ML16313A630: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 IPRenewal NPEmails From: Dentel, Glenn Sent: Friday, September 09, 2016 7:13 AM To: DR WILLIAM CORCORAN Cc: McKenzie, Kieta; Scott, Michael; Pelton, David
{{#Wiki_filter:IPRenewal NPEmails From:                             Dentel, Glenn Sent:                             Friday, September 09, 2016 7:13 AM To:                               DR WILLIAM CORCORAN Cc:                               McKenzie, Kieta; Scott, Michael; Pelton, David


==Subject:==
==Subject:==
RE: Re: Re: UCS bolt assessment of operability Dr. Corcoran, Entergy's root cause was reviewed by the inspectors during their onsite inspection, but was not formally submitted to the NRC. Therefore, it is not been docketed and given an ML#.
RE: Re: Re: UCS bolt assessment of operability Dr. Corcoran, Entergys root cause was reviewed by the inspectors during their onsite inspection, but was not formally submitted to the NRC. Therefore, it is not been docketed and given an ML#.
Glenn Dentel, Chief Division of Reactor Projects Branch 2 NRC Region I From: DR WILLIAM CORCORAN [mailto:williamcorcoran@sbcglobal.net] Sent: Thursday, September 08, 2016 6:51 PM To: Dentel, Glenn Cc: McKenzie, Kieta ; Scott, Michael ; Pelton, David
Glenn Dentel, Chief Division of Reactor Projects Branch 2 NRC Region I From: DR WILLIAM CORCORAN [mailto:williamcorcoran@sbcglobal.net]
Sent: Thursday, September 08, 2016 6:51 PM To: Dentel, Glenn Cc: McKenzie, Kieta ; Scott, Michael ; Pelton, David


==Subject:==
==Subject:==
[External_Sender] Re: Re: UCS bolt assessment of operability Mr. Dentel, Thanks ever so much.
[External_Sender] Re: Re: UCS bolt assessment of operability Mr. Dentel, Thanks ever so much.
Do you have the ML# for a root cause analysis?
Do you have the ML# for a root cause analysis?
Take care, Bill Corcoran William R. Corcoran, Ph.D., P.E.
Take care, Bill Corcoran William R. Corcoran, Ph.D., P.E.
21 Broadleaf Circle Windsor, CT 06095-1634 860-285-8779 William.R.Corcoran@1959.USNA.com http://www.linkedin.com/in/williamcorcoranphdpe https://www.box.com/shared/kfxg1lt9dh On Thursday, September 8, 2016 2:45 PM, "Dentel, Glenn" <Glenn.Dentel@nrc.gov
21 Broadleaf Circle Windsor, CT 06095-1634 860-285-8779 William.R.Corcoran@1959.USNA.com http://www.linkedin.com/in/williamcorcoranphdpe https://www.box.com/shared/kfxg1lt9dh On Thursday, September 8, 2016 2:45 PM, "Dentel, Glenn" <Glenn.Dentel@nrc.gov> wrote:
> wrote:


==Dear Dr. Corcoran:==
==Dear Dr. Corcoran:==


2 As promised in my June 16 email response to you, I am writing to let you know the NRC has issued an inspection report on baffle-former bolting conditions at Indian Point Units 2 and 3. This inspection report can be found by using the NRC's publicly available web-based Agencywide Documents Access and Management System. To retrieve the document, enter the Accession Number (ML16243A245) in the Document Properties field located in the Advanced Search tab at the following webpage:
1
http://adams.nrc.gov/wba/. The NRC implemented significant, comprehensive ins pections after learning of the degraded baffle-former bolt issues at Indian Point. This included various baseline inspection samples to assess the issue at Unit 2, and the extent of the issue as it pertains to Unit 3. The inspections included reviews of Entergy's non-destructive examination techniques and results; observations of a portion of bolt replacement activities on-site; assessments of foreign material controls and loose parts analysis; and reviews of the design change package and evaluations associated with both the degraded and new, replacement baffle-former bolts. Enforcement action was taken for Entergy's failure to perform an operability evaluation on the baffle-former bolts associated with Unit 3. All of these inspections and other reviews are documented in the above mentioned report. In summary, NRC inspectors reviewed Entergy's actions to address the baffle-former bolting issue and concluded there are no concerns pertaining to the safe operation of Units 2 and 3" Thank you for your concerns about the safe operations of the Indian Point nuclear plant. If you have any questions regarding this email or the inspection report, please contact me at (610) 337-5233.
Sincerely,  Glenn Dentel, Chief Division of Reactor Projects Branch 2 NRC Region I


Hearing Identifier: IndianPointUnits2and3NonPublic_EX Email Number: 8535   Mail Envelope Properties   (bd8805acb5d54cd2b0630222ec57537d)
As promised in my June 16 email response to you, I am writing to let you know the NRC has issued an inspection report on baffle-former bolting conditions at Indian Point Units 2 and 3. This inspection report can be found by using the NRCs publicly available web-based Agencywide Documents Access and Management System. To retrieve the document, enter the Accession Number (ML16243A245) in the Document Properties field located in the Advanced Search tab at the following webpage:
http://adams.nrc.gov/wba/.
The NRC implemented significant, comprehensive inspections after learning of the degraded baffle-former bolt issues at Indian Point. This included various baseline inspection samples to assess the issue at Unit 2, and the extent of the issue as it pertains to Unit 3. The inspections included reviews of Entergys non-destructive examination techniques and results; observations of a portion of bolt replacement activities on-site; assessments of foreign material controls and loose parts analysis; and reviews of the design change package and evaluations associated with both the degraded and new, replacement baffle-former bolts. Enforcement action was taken for Entergys failure to perform an operability evaluation on the baffle-former bolts associated with Unit 3. All of these inspections and other reviews are documented in the above mentioned report. In summary, NRC inspectors reviewed Entergys actions to address the baffle-former bolting issue and concluded there are no concerns pertaining to the safe operation of Units 2 and 3 Thank you for your concerns about the safe operations of the Indian Point nuclear plant. If you have any questions regarding this email or the inspection report, please contact me at (610) 337-5233.
Sincerely, Glenn Dentel, Chief Division of Reactor Projects Branch 2 NRC Region I 2
 
Hearing Identifier:     IndianPointUnits2and3NonPublic_EX Email Number:           8535 Mail Envelope Properties     (bd8805acb5d54cd2b0630222ec57537d)


==Subject:==
==Subject:==
RE: Re: Re: UCS bolt assessment of operability Sent Date:   9/9/2016 7:12:56 AM Received Date: 9/9/2016 7:12:57 AM From:   Dentel, Glenn Created By:   Glenn.Dentel@nrc.gov Recipients:     "McKenzie, Kieta" <Kieta.McKenzie@nrc.gov>
RE: Re: Re: UCS bolt assessment of operability Sent Date:             9/9/2016 7:12:56 AM Received Date:         9/9/2016 7:12:57 AM From:                   Dentel, Glenn Created By:             Glenn.Dentel@nrc.gov Recipients:
Tracking Status: None "Scott, Michael" <Michael.Scott@nrc.gov>
"McKenzie, Kieta" <Kieta.McKenzie@nrc.gov>
Tracking Status: None "Pelton, David" <David.Pelton@nrc.gov> Tracking Status: None "DR WILLIAM CORCORAN" <William.R.Corcoran@1959.USNA.com> Tracking Status: None  
Tracking Status: None "Scott, Michael" <Michael.Scott@nrc.gov>
 
Tracking Status: None "Pelton, David" <David.Pelton@nrc.gov>
Post Office:   R1PWMSMRS01.nrc.gov Files     Size     Date & Time MESSAGE   3023     9/9/2016 7:12:57 AM
Tracking Status: None "DR WILLIAM CORCORAN" <William.R.Corcoran@1959.USNA.com>
 
Tracking Status: None Post Office:           R1PWMSMRS01.nrc.gov Files                           Size                   Date & Time MESSAGE                         3023                   9/9/2016 7:12:57 AM Options Priority:                       Standard Return Notification:           No Reply Requested:               No Sensitivity:                   Normal Expiration Date:
Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Recipients Received:}}

Revision as of 12:16, 30 October 2019

2016/09/09 Indian Point Lr Hearing - Ucs Bolt Assessment of Operability
ML16313A630
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 09/09/2016
From:
NRC
To:
Division of License Renewal
References
Download: ML16313A630 (3)


Text

IPRenewal NPEmails From: Dentel, Glenn Sent: Friday, September 09, 2016 7:13 AM To: DR WILLIAM CORCORAN Cc: McKenzie, Kieta; Scott, Michael; Pelton, David

Subject:

RE: Re: Re: UCS bolt assessment of operability Dr. Corcoran, Entergys root cause was reviewed by the inspectors during their onsite inspection, but was not formally submitted to the NRC. Therefore, it is not been docketed and given an ML#.

Glenn Dentel, Chief Division of Reactor Projects Branch 2 NRC Region I From: DR WILLIAM CORCORAN [1]

Sent: Thursday, September 08, 2016 6:51 PM To: Dentel, Glenn Cc: McKenzie, Kieta ; Scott, Michael ; Pelton, David

Subject:

[External_Sender] Re: Re: UCS bolt assessment of operability Mr. Dentel, Thanks ever so much.

Do you have the ML# for a root cause analysis?

Take care, Bill Corcoran William R. Corcoran, Ph.D., P.E.

21 Broadleaf Circle Windsor, CT 06095-1634 860-285-8779 William.R.Corcoran@1959.USNA.com http://www.linkedin.com/in/williamcorcoranphdpe https://www.box.com/shared/kfxg1lt9dh On Thursday, September 8, 2016 2:45 PM, "Dentel, Glenn" <Glenn.Dentel@nrc.gov> wrote:

Dear Dr. Corcoran:

1

As promised in my June 16 email response to you, I am writing to let you know the NRC has issued an inspection report on baffle-former bolting conditions at Indian Point Units 2 and 3. This inspection report can be found by using the NRCs publicly available web-based Agencywide Documents Access and Management System. To retrieve the document, enter the Accession Number (ML16243A245) in the Document Properties field located in the Advanced Search tab at the following webpage:

http://adams.nrc.gov/wba/.

The NRC implemented significant, comprehensive inspections after learning of the degraded baffle-former bolt issues at Indian Point. This included various baseline inspection samples to assess the issue at Unit 2, and the extent of the issue as it pertains to Unit 3. The inspections included reviews of Entergys non-destructive examination techniques and results; observations of a portion of bolt replacement activities on-site; assessments of foreign material controls and loose parts analysis; and reviews of the design change package and evaluations associated with both the degraded and new, replacement baffle-former bolts. Enforcement action was taken for Entergys failure to perform an operability evaluation on the baffle-former bolts associated with Unit 3. All of these inspections and other reviews are documented in the above mentioned report. In summary, NRC inspectors reviewed Entergys actions to address the baffle-former bolting issue and concluded there are no concerns pertaining to the safe operation of Units 2 and 3 Thank you for your concerns about the safe operations of the Indian Point nuclear plant. If you have any questions regarding this email or the inspection report, please contact me at (610) 337-5233.

Sincerely, Glenn Dentel, Chief Division of Reactor Projects Branch 2 NRC Region I 2

Hearing Identifier: IndianPointUnits2and3NonPublic_EX Email Number: 8535 Mail Envelope Properties (bd8805acb5d54cd2b0630222ec57537d)

Subject:

RE: Re: Re: UCS bolt assessment of operability Sent Date: 9/9/2016 7:12:56 AM Received Date: 9/9/2016 7:12:57 AM From: Dentel, Glenn Created By: Glenn.Dentel@nrc.gov Recipients:

"McKenzie, Kieta" <Kieta.McKenzie@nrc.gov>

Tracking Status: None "Scott, Michael" <Michael.Scott@nrc.gov>

Tracking Status: None "Pelton, David" <David.Pelton@nrc.gov>

Tracking Status: None "DR WILLIAM CORCORAN" <William.R.Corcoran@1959.USNA.com>

Tracking Status: None Post Office: R1PWMSMRS01.nrc.gov Files Size Date & Time MESSAGE 3023 9/9/2016 7:12:57 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: