ML14342A873: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION  
{{#Wiki_filter:UNITED STATES
REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257
                                NUCLEAR REGULATORY COMMISSION
  December 4, 2014  
                                              REGION II
Mr. Steven D. Capps Site Vice President  
                            245 PEACHTREE CENTER AVENUE NE, SUITE 1200
Duke Energy Corporation  
                                      ATLANTA, GEORGIA 30303-1257
McGuire Nuclear Station  
                                          December 4, 2014
MG01VP/12700 Hagers Ferry Road  
Mr. Steven D. Capps
Site Vice President
Duke Energy Corporation
McGuire Nuclear Station
MG01VP/12700 Hagers Ferry Road
Huntersville, NC 28078
SUBJECT: WILLIAM B. MCGUIRE NUCLEAR STATION - NOTIFICATION OF LICENSED
            OPERATOR INITIAL EXAMINATION 05000369/2015301 AND 05000370/2015301
Dear Mr. Capps:
In a telephone conversation on November 25, 2014, between Mr. Steven Mosteller, MNS Exam
Team Lead, and Mr. Daniel Bacon, Senior Operations Engineer, arrangements were made for
the administration of licensing examinations at William B. McGuire Nuclear Station. The
operating test is scheduled to be administered during the weeks of April 27 and May 4, 2015.
The written examination is scheduled to be administered the week of May 11, 2015. The on-site
preparatory week is scheduled for the week of March 30, 2015.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
Commission (NRC) Regional office will discuss any changes with your staff that might be
necessary before the examinations are administered. Your staff has also agreed to make
copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by February 11, 2015. Mr. Daniel Bacon provided the written examination outline to your
staff in September, 2014. The operating test, written examination, and the supporting reference
materials identified in Attachment 3 to ES-201 will be due by March 13, 2015. Pursuant to Title
10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outline, examination, and test before
they are submitted to the NRC for review and approval. All materials shall be complete and
ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,


Huntersville, NC  28078
S. Capps                                      2
SUBJECT: WILLIAM B. MCGUIRE NUCLEAR STATION - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000369/2015301 AND 05000370/2015301
your staff should retain the original simulator performance data (e.g., system pressures,
Dear Mr. Capps:
temperatures, and levels) generated during the dynamic operating tests until the examination
In a telephone conversation on November 25, 2014, between Mr. Steven Mosteller, MNS Exam
results are final.
Team Lead, and Mr. Daniel Bacon, Senior Operations Engineer, arrangements were made for
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
the administration of licensing examinations at William B. McGuire Nuclear Station.  The
effect while the written examinations and operating tests are being administered.
operating test is scheduled to be administered during the weeks of April 27 and May 4, 2015. The written examination is scheduled to be administered the week of May 11, 2015. The on-site preparatory week is scheduled for the week of March 30, 2015.  
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications, medical certifications, and waiver
requests (if any) at least 30 days before the first examination date. If the applications are not
received at least 30 days before the examination date, a postponement may be necessary.
Signed applications certifying that all training has been completed should be submitted at least
14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act
of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office
of Management and Budget (OMB) under approval number 3150-0018, which expires on
April 30, 2016. The public reporting burden for this collection of information is estimated to
average 500 hours per response, including the time for reviewing instructions, gathering and
maintaining the data needed, writing the examinations, and completing and reviewing the
collection of information. Send comments on any aspect of this collection of information,
including suggestions for reducing the burden, to the Information and Records Management
Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by
Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of
Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and
Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will
be available electronically for public inspection in the NRC Public Document Room, or from
the Publicly Available Records (PARS) component of the NRCs Agencywide Documents
Access and Management System (ADAMS), accessible from the NRC Web site
at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Steven Mosteller has been advised of the
policies and guidelines referenced in this letter. If you have any questions regarding the NRCs
examination procedures and guidelines, please contact Mr. Daniel Bacon at 404-997-4518,
(Internet E-mail: daniel.bacon@nrc.gov), or me at 404-997-4662, (Internet E-mail:
eugene.guthrie@nrc.gov).
                                                Sincerely,
                                                /RA/
                                                Eugene F. Guthrie, Chief
                                                Operations Branch 2
                                                Division of Reactor Safety
Docket Nos. 50-369 and 50-370
License Nos. NPF-9 and NPF-17
cc: Distribution via Listserv


As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, 
"Operator Licensing Examination Standards for Power Reactors."  The U.S. Nuclear Regulatory Commission (NRC) Regional office will discuss any changes with your staff that might be necessary before the examinations are administered.  Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by February 11, 2015.  Mr. Daniel Bacon pr
ovided the written examination outline to your staff in September, 2014.  The operating test, written examination, and the supporting reference
materials identified in Attachment 3 to ES-201 will be due by March 13, 2015.  Pursuant to Title
10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outline, examination, and test before
they are submitted to the NRC for review and approval.  All materials shall be complete and
ready-to-use. 
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked.  Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above.  In accordance with ES-302,
S. Capps 2
your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.


