-Way FM NO YES -satellite Radio System phone (High Band)
Notification System (ENS)
NLS2013028 Attachment 2 I Page 22 of 37 Emergency Minimum Primary Primary Method Backup Backup Planned or Response Communications Method Available Method(s)
Communicator Technical           1 for ENS           ENS           NO                 PBX             NO               YES - satellite phone Support Center     Communicator       Dedicated Phone Line Location(s)         1 for HPN           HPN           NO                 PBX             NO               YES - satellite phone where HPN           Communicator       Dedicated communications                         Phone Line are performed (TSC, EOF)
Method(s)
 
Potential Facility Links Described in Following Described in Available Enhancement Site E-Plan Assumed LSEE? Site E-Plan Following Identified?
NLS2013028 Attachment 2 I Page 21 of 37 Table 3: Licensee Emergency Response Facilities Communications between licensee emergency response facilities [per 10 CFR 50 Appendix E.9.c. Additional links that support performance of critical response functions are also specified]. The minimum communications links to support this function are listed below by facility. For example, if the normally used telephone system cannot be restored to service, these links could rely upon some combination of radio, sound-powered, and satellite-based communications systems.
Assumed LSEE?Technical Support Center 1 each for:-Senior/Lead TSC Manager-Operations Coordination
Emergency         Minimum               Primary         Primary Method     Backup           Backup                 Planned or Response         Communications         Method         Available           Method(s)         Method(s)             Potential Facility         Links                 Described in   Following           Described in     Available             Enhancement Site E-Plan     Assumed LSEE?       Site E-Plan       Following             Identified?
-Maintenance Coordination
Assumed LSEE?
-Engineering Coordination
Control Room       1 per Unit           PBX             NO                 Two-Way FM       NO                   YES - satellite Radio System                             phone (High Band)
-Radiological Support Additional response coordination links for multi-unit site:-1 for each position providing Unit Response Coordination PBX (ALL)NO Two-Way FM Radio System (High Band)(ALL)NO YES -satellite phones or handheld radios NLS2013028 Attachment 2 I Page 23 of 37 Emergency Minimum Primary Primary Method Backup Backup Planned or Response Communications Method Available Method(s)
 
Method(s)
NLS2013028 Attachment 2 I Page 22 of 37 Emergency     Minimum             Primary     Primary Method Backup       Backup       Planned or Response     Communications       Method       Available     Method(s)   Method(s)     Potential Facility     Links               Described in Following     Described in Available     Enhancement Site E-Plan Assumed LSEE? Site E-Plan Following     Identified?
Potential Facility Links Described in Following Described in Available Enhancement Site E-Plan Assumed LSEE? Site E-Plan Following Identified?
Assumed LSEE?
Assumed LSEE?Operations 1 each for: PBX NO Two-Way FM NO YES -satellite Support
Technical     1 each for:         PBX          NO            Two-Way FM  NO            YES - satellite Support      - Senior/Lead TSC   (ALL)                      Radio System              phones or Center        Manager                                         (High Band)                handheld radios
* Senior/Lead OSC (ALL) Radio System phones or Center Manager (High Band) handheld radios* Radiological (ALL)Support Additional response coordination links for multi-unit site:* 1 for each position providing Unit In-Plant Team Coordination NLS2013028 Attachment 2 I Page 24 of 37 Emergency Minimum Primary Primary Method Backup Backup Planned or Response Communications Method Available Method(s)
                - Operations                                     (ALL)
Method(s)
Coordination
Potential Facility Links Described in Following Described in Available Enhancement Site E-Plan Assumed LSEE? Site E-Plan Following Identified?
                - Maintenance Coordination
Assumed LSEE?Emergency 1 each for: PBX NO Two-Way FM NO YES -satellite Operations
                - Engineering Coordination
* Senior/Lead (ALL) Radio System phones Facility Manager (High Band)* Key Protective (ALL)Measures-Operations or Technical Support (as needed to support performance of dose projections, formulation of PARs and plant status updates to ORO authorities)
                - Radiological Support Additional response coordination links for multi-unit site:
Joint 1 for Senior PBX NO Alternate NO YES -satellite Information Manager Intercom phone Center system NLS2013028 Attachment 2 Page 25 of 37 Table 4: Field / Offsite Monitoring Teams Communications with field/offsite monitoring teams [per 10 CFR 50 Appendix E.9.c].Emergency Minimum Primary Primary Backup Backup Planned or Potential Response Communications Method Method Method(s)
                - 1 for each position providing Unit Response Coordination
Method(s)
 
Enhancement Facility Links Described in Available Described in Available Identified?
NLS2013028 Attachment 2 I Page 23 of 37 Emergency     Minimum             Primary     Primary Method Backup       Backup       Planned or Response     Communications       Method       Available     Method(s)   Method(s)     Potential Facility     Links               Described in Following     Described in Available     Enhancement Site E-Plan Assumed LSEE? Site E-Plan Following     Identified?
Site E-Plan Following Site E-Plan Following Assumed Assumed LSEE? LSEE?Primary location Field/offsite Two-Way FM NO Two-Way FM NO YES -satellite phone where monitoring team Radio Radio System field/offsite coordination System (Low (High Band)monitoring team Band)coordination is performed (EOF)Primary location 1 for each Two-Way FM NO Two-Way FM NO YES -satellite phones from which field/offsite Radio Radio System field/offsite monitoring team System (Low (High Band)monitoring Band)teams are deployed (TSC)
Assumed LSEE?
NLS2013028 Attachment 2 I Page 26 of 37 Table 5: Other Federal Agencies Communications with other Federal agencies as described in the site E-Plan (e.g., the US Coast Guard) [per 10 CFR 50 Appendix E.9.b]Emergency Minimum Primary Primary Backup Backup Planned or Potential Response Communications Method Method Method(s)
Operations     1 each for:         PBX         NO             Two-Way FM   NO           YES - satellite Support
Method(s)
* Senior/Lead OSC   (ALL)                       Radio System               phones or Center       Manager                                         (High Band)               handheld radios
Enhancement Facility Links Described in Available Described in Available Identified?
* Radiological                                   (ALL)
Site E-Plan Following Site E-Plan Following Assumed Assumed LSEE? LSEE?Primary location Coordination with FTS 2001 NO Commercial NO YES -satellite phone where Federal agencies -Network Telephone communication CR, TSC, EOF with Federal agencies is performed NLS2013028 Attachment 2 I Page 27 of 37 Table 6: On-site and In-plant Response Teams Coordination and direction of on-site and in-plant response teams. This includes teams necessary to affect emergency repairs, firefighting, search and rescue, radiological monitoring, and implementation of Transition Phase coping and severe accident management strategies.
Support Additional response coordination links for multi-unit site:
To accommodate the timeline associated with NRC Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (as discussed in Section 1).Emergency Minimum Primary Primary Backup Backup Planned or Potential Response Communications Method Method Method(s)
* 1 for each position providing Unit In-Plant Team Coordination
Method(s)
 
Enhancement Facility Links Described Available Described in Available Identified?
NLS2013028 Attachment 2 I Page 24 of 37 Emergency     Minimum           Primary     Primary Method Backup       Backup       Planned or Response     Communications   Method       Available     Method(s)   Method(s)     Potential Facility     Links             Described in Following     Described in Available     Enhancement Site E-Plan Assumed LSEE? Site E-Plan Following     Identified?
in Site E- Following Site E-Plan Following Plan Assumed Assumed LSEE? LSEE?On-shift staff Number necessary Station YES -4 hours Two-Way FM YES YES -additional for the onshift staff Intercom/
Assumed LSEE?
only Radios batteries for radios to perform Initial Gaitronics Phase coping actions (reflecting current staff &strategies)
Emergency     1 each for:       PBX         NO             Two-Way FM   NO           YES - satellite Operations
NLS2013028 Attachment 2 Page 28 of 37 Emergency Minimum Primary Primary Backup Backup Planned or Potential Response Communications Method Method Method(s)
* Senior/Lead     (ALL)                       Radio System               phones Facility     Manager                                       (High Band)
Method(s)
* Key Protective                             (ALL)
Enhancement Facility Links Described Available Described in Available Identified?
Measures
in Site E- Following Site E-Plan Following Plan Assumed Assumed LSEE? LSEE?Operational Support Center and other site-specific locations as necessary 1 each for:-On-site radiological monitoring 2 each for:* Firefighting (1 for brigade leader and 1 for the brigade)2 each per unit for:* In-plant radiological monitoring
                - Operations or Technical Support (as needed to support performance of dose projections, formulation of PARs and plant status updates to ORO authorities)
-Search and Rescue-Emergency repairs Site-specific number needed to implement any 2 severe accident mitigation strategies Station Intercom/Gaitronics YES -4 hours only Two-Way FM Radios YES YES -additional batteries for radios NLS2013028 Attachment 2 Page 29 of 37 Table 7: Plant Paging (Announcement)
Joint         1 for Senior     PBX         NO             Alternate   NO           YES - satellite Information   Manager                                       Intercom                   phone Center                                                     system
System Emergency Response Minimum Is This System Available Planned or Potential Enhancement Facility Communications Links Following Assumed Identified?
 
LSEE?N/A (Site-wide)
NLS2013028 Page 25 of 37 Table 4: Field / Offsite Monitoring Teams Communications with field/offsite monitoring teams [per 10 CFR 50 Appendix E.9.c].
See assumptions and YES -4 hours only NO discussion in NEI 12-01.
Emergency         Minimum               Primary         Primary         Backup       Backup   Planned or Potential Response         Communications       Method         Method         Method(s)   Method(s) Enhancement Facility         Links                 Described in   Available       Described in Available Identified?
NLS2013028 Attachment 2 Page 30 of 37 Table 8: Communications Equipment at ORO Facilities Emergency Minimum Primary Primary Method Backup Backup Planned or Response Communications Method Available Method(s)
Site E-Plan     Following       Site E-Plan Following Assumed                     Assumed LSEE?                       LSEE?
Method(s)
Primary location Field/offsite         Two-Way FM     NO             Two-Way FM   NO       YES - satellite phone where             monitoring team       Radio                           Radio System field/offsite     coordination         System (Low                     (High Band) monitoring team                         Band) coordination is performed (EOF)
Potential Facility Links Described following Described Available Enhancement in site E- Assumed LSEE? in site E- following Identified?
Primary location 1 for each           Two-Way FM     NO             Two-Way FM   NO       YES - satellite phones from which       field/offsite         Radio                           Radio System field/offsite     monitoring team       System (Low                     (High Band) monitoring                             Band) teams are deployed (TSC)
Plan Plan Assumed LSEE?Location where OROs receive notifications of an emergency declaration or a Protective Action Recommendation (as described in the site emergency plan)At least one. See assumptions and discussion in NEI 12-01.ORO FACILITY Nebraska State Patrol Nemaha County Sheriff Richardson County Sheriff Missouri State Patrol Atchison County 911 Center Commercial Telephone (ALL)NO NONE (ALL)NO (ALL)YES -satellite phones I. I A A &
 
NLS2013028 Attachment 2 Page 31 of 37 Table 9: Equipment Locations and Protection System / Primary System Equipment protected from the below hazards Equipment Component Location Protected from Protected from Protected from Comments Seismic Flooding Wind as defined in this as defined in this as defined in this document document document UHF Radio ERP Tower & NO YES YES See Section 4.13.1 Base Enclosure for details of Repeaters protection and Radio conclusions Link Communications NO NO YES See Section 4.13.2 Tower & Enclosure for details of protection conclusions EOF NO YES YES See Section 4.13.3 for details of protection conclusions CAS YES YES YES See Section 4.13.5 for details of protection conclusions NLS2013028 Attachment 2 I Page 32 of 37 System / Primary System Equipment protected from the below hazards Equipment Component Location Protected from Protected from Protected from Comments Seismic Flooding Wind as defined in this as defined in this as defined in this document document document UHF Radio TSC/OSC YES YES YES See section 4.13.4 Base for details of Repeaters protection and Radio conclusions Link NLS2013028 Attachment 2 I Page 33 of 37 Table 10 CNS Analysis of Required EP Communications Links Reference NEI 12-01 Section 4, Communications During An Extended Loss of AC Power Total number Total number Additional required required on-hand Satellite phones 13 13 0 Radios 22 26 are available in 0 CR and TSC/OSC** Additional radios are available from Security and Fire Brigade but were not credited.Several of the reporting requirements listed above are performed by one individual.
NLS2013028 Attachment 2 I Page 26 of 37 Table 5: Other Federal Agencies Communications with other Federal agencies as described in the site E-Plan (e.g., the US Coast Guard) [per 10 CFR 50 Appendix E.9.b]
Below is a list of satellite phones and radios credited for establishing critical communications links.Facility Satellite phones Radios Control Room 13* Shift Manager 1* Shift Communicator 1* Shift Rad. Tech. 1 Technical Support Center/Operational Support Center 13* TSC Director 1* ENS Communicator 1 Emergency Operations Facility* Emergency Director 1* Offsite Communicator 1* Field Team Coordinator 1 Field Monitoring Teams 2 Joint Information Center a Designated Spokesperson 1 Fire Brigade 2 Total 13 26 NLS2013028 Attachment 2 Page 34 of 37 Table 11 Summary of Enhancements
Emergency       Minimum             Primary         Primary             Backup           Backup             Planned or Potential Response         Communications     Method         Method             Method(s)         Method(s)         Enhancement Facility         Links               Described in   Available           Described in     Available         Identified?
# Description Projected Completion Date 1 Resolve issues identified related to anchorages, spatial Complete interactions, and housekeeping.
Site E-Plan     Following           Site E-Plan       Following Assumed                               Assumed LSEE?                                 LSEE?
2 Evaluate and assure that batteries supporting a minimum of 02/28/14 two installed radio system repeaters are sized to provide adequate (24 hour) capacity.3 Ensure that primary OROs within a 25 mile radius have 12/31/13 satellite communications capabilities.
Primary location Coordination with   FTS 2001       NO                 Commercial       NO                 YES - satellite phone where           Federal agencies - Network                             Telephone communication   CR, TSC, EOF with Federal agencies is performed
4 Evaluate options and select method(s) to support indoor 12/10/13 (remote) access to satellite-based communications.
 
5 Ensure adequate battery-based power is available to Complete handheld communications devices credited to support prolonged SBO conditions.
NLS2013028 Attachment 2 I Page 27 of 37 Table 6: On-site and In-plant Response Teams Coordination and direction of on-site and in-plant response teams. This includes teams necessary to affect emergency repairs, firefighting, search and rescue, radiological monitoring, and implementation of Transition Phase coping and severe accident management strategies. To accommodate the timeline associated with NRC Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (as discussed in Section 1).
6 Determine if alternative measures now used for inoperable Complete paging coverage areas can be used for site-wide notification.
Emergency           Minimum                 Primary       Primary         Backup           Backup           Planned or Potential Response           Communications         Method         Method         Method(s)         Method(s)         Enhancement Facility           Links                   Described     Available       Described in     Available       Identified?
7 Ensure enhancements implemented include programmatic 09/30/15 support (procedures, inventories, training, testing).8 Obtain additional GETS cards for key personnel or ERFs. Complete 9 Install indoor (remote) access to satellite-based 06/30/14 communications; three at plant site, three at OROs.The enhancements identified above may be modified or changed as implementation progresses.
in Site E-     Following       Site E-Plan       Following Plan           Assumed                           Assumed LSEE?                             LSEE?
Alternate approaches may be utilized if prudent (e.g., alternate/new technology, improved capability, cost savings, etc.).
On-shift staff     Number necessary       Station       YES - 4 hours   Two-Way FM       YES             YES - additional for the onshift staff   Intercom/     only           Radios                             batteries for radios to perform Initial     Gaitronics Phase coping actions (reflecting current staff &
NLS2013028 Attachment 2 Page 35 of 37 Figure 1 Block diagram of the CNS radio system, repeater system Base #1 (NOTE -Print is in the process of being revised as a result of the narrow-banding modification.
strategies)
While the specific equipment models may have changed, basic configuration has not.)(Security Use)8oso I Transmit = 451.250 MHz Receive -456.250 MHz MC2500 DekSAets 2 ontlrol oo- RO Desk 2 Control Room S64i.1ntc Monitor 3 Simulator P.O ocsk 4 Siruflator Se~srrfic Monitor 5 Simulotor Control Booth 6 FAC 7 OSC 8) TSC All EQ~rtqb& & Mobfles Are Equipped With F1, F2. F3. F4, & F5.Security Radios Also Include F6 & F7 Transmit F: -456.075 MHz F2 = 451.075 MHz 43 456,250 MHz F54 451.250 MHz 15 -451.5375 MHz F6 = 469.2 M4Hz F7 464.2 MdHz 451.075 MI-z 451.075 MI-tz 451.250 MHz 451.250 MHz 451,5375 MHz 4.42 MHz 4-64-.2 MHZ[ 2 j i' 1:OOPER NUCLEAR SI RADIO SYSTEM ERP TOWER BASE #1 NLS2013028 Attachment 2 I Page 36 of 37 Figure 2 Block diagram of the CNS radio system, repeater system Base #2 (NOTE -Print is in the process of being revised as a result of the narrow-banding modification.
 
While the specific equipment models may have changed, basic configuration has not.)Q.4ointenonce.
NLS2013028 Page 28 of 37 Emergency       Minimum               Primary   Primary       Backup       Backup   Planned or Potential Response       Communications         Method     Method       Method(s)   Method(s) Enhancement Facility       Links                 Described Available     Described in Available Identified?
R.P. Use)-Fc3 -~ Contr~,I Station 1) Aub~jrn COF Alf' F*4 loll MArund rci Opecrotiono
in Site E- Following     Site E-Plan Following Plan       Assumed                   Assumed LSEE?                     LSEE?
[l Trnmt= 451.250 MHz Iecive = 456,250 M4Hz 1) Control Room RO Desk 2) Control Room Seismk Monitor 3) Simulator RO 0---k 4) Slmu1ntor Seismic fonitor 5) Simulotor Control 8ooth'S FAC a TSC All Portal & Mobiles Are Equipped With F1, F2, F3. F4. & F5.Security Radios Aiso Include F6 & F7 Transmitr MCC-5500 Conro=cs I1 CAS 2SAS 3 Telecom Shop F1 V2 F3 F4 F5 F6 i 456.075 MHz 4.%1 nf7s, M1R, 456,250 MHz 451.250 MHz 451.5375 Mli 469.2 MHz 464.2 MHz 451,075 MHz 4.1.- 7S MHz 451.250 MHz 451.250 MHz 451.5375 MHz 464,2 MHz 464.2 MHz COOPER NUCLEAR S1 RADIO SYSTEM MET TOWER BASE #2 NLS2013028 Attachment 2 I Page 37 of 37 Figure 3 Block diagram of the CNS radio system, repeater system Low-Band (NOTE -Print is in the process of being revised as a result of the narrow-banding modification.
Operational     1 each for:           Station    YES - 4 hours Two-Way FM  YES      YES - additional Support Center  - On-site radiological Intercom/  only          Radios                batteries for radios and other site- monitoring             Gaitronics specific locations as    2 each for:
While the specific equipment models may have changed, basic configuration has not.)"t -=-345-kV-Sub
necessary
: 2) Control Room 3) Auburn EO- (T 4 NS t 5, S.utator System Operates On F1 Or F2 As Assigned.Cooper Normally On F2 Maintenance, R.P. On Fl Transmit & Receive F1 -48.180 MHz F2 = 47.960 MHz COOPER NUCLEAR STATIONl RADIO SYSTEM (LOW BAND.)MET TOWER}}
* Firefighting (1 for brigade leader and 1 for the brigade) 2 each per unit for:
* In-plant radiological monitoring
                - Search and Rescue
                - Emergency repairs Site-specific number needed to implement any 2 severe accident mitigation strategies
 
NLS2013028 Page 29 of 37 Table 7: Plant Paging (Announcement) System Emergency Response       Minimum                 Is This System Available Planned or Potential Enhancement Facility                 Communications Links     Following Assumed       Identified?
LSEE?
N/A (Site-wide)           See assumptions and     YES - 4 hours only       NO discussion in NEI 12-01.
 
NLS2013028 Page 30 of 37 Table 8: Communications Equipment at ORO Facilities Emergency             Minimum           Primary     Primary Method   Backup       Backup         Planned or Response               Communications   Method       Available       Method(s)   Method(s)       Potential Facility               Links             Described   following       Described   Available       Enhancement in site E-   Assumed LSEE?   in site E-   following       Identified?
Plan                         Plan         Assumed LSEE?
Location where         At least one. See OROs receive           assumptions and notifications of an   discussion in NEI emergency              12-01.
declaration or a Protective Action     ORO FACILITY Recommendation                           Commercial (as described in       Nebraska State    Telephone    NO              NONE        NO              YES - satellite the site               Patrol            (ALL)                        (ALL)        (ALL)          phones emergency plan)
Nemaha County Sheriff Richardson County Sheriff Missouri State Patrol Atchison County 911 Center I.                             I               A           A               &
 
NLS2013028 Page 31 of 37 Table 9: Equipment Locations and Protection System /     Primary System     Equipment protected from the below hazards Equipment   Component Location Protected from         Protected from     Protected from     Comments Seismic               Flooding           Wind as defined in this     as defined in this as defined in this document               document           document UHF Radio   ERP Tower &       NO                     YES                 YES               See Section 4.13.1 Base         Enclosure                                                                       for details of Repeaters                                                                                     protection and Radio                                                                                     conclusions Link Communications     NO                     NO                 YES               See Section 4.13.2 Tower & Enclosure                                                               for details of protection conclusions EOF               NO                     YES                 YES               See Section 4.13.3 for details of protection conclusions CAS               YES                   YES                 YES               See Section 4.13.5 for details of protection conclusions
 
NLS2013028 Attachment 2 I Page 32 of 37 System /     Primary System Equipment protected from the below hazards Equipment   Component Location Protected from         Protected from     Protected from     Comments Seismic               Flooding           Wind as defined in this     as defined in this as defined in this document               document           document UHF Radio   TSC/OSC       YES                   YES                 YES               See section 4.13.4 Base                                                                                     for details of Repeaters                                                                                 protection and Radio                                                                                 conclusions Link
 
NLS2013028 Attachment 2 I Page 33 of 37 Table 10         CNS Analysis of Required EP Communications Links Reference NEI 12-01 Section 4, Communications During An Extended Loss of AC Power Total number         Total number             Additional required required             on-hand Satellite phones                   13                     13                       0 Radios                             22           26 are available in                 0 CR and TSC/OSC*
* Additional radios are available from Security and Fire Brigade but were not credited.
Several of the reporting requirements listed above are performed by one individual.
Below is a list of satellite phones and radios credited for establishing critical communications links.
Facility                                                     Satellite phones         Radios Control Room                                                                             13
* Shift Manager                                                     1
* Shift Communicator                                               1
* Shift Rad. Tech.                                                 1 Technical Support Center/Operational Support Center                                     13
* TSC Director                                                     1
* ENS Communicator                                                 1 Emergency Operations Facility
* Emergency Director                                               1
* Offsite Communicator                                             1
* Field Team Coordinator                                           1 Field Monitoring Teams                                                 2 Joint Information Center a Designated Spokesperson                                           1 Fire Brigade                                                           2 Total                                                                 13               26
 
NLS2013028 Page 34 of 37 Table 11       Summary of Enhancements
  #                             Description                                 Projected Completion Date 1   Resolve issues identified related to anchorages, spatial       Complete interactions, and housekeeping.
2   Evaluate and assure that batteries supporting a minimum of     02/28/14 two installed radio system repeaters are sized to provide adequate (24 hour) capacity.
3   Ensure that primary OROs within a 25 mile radius have           12/31/13 satellite communications capabilities.
4   Evaluate options and select method(s) to support indoor         12/10/13 (remote) access to satellite-based communications.
5   Ensure adequate battery-based power is available to             Complete handheld communications devices credited to support prolonged SBO conditions.
6   Determine if alternative measures now used for inoperable       Complete paging coverage areas can be used for site-wide notification.
7   Ensure enhancements implemented include programmatic           09/30/15 support (procedures, inventories, training, testing).
8   Obtain additional GETS cards for key personnel or ERFs.         Complete 9   Install indoor (remote) access to satellite-based               06/30/14 communications; three at plant site, three at OROs.
The enhancements identified above may be modified or changed as implementation progresses. Alternate approaches may be utilized if prudent (e.g., alternate/new technology, improved capability, cost savings, etc.).
 
NLS2013028 Page 35 of 37 Figure 1         Block diagram of the CNS radio system, repeater system Base #1 (NOTE - Print is in the process of being revised as a result of the narrow-banding modification. While the specific equipment models may have changed, basic configuration has not.)
(Security Use)
MC2500 DekSAets 2          oo- RO Desk ontlrol Room 8oso I                                                     2  Control       S64i.1ntc Monitor 3 Simulator P.O ocsk Transmit =  451.250 MHz                                    4 Siruflator Se~srrfic Monitor Receive  - 456.250                                        5 Simulotor Control Booth MHz 6 FAC 7 OSC
: 8) TSC All EQ~rtqb& & Mobfles Are Equipped With F1, F2. F3. F4, & F5.
Security Radios Also Include F6 & F7 Transmit F: - 456.075 MHz           451.075 MI-z F2 = 451.075 MHz            451.075 MI-tz 43 456,250 MHz        451.250 MHz F54   451.250 MHz        451.250 MHz 15 - 451.5375 MHz          451,5375 MHz F6 = 469.2 M4Hz           4.42 MHz F7     464.2 MdHz         4-64-.2 MHZ
[2     j       i'1
:OOPER NUCLEAR SI RADIO SYSTEM ERP TOWER BASE #1
 
NLS2013028 Attachment 2 I Page 36 of 37 Figure 2       Block diagram of the CNS radio system, repeater system Base #2 (NOTE - Print is in the process of being revised as a result of the narrow-banding modification. While the specific equipment models may have changed, basic configuration has not.)
Q.4ointenonce. R.P. Use)
                                                                      -       Fc3           -~   Contr~,I Station
: 1) Aub~jrn COF Alf'     F*4 loll MArund Opecrotiono      rci
[l Iecive
: 1) Control Room RO Desk
: 2) Control Room Seismk Monitor Trnmt=  451.250 MHz                                            3) Simulator RO 0---k
: 4) Slmu1ntor Seismic fonitor
                      =  456,250 M4Hz                                            5) Simulotor Control 8ooth
                                                                                'S FAC a TSC All Portal & Mobiles Are Equipped With F1, F2, F3. F4. & F5.
Security Radios Aiso Include                                         MCC-5500   Conro=cs F6 & F7 I1 CAS Transmitr                                                            2SAS 3   Telecom Shop F1   456.075 MHz         451,075 MHz i
V2    4.%1 nf7s, M1R,     4.1.- 7S MHz F3    456,250 MHz         451.250 MHz F4    451.250 MHz        451.250 MHz F5    451.5375 Mli       451.5375 MHz 469.2 MHz           464,2 MHz F6    464.2 MHz           464.2 MHz COOPER NUCLEAR S1 RADIO SYSTEM MET TOWER BASE #2
 
NLS2013028 Attachment 2 I Page 37 of 37 Figure 3       Block diagram of the CNS radio system, repeater system Low-Band (NOTE - Print is in the process of being revised as a result of the narrow-banding modification. While the specific equipment models may have changed, basic configuration has not.)
                                                                      "t
: 2) -=-345-kV-Sub Control Room
: 3) Auburn EO-   (T 45, S.utator NS t
System Operates On F1 Or F2 As Assigned.
Cooper Normally On F2 Maintenance, R.P. On Fl Transmit & Receive F1 - 48.180 MHz F2 = 47.960 MHz COOPER NUCLEAR STATIONl RADIO SYSTEM (LOW BAND.)
MET TOWER}}

Latest revision as of 22:48, 4 November 2019

Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3
ML13057A028
Person / Time
Site: Cooper Entergy icon.png
Issue date: 02/21/2013
From: Limpias O
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NLS2013028, TAC ME7951
Download: ML13057A028 (50)


Text

N Nebraska Public Power District Always there when you need us NLS2013028 February 21, 2013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852

Subject:

Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3 (TAC No ME7951)

Cooper Nuclear Station, Docket No. 50-298, DPR-46

References:

1. NRC letter to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status, Requestfor Information Pursuantto Title 10 of the Code of FederalRegulations 50.54Wf Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task ForceReview of Insightsfrom the Fukushima Dai-IchiAccident, dated March 12, 2012
2. NPPD Letter to NRC (NLS2012034), Nebraska Public Power District's 60-Day Response to the March 12, 2012, InformationRequest, Action Plan for CompletingEmergency Communication and Staffing Assessments, dated May 9, 2012
3. NPPD Letter to NRC (NLS2012048), Nebraska Public Power District's 90-Day Response to the March 12, 2012, Information Request, Action Plan for Completing Emergency Communication and Staffing Assessments, dated June 7, 2012
4. NPPD Letter to NRC (NLS2012112), Nebraska Public Power District's Response to the March 12, 2012, Information Request Pursuantto 10 CFR 50.5469 Regarding Recommendation 9.3 for Completing Emergency CommunicationAssessments, dated October 31, 2012
5. NRC letter to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status, Follow-up Letter on Technical Issues For Resolution RegardingLicensee Communication Submittals Associated with Near-Term Task ForceRecommendation 9.3 (TAC NO. ME7951),

dated January 23, 2013 COOPER NUCLEAR STATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 ,g www.nppd.com Pa, A

NLS2013028 Page 2 of 3

Dear Sir or Madam:

On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued a letter (Reference 1) entitled, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident. Enclosure 5 of the letter contained specific requested actions and requested information associated with Recommendation 9.3 for Emergency Preparedness programs communications. In accordance with 10 CFR 50.54, "Conditions of licenses," paragraph (f), addressees were requested to submit a written response to the information requests within 90 days or provide a response within 60 days of the date of the letter and describe the alternative course of action that it proposes to take.

Nebraska Public Power District (NPPD) responded within 60 days (Reference 2) proposing to take the alternative course of action for communications described in Attachment 1 of Reference

2. NPPD implemented this alternate course of action with the submittal of Reference 3 (described interim/planned actions to enhance existing communications systems power supplies pending the communications assessment and completion of actions) and Reference 4 (summarized the results of the communications assessment and the potential enhancements).

The purpose of this letter is to respond to Reference 5, the NRC follow-up letter regarding technical issues to be resolved with Reference 4. Responses to the eight technical issues in Reference 5 are provided in Attachment 1. The communications assessment, originally provided in Reference 4, has been revised to reflect the responses in Attachment 1 and is found in . These responses are subject to change as a result of Diverse and Flexible Coping Strategies developments, advances in technology, and progress in the manner of addressing the need for these enhancements.

There are no new commitments identified in this submittal.

If you have any questions concerning the content of this letter, please contact David Van Der Kamp, Licensing Manager, at (402) 825-2904.

I declare under penalty of perjury that the foregoing is true and correct.

Executed On 0Z-//7 /, 3 (Date)

Sinc re sc,4r A. Limpia Vice President -Luclear and Chief Nuclear Officer

/bk

NLS2013028 Page 3 of 3 Attachments: 1. Cooper Nuclear Station Communications Assessment - Addressing Eight Technical Issues

2. Cooper Nuclear Station Communications Assessment, Revision 1 cc: Regional Administrator, w/attachments USNRC - Region IV Director, w/attachments USNRC - Office of Nuclear Reactor Regulation Cooper Project Manager, w/attachments USNRC - NRR Project Directorate IV-1 Senior Resident Inspector, w/attachments USNRC - CNS CNS Records, w/attachments NPG Distribution, w/o attachments

NLS2013028 Page 1 of 10 NLS2013028 ATTACHMENT 1 COOPER NUCLEAR STATION COMMUNICATIONS ASSESSMENT -

ADDRESSING EIGHT TECHNICAL ISSUES

NLS2013028 Page 2 of 10 Attachment 1 Cooper Nuclear Station Communications Assessment -

Addressing Eight Technical Issues The Nuclear Regulatory Commission's (NRC) eight generic technical issues regarding licensee's Communications Assessment submittals are shown in italics below. Nebraska Public Power District's (NPPD) responses are shown in block font. As a result of the responses to the technical issues, NPPD has revised the Cooper Nuclear Station (CNS)

Communications Assessment, including providing a projected completion schedule for the enhancements identified in Table 11 of the Communications Assessment.

Generic Technical Issue 1:

The staff identified that licensees need to discuss how the powerfor the equipment analyzed is expected to be available,and how the planned communications enhancements are expected to be maintained.The following areaswere identified:

A. A detaileddescriptionof how power will be maintainedfor (1) planned or potential enhancements to the communication links and (2) existing equipment analyzed to be available.

1. The number of replacementbatteries expected to be neededfor a 24-hour duration,per the Nuclear Energy Institute (NEI) 12-01 "Guidelinefor Assessing Beyond Design Basis [sic] Accident Response Staffing and Communications Capabilities".
2. Generatoravailabilityto charge batteries without offsite equipmentfor a duration of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
3. A descriptionof how ancillary equipment supports operationsfor a 24-hour duration (e.g,. adequacy offuel suppliesfor the generators;and the minimum number of battery chargersexpected to be necessary).

NPPD Response:

Only two means to establish communications links were initially credited by NPPD in the CNS Communications Assessment; handheld radios (on-site communications) and satellite phones (off-site communications). Subsequently, NPPD credited the plant Public Address/Paging system (Gaitronics) for use in making initial alert and notification of on-site personnel. This system is limited to four hours without taking manual actions.

NPPD chose to ensure power to the credited portable communications links (handheld radios and satellite phones) is maintained by purchasing sufficient quantities of batteries to power these devices for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> without any required charging. NPPD does not intend to utilize a generator for the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Details are provided below:

NLS2013028 Attachment I Page 3 of 10 Satellite phones:

Three charged batteries are assigned to each satellite phone. These batteries are stored either in the phones (one each) or in chargers (two each) in the emergency response facility (ERF) inventories. Satellite phones are operationally tested quarterly and their batteries swapped into/out of a charger-conditioner.

Procedural guidance was developed to ensure programmatic maintenance is performed.

A satellite phone with its associated three batteries will provide approximately 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> of communications (assumes 25% duty cycle and three hours of transmit battery life per battery; the minimum manufacturer's claim).

Handheld Radios:

In accordance with Federal Communications Commission requirements, new handheld radios (digital, narrow-band Motorola model XTS 2500) were purchased and deployed since the submittal of CNS' initial Communications Assessment. Credited handheld radios (26) are stored in charger-conditioners, thus their batteries will be fully charged at the onset of any emergency, including the assumed Local Severe External Event (LSEE).

New battery components and better charger-conditioners have minimized the impact of battery 'memory' or over-charging of batteries. Battery capacity is now almost entirely dependent upon duty cycle (i.e., the amount of transmit time versus receive/standby time). One typical duty cycle used for rating battery capacity is 5/5/90; that is 5% transmit, 5% receive with audio, and 90% standby (receive without audio). CNS handheld radios are equipped with Impress Ni-MH FM batteries, model NTN9857. The manufacturer specifies these batteries as 2000 mAh and (assuming a 5/5/90 duty cycle) rates them to last 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />.

Anecdotal evidence from CNS' Security force indicates that these batteries will last an entire 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift.

When the installed battery of a radio is depleted, and if another radio with a charged battery is not available, additional power to these radios is provided via dry cell battery adapters and dry cell batteries. One adapter for each credited radio was added to the Control Room and Technical Support Center/Operational Support Center (TSC/OSC) inventories, together with the minimum number of dry cell batteries with which they are to be loaded. Actual use (as well as known mAh capacity [4900 mAh] of these packs) has shown that these adapter packs provide over twice the capacity of the rechargeable Ni-MH FM batteries.

These dry cell battery adapters and batteries were added to the quarterly emergency inventory of the Control Room and TSC/OSC (Procedure 5.7.21,

NLS2013028 Page 4 of 10 Maintaining Emergency Preparedness - Emergency Exercises, Drills, Tests, and Evaluations).

One rechargeable (installed) battery for each radio (10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />), plus one dry cell adapter each (approximately 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />), at a duty cycle of 5/5/90, equals approximately 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> of overall battery capacity. Per Nuclear Energy Institute (NEI) 12-01, after 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> it may be assumed that offsite sources of batteries are available. Therefore, the combination of installed rechargeable batteries and subsequent use of dry cell battery adapter packs and available dry cell batteries is assumed to provide power to handheld radios for an indefinite period of time.

Generic Technical Issue 2:

The use andfunction of the planned enhancementsfor the improvement of communications.

A. A description of the use of the planned enhancements.

1. A discussion of whether each planned enhancement identified is only to be usedfor maintainingthe communication link identified, or if it is expected to be sharedamong other communication links.
2. A generaldescriptionof the planned enhancement and how the equipment will be integrated.
3. The title andgeneral descriptionof the procedure that will be developed and used by plantpersonnel to describeprotocolsfor shared usage of communication capabilities.

NPPD Response:

NPPD did not credit any shared communications resources. Each identified communications link is supplied by its own satellite phone or radio, with sufficient battery power (assuming a certain duty cycle) for a minimum of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. NPPD will not be implementing shared usage; therefore, a procedure is not required.

Generic Technical Issue 3:

The protection of the new equipment purchasedas a planned enhancement as well as the protection of existing communications equipment analyzed as being available.

A. A discussion of how the existing equipment analyzed to be available and enhancements to these communication links as well as associatedancillary equipment will be stored in a manner that is protectivefrom a large scale natural event.

NLS2013028 Page 5 of 10

1. A description ofpre-identifiedareas that are consideredprotectivefor existing equipment and whether new equipment will be stored in a similar location. The title and briefdescriptionof a procedurefor new communications equipment storage is acceptable, if this procedureis planned to be developed in the future; or a statement that this will be completed in alignment with NRC orderEA-12-049.
2. Equipment stored offsite, should have an analysis of duration to set-up this equipmentfor use.
3. The analysis demonstrates that the existing equipment that is expected to be available will be functional.

NPPD Response:

Credited portable communications equipment (satellite phones and handheld radios) is located in areas deemed protected from both seismic and flooding. Radios are stored in two locations. The first location is the Alternate Shutdown cabinet adjacent to the Control Room on elevation 932' of the Control Building. This building is a seismic Class I structure. The second location is the TSC/OSC. This combined facility is located within the Administration Building on elevation 903'6". One wall of the TSC/OSC is a shared exterior wall of the Reactor Building (seismic Class I). The remaining walls are substantial, poured high-density concrete designed to provide radiological shielding for the TSC/OSC, and therefore provide a seismically robust structure. The elevation is above the site design basis flood level.

Credited radios are stored in charger-conditioners. These are located on cabinet shelves or on countertops, but are not secured. This equipment is lightweight but is not expected to experience interactions with or from adjacent materials. These radios meet the applicable Military Specifications 810, C, D, E, and F. Therefore, these radios are not expected to receive damage even if they did fall off the shelves or countertops.

Credited satellite phones are stored in PelicanTM protective cases in several locations; the Control Room, TSC/OSC, Emergency Operations Facility (EOF) (offsite), and Joint Information Center (JIC) (offsite). The Control Room and TSC/OSC are as described above; therefore, the equipment is protected from seismic and flooding. The EOF and JIC are located approximately 11 miles from the site in Auburn, Nebraska. The satellite phones and batteries/chargers for these facilities are located in a steel cabinet. The building housing the EOF/JIC is cement block, is not near any bodies of water, and therefore is judged to protect the equipment from seismic and flooding.

Credited radios and satellite phones are inventoried and tested periodically. This has been incorporated into Procedure 5.7.21 (Maintaining Emergency Preparedness -

Emergency Exercises, Drills, Tests, and Evaluations), and Emergency Preparedness Department Guide (EPDG) #2 (Quarterly Satellite Phone Test and Battery Swap and Monthly Testing 2-Way Radios).

NLS2013028 Page 6 of 10 Any additional batteries purchased as enhancements for radio repeaters will be installed adjacent to the existing batteries and therefore will have the same protection as discussed in Sections 4.13.1 through 4.13.5 of the assessment report.

No equipment to be used on-site is to be stored off-site.

Generic Technical Issue 4:

The programmaticcontrolsfor the use of the new equipment purchasedas a planned enhancement.

A. A descriptionofplannedproceduralizationand trainingfor the use of these planned enhancements. It is acceptable to provide the title and descriptionof a new procedurefor communications equipment.

1. A description of any credited manual actions and theirprocedures.
2. A description of any maintenancefor this equipment, including operability testing.
3. A description ofperiodic inventory checks.
4. A description ofplanned staff training.

NPPD Response:

No additional training is planned for the use of handheld radios or satellite phones.

Operations, Maintenance, Radiological Protection, Chemistry, and Security personnel are familiar with the operation of handheld radios. Non-Security personnel on-shift are typically on the Emergency Response Organization (ERO) and perform in periodic drills or exercises where radios are used for communications. Security personnel use identical radios daily. Although the radio model has changed, the operation has not. Satellite phone operation is identical to the operation of a standard cellular phone. Instructions are included in the storage cases. Emergency response telephone numbers are pre-programmed into satellite phones.

Instructions on the use of emergency communications systems are contained in Procedure 5.7COMMUN (Communications). This procedure is required reading, per Training Procedure TPP-101, for all ERO positions (except JIC positions), for both initial and re-qualification training.

No manual action is required for the long-term use of these communications devices with the exception of swapping batteries. Illustrated instructions for loading the radio dry cell battery adapters with batteries are stored with the adapters/dry cell batteries.

Procedure 5.7.21 (Maintaining Emergency Preparedness - Emergency Exercises, Drills, Tests, and Evaluations) describes the inventory of this equipment. EPDG #2 (Quarterly

NLS2013028 Page 7 of 10 Satellite Phone Test and Battery Swap and Monthly Testing 2-Way Radios) establishes detailed guidance for periodically testing the radios and satellite phones and swapping out their batteries.

Generic Technical Issue 5:

A discussion on what assumptions are used as part of the Communications Assessment.

A. A description of the assumptions usedfor the submitted Communications Assessment Summary, and technicaljustificationfor any differences from the assumptions within NEI 12-01, Sections 2.2 "Assumptions Common to Both Assessments" and 2.4 "Assumptions For CommunicationsAssessments ".

NPPD Response:

NPPD took no exceptions to the assumptions of NEI 12-01. Initially, NPPD assumed that no installed communications equipment remained operable.

Although limited site access was allowed to be assumed per NEI 12-01 after six hours, NPPD also did not rely upon this assumption. Credited portable communications links have been enhanced to provide for 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> capability without manual operator actions (except battery swap) and without any off-site resources. No AC power source (normal, backup, or emergency) is depended upon.

After determining that an exhaustive sweep of the CNS Protected Area was not feasible within 30 minutes, NPPD re-assessed the survivability of the installed plant Public Address/Paging system (Gaitronics). This assessment concluded that there is justification for believing that this system would both survive a severe event and remain operable for an adequate time period to perform its communications function.

This system is powered from the No Break Power Panel (a non-AC source), its critical components are housed in seismic Class I structures, above the design basis flood levels, with no manual actions required for operation under LSEE/Extended Loss of AC Power conditions. Therefore, crediting this system does not take exception to the assumptions of NEI 12-01.

Generic Technical Issue 6:

How plant personnel will be notified in the event of a large scale naturalevent that causes a loss ofall AC power.

A. A description and title of the procedurefor emergency notification of essentiallyall plant staff within 30 minutes [ifapplicableto the licensee Emergency Plan].

NLS2013028 Page 8 of 10 B. A description and title ofprocedurefor notification of emergency response organizationstaff (i.e., self activation) [if applicable].

NPPD Response:

The normal means for alerting and notifying on-site personnel of a declared emergency is to sound an alarm and make an announcement using the plant Public Address/Paging system (Gaitronics). In the initial Communications Assessment this system was not credited as being operable. NPPD re-assessed the survivability of this system. This system is not powered from AC sources, its critical components are housed in seismic Class I structures, above the design basis flood levels, with no manual actions required for operation. Therefore, this system is now credited for alert and notification of on-site personnel.

If it is determined portions of this paging system are impaired, alternate methods for alerting and notifying on-site personnel are proceduralized in Procedure 5.7.10 (Personnel Assembly and Accountability) and Security Procedure 3.14 (Non-Security Emergencies).

NPPD has instructed off-site ERO personnel that upon becoming aware of a large-scale localized event (which presumably would result in a declaration of an emergency and activation of the ERO) combined with a lack of notification and inability to contact the site to automatically report to their assigned ERFs once assuring the safety of their families. Procedure 0-EP-01 (Emergency Response Organization Responsibilities) was revised to include this direction. Training Program Procedure TPP-101 was revised to require ERO personnel to review this procedure as a part of their initial ERO and annual re-qualification training.

In addition, this procedure informs the ERO that if conditions are such that the site cannot be accessed, two staging areas have been designated, one on each side of the Missouri River to which personnel may report. Arrangement for logistical support (transport and helicopter landing areas) of ERO personnel from these staging areas to the site is captured by Letters of Agreement.

Generic Technical Issue 7:

How communications will be maintained during the period offinal implementation of the communications enhancements:

A. Identification and description of the interim actions that will be in place to bridge the gap until allfinal mitigationstrategiesbeing proceduralizedare implemented. This also includes equipment protection.

NLS2013028 Page 9 of 10 NPPD Response:

With the completion of enhancements related to providing 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> battery power to handheld radios and satellite phones, and fully incorporating programmatic support of these devices into plant procedures, NPPD has assured that all required communications links can be maintained under LSEE/Station Blackout conditions. Physical changes related to these on-site enhancements were completed in 2012. Associated implementing procedure changes were approved and in place in February 2013.

These communications links will initially be limited. Satellite phones will only work outdoors, and handheld radios may not be fully supported by high-power repeaters.

Relaying of messages may be necessary.

Enhancements were identified to evaluate options and select method(s) to support indoor (remote) access to satellite-based communications and evaluate and assure that batteries supporting a minimum of two installed radio systems (repeaters) are sized to provide adequate (24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) capacity. The full implementation of these enhancements will facilitate satellite communications indoors (Control Room, TSC/OSC, EOF and Offsite Response Organizations) and provide long-term (24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> minimum) power to a minimum of two radio repeater(s).

Generic Technical Issue 8:

Descriptionsare needed regardinghow communications will be maintainedwith the on-site and in-plantresponse teams and offsite response organizationsif their communication links are not expected to be available.

A. A timeline for when the evaluationfor site specific improvementsfor on-site and in-plant response teams will be completed.

B. A discussion of the enhancements that are plannedfor the offsite response organizationcommunication links.

NPPD Response:

The minimum numbers of communications links to on-site and in-plant teams will be continuously maintained using handheld radios. As discussed in the response to Technical Issue 1, NPPD has provided power to these portable radios for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with no manual actions required, except changing batteries.

The minimum numbers of communications links to offsite response organizations will be maintained using satellite phones. NPPD has two State (Nebraska and Missouri) and three County (Nemaha, Richardson, and Atchison) contact points to 'local' offsite response organizations (ORO). Per the assumptions of NEI 12-01, communications infrastructure outside a 25 mile radius may be assumed to remain intact. Both State

NLS2013028 Page 10 of 10 contact points are beyond this 25 mile radius therefore NPPD assumes that contact, via satellite phone on our end only, remains a viable means of contacting these two OROs.

The same assumption is applied to all other agencies outside this 25 mile radius (e.g.,

NRC [Headquarters and Region], United States Geological Survey, Army Corps of Engineers, NEI, and Institute of Nuclear Power Operations).

An enhancement in the CNS Communications Assessment was identified to ensure that all primary OROs have satellite communications capabilities. Three extra satellite phones (beyond the required 13 identified links in the Communications Assessment) have been purchased and will be assigned to OROs within the 25 mile radius.

NLS2013028 Page I of 37 NLS2013028 ATTACHMENT 2 COOPER NUCLEAR STATION COMMUNICATIONS ASSESSMENT REVISION I

NLS2013028 Page 2 of 37

1. Executive Summary The purpose of this report is to document the performance of a Nuclear Regulatory Commission (NRC) requested assessment of the current communications systems and equipment used at the Cooper Nuclear Station (CNS) site during an emergency event as defined by Nuclear Energy Institute (NEI) 12-01, "Guideline for Assessing Beyond Design Basis Accident Response Staffing and Communications Capabilities." Power supplies for the existing communications equipment credited have been assessed to determine power availability during a prolonged Station Blackout (SBO) event.

The beyond design basis events assumed in this assessment introduce conditions that could render a significant portion of existing installed site communications capabilities inoperable. The assessment identifies proposed enhancements to maintain the minimum communications capabilities for responding to emergency events, as well as enhancements to improve the survivability of currently installed communications systems (see Table 11). These enhancements include:

  • Addition of extra batteries and chargers in support of extended use of handheld satellite phones
  • Addition of dry-cell type battery packs in support of extended use of portable radios (walkie-talkies) 0 Evaluation of options to support indoor (remote) access to satellite-based communications
  • Correction of identified issues related to potential seismic interaction concerns
  • Evaluation and probable enhancement of battery-based power to critical communications systems
2. Methodology This report is based on the recommended criteria from NEI 12-01, for use in identifying enhancements that will ensure the availability of critical communications capabilities during an extended loss of AC power, including evaluation of power sources for communications equipment. This approach provided the flexibility to accommodate specific site needs while, at the same time, ensuring consistency with industry-developed standards, and NRC regulations and guidance.

The assessment focused first on the communication systems to be credited. These required communication links were assumed to be established via satellite phones (offsite) and the use of the existing site handheld radios (onsite). Existing installed communications were initially assumed to be inoperable and therefore were not credited in this assessment. However, walkdowns to evaluate both portable and installed equipment, locations, and function were performed. Subsequent to the 2012 submission of the CNS Communications Assessment, Nebraska Public Power (NPPD) performed an evaluation of the installed plant Public Address/Page system (Gaitronics). The evaluation concluded that the Gaitronics system is adequately protected from seismic and flooding hazards, and is powered from the No Break Power Panel (a non-AC based source). Therefore, NPPD now credits this

NLS2013028 Attachment 2 I Page3 of 37 communications system for initial alerting and notification of onsite personnel. This system's primary (DC) power supply will not (unless augmented) last beyond four hours. However, alerting and notifying onsite personnel will take place at the beginning of an emergency; therefore, this capacity is deemed adequate to perform the function. See Section 4.2.

Enhancements identified from the assessment will be further developed as implementation progresses. Alternate approaches will be utilized if prudent (e.g.,

alternate/new technology, improved capability, cost savings, etc.).

3. Assumptions (Derived from NEI 12-01) 0 Extended loss of AC power event
  • Successful plant shutdown
  • No hostile action
  • 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> post event - no site access
  • 6 - 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> post event - limited site access
  • 24+ hours post event - access restored to near normal status
  • Installed sources of AC power not available
  • Non-essential loads from DC battery sources are stripped per station procedures
  • Installed inverters and battery chargers remain available provided they are protected from external events
  • Onsite diesel fuel oil is available provided it is stored in a protected manner from external events
  • Portable equipment may be used provided it is stored onsite and protected from seismic, wind, and flooding events. Includes portable AC and DC power sources 0 Onsite communications infrastructure remains available provided it is protected from seismic, wind, and flooding events 0 Offsite communications infrastructure is inoperable out to 25 miles
  • Communications equipment located at an offsite response facility and supplied from a backup power source is assumed to be functional
4. Communications During an Extended Loss of AC Power NEI 12-01 Section 4, "Communications During an Extended Loss of AC Power" provides the basis for the following assessment.

4.1 Required Emergency Communication Capabilities (NEI 12-01 Section 4.1)

NPPD has reviewed the minimum required communications links and has determined the method of communications (i.e., radio or satellite phone) to be credited for each defined link and the overall number of satellite phones and radios needed (see Table 10). NPPD determined that some additional satellite phones or radios may be required, at the Offsite Response Organization (ORO) end, to establish the required links with OROs. Area for enhancement (see Table 11, item

  1. 3).

NLS2013028 Page 4 of 37 NPPD recognizes that portable satellite telephones do not work indoors. Their antennas must have a clear direct view of the sky. Therefore, portable satellite phones have to be taken outdoors to establish the required communications link(s). This is not considered adequate for the long term.

These same communications links must be established from within the boundaries of areas within the plant which are very difficult to modify. Making penetrations to route antenna coaxial cable may require design changes, habitability considerations, regulatory reviews, and the revision of supporting documentation.

NPPD will evaluate options and select method(s) to support indoor (remote) access to satellite-based communications. Area for enhancement (see Table 11, item #4).

4.2 Plant Paging (Announcement) System (NEI 12-01 Section 4.2)

NEI 12-01 Section 4.2 requires notification of the plant staff at the onset of the event. The CNS plant paging system provides public address capability over a large portion of the site. The system was not initially credited as available for notification of plant personnel. Alternative measures now used for inoperable paging coverage areas were assessed for use site-wide. Area for enhancement (see Table 11, item #6).

The assessment directed by the enhancement determined that alternate measures used for alerting and notifying limited areas of inoperable Public Address/Page system (Gaitronics) are not feasible for the entire Protected Area. Therefore, NPPD performed a more detailed evaluation of the installed Gaitronics system. The evaluation concluded that the Gaitronics system is adequately protected from seismic and flooding hazards, and will have adequate non-AC based power to perform the communications task of alerting and notifying onsite personnel of an emergency. NPPD now credits this communications system for that task only. This system's primary (DC) power supply (unless augmented) may not last beyond four hours. The four hour capacity is deemed adequate to perform the alert and notification function. NEI 12-01, Section 4.1.2.1, requires only that this system be powered from a battery-backed source. Once initial directions have been communicated to onsite personnel, NEI 12-01 allows this communications system to be removed from service to extend critical battery capacity.

4.3 Communications Equipment at ORO Facilities (NEI 12-01 Section 4.3)

Per NEI 12-01, "Some communications capability should be available at the ORO facilities that normally receive licensee notifications of an emergency declaration or a Protective Action Recommendation." NPPD assessed capabilities at their ORO facilities. All five ORO facilities (Nebraska State Patrol, Nemaha County Sheriff, Richardson County Sheriff, Missouri State Patrol, and Atchison County 911 Center) have backup power. Additional communication capabilities (i.e., satellite phones) are recommended at some of these facilities. Area for enhancement (see Table 11, item #3).

NLS2013028 Page 5 of 37 Per the assumptions of NEI 12-01, it may be assumed that communications infrastructure outside a 25 mile radius remains intact. Both State contact points are beyond this 25 mile radius; therefore, NPPD assumes that contact, via satellite phone on our end, remains a viable means of contacting these two OROs. NPPD will ensure that OROs within the 25 mile radius of the CNS have installed satellite phone capability. Area for enhancement (see Table 11, item #9).

4.4 Notification of the Emergency Response Organization (ERO) (NEI 12-01 Section 4.4)

NEI 12-01 offers two potential options to promote timely staff augmentation by the ERO. CNS will ensure that "ERO members are trained to automatically respond to their assigned facilities or a designated staging area when made aware of a wide area loss-of-grid (e.g., by direct observation, media reports, word-of-mouth, etc.)."

This expectation has been established with the ERO. This expectation will also be included in annual ERO requalification training. Area for enhancement (see Table 11, item #7).

Instructions for ERO personnel to report to their Emergency Response Facility (or an alternate staging area) have been communicated. These instructions have also been incorporated into Procedure 0-EP-01, Emergency Response Organization Responsibilities. This procedure is required reading for all ERO positions for both initial and annual re-qualification training. All actions associated with this area for enhancement have been completed.

4.5 Equipment Location Requirements (NEI 12-01 Section 4.5)

Communication equipment to be used or considered operable, "...should be in a location and maintained in a manner that maximizes survivability following a beyond design basis external event. In particular, the location or manner should reasonably preclude wetting from flooding or impact damage from a seismic event." The communication links as defined by NEI 12-01 will be established using satellite phones and handheld radios. Assessments were performed, including walkdowns, of the existing installed radio equipment. Enhancements have been identified associated with installed equipment's support/mounting as well as potential impact from adjacent equipment and/or stored material. One issue associated with wetting from flooding was identified related to the Communications Tower enclosure. See Sections 4.13.2 for details. Area for enhancement (see Table 11, item #1).

All seismic interaction and housekeeping issues identified in the initial Communications Assessment have been corrected. NPPD continues to evaluate potential enhancements related to the location of installed communications equipment. All credited communications (satellite phones and handheld radios) are stored in locations which provide reasonable protection from seismic and flooding hazards.

NLS2013028 Attachment 2 I Page6 of 37 4.6 Performance Characteristics (NEI 12-01 Section 4.6)

The performance characteristics as identified in this section of NEI 12-01 require that communication pathways (e.g., radio channels, satellite phones) designated to support multiple functions must be analyzed to demonstrate that they can simultaneously support both functions. NPPD assessed capabilities on a radio channel by channel and satellite phone device basis and did not identify any instances where a single communication pathway was assigned to support multiple functions. No further action is required.

4.7 Other Assessment Considerations (NEI 12-01 Section 4.7)

Enhancements (physical and programmatic) are recommended to ensure considerations, as identified in this section of NEI 12-01, are met. Provisions for portable backup power sources and batteries for battery operated equipment need to be established. Area for enhancement (see Table 11, item #5).

NPPD has provided the physical and programmatic means to power credited communications devices (satellite phones and handheld radios) for a minimum of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> without the need for manual actions, except changing batteries.

However, these devices are limited. Radios have poor coverage without repeaters, and portable satellite phones work only outdoors. Enhancements (Table 11, items #2, #4, and #9) will address these limitations. Upon full implementation of all enhancements, NPPD will have indoor satellite capability and expand the battery capacity of at least two installed radio repeaters to a minimum of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

4.8 Quality and Maintenance-Related Requirements (NEI 12-01 Section 4.8)

The requirements identified in this section of NEI 12-01 need to be incorporated into the program for ensuring the credited equipment is maintained in a manner that maximizes survivability. Programmatic controls need to be established to ensure that equipment remains available and operable. This may include documenting inventories and adding preventive maintenance for periodic testing of the satellite phones and chargers. Area for enhancement (see Table 11, item #7).

Programmatic controls for the credited communications equipment were fully incorporated into plant procedures. As additional enhancements are completed, appropriate programmatic controls for those enhancements will be incorporated into processes and procedures.

4.9 National Communications System (NCS) Services (NEI 12-01 Section 4.9)

NPPD assessed the NCS services. NPPD recommends that additional Government Emergency Telecommunications Service (GETS) access cards be acquired for key CNS site positions or Emergency Response Facilities (ERFs).

Area for enhancement (see Table 11, item #8).

NLS2013028 Page 7 of 37 Additional GETS cards were distributed and a process to inventory the cards to ensure that they work was implemented. This area for enhancement is complete.

4.10 Communication Provider Emergency Services (NEI 12-01 Section 4.10)

NPPD contacted the major communications service providers for CNS (Verizon and AT&T). Neither company has a separate emergency services priority other than government telecommunications service priority. No further action is recommended.

4.11 Personnel Training (NEI 12-01 Section 4.11)

The requirements identified in this section of NEI 12-01 are recommended to be incorporated into the CNS Emergency Planning program. NPPD will evaluate existing training to determine if the adequacy and periodicity of training is sufficient. Area for enhancement (see Table 11, item #7).

4.12 Emergency Plan (E-Plan) Identified Systems Overview and Assumptions The following sections summarize the communications systems discussed in the CNS E-Plan.

The E-Plan Section 7.3 notes that communications may be provided by different means (telephone system, plant paging system, alternate intercom, FM radio, and sound power). For the purposes of this assessment, the communications capabilities in E-Plan Section 7.3 were assumed to be successfully met only if they were judged to be continuously available for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after the loss of onsite and offsite AC power. The majority of the installed emergency preparedness (EP) communication systems have been assumed (by this assessment) to have deficiencies which would prevent their survival in the beyond design basis external event.

However, the assumptions underlying this assessment were conservative.

Although the assessment identified areas for enhancement, it also established that the communications systems at CNS are well designed, installed, and maintained. They are diverse both in their locations, their primary and backup power sources, and their supporting infrastructures. NPPD feels confident that by making the enhancements identified by this assessment, these same communications systems may be more likely to survive a beyond design basis event. See Sections 4.13.1 - 4.13.5 for details concerning proposed enhancements.

4.13 Equipment Locations and Capabilities The communications function, radio reception/transmission equipment, and protection of each location from seismic, wind, and flooding are discussed below.

Specifically, the capacity of the equipment in its current configuration was evaluated as to its ability to withstand the identified external hazards. These hazards include seismic, flooding, and high winds. The structural evaluation was

NLS2013028 Page 8 of 37 based on engineering judgment developed by a consensus of two engineers experienced in structural design and construction.

The maximum probable flood elevation is 903'. Because no EP communications equipment, except for the Communications Tower and equipment enclosure (refer to Section 4.13.2 for further explanation), exists below this elevation, most EP communications equipment is not at risk of flooding due to a design basis flooding event. See Section 4.13.2 for further information.

The sections below provide more detail of the area walkdowns and their potential configuration concerns that could present challenges to communications systems in the event one or more of the identified environmental hazards occur.

4.13.1 Elevated Release Point (ERP) Tower and Equipment Location and General Description EP communications equipment is located inside the ERP Tower communications enclosure. The ERP Tower is located inside the Protected Area (PA) southeast of the Reactor Building and is 325' tall. The communications enclosure is a pre-fabricated trailer-like structure constructed of a metal frame covered with fiberglass panels. This enclosure is attached to the ERP Tower structural steel members, at an elevation of approximately 920' mean sea level (MSL).

Equipment & Functionality Radio System Base #1 Repeater is located in the ERP Tower communications enclosure. The radio system for Base #1 is comprised of a narrow-band UHF transciever, connected to receive and transmit antennas mounted near the top of the ERP Tower. Base #1 radio provides repeater coverage to portable radios (walkie-talkies) and mobile units at the plant site and the Emergency Operations Facility (EOF),

located in Auburn, Nebraska (approximately 11 miles to the west). This radio equipment is also hardwired to desksets and consoles at various locations at CNS and the EOF. A simplified block diagram shows interconnections for Radio System Base #1. See Figure 1.

Power 120V AC power to the Base #1 radio system is supplied from a lighting panel LP-ERP (Shack) Comm Box. This panel gets AC power from switchboard MSB located in the Machine Shop via step down transformer EE-XFMR-LPERP (Shack). Switchboard MSB gets its feed from non-essential 480V switchgear 1B via switchboard MSA.

This panel is also permanently wired to an outside emergency generator receptacle via transfer switch CC-SW-LPERP (Shack).

A battery charger for Base #1 is now integrated into the radio unit itself. There is a bank of batteries to power the radio in the event of loss of AC power. The backup battery

NLS2013028 Attachment 2 I Page9 of 37 I bank will be evaluated to assure that it provides adequate (24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) power. Area for enhancement (see Table 11, item #2).

Structural Assessment The ERP Tower communications enclosure, attached to the ERP Tower at approximately 920' elevation, provides reasonable assurance that the EP communications equipment is protected during a flooding event, as defined in NEI 12-01.

The communications enclosure has been designed (per the manufacturer) to withstand 3 second bursts of 100 mph wind. The ERP Tower itself is described by the Updated Safety Analysis Report (USAR) as being designed in accordance with Class 1 seismic loadings and includes a dynamic analysis. This does not include tornadic winds as this structure is not required for safe shutdown. Therefore, the ERP Tower and communications enclosure itself (notwithstanding the communications rack itself) provides reasonable assurance that the EP communications equipment is protected during a seismic or wind event, as defined in NEI 12-01.

Communication Equipment and Racks Seismic Protection - Enhancement identified. See Table 11, item #1.

" Anchorages o The rack that supports the Radio Repeater (Base #1) is anchored to the floor but is unsupported at the free (upper) end. The free end of this rack may require a brace. An additional evaluation is required.

o Some electrical equipment is missing hardware that fastens it to the rack.

For example, the two batteries located on the bottom shelf of the Radio Repeater rack are not attached to the shelf.

  • Spatial Interactions o Adjacent to the rack is an unanchored box fan and an unanchored metal stand. These items should be removed or anchored.
  • Housekeeping o There are several miscellaneous items in the room that should be removed.

o The entire room needs to be cleaned up. Box fans and unused chairs should be removed.

Flood Protection - ACCEPTABLE High Winds Protection - ACCEPTABLE

NLS2013028 Page 10 of 37 Antennas Seismic Protection - ACCEPTABLE

  • Anchorages o No concerns
  • Spatial Interactions o No concerns
  • Housekeeping o No concerns Flood Protection - ACCEPTABLE High Winds Protection - ACCEPTABLE 4.13.2 Communications Tower Following submittal of the initial Communications Assessment, NPPD installed and commissioned a new Meteorological (MET) tower. The old MET tower was re-designated as the Communications Tower. The Communications Tower, and its enclosure, continue to house and support all the same communications systems, although the narrow-banding modification made changes to the specific equipment itself. All meteorological equipment was removed from the Communications Tower following final acceptance of the new MET tower.

Location and General Description EP communications equipment is located outside the PA in an enclosure adjacent to the Communications Tower. This enclosure is a pre-fabricated trailer-like structure constructed of a metal frame covered by fiberglass panels that rests on an at-grade concrete slab. The Communications Tower is a 100-meter commercial radio tower.

The tower is heavily guyed with substantial guy anchors and the tower base is anchored to the concrete slab.

Equipment & Functionality Radio System Base #2 repeater is located in the Communications Tower equipment enclosure. The Radio System Base #2 is comprised of a UHF transceiver and is connected to a directional antenna mounted at 50' on the tower. The Base #2 directional antenna is pointed toward the power block. Base #2 is intended to be the primary repeater for coverage using portable radios (walkie-talkies) and mobile units at the plant site. Control points for Base #2 are located at various locations at CNS and the EOF. A simplified block diagram shows interconnections for Radio System Base #2.

See Figure 2.

A Low-Band (VHF) radio system transceiver is located in the Communications Tower and equipment enclosure. The Low-Band antenna is installed near the top of the Communications Tower.

NLS2013028 Page I Iof 37 Low-Band control points are located at various locations at CNS and the EOF in Auburn, Nebraska. A simplified block diagram shows interconnections for Radio System (Low-Band). See Figure 3.

Power 120V AC power to the radio system equipment is supplied from a local power panel Ml-PNL-100M. Panel MI-PNL-100M gets primary power from 480V AC switchboard EE-SWBD-NLDC via step-down transformer MI-XFMR-100M. Alternate power is supplied from critical bus MCC-L via an ASCO 7000 transfer switch MI-SW-100M (Trans).

There is a 48VDC charger with backup batteries installed in the Communications Tower equipment enclosure. It supplies 48VDC to the DC bus and charges the backup batteries. The charger provides power to the Base #2 repeater, a Hot-Standby Siren repeater, and a 48VDC to 12VDC converter. The 48VDC to 12VDC converter provides power to the Low-Band Radio. Battery life will be evaluated to ensure adequate capacity. Area for enhancement (see Table 11, item #2).

Structural Assessment The Communications Tower equipment enclosure is similar to the ERP Tower communications enclosure, and is bolted to a supporting concrete slab a few feet from the Communications Tower. The tower and enclosure are located on the non-river side of the Missouri River protective dike at an elevation higher than the surrounding ground, but lower than the nominal top of levee elevation of 902'. Therefore, if the protective dike was breached, and the surrounding area flooded to a level of several feet, there is a potential for the enclosure to be flooded.

CNS experienced near-design flooding in 2011, and previously in 1993. In both cases the protective levee north of the plant failed on the Missouri side, and caused flooding into the 4-5 mile wide River basin.

The Communications Tower (and enclosure) is one of the locations/equipment listed in CNS Emergency Procedure 5.1 FLOOD to consider when protecting the site from the effects of flooding. In 2011, the Communications Tower was sandbagged. A portable gas-powered pump was staged on the inside of the sandbagged area to facilitate pumping out any in-leakage or precipitation accumulation. It was not needed.

River level increases gradually and predictably if due to precipitation. The USAR describes the most critical acute flooding event to be the failure of a major flood control dam; either the Oahe or Fort Randall dam. The closer of the two is almost 350 miles upstream from the CNS site. The waters released by failure of this dam would require at least three days to reach the CNS site. This would be ample time for protective measures to be taken to protect this equipment.

Because this equipment is located below the protective levee height, it is therefore assessed as 'questionable' that the EP communications equipment within the enclosure is protected during a severe flooding event, as defined in NEI 12-01.

NLS2013028 Page 12 of 37 The Communications Tower is designed for 90 mph wind with no ice buildup on the structure, or a 40 mph wind with %" ice buildup on the structure. The tower structure provides reasonable assurance that it is protected during a high wind event, as defined in NEI 12-01. No seismic evaluation was performed on this tower.

A metal stair case is lying on the ground approximately 3' from the tower base. The stair case is judged to have no adverse effect to the tower function during a seismic, wind, or flooding event. However it should be relocated away from the tower or secured.

Communication Equipment and Racks Seismic Protection - Enhancement identified. See Table 11, item #1.

" Anchorages o

Enclosure:

The backup batteries are located on a metal stand housed in a small room attached to the enclosure. The metal stand is anchored to the floor but is unsupported at the upper end. The batteries should be fastened to the metal stand shelf and the upper end of the metal stand may require a brace. An additional evaluation is required. Outside the communications enclosure is a low profile transformer. The transformer anchorage could not be verified because of a build-up of silt. It is recommended that the silt be removed to inspect anchorage adequacy.

  • Spatial Interactions o

Enclosure:

Inside the enclosure, adjacent to the equipment racks, are an unanchored pump and hoses, a 55-gallon trash barrel, and a metal tool box. These items should be removed or secured.

  • Housekeeping o The entire room needs to be cleaned up. The portable pump, hoses, tool box and trash barrels should be removed.

Flood Protection - QUESTIONABLE High Winds Protection - ACCEPTABLE Antennas - Communications Tower Seismic Protection - ACCEPTABLE

  • Anchorages o No concerns
  • Spatial Interactions o No concerns
  • Housekeeping o No concerns Flood Protection - ACCEPTABLE High Winds Protection - ACCEPTABLE

NLS2013028 Page 13 of 37 4.13.3 Emergency Operations Facility Location and General Description The EOF is one of several dedicated rooms within the NPPD Offsite Response Center, located in Auburn, Nebraska. The Offsite Response Center is one of several interconnected buildings making up part of the downtown district. It is a one-story commercial block building, with a partial basement.

Equipment & Functionality The EOF communications equipment room (Telecom Room 117) contains the Base #1 and #2 link radio and a control circuit to the Low Band radio transceiver located at the site. The Base #1 and #2 link radio is connected to antennas mounted on the roof of the building. The Low Band radio console is connected via redundant telecom circuits to the Low Band radio base in the Communications Tower equipment enclosure at the site.

The telecom circuit is provided by a private fiber optic system with a backup leased TI.

Desktop radio consoles are hardwired to their respective radio transceiver or Low Band control circuit. Wireless headsets are used by the EOF Director, EOF Radiological Control Manager, and the Health Physics Network (HPN) Bridge for offsite communications. There are three satellite phones in the EOF used to communicate with the plant, offsite agencies, and downwind survey field teams.

Power Primary power to the EOF (Offsite Response Center) is supplied from the local utility.

120V AC power supply to communications equipment is provided from distribution panel MBP through a 1OKVA, EATON model 10, System 9355-10, UPS. Backup power is supplied by a Diesel Generator (DG) via an auto-transfer switch. As an enhancement, the UPS batteries should be sized to provide adequate amp hour capacity as required.

Enhancement identified (see Table 11, item #2).

Structural Assessment The Offsite Response Center is a one-story commercial block building, with a partial basement. There are no streams or rivers nearby and the land slopes to the rear of the building providing sufficient runoff during rain storms. Therefore, the building structure provides reasonable assurance that the EP communications equipment is protected during a seismic, wind, or flooding event, as defined in NEI 12-01.

Antennas are attached to a robust steel structural member located on the roof. This provides reasonable assurance that the EP communications equipment is protected during a seismic, wind, or flooding event, as defined in NEI 12-01.

Diesel Generator Room Seismic Protection - Enhancement identified. See Table 11, item #1.

NLS2013028 Page 14 of 37

" Anchorages o No concerns

  • Spatial Interactions o Fluorescent lights in the overhead could fall out of the light fixture and could be secured.

" Housekeeping o Combustible materials such as a storage bin, trash barrel, vacuum cleaner, and mop are stored near the DG and should be removed.

Flood Protection - ACCEPTABLE High Winds Protection - ACCEPTABLE Telecom Room 117 Communications Equipment and Racks Seismic Protection - Enhancement identified. See Table 11, item #1.

" Anchorages o Rack 1 is anchored to the floor but is unsupported at the free (upper) end. The free end of this rack may require an additional brace. An additional evaluation may be required. The Siren Encoder Radio and CNS base components are not attached to Rack 1 shelf.

o The nearby UPS is unanchored. This unit should be anchored.

  • Spatial Interactions o No concerns
  • Housekeeping o Telecom Room 117 could use a cleaning of papers, miscellaneous unused hardware, and other items.

Flood Protection - ACCEPTABLE High Winds Protection - ACCEPTABLE Antennas Seismic Protection - ACCEPTABLE

  • Anchorages o No concerns
  • Spatial Interactions o No concerns
  • Housekeeping o No concerns Flood Protection - ACCEPTABLE High Winds Protection - ACCEPTABLE

NLS2013028 Page 15 of 37 4.13.4 Technical Support Center/Operational Support Center (TSC/OSC)

Location and General Description The TSC/OSC is located inside the PA on the ground floor of the Administration Building at 903' 6" elevation. The TSC and OSC exterior walls, floor and ceiling are constructed of reinforced concrete. Interior walls are similar to an office style environment.

Equipment & Functionality The TSC contains several PBX-dependent communications bridges. If the site PBX is inoperable (as assumed by this assessment) these bridges would be unavailable. Other installed communications (Central Office lines, Alternate intercom, Sound power, Plant paging) were also initially assumed to be inoperable.

The TSC/OSC inventory includes portable, handheld multi-channel radios which provide point-to-point onsite communications for the OSC and TSC. This includes in-plant operations, radiation protection, and maintenance/repair teams. This is the method credited by this assessment. Some relaying of messages may be required.

The TSC inventory also includes portable satellite telephones, providing communications between key TSC personnel and offsite response organizations.

Power Installed communication equipment located in the TSC and OSC is powered from lighting panel LP-TSC. Primary power to this panel is fed from the plant 12.5Kv system.

On loss of the primary power source, power to panel LP-TSC may be transferred to an alternate power supply (MCC-CA). Backup power to MCC-CA comes from a station DG. During an SBO, the TSC and OSC will have no AC power available.

Structural Assessment The desktop communication equipment and handheld radios with battery chargers are light weight, and would not ordinarily be affixed to a desk. Therefore from a structural perspective, this equipment is judged as acceptable.

The Administration Building is constructed of concrete and steel. The TSC and OSC are more substantial rooms within the Administration Building and meet regulatory requirements for Emergency Response Facilities (ERF). The Administration Building is built at elevation 903' 6" and has sufficient drainage. Therefore, the building structure provides reasonable assurance that the EP communications equipment is protected during a seismic, wind, or flooding event, as defined in NEI 12-01.

NLS2013028 Attachment 2 I Page 16 of 37 TSC/OSC Seismic Protection - ACCEPTABLE

  • Anchorages o No concerns
  • Spatial Interactions o No concerns
  • Housekeeping o No concerns Flood Protection - ACCEPTABLE High Winds Protection - ACCEPTABLE 4.13.5 Central Alarm Station (CAS)

Location and General Description The CAS enclosure is located inside the PA interior to the Security Building, not exposed to the outside environment. The CAS enclosure itself is fabricated from plate steel with steel intermediate members. The CAS communications antenna is located outside and adjacent to the Communications Building.

Equipment & Functionality Radio System Base #3 repeater is installed in a security equipment rack in the CAS enclosure. The radio system Base #3 repeater is a Motorola Quantar repeater, and is connected to an antenna on a tower adjacent to the north wall of the Communications Building. Additional details on these radios and their use is classified as Safeguards Information.

Power The CAS radio base is powered from a critical MCC, with a UPS as a backup.

Structural Assessment The CAS structure is an enclosure fabricated from plate steel and steel supporting members. This enclosure is internal to the Security Building at elevation 903' 6". The CAS enclosure provides reasonable assurance that the EP communications equipment is protected during a seismic, wind, or flooding event, as defined in NEI 12-01.

The antenna tower is anchored to a concrete slab and is laterally braced to the Security Building. A less than 1/16" wide crack exists in this slab; however this crack is outside the anchor bolt locations and is judged not to affect the anchor capacity or slab.

NLS2013028 Page 17 of 37 The antenna structure provides reasonable assurance that the' EP communications equipment is protected during a seismic, wind, or flooding event, as defined in NEI 12-01.

Communication Equipment and Racks Seismic Protection - ACCEPTABLE

" Anchorages o No concerns

  • Spatial Interactions o No concerns
  • Housekeeping o No concerns Flood Protection - ACCEPTABLE High Winds Protection - ACCEPTABLE Antenna Seismic Protection - ACCEPTABLE
  • Anchorages o No concerns
  • Spatial Interactions o No concerns
  • Housekeeping o No concerns Flood Protection - ACCEPTABLE High Winds Protection - ACCEPTABLE

NLS2013028 Page 18 of 37 Table 1: Offsite Response Organization Notifications to, and communications with, OROs [per 10 CFR 50 Appendix E.IV.D and E.9.a]

Emergency Minimum Primary Primary Backup Backup Planned or Potential Response Communications Method Method Method(s) Method(s) Enhancement Facility Links Described Available Described in Available Identified?

in Site Following site E-Plan Following E-Plan Assumed Assumed Large Scale LSEE?

External Event (LSEE)?

Control Room 1 per Control Room CNS State NO Two-Way FM NO YES (CR) for Communicator Notification Radio System Assure CR and OROs Telephone (High Band) have satellite System's telephone capability.

dedicated line Technical 1 for Key TSC CNS State NO Two-Way FM NO YES Support Center Communicator Notification Radio System Assure TSC and Telephone (High Band) OROs have satellite System's telephone capability.

dedicated line

NLS2013028 Attachment 2 I Page 19 of 37 Emergency Minimum Primary Primary Backup Backup Planned or Potential Response Communications Method Method Method(s) Method(s) Enhancement Facility Links Described Available Described in Available Identified?

in Site Following site E-Plan Following E-Plan Assumed Assumed Large Scale LSEE?

External Event (LSEE)?

Emergency 1 for Key EOF State NO Two-Way FM NO YES Operations Communicator Notification Radio System Assure EOF and Facility Telephone (High Band) OROs have satellite System's telephone capability.

dedicated line

NLS2013028 Page 20 of 37 Table 2: Nuclear Regulatory Commission Notifications to, and communications with, the NRC Headquarters Incident Response Center and the appropriate NRC Regional Office Operations Center [per 10 CFR 50 Appendix E.IV.D and E.9.d]

Emergency Minimum Primary Primary Backup Backup Planned or Potential Response Communications Method Method Method(s) Method(s) Enhancement Facility Links Described in Available Described in Available Identified?

Site E-Plan Following Site E-Plan Following Assumed Assumed LSEE? LSEE?

Control Room 1 per Control ENS NO Plant NO YES - satellite phone Room for Dedicated Telephone Emergency Phone Line (PBX)

Notification System (ENS)

Communicator Technical 1 for ENS ENS NO PBX NO YES - satellite phone Support Center Communicator Dedicated Phone Line Location(s) 1 for HPN HPN NO PBX NO YES - satellite phone where HPN Communicator Dedicated communications Phone Line are performed (TSC, EOF)

NLS2013028 Attachment 2 I Page 21 of 37 Table 3: Licensee Emergency Response Facilities Communications between licensee emergency response facilities [per 10 CFR 50 Appendix E.9.c. Additional links that support performance of critical response functions are also specified]. The minimum communications links to support this function are listed below by facility. For example, if the normally used telephone system cannot be restored to service, these links could rely upon some combination of radio, sound-powered, and satellite-based communications systems.

Emergency Minimum Primary Primary Method Backup Backup Planned or Response Communications Method Available Method(s) Method(s) Potential Facility Links Described in Following Described in Available Enhancement Site E-Plan Assumed LSEE? Site E-Plan Following Identified?

Assumed LSEE?

Control Room 1 per Unit PBX NO Two-Way FM NO YES - satellite Radio System phone (High Band)

NLS2013028 Attachment 2 I Page 22 of 37 Emergency Minimum Primary Primary Method Backup Backup Planned or Response Communications Method Available Method(s) Method(s) Potential Facility Links Described in Following Described in Available Enhancement Site E-Plan Assumed LSEE? Site E-Plan Following Identified?

Assumed LSEE?

Technical 1 each for: PBX NO Two-Way FM NO YES - satellite Support - Senior/Lead TSC (ALL) Radio System phones or Center Manager (High Band) handheld radios

- Operations (ALL)

Coordination

- Maintenance Coordination

- Engineering Coordination

- Radiological Support Additional response coordination links for multi-unit site:

- 1 for each position providing Unit Response Coordination

NLS2013028 Attachment 2 I Page 23 of 37 Emergency Minimum Primary Primary Method Backup Backup Planned or Response Communications Method Available Method(s) Method(s) Potential Facility Links Described in Following Described in Available Enhancement Site E-Plan Assumed LSEE? Site E-Plan Following Identified?

Assumed LSEE?

Operations 1 each for: PBX NO Two-Way FM NO YES - satellite Support

  • Senior/Lead OSC (ALL) Radio System phones or Center Manager (High Band) handheld radios
  • Radiological (ALL)

Support Additional response coordination links for multi-unit site:

  • 1 for each position providing Unit In-Plant Team Coordination

NLS2013028 Attachment 2 I Page 24 of 37 Emergency Minimum Primary Primary Method Backup Backup Planned or Response Communications Method Available Method(s) Method(s) Potential Facility Links Described in Following Described in Available Enhancement Site E-Plan Assumed LSEE? Site E-Plan Following Identified?

Assumed LSEE?

Emergency 1 each for: PBX NO Two-Way FM NO YES - satellite Operations

  • Senior/Lead (ALL) Radio System phones Facility Manager (High Band)
  • Key Protective (ALL)

Measures

- Operations or Technical Support (as needed to support performance of dose projections, formulation of PARs and plant status updates to ORO authorities)

Joint 1 for Senior PBX NO Alternate NO YES - satellite Information Manager Intercom phone Center system

NLS2013028 Page 25 of 37 Table 4: Field / Offsite Monitoring Teams Communications with field/offsite monitoring teams [per 10 CFR 50 Appendix E.9.c].

Emergency Minimum Primary Primary Backup Backup Planned or Potential Response Communications Method Method Method(s) Method(s) Enhancement Facility Links Described in Available Described in Available Identified?

Site E-Plan Following Site E-Plan Following Assumed Assumed LSEE? LSEE?

Primary location Field/offsite Two-Way FM NO Two-Way FM NO YES - satellite phone where monitoring team Radio Radio System field/offsite coordination System (Low (High Band) monitoring team Band) coordination is performed (EOF)

Primary location 1 for each Two-Way FM NO Two-Way FM NO YES - satellite phones from which field/offsite Radio Radio System field/offsite monitoring team System (Low (High Band) monitoring Band) teams are deployed (TSC)

NLS2013028 Attachment 2 I Page 26 of 37 Table 5: Other Federal Agencies Communications with other Federal agencies as described in the site E-Plan (e.g., the US Coast Guard) [per 10 CFR 50 Appendix E.9.b]

Emergency Minimum Primary Primary Backup Backup Planned or Potential Response Communications Method Method Method(s) Method(s) Enhancement Facility Links Described in Available Described in Available Identified?

Site E-Plan Following Site E-Plan Following Assumed Assumed LSEE? LSEE?

Primary location Coordination with FTS 2001 NO Commercial NO YES - satellite phone where Federal agencies - Network Telephone communication CR, TSC, EOF with Federal agencies is performed

NLS2013028 Attachment 2 I Page 27 of 37 Table 6: On-site and In-plant Response Teams Coordination and direction of on-site and in-plant response teams. This includes teams necessary to affect emergency repairs, firefighting, search and rescue, radiological monitoring, and implementation of Transition Phase coping and severe accident management strategies. To accommodate the timeline associated with NRC Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (as discussed in Section 1).

Emergency Minimum Primary Primary Backup Backup Planned or Potential Response Communications Method Method Method(s) Method(s) Enhancement Facility Links Described Available Described in Available Identified?

in Site E- Following Site E-Plan Following Plan Assumed Assumed LSEE? LSEE?

On-shift staff Number necessary Station YES - 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Two-Way FM YES YES - additional for the onshift staff Intercom/ only Radios batteries for radios to perform Initial Gaitronics Phase coping actions (reflecting current staff &

strategies)

NLS2013028 Page 28 of 37 Emergency Minimum Primary Primary Backup Backup Planned or Potential Response Communications Method Method Method(s) Method(s) Enhancement Facility Links Described Available Described in Available Identified?

in Site E- Following Site E-Plan Following Plan Assumed Assumed LSEE? LSEE?

Operational 1 each for: Station YES - 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Two-Way FM YES YES - additional Support Center - On-site radiological Intercom/ only Radios batteries for radios and other site- monitoring Gaitronics specific locations as 2 each for:

necessary

  • Firefighting (1 for brigade leader and 1 for the brigade) 2 each per unit for:
  • In-plant radiological monitoring

- Search and Rescue

- Emergency repairs Site-specific number needed to implement any 2 severe accident mitigation strategies

NLS2013028 Page 29 of 37 Table 7: Plant Paging (Announcement) System Emergency Response Minimum Is This System Available Planned or Potential Enhancement Facility Communications Links Following Assumed Identified?

LSEE?

N/A (Site-wide) See assumptions and YES - 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> only NO discussion in NEI 12-01.

NLS2013028 Page 30 of 37 Table 8: Communications Equipment at ORO Facilities Emergency Minimum Primary Primary Method Backup Backup Planned or Response Communications Method Available Method(s) Method(s) Potential Facility Links Described following Described Available Enhancement in site E- Assumed LSEE? in site E- following Identified?

Plan Plan Assumed LSEE?

Location where At least one. See OROs receive assumptions and notifications of an discussion in NEI emergency 12-01.

declaration or a Protective Action ORO FACILITY Recommendation Commercial (as described in Nebraska State Telephone NO NONE NO YES - satellite the site Patrol (ALL) (ALL) (ALL) phones emergency plan)

Nemaha County Sheriff Richardson County Sheriff Missouri State Patrol Atchison County 911 Center I. I A A &

NLS2013028 Page 31 of 37 Table 9: Equipment Locations and Protection System / Primary System Equipment protected from the below hazards Equipment Component Location Protected from Protected from Protected from Comments Seismic Flooding Wind as defined in this as defined in this as defined in this document document document UHF Radio ERP Tower & NO YES YES See Section 4.13.1 Base Enclosure for details of Repeaters protection and Radio conclusions Link Communications NO NO YES See Section 4.13.2 Tower & Enclosure for details of protection conclusions EOF NO YES YES See Section 4.13.3 for details of protection conclusions CAS YES YES YES See Section 4.13.5 for details of protection conclusions

NLS2013028 Attachment 2 I Page 32 of 37 System / Primary System Equipment protected from the below hazards Equipment Component Location Protected from Protected from Protected from Comments Seismic Flooding Wind as defined in this as defined in this as defined in this document document document UHF Radio TSC/OSC YES YES YES See section 4.13.4 Base for details of Repeaters protection and Radio conclusions Link

NLS2013028 Attachment 2 I Page 33 of 37 Table 10 CNS Analysis of Required EP Communications Links Reference NEI 12-01 Section 4, Communications During An Extended Loss of AC Power Total number Total number Additional required required on-hand Satellite phones 13 13 0 Radios 22 26 are available in 0 CR and TSC/OSC*

  • Additional radios are available from Security and Fire Brigade but were not credited.

Several of the reporting requirements listed above are performed by one individual.

Below is a list of satellite phones and radios credited for establishing critical communications links.

Facility Satellite phones Radios Control Room 13

  • Shift Manager 1
  • Shift Communicator 1
  • Shift Rad. Tech. 1 Technical Support Center/Operational Support Center 13
  • ENS Communicator 1 Emergency Operations Facility
  • Emergency Director 1
  • Offsite Communicator 1
  • Field Team Coordinator 1 Field Monitoring Teams 2 Joint Information Center a Designated Spokesperson 1 Fire Brigade 2 Total 13 26

NLS2013028 Page 34 of 37 Table 11 Summary of Enhancements

  1. Description Projected Completion Date 1 Resolve issues identified related to anchorages, spatial Complete interactions, and housekeeping.

2 Evaluate and assure that batteries supporting a minimum of 02/28/14 two installed radio system repeaters are sized to provide adequate (24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) capacity.

3 Ensure that primary OROs within a 25 mile radius have 12/31/13 satellite communications capabilities.

4 Evaluate options and select method(s) to support indoor 12/10/13 (remote) access to satellite-based communications.

5 Ensure adequate battery-based power is available to Complete handheld communications devices credited to support prolonged SBO conditions.

6 Determine if alternative measures now used for inoperable Complete paging coverage areas can be used for site-wide notification.

7 Ensure enhancements implemented include programmatic 09/30/15 support (procedures, inventories, training, testing).

8 Obtain additional GETS cards for key personnel or ERFs. Complete 9 Install indoor (remote) access to satellite-based 06/30/14 communications; three at plant site, three at OROs.

The enhancements identified above may be modified or changed as implementation progresses. Alternate approaches may be utilized if prudent (e.g., alternate/new technology, improved capability, cost savings, etc.).

NLS2013028 Page 35 of 37 Figure 1 Block diagram of the CNS radio system, repeater system Base #1 (NOTE - Print is in the process of being revised as a result of the narrow-banding modification. While the specific equipment models may have changed, basic configuration has not.)

(Security Use)

MC2500 DekSAets 2 oo- RO Desk ontlrol Room 8oso I 2 Control S64i.1ntc Monitor 3 Simulator P.O ocsk Transmit = 451.250 MHz 4 Siruflator Se~srrfic Monitor Receive - 456.250 5 Simulotor Control Booth MHz 6 FAC 7 OSC

8) TSC All EQ~rtqb& & Mobfles Are Equipped With F1, F2. F3. F4, & F5.

Security Radios Also Include F6 & F7 Transmit F: - 456.075 MHz 451.075 MI-z F2 = 451.075 MHz 451.075 MI-tz 43 456,250 MHz 451.250 MHz F54 451.250 MHz 451.250 MHz 15 - 451.5375 MHz 451,5375 MHz F6 = 469.2 M4Hz 4.42 MHz F7 464.2 MdHz 4-64-.2 MHZ

[2 j i'1

OOPER NUCLEAR SI RADIO SYSTEM ERP TOWER BASE #1

NLS2013028 Attachment 2 I Page 36 of 37 Figure 2 Block diagram of the CNS radio system, repeater system Base #2 (NOTE - Print is in the process of being revised as a result of the narrow-banding modification. While the specific equipment models may have changed, basic configuration has not.)

Q.4ointenonce. R.P. Use)

- Fc3 -~ Contr~,I Station

1) Aub~jrn COF Alf' F*4 loll MArund Opecrotiono rci

[l Iecive

1) Control Room RO Desk
2) Control Room Seismk Monitor Trnmt= 451.250 MHz 3) Simulator RO 0---k
4) Slmu1ntor Seismic fonitor

= 456,250 M4Hz 5) Simulotor Control 8ooth

'S FAC a TSC All Portal & Mobiles Are Equipped With F1, F2, F3. F4. & F5.

Security Radios Aiso Include MCC-5500 Conro=cs F6 & F7 I1 CAS Transmitr 2SAS 3 Telecom Shop F1 456.075 MHz 451,075 MHz i

V2 4.%1 nf7s, M1R, 4.1.- 7S MHz F3 456,250 MHz 451.250 MHz F4 451.250 MHz 451.250 MHz F5 451.5375 Mli 451.5375 MHz 469.2 MHz 464,2 MHz F6 464.2 MHz 464.2 MHz COOPER NUCLEAR S1 RADIO SYSTEM MET TOWER BASE #2

NLS2013028 Attachment 2 I Page 37 of 37 Figure 3 Block diagram of the CNS radio system, repeater system Low-Band (NOTE - Print is in the process of being revised as a result of the narrow-banding modification. While the specific equipment models may have changed, basic configuration has not.)

"t

2) -=-345-kV-Sub Control Room
3) Auburn EO- (T 45, S.utator NS t

System Operates On F1 Or F2 As Assigned.

Cooper Normally On F2 Maintenance, R.P. On Fl Transmit & Receive F1 - 48.180 MHz F2 = 47.960 MHz COOPER NUCLEAR STATIONl RADIO SYSTEM (LOW BAND.)

MET TOWER