| {{#Wiki_filter:1 IPRenewal NPEmails From: Dentel, Glenn Sent: Friday, September 09, 2016 7:13 AM To: DR WILLIAM CORCORAN Cc: McKenzie, Kieta; Scott, Michael; Pelton, David | | {{#Wiki_filter:IPRenewal NPEmails From: Dentel, Glenn Sent: Friday, September 09, 2016 7:13 AM To: DR WILLIAM CORCORAN Cc: McKenzie, Kieta; Scott, Michael; Pelton, David |
|
| |
|
| ==Subject:== | | ==Subject:== |
| RE: Re: Re: UCS bolt assessment of operability Dr. Corcoran, Entergy's root cause was reviewed by the inspectors during their onsite inspection, but was not formally submitted to the NRC. Therefore, it is not been docketed and given an ML#. | | RE: Re: Re: UCS bolt assessment of operability Dr. Corcoran, Entergys root cause was reviewed by the inspectors during their onsite inspection, but was not formally submitted to the NRC. Therefore, it is not been docketed and given an ML#. |
| Glenn Dentel, Chief Division of Reactor Projects Branch 2 NRC Region I From: DR WILLIAM CORCORAN [mailto:williamcorcoran@sbcglobal.net] Sent: Thursday, September 08, 2016 6:51 PM To: Dentel, Glenn Cc: McKenzie, Kieta ; Scott, Michael ; Pelton, David | | Glenn Dentel, Chief Division of Reactor Projects Branch 2 NRC Region I From: DR WILLIAM CORCORAN [mailto:williamcorcoran@sbcglobal.net] |
| | Sent: Thursday, September 08, 2016 6:51 PM To: Dentel, Glenn Cc: McKenzie, Kieta ; Scott, Michael ; Pelton, David |
|
| |
|
| ==Subject:== | | ==Subject:== |
| [External_Sender] Re: Re: UCS bolt assessment of operability Mr. Dentel, Thanks ever so much. | | [External_Sender] Re: Re: UCS bolt assessment of operability Mr. Dentel, Thanks ever so much. |
| Do you have the ML# for a root cause analysis? | | Do you have the ML# for a root cause analysis? |
| Take care, Bill Corcoran William R. Corcoran, Ph.D., P.E. | | Take care, Bill Corcoran William R. Corcoran, Ph.D., P.E. |
| 21 Broadleaf Circle Windsor, CT 06095-1634 860-285-8779 William.R.Corcoran@1959.USNA.com http://www.linkedin.com/in/williamcorcoranphdpe https://www.box.com/shared/kfxg1lt9dh On Thursday, September 8, 2016 2:45 PM, "Dentel, Glenn" <Glenn.Dentel@nrc.gov | | 21 Broadleaf Circle Windsor, CT 06095-1634 860-285-8779 William.R.Corcoran@1959.USNA.com http://www.linkedin.com/in/williamcorcoranphdpe https://www.box.com/shared/kfxg1lt9dh On Thursday, September 8, 2016 2:45 PM, "Dentel, Glenn" <Glenn.Dentel@nrc.gov> wrote: |
| > wrote: | |
|
| |
|
| ==Dear Dr. Corcoran:== | | ==Dear Dr. Corcoran:== |
|
| |
|
| 2 As promised in my June 16 email response to you, I am writing to let you know the NRC has issued an inspection report on baffle-former bolting conditions at Indian Point Units 2 and 3. This inspection report can be found by using the NRC's publicly available web-based Agencywide Documents Access and Management System. To retrieve the document, enter the Accession Number (ML16243A245) in the Document Properties field located in the Advanced Search tab at the following webpage:
| | 1 |
| http://adams.nrc.gov/wba/. The NRC implemented significant, comprehensive ins pections after learning of the degraded baffle-former bolt issues at Indian Point. This included various baseline inspection samples to assess the issue at Unit 2, and the extent of the issue as it pertains to Unit 3. The inspections included reviews of Entergy's non-destructive examination techniques and results; observations of a portion of bolt replacement activities on-site; assessments of foreign material controls and loose parts analysis; and reviews of the design change package and evaluations associated with both the degraded and new, replacement baffle-former bolts. Enforcement action was taken for Entergy's failure to perform an operability evaluation on the baffle-former bolts associated with Unit 3. All of these inspections and other reviews are documented in the above mentioned report. In summary, NRC inspectors reviewed Entergy's actions to address the baffle-former bolting issue and concluded there are no concerns pertaining to the safe operation of Units 2 and 3" Thank you for your concerns about the safe operations of the Indian Point nuclear plant. If you have any questions regarding this email or the inspection report, please contact me at (610) 337-5233.
