ML15211A497: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:0712412015 072/05US.
{{#Wiki_filter:0712412015 072/05US.               Nuclear Reguiatnrv Commission Oneratians Center Event Renort                         Pnae 1 Part 21 (PAR)                                                                                   Event#       51262 Rep Org: FLOWSERVE CORPORATION                                 Notification Date I Time: 07/2412015 17:05       (ýDT)
Nuclear Reguiatnrv Commission Oneratians Center Event Renort Pnae 1 Part 21 (PAR) Event# 51262 Rep Org: FLOWSERVE CORPORATION Notification Date I Time: 07/2412015 17:05 (ýDT)Supplier:
Supplier: FLOWSERVE CORPORATION                                       Event Date / Time: 07/24/2015             .(EDT)
FLOWSERVE CORPORATION Event Date / Time: 07/24/2015  
Last Modification: 07/24/2015 Region:   1                                               Docket #:
.(EDT)Last Modification:
City: RALEIGH                               Agreement State:               Yes County:                                                   License #:
07/24/2015 Region: 1 Docket #: City: RALEIGH Agreement State: Yes County: License #: State: NC NRC Notified by: MICHAEL ROY Notifications:
State: NC NRC Notified by:   MICHAEL ROY                         Notifications:   SILAS KENNEDY                     R1DO HQ Ops Officer:   JEFF ROTTON                                           PART 21/50.55 REACTORS           EMAIL Emergency Class:     NON EMERGENCY 10 CFR Section:
SILAS KENNEDY R1DO HQ Ops Officer: JEFF ROTTON PART 21/50.55 REACTORS EMAIL Emergency Class: NON EMERGENCY 10 CFR Section: 21.21(d)(3)(i)
21.21(d)(3)(i)       DEFECTS AND NONCOMPLIANCE PART 21 - MOUNTING BRACKET SEISMIC QUALIFICATION The following information was excerpted from a facsimile from FLOWSERVE:
DEFECTS AND NONCOMPLIANCE PART 21 -MOUNTING BRACKET SEISMIC QUALIFICATION The following information was excerpted from a facsimile from FLOWSERVE: "In accordance with the provisions of 10CFR Part 21, [Flowserve]
  "In accordance with the provisions of 10CFR Part 21, [Flowserve] has identified a potential issue and is submitting our evaluation of the event.
has identified a potential issue and is submitting our evaluation of the event."DESCRIPTION:
  "DESCRIPTION: Entergy Design Specification, SPEC-09-0001-P, paragraph 3.1.1 a, requires that position indicators remain operable during a seismic event. The seismic analysis performed [for installation at Pilgrim Station] did not include mounting brackets for the position indicators. Later review of these brackets found them to be inadequate for the application.
Entergy Design Specification, SPEC-09-0001-P, paragraph 3.1.1 a, requires that position indicators remain operable during a seismic event. The seismic analysis performed
  "SCOPE: The engineering evaluation searched all instances of the use of safety related Topworx C7 position indicators, base part number 04126889, by the Flowserve, Raleigh facility.
[for installation at Pilgrim Station] did not include mounting brackets for the position indicators.
  "PROPOSED ACTION: Flowserve will provide seismically analyzed replacement mounting brackets to Entergy Pilgrim Station at no charge. To prevent reoccurrence of this situation, additional training on the use of nuclear order checklists will be performed.
Later review of these brackets found them to be inadequate for the application."SCOPE: The engineering evaluation searched all instances of the use of safety related Topworx C7 position indicators, base part number 04126889, by the Flowserve, Raleigh facility."PROPOSED ACTION: Flowserve will provide seismically analyzed replacement mounting brackets to Entergy Pilgrim Station at no charge. To prevent reoccurrence of this situation, additional training on the use of nuclear order checklists will be performed.
