Letter Sequence Request |
---|
|
Results
Other: GNRO-2013/00014, Entergy'S Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3, GNRO-2016/00010, Entergy Update to Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3, ML13057A116, ML13058A066, ML13127A146, NLS2013028, Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3, PLA-7034, Response to Follow-Up Letter on Technical Issues for Resolution Regarding Licensees Communication Submittals
|
MONTHYEARNOC-AE-12002867, Revised 60-Day Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-06-0404 June 2012 Revised 60-Day Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident Project stage: Response to RAI NOC-AE-12002859, Day Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident2012-06-0404 June 2012 Day Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident Project stage: Response to RAI GNRO-2012/00052, Entergy'S 90-Day Response to the March 12, 2012, Information Request, Action Plan for Completing Emergency Communication and Staffing Assessments2012-06-0808 June 2012 Entergy'S 90-Day Response to the March 12, 2012, Information Request, Action Plan for Completing Emergency Communication and Staffing Assessments Project stage: Request ML12311A0282012-10-31031 October 2012 Emergency Preparedness Information Requested by NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1,... Project stage: Request NOC-AE-13002958, STPNOC Response to January 23, 2013, Request for Additional Information Related to the Near-Term Task Force Recommendation 9.3 on Communications2013-02-21021 February 2013 STPNOC Response to January 23, 2013, Request for Additional Information Related to the Near-Term Task Force Recommendation 9.3 on Communications Project stage: Request NLS2013028, Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.32013-02-21021 February 2013 Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3 Project stage: Other GNRO-2013/00014, Entergy'S Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.32013-02-21021 February 2013 Entergy'S Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3 Project stage: Other ML13057A1162013-02-22022 February 2013 Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3 Project stage: Other ML13058A0662013-02-22022 February 2013 Response to NRC Follow-up Letter on Technical Issues for Resolution Regarding Licensee Communication Associated with Near-Term Task Force Recommendation 9.3 Project stage: Other ML13057A5932013-02-22022 February 2013 Response to Follow-up Letter on Technical Issues for Resolution Regarding Licenses Communication Submittals Project stage: Request L-13-047, Supplement to Response to NRC Letter, Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2013-02-22022 February 2013 Supplement to Response to NRC Letter, Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident Project stage: Supplement ML13127A1462013-05-0606 May 2013 Email Table 2 Response Question Project stage: Other PLA-6978, Response to Follow-Up Letter on Technical Issues for Resolution Regarding Licensees Communication Submittals2013-06-0303 June 2013 Response to Follow-Up Letter on Technical Issues for Resolution Regarding Licensees Communication Submittals Project stage: Request PLA-7034, Response to Follow-Up Letter on Technical Issues for Resolution Regarding Licensees Communication Submittals2013-06-28028 June 2013 Response to Follow-Up Letter on Technical Issues for Resolution Regarding Licensees Communication Submittals Project stage: Other GNRO-2016/00010, Entergy Update to Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.32016-08-24024 August 2016 Entergy Update to Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3 Project stage: Other 2013-02-22
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23345A0682023-11-28028 November 2023 Technical Specification Bases, Manual PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) IR 05000387/20230032023-11-0303 November 2023 Integrated Inspection Report 05000387/2023003 and 05000388/2023003 PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML23291A1132023-10-12012 October 2023 Submittal of Revision 71 to Updated Final Safety Analysis Report and Revision 25 to Fire Protection Review Report ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0412023-10-0505 October 2023 Notification of Commercial Grade Dedication Inspection (05000387/2024011 and 05000388/2024011) and Request for Information IR 05000387/20233012023-09-20020 September 2023 Initial Operator Licensing Examination Report 05000387/2023301 and 05000388/2023301 ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) IR 05000387/20230052023-08-31031 August 2023 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2023005 and 05000388/2023005) ML23228A1952023-08-21021 August 2023 Summary of August 10, 