          ML14342A873                     SUNSI REVIEW COMPLETE     FORM 665 ATTACHED
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver requests (if any) at least 30 days before the first examination date.  If the applications are not received at least 30 days before the examination date, a postponement may be necessary.  Signed applications certifying that all training has been completed should be submitted at least
OFFICE               RII:DRS/OB2     RII:DRS/OB2
14 days before the first examination date.
SIGNATURE               DXB2             EFG
 
NAME                   DBacon         EGuthrie
This letter contains information collections that are subject to the
DATE                 12/ 4/2014       12/4/2014
Paperwork Reduction Act 
E-MAIL COPY         YES       NO   YES       NO   YES     NO
of 1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by the Office  of Management and Budget (OMB) under approval number 3150-0018, which expires on 
April 30, 2016.  The public reporting burden for this collection of information is estimated to
average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information.  Send comments on any aspect of this collection of information,
including suggestions for reducing the burden, to the Information and Records Management
Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by
Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of
Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will 
be available electronically for public inspection in the NRC Public Document Room, or from  the Publicly Available Records (PARS) component of the NRC's Agencywide Documents
Access and Management System (ADAMS), accessible from the NRC Web site 
 
at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter.  Mr. Steven Mosteller has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Daniel Bacon at 404-997-4518,
(Internet E-mail: daniel.bacon@nrc.gov), or me at 404-997-4662, (Internet E-mail: eugene.guthrie@nrc.gov
).  Sincerely,
/RA/  Eugene F. Guthrie, Chief      Operations Branch 2      Division of Reactor Safety
 
Docket Nos.  50-369 and 50-370
License Nos.  NPF-9 and NPF-17
cc:  Distribution via Listserv
 
      ML14342A873                 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/OB2 RII:DRS/OB2     SIGNATURE DXB2 EFG     NAME DBacon EGuthrie     DATE 12/ 4/2014 12/4/2014     E-MAIL COPY YES NO YES NO YES NO
}}
}}

Latest revision as of 19:44, 31 October 2019

William McGuire Nuclear Station - Notification of Licensed Operator Initial Examination 05000369/2015301 and 05000370/2015301
ML14342A873
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 12/04/2014
From: Eugene Guthrie
Division of Reactor Safety II
To: Capps S
Duke Energy Corp
References
50-369/15-301, 50-370/15-301
Download: ML14342A873 (3)


See also: IR 05000369/2015301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

December 4, 2014

Mr. Steven D. Capps

Site Vice President

Duke Energy Corporation

McGuire Nuclear Station

MG01VP/12700 Hagers Ferry Road

Huntersville, NC 28078

SUBJECT: WILLIAM B. MCGUIRE NUCLEAR STATION - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000369/2015301 AND 05000370/2015301

Dear Mr. Capps:

In a telephone conversation on November 25, 2014, between Mr. Steven Mosteller, MNS Exam

Team Lead, and Mr. Daniel Bacon, Senior Operations Engineer, arrangements were made for

the administration of licensing examinations at William B. McGuire Nuclear Station. The

operating test is scheduled to be administered during the weeks of April 27 and May 4, 2015.

The written examination is scheduled to be administered the week of May 11, 2015. The on-site

preparatory week is scheduled for the week of March 30, 2015.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) Regional office will discuss any changes with your staff that might be

necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by February 11, 2015. Mr. Daniel Bacon provided the written examination outline to your

staff in September, 2014. The operating test, written examination, and the supporting reference

materials identified in Attachment 3 to ES-201 will be due by March 13, 2015. Pursuant to Title

10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outline, examination, and test before

they are submitted to the NRC for review and approval. All materials shall be complete and

ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

S. Capps 2

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications, medical certifications, and waiver

requests (if any) at least 30 days before the first examination date. If the applications are not

received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least

14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act

of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office

of Management and Budget (OMB) under approval number 3150-0018, which expires on

April 30, 2016. The public reporting burden for this collection of information is estimated to

average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and

maintaining the data needed, writing the examinations, and completing and reviewing the

collection of information. Send comments on any aspect of this collection of information,

including suggestions for reducing the burden, to the Information and Records Management

Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by

Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of

Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and

Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will

be available electronically for public inspection in the NRC Public Document Room, or from

the Publicly Available Records (PARS) component of the NRCs Agencywide Documents

Access and Management System (ADAMS), accessible from the NRC Web site

at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Steven Mosteller has been advised of the

policies and guidelines referenced in this letter. If you have any questions regarding the NRCs

examination procedures and guidelines, please contact Mr. Daniel Bacon at 404-997-4518,

(Internet E-mail: daniel.bacon@nrc.gov), or me at 404-997-4662, (Internet E-mail:

eugene.guthrie@nrc.gov).

Sincerely,

/RA/

Eugene F. Guthrie, Chief

Operations Branch 2

Division of Reactor Safety

Docket Nos. 50-369 and 50-370

License Nos. NPF-9 and NPF-17

cc: Distribution via Listserv

ML14342A873 SUNSI REVIEW COMPLETE FORM 665 ATTACHED

OFFICE RII:DRS/OB2 RII:DRS/OB2

SIGNATURE DXB2 EFG

NAME DBacon EGuthrie

DATE 12/ 4/2014 12/4/2014

E-MAIL COPY YES NO YES NO YES NO