| |
| Sincerely, Glenn Dentel, Chief Division of Reactor Projects Branch 2 NRC Region I
| |
|
| |
|
| Hearing Identifier: IndianPointUnits2and3NonPublic_EX Email Number: 8535 Mail Envelope Properties (bd8805acb5d54cd2b0630222ec57537d) | | As promised in my June 16 email response to you, I am writing to let you know the NRC has issued an inspection report on baffle-former bolting conditions at Indian Point Units 2 and 3. This inspection report can be found by using the NRCs publicly available web-based Agencywide Documents Access and Management System. To retrieve the document, enter the Accession Number (ML16243A245) in the Document Properties field located in the Advanced Search tab at the following webpage: |
| | http://adams.nrc.gov/wba/. |
| | The NRC implemented significant, comprehensive inspections after learning of the degraded baffle-former bolt issues at Indian Point. This included various baseline inspection samples to assess the issue at Unit 2, and the extent of the issue as it pertains to Unit 3. The inspections included reviews of Entergys non-destructive examination techniques and results; observations of a portion of bolt replacement activities on-site; assessments of foreign material controls and loose parts analysis; and reviews of the design change package and evaluations associated with both the degraded and new, replacement baffle-former bolts. Enforcement action was taken for Entergys failure to perform an operability evaluation on the baffle-former bolts associated with Unit 3. All of these inspections and other reviews are documented in the above mentioned report. In summary, NRC inspectors reviewed Entergys actions to address the baffle-former bolting issue and concluded there are no concerns pertaining to the safe operation of Units 2 and 3 Thank you for your concerns about the safe operations of the Indian Point nuclear plant. If you have any questions regarding this email or the inspection report, please contact me at (610) 337-5233. |
| | Sincerely, Glenn Dentel, Chief Division of Reactor Projects Branch 2 NRC Region I 2 |
| | |
| | Hearing Identifier: IndianPointUnits2and3NonPublic_EX Email Number: 8535 Mail Envelope Properties (bd8805acb5d54cd2b0630222ec57537d) |
|
| |
|
| ==Subject:== | | ==Subject:== |
| RE: Re: Re: UCS bolt assessment of operability Sent Date: 9/9/2016 7:12:56 AM Received Date: 9/9/2016 7:12:57 AM From: Dentel, Glenn Created By: Glenn.Dentel@nrc.gov Recipients: "McKenzie, Kieta" <Kieta.McKenzie@nrc.gov> | | RE: Re: Re: UCS bolt assessment of operability Sent Date: 9/9/2016 7:12:56 AM Received Date: 9/9/2016 7:12:57 AM From: Dentel, Glenn Created By: Glenn.Dentel@nrc.gov Recipients: |
| Tracking Status: None "Scott, Michael" <Michael.Scott@nrc.gov> | | "McKenzie, Kieta" <Kieta.McKenzie@nrc.gov> |
| Tracking Status: None "Pelton, David" <David.Pelton@nrc.gov> Tracking Status: None "DR WILLIAM CORCORAN" <William.R.Corcoran@1959.USNA.com> Tracking Status: None | | Tracking Status: None "Scott, Michael" <Michael.Scott@nrc.gov> |
| | | Tracking Status: None "Pelton, David" <David.Pelton@nrc.gov> |
| Post Office: R1PWMSMRS01.nrc.gov Files Size Date & Time MESSAGE 3023 9/9/2016 7:12:57 AM | | Tracking Status: None "DR WILLIAM CORCORAN" <William.R.Corcoran@1959.USNA.com> |
| | | Tracking Status: None Post Office: R1PWMSMRS01.nrc.gov Files Size Date & Time MESSAGE 3023 9/9/2016 7:12:57 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: |
| Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:}} | | Recipients Received:}} |
|
---|
Category:E-Mail
MONTHYEARML24036A0162024-02-0101 February 2024 NRC Email - Acknowledge and Accept the Indian Point Energy Center Request to Be Removed from NRC Headquarters Operation Officer (Hoo) Morning Authentication Code Calls ML23341A2002023-12-0707 December 2023 Email - Indian Point Energy Center Generating Units 1, 2, and 3 – Implementation Notice of Amendment No. 67, 300 and 276 to Independent Spent Fuel Storage Installation Only Emergency Plan (Ioep) ML23332A0802023-11-0808 November 2023 – Email from State of New York on the Revised License Amendment for Indian Point Energy Center ISFSI Only Emergency Plan ML23331A9542023-11-0808 November 2023 Email - State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23325A1632023-11-0808 November 2023 – State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23144A3382023-05-25025 May 2023 Dawn Giambalvo of Jersey City, New Jersey Email Against Treated Water Release from Indian Point Site ML23144A3422023-05-25025 May 2023 Peter Duda of Pearl River, New York Email Against Treated Water Release from Indian Point Site ML23144A3452023-05-25025 May 2023 Adam Kahn of Monsey, New York Email Against Treated Water Release from Indian Point Site ML23144A3502023-05-25025 May 2023 Dan Kwilecki of Montebello, New York Email Against Treated Water Release from Indian Point Site ML23144A3392023-05-25025 May 2023 David Morris of New City, New York Email Against Treated Water Release from Indian Point Site ML23144A3442023-05-25025 May 2023 Peggy Kurtz of Rockland County, New York Email Against Treated Water Release from Indian Point Site ML23136B1622023-05-15015 May 2023 – Town of North Salem, County of Westchester, New York Board Resolution Letter Regarding Treated Water Release from Indian Point Site ML23109A0632023-04-17017 April 2023 Email Acceptance Review for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML23055A1112023-02-23023 February 2023 Alyse Peterson Email- NYSERDA No Comments on Indian Point Unit 2 - Regarding Holtec License Amendment Request to Revise Permanently Defueled Technical Specifications and Staffing Requirements with Spent Fuel Transfer to ISFSI (Dockets 50-24 ML23049A0032023-02-14014 February 2023 – NRC Acceptance Email to Holtec for License Amendment Request for Approval of New ISFSI-Only Emergency Plan and Associated EAL Scheme ML22313A1682022-11-0909 November 2022 NRC Response to Updates to the Proposed Amended IP2 Master Trust ML22308A0912022-11-0303 November 2022 Email Acknowledgement for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML22276A1642022-09-29029 September 2022 New York State Revised Draft EA Response E-Mail ML22271A8492022-09-28028 September 2022 E-Mail Transmitting Revised Indian Point Exemption Draft EA ML22269A3452022-09-22022 September 2022 Email Objection to Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2, EPID L-2022-LLA-0072 ML22259A1992022-09-0202 September 2022 Acceptance for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22265A0142022-08-31031 August 2022 Email Acknowledgement for Amended and Restated Holtec IP3 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 3 ML22242A2592022-08-19019 August 2022 E-mail from K. Sturzebecher, NRC, to B. Noval, HDI, Acknowledgement for Amended and Restated Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2 ML22228A1332022-08-0909 August 2022 Acknowledgement for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22215A0432022-08-0101 August 2022 E-Mail Transmitting NYS NSA Exemption Comments & Draft EA Review Completion ML22208A0292022-07-19019 July 2022 E-Mail Transmitting Indian Point Exemption Draft EA ML22168A0072022-06-16016 June 2022 Acceptance Review for License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML22112A0102022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 50.54(w)(1) Concerning Indian Point Energy Center Onsite Property Damage Insurance ML22112A0122022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance for Indian Point Energy Center ML22103A2432022-04-13013 April 2022 E-mail - Request for Additional Information - License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme for Permanently Defueled Condition for Indian Point Energy Center ML22104A0342022-04-13013 April 2022 E-mail from Z. Cruz, NRC to J. Fleming, Holtec - Request for Additional Information Related to Request for Exemption from Portions of 10 CFR 50.47 and Part 50 Appendix E for Indian Point Energy Center ML22038A2572022-02-0707 February 2022 E-mail from Z. Cruz, NRC, to J. Fleming, HDI - Acceptance Review: License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme to Address Permanently Defueled Condition for Indian Point Energy Center ML22035A1862022-02-0404 February 2022 E-mail to J. Fleming, Holtec, from Z. Cruz Perez, NRC - Acceptance Review: Exemption Requests from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E, Section IV for Indian Point Energy Center ML22028A1032022-01-28028 January 2022 E-mail Dated 1/28/2022, Transmittal of Draft Safety Evaluation for Proposed License Amendment Revision to Licensing Basis to Incorporate the Installation and Use of of New Auxiliary Lifting Device ML22038A1592022-01-24024 January 2022 NRR E-mail Capture - (External_Sender) 2021 IPEC Annual Sturgeon Impingement Report ML22006A0442022-01-0505 January 2022 Email from Z Cruz to J Fleming Request for Additional Information - HDI Indian Point Post-Shutdown Decommissioning Activities Report ML21337A2952021-12-0303 December 2021 Subsequent Request for Additional Information License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device (E-mail Dated 12/3/2021) ML21335A3692021-12-0101 December 2021 Acceptance Review: Indian Point Energy Center - Exemption Request from 10 CFR Part 20 App G Section Iii.E ML21266A2972021-08-18018 August 2021 8/18/2021 E-mail from H. Specter to R. Guzman Public Comments to NRC, Indian Point Post-Shutdown Decommissioning Activities Report Public Meeting on July 29, 2021 ML21225A5012021-08-0909 August 2021 Email from NRC to the Shinnecock Indian Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21224A3032021-08-0909 August 2021 Email from NRC to the Mashantucket Pequot Tribe of Connecticut Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A6142021-08-0909 August 2021 Email from NRC to the Tuscarora Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5682021-08-0909 August 2021 Email from NRC to the Stockbridge-Munsee Community Band of Mohican Indians Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A4252021-08-0909 August 2021 Email from NRC to the Oneida Nation of Wisconsin Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A3142021-08-0606 August 2021 Email from NRC to the Oneida Indian Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A4402021-08-0606 August 2021 Email from NRC to the Onondaga Nation of Wisconsin Announcing the IPEC PSDAR Meeting on August 18, 2021 ML21225A5352021-08-0606 August 2021 Email from NRC to the Tonawanda Band of Seneca Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5462021-08-0606 August 2021 Email from NRC to the St. Regis Mohawk Tribe Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21266A2942021-07-25025 July 2021 E-mail from Paul Blanch to NRC (N. Sheehan, D. Screnci) Public Comments to NRC, Indian Point Post-Shutdown Decommissioning Activities Report Public Meeting, July 29, 2021 ML21197A2002021-07-16016 July 2021 (E-mail 7/16/2021) NRC Staff Assessment and RAI Closeout HDI Fleet Decommissioning Quality Assurance Program and Indian Point Energy Center Quality Assurance Program Manual 2024-02-01
[Table view] |
Text
IPRenewal NPEmails From: Dentel, Glenn Sent: Friday, September 09, 2016 7:13 AM To: DR WILLIAM CORCORAN Cc: McKenzie, Kieta; Scott, Michael; Pelton, David
Subject:
RE: Re: Re: UCS bolt assessment of operability Dr. Corcoran, Entergys root cause was reviewed by the inspectors during their onsite inspection, but was not formally submitted to the NRC. Therefore, it is not been docketed and given an ML#.