 
manr~'lri ividrK[irlmy Uý:Uý1:40 P.M. U/-Z4-ZU1t)
manr~'lri ividrK[irlmy i*1our                                    Uý:Uý1:40 P.M.         U/-Z4-ZU1t)           I1 /1 Flow Control Division Anchor/Darling Valves FLOWSERVE                                                                                                 BW/IP Valves Edward Valves Valtek Control Products Worcester Valves July 24, 2015 US Nuclear Regulatory Commission Document Control Desk 11545 Rockville Pike
I1 /1 FLOWSERVE July 24, 2015 US Nuclear Regulatory Commission Document Control Desk 11545 Rockville Pike ,Rockville, MD 20852-2746 Flow Control Division Anchor/Darling Valves BW/IP Valves Edward Valves Valtek Control Products Worcester Valves'
,Rockville, MD 20852-2746
'


==Subject:==
==Subject:==
Entergy Pilgrim -Mounting Bracket Seismic Qualification This is to notify the US Nuclear Regulatory Commission that, in accordance with the provisions of 1 OCFR Part 21, we have identified a potential issue and are submitting our evaluation of the ,event.I DESCRIPTION:
Entergy Pilgrim - Mounting Bracket Seismic Qualification This is to notify the US Nuclear Regulatory Commission that, in accordance with the provisions of 1OCFR Part 21, we have identified a potential issue and are submitting our evaluation of the
Entergy Design Specification, SPEC-09-0001-P, paragraph 3.1.1a, requires that position indicators remain operable during a seismic event. The seismic analysis performed did not include mounting brackets for the position indicators.
,event.
Later review of these brackets found them to be inadequate for the application.
I DESCRIPTION: Entergy Design Specification, SPEC-09-0001-P, paragraph 3.1.1a, requires that position indicators remain operable during a seismic event. The seismic analysis performed did not include mounting brackets for the position indicators. Later review of these brackets found them to be inadequate for the application.
SCOPE: The engineering evaluation searched all instances of the use of safety related Topworx C7 position indicators, base part number 04126889, by the Flowserve, Raleigh facility.See attached Part 21 evaluation report.PROPOSED ACTION: Flowserve will provide seismically analyzed replacement mounting brackets to Entergy Pilgrim station at no charge. To prevent reoccurrence of this situation, additional training on the use of nuclear order checklists will be performed, see attached CAR.Please do not hesitate to contact me if you have any questions or require additional information.
SCOPE: The engineering evaluation searched all instances of the use of safety related Topworx C7 position indicators, base part number 04126889, by the Flowserve, Raleigh facility.
Respectfully submitted,1/4.ýMichael V. Roy Quality Assurance Manager Flowserve Corporation
See attached Part 21 evaluation report.
:1900 S Saunders St.Raleigh, NC 27603 ,!i:!rI!::i!Flowserve U S Inc Flow Control Division Raleigh Operations PO Box 1961 1900 South Saunders Street Ralpinh. NC 27603 TolOFree:
PROPOSED ACTION: Flowserve will provide seismically analyzed replacement mounting brackets to Entergy Pilgrim station at no charge. To prevent reoccurrence of this situation, additional training on the use of nuclear order checklists will be performed, see attached CAR.
1-800-225-6989 Phohe: 1-919-832-D525 Facsirnmle:
Please do not hesitate to contact me if you have any questions or require additional information.
1.919-831-3369 vf..lowserve.com VIlJ03l.110 ramlril~l ivlarKeLirly ImuorL Uý-:60:-11 P.m U/-24-ZU15 11 /!1 FLOWSE RVE Page 1 of 2 PART 21 EVALUATION FOR FLOWSERVE CAR 1384 This evaluation was a search of all instances of the use of the safety related Topworx C7 position indicators, base part number 04126889, by the Flowserve, Raleigh facility.
Respectfully submitted, 1/4.ý Michael V. Roy Quality Assurance Manager Flowserve Corporation
Where these position indicators have been used, determination was made whether appropriate analysis was performed.
:1900 S Saunders St.
Summary: No other situation described in CAR 1384 was discovered with other orders involving Yopworx C7 position indicators, base part number 04126889."0 ~nthan Andeso!Flowserve Sr. Product Engineer 6/l1/-D te:f PART 21 EVALUATION FOR CAR 1384 ORDERS UTILIZING TOPWORX C7 POSITION INDICATORS, BASE P/N 04126889 Page 2 of 2 73561 08 N/A -Qualification Testing ...... N/A Internal 78470 01, 02, 03, 04, 05, 06, 07, 08 N/A -Customer Material Entergy -Pilgrim 91131 02, 04, 06, 07, 12, 13, 14, 15, 16, YES Westinghouse  
Raleigh, NC 27603
-Sanmen & Haiyang 17, 19, 20, 22, 24, 26, 27, 32, 33, 34 35, 36, 37, 39, 40, 55, 56, 57, 58, 59, 60, 67, 68 91139 06, 07, 20, 35, 36, 49, 65, 66 YES Westinghouse  
                                                                                              ,!
-Sanmen & Haiyang 91154 10, 17, 18, 26 YES Westinghouse  
i:
-VC Summer 91170 02, 04, 05, 07, 08, 13, 14, 15, 16, YES Westinghouse  
                                                                                              !rI
-VC Summer 17, 19, 20, 21, 22, 24, 26, 27, 29, 30, 35, 36, 37, 38, 39, 41, 42, 43, 44, 51, 52, 53, 54, 55, 56, 57, 58, 91175 02, 04, 05, 07, 08, 13, 14, 15, 16, YES Westinghouse  
                                                                                              !:
-Vogtle 17, 19, 20, 21, 22, 24, 26, 27, 29, 30, 35, 36, 37, 38, 39, 41, 42, 43, 44, 51, 52, 53, 54, 56, 57, 58, 91176 06,08,24,71,76 YES Westinghouse -Vogtle 91213 01, 03, 05, 06, 11, 12, 13, 14, 15, YES SNPEC -Sanmen 16, 18, 19, 20, 21, 79, 80, 81 91214 01, 03, 05, 06, 11, 12, 13, 14, 15, YES SNPEC -Haiyang 16, 18, 19, 20, 21, 48, 49, 50 91215 01,02 YES SNPEC -Sanmen 91216 01,02 YES SNPEC -Haiyang V I Vaj 13.1/0 namign iviameunq imou UD;U/:Ul P.M. U/-Z4-ZU1D 41V 00,ý*-DATE INITIATED:
:i
5/11/15 ~ PROPOSAL DUE: 6/11/15 CORRECTIVE MANAGER/SUPERVISOR OR VENDOR: Jonathan Anderson ACTION PART, RT# OR OTHER IDENTIFIER:
                                                                                              !
Pilgrim Station Limit Switch R E ST Mounting Bracket R 1OCFR21 EVALUATION REQUIRED?
Flowserve US Inc                             Raleigh Operations                     TolOFree: 1-800-225-6989 Flow Control Division                        PO Box 1961                            Phohe:         1-919-832-D525 1900 South Saunders Street              Facsirnmle: 1.919-831-3369 Ralpinh. NC 27603                      vf..lowserve.com
Y M N [ INTERNAL E EXTERNAL LI HOW IDENTIFIED:
 
Review of Order CAR# 1384 INITIATED BY: Kerri Madden CODE MATERIAL?
VIlJ03l.110 ramlril~l ivlarKeLirly ImuorL                                         Uý-:60:-11 P.m   U/-24-ZU15 11 /!1 FLOWSE RVE Page 1 of 2 PART 21 EVALUATION FOR FLOWSERVE CAR 1384 This evaluation was a search of all instances of the use of the safety related Topworx C7 position indicators, base part number 04126889, by the Flowserve, Raleigh facility. Where these position indicators have been used, determination was made whether appropriate analysis was performed.
Y --N .IF CODE, ANI REVIEW: PROBLEM STATEMENT-( to be completed by QA or responsible department):
Summary: No other situation described in CAR 1384 was discovered with other orders involving Yopworx C7 position indicators, base part number 04126889.
Contrary to the customer P.O. requirements, the limit switch bracket was not seismically analyzed.BELOW DESCRIBE THE CONDITION OR CIRCUMSTANCE VIOLATING THE ABOVE LISTED REQUIREMENT ACKNOWLEDGEMENT OF RECEIPT OF THIS REQUEST SI T (BUYER ACKNOWLEDGES EXTERNAL REQUESTS)
6/l1/-
I/(/ROOT CAUSE AND PROPOSED ACTION (to be completed byeponsibe manager or designee)Root Cause: Requirement from design specification for position indicators to remain operable during seismic event, §3.1.1a, was missed when performing seismic analysis.Proposed Action: Provide Pilgrim with new limit switch brackets which will be analyzed in revised seismic reports, also to be provided.
D te:f "0~nthan Andeso
Provide training to engineers responsible for performing analyses to reinforce specification review and understanding of requirements for analysis of components such as brackets.ACTIONS WILLIBE COMPLETED BY (DATE): -71 CORRECTIVE ACTION TAKEN TO PRECLUDE RECURRENCE: (a04ch evidence of actions taken)Provide training to engineers responsible for performing analyses to reinforce specification review and understanding of requirements for analysis of components such as brackets..... ... i._.._ __. .../ ... .......SUMITE BYri (pine name)L CONFIRMATION OF CORRECTIVE ACTIO /AKEN (To be completed by Flowserve QA after review of evidence)EVDNC-E uFF/C, E-N-TTO CL----OSE?-Y-N'-D "- FURTH-E'R F-OL'LO-W UP R--EQUI-RED?'Y-"N'-
            !Flowserve Sr. Product Engineer
CRRECT IVE ACTION REVIEWED Q 4, -SIGNATURE 2 BY (QA Manager or Deigne /'f'FORM Q-985 REV. 2 Form No. Q-985 Rev. 2 C(A a FLOWSE RVE 2 Training for Engineers Performing Design Analysis CAR 1384 Closeout UC"C C I 1 I CAR 1384* Customer design specification required that position indicators were to remain operable during seismic event.Position indicator mounting brackets were not considered in seismic analysis.Subsequent review found that the provided brackets were not adequate to maintain seismic qua lifaon of the position indicators.
 
PART 21 EVALUATION FOR CAR 1384                                                                                 Page 2 of 2 ORDERS UTILIZING TOPWORX C7 POSITION INDICATORS, BASE P/N 04126889
                                                                              .   ..... N/A Internal 08                N/A  Qualification Testing
                                                        -
73561 78470       01, 02, 03, 04, 05, 06, 07, 08     N/A - Customer Material               Entergy - Pilgrim 91131     02, 04, 06, 07, 12, 13, 14, 15, 16,           YES               Westinghouse - Sanmen & Haiyang 17, 19, 20, 22, 24, 26, 27, 32, 33, 34 35, 36, 37, 39, 40, 55, 56, 57, 58, 59, 60, 67, 68 91139       06, 07, 20, 35, 36, 49, 65, 66               YES               Westinghouse - Sanmen & Haiyang 91154                 10, 17, 18, 26                     YES                   Westinghouse - VC Summer 91170     02, 04, 05, 07, 08, 13, 14, 15, 16,           YES                   Westinghouse - VC Summer 17, 19, 20, 21, 22, 24, 26, 27, 29, 30, 35, 36, 37, 38, 39, 41, 42, 43, 44, 51, 52, 53, 54, 55, 56, 57, 58, 91175     02, 04, 05, 07, 08, 13, 14, 15, 16,           YES                       Westinghouse - Vogtle 17, 19, 20, 21, 22, 24, 26, 27, 29, 30, 35, 36, 37, 38, 39, 41, 42, 43, 44, 51, 52, 53, 54, 56, 57, 58, 91176               06,08,24,71,76                       YES                       Westinghouse SNPEC - Sanmen
                                                                                                        -Vogtle YES 91213     01, 03, 05, 06, 11, 12, 13, 14, 15, 21, 79, 80, 81 16, 18, 19, 20, 91214     01, 03, 05, 06, 11, 12, 13, 14, 15,           YES                         SNPEC - Haiyang 16, 18, 19, 20, 21, 48, 49, 50 91215                     01,02                           YES                         SNPEC SNPEC -- Sanmen Haiyang 01,02                           YES 91216
 
VI Vaj 13.1/0     namign iviameunq imou                                                     UD;U/:Ul P.M. U/-Z4-ZU1D   41V 00,ý*-
DATE INITIATED: 5/11/15         ~ PROPOSAL DUE: 6/11/15                       CORRECTIVE MANAGER/SUPERVISOR OR VENDOR: Jonathan Anderson                                     ACTION PART, RT# OR OTHER IDENTIFIER: Pilgrim Station Limit Switch                       R E ST Mounting Bracket                                                                   R 1OCFR21 EVALUATION REQUIRED?           YM        N [   ý*II              INTERNAL E       EXTERNAL     LI HOW IDENTIFIED: Review of Order                                           CAR# 1384 INITIATED BY: Kerri Madden           CODE MATERIAL?       Y   -N    - . IF CODE, ANI REVIEW:
PROBLEM STATEMENT-( to be completed by QA or responsible department):
Contrary to the customer P.O. requirements, the limit switch bracket was not seismically analyzed.
BELOW DESCRIBE THE CONDITION OR CIRCUMSTANCE VIOLATING THE ABOVE LISTED REQUIREMENT ACKNOWLEDGEMENT OF RECEIPT OF THIS REQUEST                     SI     T (BUYER ACKNOWLEDGES EXTERNAL REQUESTS)                       I/(/
ROOT CAUSE AND PROPOSED ACTION (to be completed byeponsibe manager or designee)
Root Cause: Requirement from design specification for position indicators to remain operable during seismic event, §3.1.1a, was missed when performing seismic analysis.
Proposed Action: Provide Pilgrim with new limit switch brackets which will be analyzed in revised seismic reports, also to be provided. Provide training to engineers responsible for performing analyses to reinforce specification review and understanding of requirements for analysis of components such as brackets.
ACTIONS WILLIBE COMPLETED BY (DATE):           -71 CORRECTIVE ACTION TAKEN TO PRECLUDE RECURRENCE: (a04ch evidence of actions taken)
Provide training to engineers responsible for performing analyses to reinforce specification review and understanding of requirements for analysis of components such as brackets.
                ...
                ....
SUMITE BYri (pine    name)L        i._.._
                                                      ...
                                                        ...                   __.                 .......
                                                                                                      /
CONFIRMATION OF CORRECTIVE ACTIO             /AKEN (To be completed by Flowserve QA after review of evidence)
EVDNC-E uFF/C, E-N-TTO CL----OSE?-Y-           N'-D "- FURTH-E'R F-OL'LO-W UP R--EQUI-RED?'Y-"N'-
CRRECT IVE ACTION REVIEWED           Q     4,   -   SIGNATURE             2 BY (QA Manager or Deigne               /'f' FORM Q-985 REV. 2 Form No. Q-985 Rev. 2
 
C(A a
FLOWSE RVE 2
Training for Engineers Performing Design Analysis CAR 1384 Closeout UC "C
C I
1
 
I CAR 1384
* Customer design specification required that position indicators were to remain operable during seismic event.
Position indicator mounting brackets were not considered in seismic analysis.
Subsequent review found that the provided brackets were not adequate to maintain seismic qua lifaon of the position indicators.
 
In Context While the position indicators themselves were suitable for the application and qualified by the manufacturer, the mounting brackets used were not seismically sufficient and consequently nullified the qualification.
In Context While the position indicators themselves were suitable for the application and qualified by the manufacturer, the mounting brackets used were not seismically sufficient and consequently nullified the qualification.
* Attachment of accessories to the valve is critical for component operation.
* Attachment of accessories to the valve is critical for component operation.
Prevent Reoccurrence 9 Thorough review and understanding of all customer purchase order and specification requirements.
Prevent Reoccurrence 9 Thorough review and understanding of all customer purchase order and specification requirements.
o Appropriate analysis to substantiate compliance with customer requirements.
o Appropriate analysis to substantiate compliance with customer requirements.
* Do not neglect accessories and mounting hardware when applicable.  
* Do not neglect accessories and mounting hardware when applicable.
*' ., = ,..,, I u Iidi AMIly L U.:U : :4U p.m. U/-24-2U' b 9/9 FLOWSERVE, RALEIGH TRAINING RECORD Department:
 
Engineering Date: 7M7/15  
*' =.,,..,, u      r* I        IidiAMIly I*uI L 1*,*IWI                                                              :
U.:U :4U   p.m.     U/-24-2U' b 9/9 FLOWSERVE, RALEIGH TRAINING RECORD Department:           Engineering                               Date:     7M7/15


==Subject:==
==Subject:==
CAR 1384 Closeout-,Training for Engineers Performing Desiin Analysis Na e(s) Initials'____ ____ ____ ____ __:54 ,, ,,,k C o,.,,,,_____D_
CAR 1384 Closeout-,Training for Engineers Performing Desiin Analysis Na e(s)                                     Initials'
~~~~~~ Lr& _ _ __ _ __ _Length of session 20____m___nutes
____     ____
_____Signature of Instructor}}
____   ____   __:54
                        ,, ,,,k                 C o,.,,,,_____D_
                                                  ~~~~~~                                 _    _ Lr&__        _   __       _
Length of session         20____m___nutes     _____
Signature of Instructor}}

Revision as of 09:38, 31 October 2019

Part 21 - Mounting Bracket Seismic Qualification
ML15211A497
Person / Time
Site: Pilgrim
Issue date: 07/24/2015
From: Roy M
Flowserve Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
51262
Download: ML15211A497 (10)


Text

0712412015 072/05US. Nuclear Reguiatnrv Commission Oneratians Center Event Renort Pnae 1 Part 21 (PAR) Event# 51262 Rep Org: FLOWSERVE CORPORATION Notification Date I Time: 07/2412015 17:05 (ýDT)

Supplier: FLOWSERVE CORPORATION Event Date / Time: 07/24/2015 .(EDT)

Last Modification: 07/24/2015 Region: 1 Docket #:

City: RALEIGH Agreement State: Yes County: License #:

State: NC NRC Notified by: MICHAEL ROY Notifications: SILAS KENNEDY R1DO HQ Ops Officer: JEFF ROTTON PART 21/50.55 REACTORS EMAIL Emergency Class: NON EMERGENCY 10 CFR Section:

21.21(d)(3)(i) DEFECTS AND NONCOMPLIANCE PART 21 - MOUNTING BRACKET SEISMIC QUALIFICATION The following information was excerpted from a facsimile from FLOWSERVE:

"In accordance with the provisions of 10CFR Part 21, [Flowserve] has identified a potential issue and is submitting our evaluation of the event.

"DESCRIPTION: Entergy Design Specification, SPEC-09-0001-P, paragraph 3.1.1 a, requires that position indicators remain operable during a seismic event. The seismic analysis performed [for installation at Pilgrim Station] did not include mounting brackets for the position indicators. Later review of these brackets found them to be inadequate for the application.

"SCOPE: The engineering evaluation searched all instances of the use of safety related Topworx C7 position indicators, base part number 04126889, by the Flowserve, Raleigh facility.

"PROPOSED ACTION: Flowserve will provide seismically analyzed replacement mounting brackets to Entergy Pilgrim Station at no charge. To prevent reoccurrence of this situation, additional training on the use of nuclear order checklists will be performed.

manr~'lri ividrK[irlmy i*1our Uý:Uý1:40 P.M. U/-Z4-ZU1t) I1 /1 Flow Control Division Anchor/Darling Valves FLOWSERVE BW/IP Valves Edward Valves Valtek Control Products Worcester Valves July 24, 2015 US Nuclear Regulatory Commission Document Control Desk 11545 Rockville Pike

,Rockville, MD 20852-2746

'

Subject:

Entergy Pilgrim - Mounting Bracket Seismic Qualification This is to notify the US Nuclear Regulatory Commission that, in accordance with the provisions of 1OCFR Part 21, we have identified a potential issue and are submitting our evaluation of the

,event.

I DESCRIPTION: Entergy Design Specification, SPEC-09-0001-P, paragraph 3.1.1a, requires that position indicators remain operable during a seismic event. The seismic analysis performed did not include mounting brackets for the position indicators. Later review of these brackets found them to be inadequate for the application.

SCOPE: The engineering evaluation searched all instances of the use of safety related Topworx C7 position indicators, base part number 04126889, by the Flowserve, Raleigh facility.

See attached Part 21 evaluation report.

PROPOSED ACTION: Flowserve will provide seismically analyzed replacement mounting brackets to Entergy Pilgrim station at no charge. To prevent reoccurrence of this situation, additional training on the use of nuclear order checklists will be performed, see attached CAR.

Please do not hesitate to contact me if you have any questions or require additional information.

Respectfully submitted, 1/4.ý Michael V. Roy Quality Assurance Manager Flowserve Corporation

1900 S Saunders St.

Raleigh, NC 27603

,!

i:

!rI

!:

i

!

Flowserve US Inc Raleigh Operations TolOFree: 1-800-225-6989 Flow Control Division PO Box 1961 Phohe: 1-919-832-D525 1900 South Saunders Street Facsirnmle: 1.919-831-3369 Ralpinh. NC 27603 vf..lowserve.com

VIlJ03l.110 ramlril~l ivlarKeLirly ImuorL Uý-:60:-11 P.m U/-24-ZU15 11 /!1 FLOWSE RVE Page 1 of 2 PART 21 EVALUATION FOR FLOWSERVE CAR 1384 This evaluation was a search of all instances of the use of the safety related Topworx C7 position indicators, base part number 04126889, by the Flowserve, Raleigh facility. Where these position indicators have been used, determination was made whether appropriate analysis was performed.

Summary: No other situation described in CAR 1384 was discovered with other orders involving Yopworx C7 position indicators, base part number 04126889.

6/l1/-

D te:f "0~nthan Andeso

!Flowserve Sr. Product Engineer

PART 21 EVALUATION FOR CAR 1384 Page 2 of 2 ORDERS UTILIZING TOPWORX C7 POSITION INDICATORS, BASE P/N 04126889

. ..... N/A Internal 08 N/A Qualification Testing

-

73561 78470 01, 02, 03, 04, 05, 06, 07, 08 N/A - Customer Material Entergy - Pilgrim 91131 02, 04, 06, 07, 12, 13, 14, 15, 16, YES Westinghouse - Sanmen & Haiyang 17, 19, 20, 22, 24, 26, 27, 32, 33, 34 35, 36, 37, 39, 40, 55, 56, 57, 58, 59, 60, 67, 68 91139 06, 07, 20, 35, 36, 49, 65, 66 YES Westinghouse - Sanmen & Haiyang 91154 10, 17, 18, 26 YES Westinghouse - VC Summer 91170 02, 04, 05, 07, 08, 13, 14, 15, 16, YES Westinghouse - VC Summer 17, 19, 20, 21, 22, 24, 26, 27, 29, 30, 35, 36, 37, 38, 39, 41, 42, 43, 44, 51, 52, 53, 54, 55, 56, 57, 58, 91175 02, 04, 05, 07, 08, 13, 14, 15, 16, YES Westinghouse - Vogtle 17, 19, 20, 21, 22, 24, 26, 27, 29, 30, 35, 36, 37, 38, 39, 41, 42, 43, 44, 51, 52, 53, 54, 56, 57, 58, 91176 06,08,24,71,76 YES Westinghouse SNPEC - Sanmen

-Vogtle YES 91213 01, 03, 05, 06, 11, 12, 13, 14, 15, 21, 79, 80, 81 16, 18, 19, 20, 91214 01, 03, 05, 06, 11, 12, 13, 14, 15, YES SNPEC - Haiyang 16, 18, 19, 20, 21, 48, 49, 50 91215 01,02 YES SNPEC SNPEC -- Sanmen Haiyang 01,02 YES 91216

VI Vaj 13.1/0 namign iviameunq imou UD;U/:Ul P.M. U/-Z4-ZU1D 41V 00,ý*-

DATE INITIATED: 5/11/15 ~ PROPOSAL DUE: 6/11/15 CORRECTIVE MANAGER/SUPERVISOR OR VENDOR: Jonathan Anderson ACTION PART, RT# OR OTHER IDENTIFIER: Pilgrim Station Limit Switch R E ST Mounting Bracket R 1OCFR21 EVALUATION REQUIRED? YM N [ ý*II INTERNAL E EXTERNAL LI HOW IDENTIFIED: Review of Order CAR# 1384 INITIATED BY: Kerri Madden CODE MATERIAL? Y -N - . IF CODE, ANI REVIEW:

PROBLEM STATEMENT-( to be completed by QA or responsible department):

Contrary to the customer P.O. requirements, the limit switch bracket was not seismically analyzed.

BELOW DESCRIBE THE CONDITION OR CIRCUMSTANCE VIOLATING THE ABOVE LISTED REQUIREMENT ACKNOWLEDGEMENT OF RECEIPT OF THIS REQUEST SI T (BUYER ACKNOWLEDGES EXTERNAL REQUESTS) I/(/

ROOT CAUSE AND PROPOSED ACTION (to be completed byeponsibe manager or designee)

Root Cause: Requirement from design specification for position indicators to remain operable during seismic event, §3.1.1a, was missed when performing seismic analysis.

Proposed Action: Provide Pilgrim with new limit switch brackets which will be analyzed in revised seismic reports, also to be provided. Provide training to engineers responsible for performing analyses to reinforce specification review and understanding of requirements for analysis of components such as brackets.

ACTIONS WILLIBE COMPLETED BY (DATE): -71 CORRECTIVE ACTION TAKEN TO PRECLUDE RECURRENCE: (a04ch evidence of actions taken)

Provide training to engineers responsible for performing analyses to reinforce specification review and understanding of requirements for analysis of components such as brackets.

...

....

SUMITE BYri (pine name)L i._.._

...

... __. .......

/

CONFIRMATION OF CORRECTIVE ACTIO /AKEN (To be completed by Flowserve QA after review of evidence)

EVDNC-E uFF/C, E-N-TTO CL----OSE?-Y- N'-D "- FURTH-E'R F-OL'LO-W UP R--EQUI-RED?'Y-"N'-

CRRECT IVE ACTION REVIEWED Q 4, - SIGNATURE 2 BY (QA Manager or Deigne /'f' FORM Q-985 REV. 2 Form No. Q-985 Rev. 2

C(A a

FLOWSE RVE 2

Training for Engineers Performing Design Analysis CAR 1384 Closeout UC "C

C I

1

I CAR 1384

  • Customer design specification required that position indicators were to remain operable during seismic event.

Position indicator mounting brackets were not considered in seismic analysis.

Subsequent review found that the provided brackets were not adequate to maintain seismic qua lifaon of the position indicators.

In Context While the position indicators themselves were suitable for the application and qualified by the manufacturer, the mounting brackets used were not seismically sufficient and consequently nullified the qualification.

  • Attachment of accessories to the valve is critical for component operation.

Prevent Reoccurrence 9 Thorough review and understanding of all customer purchase order and specification requirements.

o Appropriate analysis to substantiate compliance with customer requirements.

  • Do not neglect accessories and mounting hardware when applicable.
  • ' =.,,..,, u r* I IidiAMIly I*uI L 1*,*IWI  :

U.:U :4U p.m. U/-24-2U' b 9/9 FLOWSERVE, RALEIGH TRAINING RECORD Department: Engineering Date: 7M7/15

Subject:

CAR 1384 Closeout-,Training for Engineers Performing Desiin Analysis Na e(s) Initials'

____ ____

____ ____ __:54

,, ,,,k C o,.,,,,_____D_

~~~~~~ _ _ Lr&__ _ __ _

Length of session 20____m___nutes _____

Signature of Instructor