2023, Public Observation Meeting Re. Proposed Alternative PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval IR 05000387/20230022023-08-0101 August 2023 Integrated Inspection Report 05000387/2023002 and 05000388/2023002 ML23195A1852023-07-27027 July 2023 Correction to Technical Specifications Page 3.3-73 in Amendment No. 265 PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) ML23201A0152023-07-20020 July 2023 Operator Licensing Examination Approval ML23200A1012023-07-19019 July 2023 Notification of Conduct of a Fire Protection Team Inspection ML23193A0062023-07-12012 July 2023 Requalification Program Inspection PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 ML23163A1012023-06-12012 June 2023 10 CFR 50.46 Annual Report (Pla 8065) PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence IR 05000387/20234012023-06-0707 June 2023 Security Baseline Inspection Report 05000387/2023401 and 05000388/2023401 PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) ML23132A3212023-05-17017 May 2023 Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 285 and 269 Related to Order Approving Transfer of Licenses PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) IR 05000387/20230012023-05-12012 May 2023 Integrated Inspection Report 05000387/2023001 and 05000388/2023001 PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 ML23090A2302023-03-31031 March 2023 NRC Decommissioning Funding Status Report PLA-8049 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) ML23095A0572023-03-29029 March 2023 NRC Decommissioning Funding Status Report December 31, 2022 PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 ML23065A1962023-03-0202 March 2023 EN 56387 Paragon - Part 21 Report Re Defect Identified in Automatic Transfer Switch Pn: NLI-ATS480A400X1 IR 05000387/20220062023-03-0101 March 2023 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2022006 and 05000388/2022006) PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums IR 05000387/20220042023-02-0808 February 2023 Integrated Inspection Report 05000387/2022004 and 05000388/2022004 ML23010A0882023-01-15015 January 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Control Rod Technical Specifications 2024-02-07
[Table view] Category:Legal-Affidavit
MONTHYEARPLA-8015, Application for Order Approving Indirect Transfer of Control of Licenses2022-09-29029 September 2022 Application for Order Approving Indirect Transfer of Control of Licenses ML20248H4702020-08-19019 August 2020 Submittal of Annual Financial Information Required by 10 CFR 50.71 PLA-7861, Submittal of Unit 2 Cycle 21 Reload Licensing Documents to Support License Amendment Requesting Application of Advanced Framatome Methodologies (PLA-7861)2020-04-0909 April 2020 Submittal of Unit 2 Cycle 21 Reload Licensing Documents to Support License Amendment Requesting Application of Advanced Framatome Methodologies (PLA-7861) PLA-7847, Submittal of Revised Topical Report to Support License Amendment Requesting Application of Advanced Framatome Methodologies2020-03-0909 March 2020 Submittal of Revised Topical Report to Support License Amendment Requesting Application of Advanced Framatome Methodologies PLA-7841, Thirty-Day Response to Request for Additional Information Regarding Proposed License Amendment Requesting Application of Advanced Framatome Methodologies2020-02-0606 February 2020 Thirty-Day Response to Request for Additional Information Regarding Proposed License Amendment Requesting Application of Advanced Framatome Methodologies PLA-7585, Annual Financial Information for the Years Ended December 31, 2105 and 20162017-04-13013 April 2017 Annual Financial Information for the Years Ended December 31, 2105 and 2016 PLA-7500, Affidavit of Timothy S. Rausch2016-06-29029 June 2016 Affidavit of Timothy S. Rausch PLA-7274, Response to Second Request for Additional Information Regarding Application for Approval of Indirect Transfer of Control PLA-72742015-01-0505 January 2015 Response to Second Request for Additional Information Regarding Application for Approval of Indirect Transfer of Control PLA-7274 ML14204A7092014-07-23023 July 2014 Enclosure 3, Affidavit of Peter M. Yandow ML13057A5932013-02-22022 February 2013 Response to Follow-up Letter on Technical Issues for Resolution Regarding Licenses Communication Submittals ML1127000682011-09-26026 September 2011 Enclosure 3, Mfn 10-245 R4, Affidavit ML0808605052008-03-20020 March 2008 MD8079 - Susquehanna 1 and 2 - Meeting on March 18, 2008, Affidavit for Proprietary Presentation Material PLA-6236, Proposed License Amendments No. 285 & 253 for Units 1 & 2, Respectively Re Extended Power Uprate Application Supplement to Instrumentation and Controls & Balance-of-Plant Safety System2007-07-13013 July 2007 Proposed License Amendments No. 285 & 253 for Units 1 & 2, Respectively Re Extended Power Uprate Application Supplement to Instrumentation and Controls & Balance-of-Plant Safety System PLA-6203, Proposed License Amendment Extended Power Uprate Application Containment and Ventilation Technical Review Request for Additional Information Responses, PLA-62032007-06-0404 June 2007 Proposed License Amendment Extended Power Uprate Application Containment and Ventilation Technical Review Request for Additional Information Responses, PLA-6203 ML0629001612006-10-11011 October 2006 Supplemental Environmental Report for Extended Power Uprate. ML0629001622006-10-11011 October 2006 Extended Power Uprate Steam Dryer Evaluation. PLA-5979, Decommissioning Report of Financial Assurance, Supplemental Information2005-11-0707 November 2005 Decommissioning Report of Financial Assurance, Supplemental Information ML0520003282005-07-14014 July 2005 Surveillance Program for Channel-Control Blade Interference PLA-5920, Transmittal of Susquehanna - Guarantee of Payment of Deferred Premiums - 10 CFR 140.212005-06-28028 June 2005 Transmittal of Susquehanna - Guarantee of Payment of Deferred Premiums - 10 CFR 140.21 ML19186A1231979-01-17017 January 1979 Amended Petition for Leave to Intervene ML18023A7421978-09-18018 September 1978 Letter Attaching an Affidavit of Service for Amendment No. 2 to Ses Operating License Application Containing Revision No. 2 to the Final Safety Analysis Report ML18024A1451978-09-18018 September 1978 Letter Enclosing an Affidavit of Service for Amendment No. 2 of Operating License Application ML19184A5341978-07-20020 July 1978 Affidavit of Service: Environmental Report - Operating License Stage 2022-09-29
[Table view] |
Text
Timothy S. Rausch Senior Vice President
& Chief Nuclear Officer FEB 2 2 2013 U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, DC 20555-0001 PPL Susquehanna, LLC 769 Salem Boulevard Berwick, P A 18603 Tel. 570.542.3345 Fax 570.542.1504 tsrausch @pplweb.com SUSQUEHANNA STEAM ELECTRIC STATION RESPONSE TO FOLLOW-UP LETTER ON TECHNICAL ISSUES FOR RESOLUTION REGARDING LICENSEES COMMUNICATION SUBMITTALS Docket Nos. 50-387 and 50-388 PLA-6978
References:
- 1. NRC Letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(!) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident," dated March 12, 2012. 2. PLA-6852, "60-Day Response to NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(!) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident, dated March 12, 2012," dated May 11, 2012. 3. PLA-6866, "Emergency Preparedness Information Requested by NRC Letter," dated June 11,2012. 4. PLA-6927, "Requested Communications Assessment Results and Implementation Schedule per References 1 and 2," dated October 31, 2012. 5. NRC Letter, "Follow-Up Letter on Technical Issues for Resolution Regarding Licensee Communication Submittals associated with Near-Term Task Force Recommendation 9.3 (TAC NO. ME7951)," dated January 23, 2013. On March 12, 2012, the Nuclear Regulatory Commission (NRC) staff issued a letter entitled "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident," (Reference 1). Enclosure 5 of Reference 1 contains specific Requested Actions and Requested Information associated with Recommendation 9.3 for Emergency Preparedness (EP) programs.
In accordance with 10 CFR 50.54, "Conditions of licenses," paragraph (f), addressees were requested to submit a written response to the information request within 90 days from the date of letter. Reference 1 also states that if an addressee cannot meet the requested response date, the addressee must provide a response within 60 days of the date of the letter and describe Document Control Desk PLA-6978 the alternative course of action that it proposes to take, including the basis of the acceptability of the proposed alternative course of action and estimated completion date. After a careful review of the requested actions and information, PPL Susquehanna, LLC (PPL) opted to take an alternative course of action as described in Enclosure 1 of Reference
- 2. The basis for PPL's alternative course of action was documented in Enclosure 2 of Reference
- 2. This alternative course of action was based on the industry standard guidance developed with the Nuclear Energy Institute (NEI). Reference 4 provided PPL's Communications Assessment Results and Implementation Schedule for planned changes. Enclosure 1 to Reference 3 contains the results of the Communications Assessment in the format presented in NEI 12-01, "Guideline for Assessing Beyond Design Basis Accident Response Staffing and Communications Capabilities." Enclosure 2 of Reference 4 contains a list of regulatory commitments regarding the changes PPL planned to make as a result of the Communications Assessment.
In Reference 5, the NRC identified eight (8) eight generic technical issues needing resolution to determine the licensee's communications capability regarding a multi-unit station blackout event. The NRC requested a response be provided within 30 days from the date of the letter. The purpose of this letter and associated Enclosure 1 is to provide PPL' s response to Reference
- 5. PPL's response in Enclosure 1 is in a tabular format with three columns. The table presents the NRC's Generic Technical Issues in the left hand column. Information from PPL' s Communications Assessment submittal (Reference
- 4) is presented in the center column. The right hand column provides additional information to fully respond to the NRC's Generic Technical Issues and augments PPL's original response (Reference 4). PPL requests that Enclosure 1 to this letter be withheld from public disclosure.
The information represents proprietary, confidential, and Security sensitive material as defined by 10 CPR 2.390. Enclosure 2 to this letter contains a list of new regulatory commitments.
If you have any questions regarding the information contained in this letter, please contact Mr. John L. Tripoli, Manager, Nuclear Regulatory Affairs, at (570) 542-3100. Document Control Desk PLA-6978 I declare under penalty of perjury that the foregoing is true and correct. Executed on 7-('2..-z-I IS '2013. Senior Vice President
& Chief Nuclear Officer
Enclosures:
- 1. PPL's Response to the NRC's 8 Generic Technical Issues for RFI 9.3 Communications Assessment-Withhold from Public Disclosure in Accordance with 10 CFR 2.390 2. List of Regulatory Commitments
- 3. Affidavit Copy: Mr. P. W. Finney, NRC Sr. Resident Inspector Mr. J. A. Whited, NRC Project Manager Mr. L. J. Winker, PADEP/BRP Region I Administrator, NRC Enclosure 2 to PLA-6978 List of Regulatory Commitments Enclosure 2 to PLA-6978 List of Regulatory Commitments Item Description Due Date Tracking # 1 SSES will revise EP-RM -008, 06/28/2013 1671371 "Emergency Telephone Directory" to include satellite phone usage instructions.
2 NDAP-QA-0777, "PPL Susquehanna 05/24/2013 1499071 Emergency Preparedness Program" will be revised to include the "self-activation" expectation and guidance that SSES' NERO personnel have already been trained on.
Enclosure 3 to PLA -6978 Affidavit AFFIDAVIT OF TIMOTHY S. RAUSCH I, Timothy S. Rausch, Senior Vice President and Chief Nuclear Officer, PPL Susquehanna, LLC, do hereby affirm and state: 1. I am authorized to execute this affidavit on behalf of PPL Susquehanna, LLC (hereinafter referred to as .. PPL .. ). 2. PPL requests that the document enclosed hereto ("Enclosure 1 11) be withheld from public disclosure under the provisions of 10 C.F.R. 2.390(a)(4) and 2.390(d)(1
). 3. The PPL Document contains confidential commercial information, the disclosure of which would adversely affect PPL. 4. This information has been held in confidence by PPL. To the extent that PPL has shared this information with others, it has done so on a confidential basis. 5. PPL customarily keeps such information in confidence and there is a rational basis for holding such information in confidence.
The information is not available from public sources and could not be gathered readily from other publicly available information.
- 6. Public disclosure of this information would cause substantial harm to the competitive position of PPL, because such information has significant commercial value to PPL. 7. PPL requests that the information identified in paragraph (2) above be classified as proprietary commercial information because it details results of an assessment performed to assess PPL's communications capabilities during an extended loss of AC power. The results and the conditions under which it was collected constitutes a major PPL asset. 8. This information is of a type that is held in confidence by PPL, and there is a rational basis for doing so because the information contains sensitive commercial information concerning the physical protection of PPL*s facility.
1 Commonwealth of Pennsylvania County of ) Subscribed and sworn before me, a Notary Public in and for the Commonwealth of Pennsylvania This J.. 1.. day of , 2013 NOTARIAL SEAL JACQUELINE M. JACOB Notary Public ALLENTOWN.
CITY, LEHIGH COUNTY My Commilllon Expires Mar 20, 2016 PPL SUSQUEHANNA, LLC 2