Glenn Dentel, Chief Division of Reactor Projects Branch 2 NRC Region I From: DR WILLIAM CORCORAN [1]
Sent: Thursday, September 08, 2016 6:51 PM To: Dentel, Glenn Cc: McKenzie, Kieta ; Scott, Michael ; Pelton, David
Subject:
[External_Sender] Re: Re: UCS bolt assessment of operability Mr. Dentel, Thanks ever so much.
Do you have the ML# for a root cause analysis?
Take care, Bill Corcoran William R. Corcoran, Ph.D., P.E.
21 Broadleaf Circle Windsor, CT 06095-1634 860-285-8779 William.R.Corcoran@1959.USNA.com http://www.linkedin.com/in/williamcorcoranphdpe https://www.box.com/shared/kfxg1lt9dh On Thursday, September 8, 2016 2:45 PM, "Dentel, Glenn" <Glenn.Dentel@nrc.gov> wrote:
Dear Dr. Corcoran:
1
As promised in my June 16 email response to you, I am writing to let you know the NRC has issued an inspection report on baffle-former bolting conditions at Indian Point Units 2 and 3. This inspection report can be found by using the NRCs publicly available web-based Agencywide Documents Access and Management System. To retrieve the document, enter the Accession Number (ML16243A245) in the Document Properties field located in the Advanced Search tab at the following webpage:
http://adams.nrc.gov/wba/.
The NRC implemented significant, comprehensive inspections after learning of the degraded baffle-former bolt issues at Indian Point. This included various baseline inspection samples to assess the issue at Unit 2, and the extent of the issue as it pertains to Unit 3. The inspections included reviews of Entergys non-destructive examination techniques and results; observations of a portion of bolt replacement activities on-site; assessments of foreign material controls and loose parts analysis; and reviews of the design change package and evaluations associated with both the degraded and new, replacement baffle-former bolts. Enforcement action was taken for Entergys failure to perform an operability evaluation on the baffle-former bolts associated with Unit 3. All of these inspections and other reviews are documented in the above mentioned report. In summary, NRC inspectors reviewed Entergys actions to address the baffle-former bolting issue and concluded there are no concerns pertaining to the safe operation of Units 2 and 3 Thank you for your concerns about the safe operations of the Indian Point nuclear plant. If you have any questions regarding this email or the inspection report, please contact me at (610) 337-5233.
Sincerely, Glenn Dentel, Chief Division of Reactor Projects Branch 2 NRC Region I 2
Hearing Identifier: IndianPointUnits2and3NonPublic_EX Email Number: 8535 Mail Envelope Properties (bd8805acb5d54cd2b0630222ec57537d)
Subject:
RE: Re: Re: UCS bolt assessment of operability Sent Date: 9/9/2016 7:12:56 AM Received Date: 9/9/2016 7:12:57 AM From: Dentel, Glenn Created By: Glenn.Dentel@nrc.gov Recipients:
"McKenzie, Kieta" <Kieta.McKenzie@nrc.gov>
Tracking Status: None "Scott, Michael" <Michael.Scott@nrc.gov>
Tracking Status: None "Pelton, David" <David.Pelton@nrc.gov>
Tracking Status: None "DR WILLIAM CORCORAN" <William.R.Corcoran@1959.USNA.com>
Tracking Status: None Post Office: R1PWMSMRS01.nrc.gov Files Size Date & Time MESSAGE 3023 9/9/2016 7:12:57 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: