|
|
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:5'-/i'.r u'4 REGULATOR1 INFORMATION DISTRIBUTION b STEM (RIDS)~'CCESSION NBR:8502050078 DOC~DATE: 85/01/30, NOTARIZED: | | {{#Wiki_filter:5'-/i'.r u'4 REGULATOR1 INFORMATION DISTRIBUTION b STEM (RIDS) |
| NO DOCKET FACIL:50-397 NPPSS Nuclear Pro.lect'nit 2i Washington Public Powe 05000397 AUTH INANE A/THOR AFFILIATION SORENSENiG.C. | | ~ |
| Washington Public Power Supply System RECIP~NAME RECIPIENT AFFILIATION SCH'AENCERgA | | NBR:8502050078 DOC ~ DATE: 85/01/30, NOTARIZED: NO DOCKET Nuclear Pro.lect'nit 2i Washington Public |
| ~Licensing Branch 2 | | 'CCESSION FACIL:50-397 NPPSS Powe 05000397 AUTH INANE A/THOR AFFILIATION SORENSENiG.C. Washington Public Power Supply System RECIP ~ NAME RECIPIENT AFFILIATION SCH'AENCERgA ~ Licensing Branch 2 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| Application for;amend to License NPF,2iichanging,Condition 28 deadline for envirop qual,ification of electrical equipment per 10CpR50.49 from 850331 to 1130~Equipment.Justification encl'ISTRIBUTION CODE: A048D, COPIES RECEIVED:LTR TITLE: OR/Licensing Submittal: | | Application for; amend to License NPF,2iichanging, Condition 28 deadline for envirop qual,ification of electrical equipment per 10CpR50.49 from 850331 to 1130 ~ |
| Equipment Qual NOTES: OL: 12/20/83'NCL SI E'o ification 05000397 RECIPIENT ID CODE/NAME NRR LB2 BC 12'NTERNAL: | | Equipment .Justification CODE: A048D, COPIES RECEIVED:LTR encl'ISTRIBUTION |
| ACRS 15 ELD/HDS2 12 NRR KARSCHiR NRR/DL DIR 14 NRR/DS I/AEB RGN5 COPIES LTTR ENCL 1 0 8 8 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAtdE AULUCKiR 01 ADM/LFMB GC , 13 ,NRR/DE/EQB 07 NRR/DL/ORAB 06 04 COPIES LTTR ENCL 1,1 1=0 2 2 1 1 1 1 EXTERNAL: LPDR NSIC 03 05-1 1 1 1 NRC PDR TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL, 22 C 1 4 g p 3 4 3 H It 4 I C Washington Public Power Supply System P.O.Box 968 3000 George Washington Way Richland, Washington 99352 (509)372-5000 January 30, 1985 G02-85-048 Docket No.50-397 Director of Nuclear Reactor Regulation Attention: | | 'NCL SI E'o TITLE: OR/Licensing Submittal: Equipment Qual ification NOTES: 05000397 OL: 12/20/83 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME NRR LB2 BC LTTR ENCL 1 0 ID CODE/NAtdE AULUCKiR 01 1,1 LTTR ENCL ADM/LFMB 12'NTERNAL: |
| Mr.A.Schwencer, Chief Licensing Branch No.2 Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555
| | ACRS 15 8 8 1= 0 ELD/HDS2 12 1 1 GC , |
| | 13 NRR KARSCHiR 1 1 ,NRR/DE/EQB 07 2 2 NRR/DL DIR 14 1 1 NRR/DL/ORAB 06 1 1 NRR/DS I /AEB 1 1 04 1 1 RGN5 1 1 EXTERNAL: LPDR 03 1 1 NRC PDR NSIC 05- 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL, 22 |
|
| |
|
| ==Dear Mr.Schwencer:== | | C 1 4 |
| | g 3 |
| | p 4 |
| | 3 H It 4 I |
| | C |
| | |
| | Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 January 30, 1985 G02-85-048 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555 |
| | |
| | ==Dear Mr. Schwencer:== |
|
| |
|
| ==Subject:== | | ==Subject:== |
| NUCLEAR PLANT NO.2 OPERATING LICENSE NPF-21, RE/VEST FOR AMENDMENT TO LICENSE CONDITION (28) | | NUCLEAR PLANT NO. 2 OPERATING LICENSE NPF-21, RE/VEST FOR AMENDMENT TO LICENSE CONDITION (28) |
|
| |
|
| ==Reference:== | | ==Reference:== |
| | : 1) Letter, UL NRC-1006, D. F. Schnell (Union Electric Company} to H. R. Denton (NRC), "Callaway Plant Unit 1, Revision to License Condition 2.C.(3)(a)", |
| | dated December. 28, 1984. |
| | =2} Letter, G02-85-021, G. C. Sorensen (SS) to A. |
| | Schwencer (NRC), "Operating License NPF-21, Request for Amendment to License Condition (28) and Environ-mental gualification '10 CFR 50.49(h) Notification", |
| | dated January 17, 1985 This amendment application requests that the March 31, 1985 deadline stated in the subject license condition be changed to November 30, 1985. At present, License Condition .(28} requires that "prior to March 31, 1985, the licensee shall environmentally qualify all electrical equipment according to the provisions of 10 CFR 50.49". Recent discussions with the Staff indicate that the appropriate section of'he rule applicable to WNP-2 is 10 CFR 50.49(i) which does not stipulate a qualification deadline for applicants granted licenses on or after February 22, 1983. (The WNP-2 license was issued |
| | ,December. 20, 1983.} |
| | The March,31, 1985 date is mentioned in 10 CFR 50.49(g) which is applicable to "each holder'f an operating license issued prior to February 22, 1983". |
| | Since the rule, does not appear to impose the March 31, 1985 deadline on the WNP-2 license, the requested amendment does not involve an exemption to 10 CFR 50.49. In fact, consistent with the request, 10 CFR 50.49(g) permits the Staff to extend the compliance deadline to November 30, 1985, for those operating licenses issued prior to February 22, 1983, where appropriate JIO's are provided. |
| | 8502050078 850i30 PDR ADOCK 05000397 p PDR |
| | |
| | / |
| | l f |
| | $ l, I |
| | ( 5 |
| | ~ |
| | I |
| | |
| | A. Schwencer Page Two January 30, 1985 REQUEST FOR AMENDMENT TO LICENSE CONDITION (28) |
| | Although the deadlines given in 10 CFR 50.49(g) are not expressly applicable to WNP-2, it is understood that: |
| | a) explicit Commission approval is required for extensions past November 30, 1985; and, b) precedents have been established in recently issued operating licenses that included the November 30, 1985 qualification deadline. |
| | Specifically, NPF-23 issued to Byron Station Unit 1 has November 30, 1985 as the environmental qualification deadline. Additionally, Callaway Plant Unit 1, NPF-30, has recently requested the same change to the license condition addressing environmental qualification in the Callaway license (Reference 1). |
| | In support of this amendment request, the Supply System has reviewed all the JIO's applicable to WNP-2 and concluded that they will remain valid and effective through November, 30, 1985. The Supply System review of the Justifi-cation for Interim Operation reveals that Table A, Page 3 should include CIA-V-39A. Equipment Justification,82 discusses and includes justification for this valve. Further justification is not necessary. Additionally, Page A-27 should include REA-E/P-1A.- A 'Justification for Interim Operation is attached for this device. The discussions provided by these JIO's ensure that the plant can be safely operated, pending completion of equipment qualification. |
| | The issue at question ls.not one, of compliance with the regulation, rather it is the date by which the compliance is achieved. It is noted that the Staff has concluded that the Supply System has demonstrated conformance with the qualification requirements of 10 CFR 50.49 (Supplement 4 to WPPSS Nuclear Project No. 2 Safety Evaluation, Report, NUREG-0892, Section 3.11.5). |
| | Pursuant to the above information, this amendment request does not adversely affect or endanger the health of the general public and does not involve an unreviewed safety .question. |
| | The Supply System has reviewed this change per 10 CFR 50.92 and the guidance provided by the Staff in applying the standards of 10 CFR 50.92 (48 FR 14870) and determined that this change does not involve a significant hazard. This change is similar to the example of an action involving no significant hazards consideration which relates to a change to make the license conform to regula-tions, where the license amendment, results in very minor changes to facility operations clearly in. keeping with the regulations. |
| | |
| | 0 4 |
| | ~ iP p% |
| | Il>g |
| | 'g |
| | ) |
| | |
| | A. Schwencer Page Three January 30, 1985 RE(VEST FOR AMENDMENT TO LICENSE CONDITION (28) |
| | This amendment request does not involve a significant increase in the prob-ability or consequences of an accident or other adverse condition over previous evaluations (the requested amendment does not constitute a significant change to the licensing basis of the plant); nor create the possibility of a new or different kind of accident or condition over previous evaluations (no changes are being made to any equipment and/or systems, and therefore no new or different kinds of accidents would be made possible); nor involve a signifi-cant reduction in a margin of safety (no original design parameters are being reduced). Based on the foregoing, the requested amendment does not present a significant hazard. |
| | It should be noted that this request supercedes that requested in Reference 2 and the warrant provided with Reference 2 should be applied as initial payment for this amendment request per 10 CFR 170.21 Category A (Power Reactors). |
| | In accordance with 10 CFR 50.91, the State of Washington has been provided a copy of this letter. |
| | Should you have any questions, please contact Hr. P. L. Powell, Manager, WNP-2 Licensing. As you are aware, prompt attention to this amendment is necessary; continued operation of WNP-2.requires approval of this amendment no later than Harch 31, 1985. |
| | Yery truly yours, |
| | ~.Regulatory C. Sorensen, Manager Programs PLP/tmh cc: R Auluck - NRC WS Chin - BPA N Lewis - EFSEC JB Hartin NRC RV A Masciantonio - NRC AD Toth - NRC Site |
|
| |
|
| 1)Letter, UL NRC-1006, D.F.Schnell (Union Electric Company}to H.R.Denton (NRC),"Callaway Plant Unit 1, Revision to License Condition 2.C.(3)(a)", dated December.28, 1984.=2}Letter, G02-85-021, G.C.Sorensen (SS)to A.Schwencer (NRC),"Operating License NPF-21, Request for Amendment to License Condition (28)and Environ-mental gualification | | II 1 |
| '10 CFR 50.49(h)Notification", dated January 17, 1985 This amendment application requests that the March 31, 1985 deadline stated in the subject license condition be changed to November 30, 1985.At present, License Condition.(28}requires that"prior to March 31, 1985, the licensee shall environmentally qualify all electrical equipment according to the provisions of 10 CFR 50.49".Recent discussions with the Staff indicate that the appropriate section of'he rule applicable to WNP-2 is 10 CFR 50.49(i)which does not stipulate a qualification deadline for applicants granted licenses on or after February 22, 1983.(The WNP-2 license was issued ,December.
| | I k 9 |
| 20, 1983.}The March,31, 1985 date is mentioned in 10 CFR 50.49(g)which is applicable to"each holder'f an operating license issued prior to February 22, 1983".Since the rule, does not appear to impose the March 31, 1985 deadline on the WNP-2 license, the requested amendment does not involve an exemption to 10 CFR 50.49.In fact, consistent with the request, 10 CFR 50.49(g)permits the Staff to extend the compliance deadline to November 30, 1985, for those operating licenses issued prior to February 22, 1983, where appropriate JIO's are provided.8502050078 850i30 PDR ADOCK 05000397 p PDR
| | , il,~>> |
| /l f$l, I (5~I A.Schwencer Page Two January 30, 1985 REQUEST FOR AMENDMENT TO LICENSE CONDITION (28)Although the deadlines given in 10 CFR 50.49(g)are not expressly applicable to WNP-2, it is understood that: a)explicit Commission approval is required for extensions past November 30, 1985;and, b)precedents have been established in recently issued operating licenses that included the November 30, 1985 qualification deadline.Specifically, NPF-23 issued to Byron Station Unit 1 has November 30, 1985 as the environmental qualification deadline.Additionally, Callaway Plant Unit 1, NPF-30, has recently requested the same change to the license condition addressing environmental qualification in the Callaway license (Reference 1).In support of this amendment request, the Supply System has reviewed all the JIO's applicable to WNP-2 and concluded that they will remain valid and effective through November, 30, 1985.The Supply System review of the Justifi-cation for Interim Operation reveals that Table A, Page 3 should include CIA-V-39A.Equipment Justification,82 discusses and includes justification for this valve.Further justification is not necessary.
| | |
| Additionally, Page A-27 should include REA-E/P-1A.-
| | ~ ~ |
| A'Justification for Interim Operation is attached for this device.The discussions provided by these JIO's ensure that the plant can be safely operated, pending completion of equipment qualification.
| | ~ Q E UIPMENT JUSTIFICATION |
| The issue at question ls.not one, of compliance with the regulation, rather it is the date by which the compliance is achieved.It is noted that the Staff has concluded that the Supply System has demonstrated conformance with the qualification requirements of 10 CFR 50.49 (Supplement 4 to WPPSS Nuclear Project No.2 Safety Evaluation, Report, NUREG-0892, Section 3.11.5).Pursuant to the above information, this amendment request does not adversely affect or endanger the health of the general public and does not involve an unreviewed safety.question.
| | : 1. 0 COMPONENT IDENTIFICATION EPN: REA- E/P-1A |
| The Supply System has reviewed this change per 10 CFR 50.92 and the guidance provided by the Staff in applying the standards of 10 CFR 50.92 (48 FR 14870)and determined that this change does not involve a significant hazard.This change is similar to the example of an action involving no significant hazards consideration which relates to a change to make the license conform to regula-tions, where the license amendment, results in very minor changes to facility operations clearly in.keeping with the regulations.
| |
| 0 4~iP p%l>g I'g)
| |
| A.Schwencer Page Three January 30, 1985 RE(VEST FOR AMENDMENT TO LICENSE CONDITION (28)This amendment request does not involve a significant increase in the prob-ability or consequences of an accident or other adverse condition over previous evaluations (the requested amendment does not constitute a significant change to the licensing basis of the plant);nor create the possibility of a new or different kind of accident or condition over previous evaluations (no changes are being made to any equipment and/or systems, and therefore no new or different kinds of accidents would be made possible);
| |
| nor involve a signifi-cant reduction in a margin of safety (no original design parameters are being reduced).Based on the foregoing, the requested amendment does not present a significant hazard.It should be noted that this request supercedes that requested in Reference 2 and the warrant provided with Reference 2 should be applied as initial payment for this amendment request per 10 CFR 170.21 Category A (Power Reactors).
| |
| In accordance with 10 CFR 50.91, the State of Washington has been provided a copy of this letter.Should you have any questions, please contact Hr.P.L.Powell, Manager, WNP-2 Licensing.
| |
| As you are aware, prompt attention to this amendment is necessary; continued operation of WNP-2.requires approval of this amendment no later than Harch 31, 1985.Yery truly yours,~.C.Sorensen, Manager Regulatory Programs PLP/tmh cc: R Auluck-NRC WS Chin-BPA N Lewis-EFSEC JB Hartin-NRC RV A Masciantonio
| |
| -NRC AD Toth-NRC Site II I 1 k 9 ,il,~>>
| |
| ~~~Q E UIPMENT JUSTIFICATION 1.0 COMPONENT IDENTIFICATION EPN: REA-E/P-1A | |
|
| |
|
| == Description:== | | == Description:== |
| | Fan Damper Electro-Pneumatic Converter Manufacturer/Model: Moore Industries/77-16 2.0 ACCIDENT CONDITIONS Tem erature Relative Humidit Accident Profile: 1/4, 21X Use Code: 2Gl Operability Time: 4320 Hours Radiation Zone: 572C Zone Dose: 3.0 x 104 3.0 COMPONENT SAFETY FUNCTION This passive device must maintain electrical integrity during a high humidity condition resulting from a high energy line break for 24 hours. |
| | : 4. 0 UALI F I CATI ON STATUS 4.1 Summar of uglification Status REA-E/P-1A is located in a relatively mild environment for temperature and pressure. It is exposed to 1005 relative humidity due to High Energy Line Break. The equipment has not been tested for 100'A relative humidity. |
| | The equipment is to be replaced with equipment with available qualification documentation. |
| | : 4. 2 Parameters Re uirin Jus ti fi cati on Humi di ty. |
|
| |
|
| Fan Damper Electro-Pneumatic Converter Manufacturer/Model:
| | I e ~ |
| Moore Industries/77-16 2.0 ACCIDENT CONDITIONS Accident Profile: Use Code: 2Gl Operability Time: Radiation Zone: Zone Dose: Tem erature 4320 Hours 572C 3.0 x 104 Relative Humidit 1/4, 21X 3.0 COMPONENT SAFETY FUNCTION This passive device must maintain electrical integrity during a high humidity condition resulting from a high energy line break for 24 hours.4.0 UAL I F I CATI ON STATUS 4.1 Summar of uglification Status REA-E/P-1A is located in a relatively mild environment for temperature and pressure.It is exposed to 1005 relative humidity due to High Energy Line Break.The equipment has not been tested for 100'A relative humidity.The equipment is to be replaced with equipment with available qualification documentation.
| | I |
| 4.2 Parameters Re uirin Jus ti f i cati on Humi di ty.
| | '1 I |
| e~II'1 I K~g C g r 5.0 JUSTIFICATION FOR INTERIM OPERATION', The component is rated as NEMA 3R, which means it can be applied in outdoor use and has passed rain tests.Additionally, the transducer's exhaust provides an air purge of the terminal enclosure.
| | K |
| The duration of the accident during which it would experience high relative humidity is short (i.e., 24 hours).The equipment is required only to maintain electrical integrity for this period.No significant degradation is likely to occur which would compromise this minimal function during this period. | | ~g C |
| | g r |
| | |
| | 5.0 JUSTIFICATION FOR INTERIM OPERATION', |
| | The component is rated as NEMA 3R, which means it can be applied in outdoor use and has passed rain tests. Additionally, the transducer's exhaust provides an air purge of the terminal enclosure. The duration of the accident during which it would experience high relative humidity is short (i.e., 24 hours). The equipment is required only to maintain electrical integrity for this period. No significant degradation is likely to occur which would compromise this minimal function during this period. |
|
| |
|
| ==6.0 CONCLUSION== | | ==6.0 CONCLUSION== |
|
| |
|
| Interim operation is justified on the following basis: The device housing is resistant to ivater, the duration of the high humidity condition is short, and the required function is likely to be protected. | | Interim operation is justified on the following basis: |
| STATE OF WASHINGTON
| | The device housing is resistant to ivater, the duration of the high humidity condition is short, and the required function is likely to be protected. |
| ))County of Benton)WNP-2 OL NPF-21 RE(}UEST FOR LICENSE AMENDMENT TO LICENSE
| | |
| | WNP-2 OL NPF-21 RE(}UEST FOR LICENSE AMENDMENT TO LICENSE STATE OF WASHINGTON ) |
|
| |
|
| ==Subject:== | | ==Subject:== |
| CONDITION (28)I, R.B.GLASSCOCK, being duly sworn, subscribe to and say that I am the Manager, Regulatory Programs, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein;that I have full authority to execute this oath;that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true.DATE , 1985 asscoc , iree or Licensing and Assurance On this day personally appeared before me R.B.GLASSCOCK to me known to be the individual who executed the foregoing instrument and acknowledge that he signed the same as his free act and deed for the uses and purposes therein mentioned. | | CONDITION (28) |
| GIVEN under my hand and seal this 3/day of , 1985.otary Public in and for the State of Washington Residing at fl~1 1 ar l r II 14~y~pa>'$l.V 1 l, I, g J/g 4.//ql 1 L~'I'I}} | | ) |
| | County of Benton ) |
| | I, R. B. GLASSCOCK, being duly sworn, subscribe to and say that I am the Manager, Regulatory Programs, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true. |
| | DATE , 1985 asscoc , iree or Licensing and Assurance On this day personally appeared before me R. B. GLASSCOCK to me known to be the individual who executed the foregoing instrument and acknowledge that he signed the same as his free act and deed for the uses and purposes therein mentioned. |
| | GIVEN under my hand and seal this 3 / day of , 1985. |
| | otary Public in and for the State of Washington Residing at |
| | |
| | fl ~ |
| | 1 1 |
| | ar l |
| | r II 14 |
| | ~ |
| | y |
| | ~pa> |
| | '$l 1 l, I, g J /g |
| | .V 4 .// |
| | ql 1 L ~ 'I'I}} |
|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML17284A9101999-10-13013 October 1999 Application for Amend to License NPF-21,revising TS 3.3.6.1, Table 3.3.6.1-1, Primary Containment Isolation Instrumentation. Footnote (D) Is Removed Since Both Inboard & Outboard Trip Sys Are Now Functional in All Modes ML17284A8501999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS 3.4.9, RHR Shutdown Cooling Sys - Hot Shutdown. ML17284A8471999-07-29029 July 1999 Application for Amend to License NPF-21,revising Tech Specs SR 3.5.2.2, Condensate Storage Tank Water Level. ML17284A8441999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS Table 3.3.5.1-1, ECCS Instrumentation Items 1.a,2.a,4.a & 5.a. ML17284A8431999-07-29029 July 1999 Application for Amend to License NPF-21,removing License Condition 2.C.(16),Attachment 2,Item 3(b) Re post-accident Neutron Flux Monitoring ML17284A8401999-07-29029 July 1999 Application for Amend to License NPF-21,amending Tech Specs SR 3.8.4.6 of TS 3.8.5, DC Sources - Operating & SR 3.8.5.1 of TS 3.8.5, DC Sources - Shutdown. ML17292B6891999-06-0303 June 1999 Application for Amend to License NPF-21,reflecting Change in Name of Washington Public Power Supply Sys to Energy Northwest.Marked-up Copy of Affected Pages of OL for Plant, Encl ML17292B6441999-04-20020 April 1999 Application for Amend to License NPF-21,revising TS 3.4.11 to Replace Existing Reactor Pressure Temp Limit Curves by 000630 ML17292B6321999-04-0707 April 1999 Application for Amend to License NPF-21,requesting Mod to MCPR Safety Limits by 990930 to Allow Continued Power Operation at Plant Following Restart from R-14 RFO ML17292B4861998-12-17017 December 1998 Application for Amend to License NPF-21,revising TS SR 3.8.1.8 to Allow for Capability to Manually Transfer Between Preferred & Alternate Offsite Power Sources During Modes 1 & 2 by 990125 ML17284A8071998-11-0909 November 1998 Supplemental Application for Amend to License NPF-21, Requesting Minor Wording Changes to Clarify Intent of Proposed New License Section 2.B.(6).Addl Info That Describes Physical Storage of Matls,Encl ML17284A7161998-08-0505 August 1998 Application for Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 1 & 3,125 Vdc Batteries E-B1-1 & HPCS-B1-DG3 & Div 1,250 Vdc Battery E-B2-1 ML17284A7051998-07-17017 July 1998 Application for Exigent Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc, Battery E-B1-2 ML17292B3401998-04-16016 April 1998 Application for Amend to License NPF-21,modifying Requirement That cold-worked Austenitic Stainless Steel Used in Newly Designed ECCS Pump Suction Strainers Must Have Yield Strength Not Greater than 90,000 Psi ML17292B1301997-12-0404 December 1997 Application for Amend to License NPF-21,modifying Min Critical Power Ratio Safety Limits by 980515 to Allow Continued Power Operation at WNP-2 Following Restart from R-13 Refueling Outage ML17292B0261997-08-14014 August 1997 Application for Amend to License NPF-21,modifying Inservice Testing Requirements Specified in TS 5.5.6 for Inboard Primary Containment Isolation Valve on Transvering in-core Probe (TIP) Sys Nitrogen Purge Line ML17292A9401997-07-16016 July 1997 Application for Amend to License NPF-21,adding New Min Reactor Vessel Pressure Versus Reactor Vessel Metal Temp (P/T) Curves,Applicable Up to 12 Efpys.Changes Support Vessel Leak Testing ML17292A8631997-05-20020 May 1997 Application for Amend to License NPF-21,requesting Mod of Minimum Critical Power Ratio Safety Limits by 970615 ML17292A7561997-03-22022 March 1997 Application for Amend to License NPF-21,modifying Response Time Testing Surveillance Requirements for RPS Instrumentation,Primary Containment Isolation Actuation Instrumentation & ECCS Actuation Instrumentation ML17292A5491996-10-15015 October 1996 Application for Amend to License NPF-21 to Modify TS for Secondary Containment & Standby Gas Treatment Sys to Reflect Revised Secondary Containment Drawdown & post-accident Analyses Results.Affidavit,Encl ML17292A5381996-10-10010 October 1996 Application for Amend to License NPF-21,requesting Addition of Section 2B(6) Re Allowance of Storage of Byproduct, Source & Special Nuclear Materials ML17292A4081996-08-0909 August 1996 Requests Amend to License NPF-21,revising TS Section 6.3 Re Unit Staff Qualifications,By Changing Operations Manager Qualification Requirements Associated W/Operations Knowledge from Meeting Ansi/Ans N18.1-1971 GO2-96-089, Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage1996-04-24024 April 1996 Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage ML17291B2781996-03-19019 March 1996 Application for Amend to License NPF-21,revising Containment Leakage Testing ML17291B2071996-01-19019 January 1996 Application for Amend to License NPF-21 Re Primary Containment Leakage Testing GO2-95-265, Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC1995-12-0808 December 1995 Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC ML17291B0921995-10-26026 October 1995 Application for Amend to License NPF-21,revising TS to Reflect Replacement of Existing Reactor Recirculation Flow Control Sys W/Adjustable Speed Drive Sys ML17291A8421995-06-0606 June 1995 Application for Amend to License NPF-21,changing TS 6.0, Administrative Controls by Revising Assistant Managing Director,Operations & Plant Manager Position Titles ML17291A8381995-06-0606 June 1995 Application for Amend to License NPF-21,modifying Index of TS by Deleting Ref to Bases Pages.Future Changes to Bases Info Will Be Evaluated Per 10CFR50.59 ML17291A8321995-06-0606 June 1995 Application for Amend to License NPF-21,modifying TS 6.9.3.2 by Adding Re to Three TRs Describing Analytical Methods That May Be Used in Determining Reactor Core Operating Limits for Reload Licensing Applications,Consistent W/Gl 88-16 ML17291A7551995-04-25025 April 1995 Application for Amend to License NPF-21,adding RWCU Sys High Blowdown Containment Isolation Trip Function & Associated LCO & SRs to Tables 3.3.2-1,3.3.2-2 & 4.3.2.1-1 ML17291A4791994-10-31031 October 1994 Application for Amend to License NPF-21,revising TSs to Relocate Safety/Relief Valve Position Indication Instrumentation Requirements ML17291A4741994-10-31031 October 1994 Application for Amend to License NPF-21,revising TS 3/4.1.3.1, Reactivity Control Sys. ML17291A4201994-09-26026 September 1994 Suppl to 930709 Application for Amend to License NPF-21 Re Increase in Power Operation,Changing Power/Flow Maps in TS 3/4.2.6,3/4.2.7,3/4.2.8 & 3/4.4.1 & Bases to Reflect Use of Siemens Power Corp Staif Code for Stability Analysis ML17291A3941994-09-18018 September 1994 Application for Amend to License NPF-21,changing TS Table 3.6.3-1 Re Primary Containment Isolation Valve Requirements ML17291A3171994-08-0808 August 1994 Application for Amend to License NPF-21,amending TS 4.0.5, Surveillance Requirements for Inservice Insp & Testing Program. ML17291A2151994-07-12012 July 1994 Application for Amend to License NPF-21,requesting Amend to Ts,Relocating TS Table for Instrument Response Time Limits ML17291A2201994-07-0808 July 1994 Application for Amend to License NPF-21,revising TS W/Regard to Control Rod Scram Insertion Testing Under Emergency Circumstances ML17290B1711994-05-0606 May 1994 Application for Amend to License NPF-21,revising TSs 3/4.3.7.5,3/4.4.2 & 3/4.5.1 for Main Steam Relief Valve Position Indication ML17290B1551994-05-0505 May 1994 Application for Amend to License NPF-21,requesting Mod of Three Equipment Piece Numbers Included in Table 3.6.3-1, Primary Containment Isolation Valves. ML17290A9631994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS to Support Hydrostatic Testing ML17290A9601994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS Section 6.0, Administrative Controls, Including Changing Reporting Relationship for QA Functions in Section 6.2.1.e of TS from Managing Director to Assistant Managing Director,Operations ML17290A9551994-02-0808 February 1994 Application for Amend to License NPF-21,consisting of Changes to TS Table 3.6.3-1,for RCIC-V-8,increasing Stroke Time from 13 Seconds to 26 Seconds & Deleting Note (J) Reference from RCIC-V-8 & RCIC-V-63 ML17290A9031994-01-13013 January 1994 Application for Amend to License NPF-21,requesting Continued Plant Operation W/Eccs Functional,But Not in Strict Compliance W/Requirements for Demonstrating That Response Time within Limits of TS 3/4.3.3, ECCS Instrumentation. ML17290A8961994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Changes to TS to Clarify Instrumentation Testing Requirements ML17290A8781994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Rev to TS to Relocate Requirements for Seismic Monitoring Instrumentation to FSAR & Plant Procedures ML17290A8921994-01-0606 January 1994 Suppl to 930709 Application for Amend to License NPF-21, Increasing Licensed Power Level from 3,323 Mwt to 3,486 Mwt W/Extended Load Line Limit & Changing SRV Setpoint Tolerance to Include Changes to TS Paragraph 6.9.3.2 ML17290A8391993-12-20020 December 1993 Application for Amend to License NPF-21,revising TS 3/4.6.1.8, Drywell & Suppression Chamber Purge Sys. ML17290A8181993-12-0606 December 1993 Application for Amend to License NPF-21,requesting TS Surveillance Requirement 4.6.6.1.b.3 Be Revised to Provide Appropriate Acceptance Criteria for Demonstrating Operability of Primary Containment Hydrogen Recombiner Sys ML17290A8221993-12-0606 December 1993 Application for Amend to License NPF-21,adding Footnote to TS Table 4.3.7.5-1, Accident Monitoring Instrumentation Srs, Exempting Channel Calibr of Safety/Relief Valve Position Indicators from Spec 4.0.4 for 24 H 1999-07-29
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML17284A9101999-10-13013 October 1999 Application for Amend to License NPF-21,revising TS 3.3.6.1, Table 3.3.6.1-1, Primary Containment Isolation Instrumentation. Footnote (D) Is Removed Since Both Inboard & Outboard Trip Sys Are Now Functional in All Modes ML17284A8501999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS 3.4.9, RHR Shutdown Cooling Sys - Hot Shutdown. ML17284A8471999-07-29029 July 1999 Application for Amend to License NPF-21,revising Tech Specs SR 3.5.2.2, Condensate Storage Tank Water Level. ML17284A8441999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS Table 3.3.5.1-1, ECCS Instrumentation Items 1.a,2.a,4.a & 5.a. ML17284A8431999-07-29029 July 1999 Application for Amend to License NPF-21,removing License Condition 2.C.(16),Attachment 2,Item 3(b) Re post-accident Neutron Flux Monitoring ML17284A8401999-07-29029 July 1999 Application for Amend to License NPF-21,amending Tech Specs SR 3.8.4.6 of TS 3.8.5, DC Sources - Operating & SR 3.8.5.1 of TS 3.8.5, DC Sources - Shutdown. ML17292B6891999-06-0303 June 1999 Application for Amend to License NPF-21,reflecting Change in Name of Washington Public Power Supply Sys to Energy Northwest.Marked-up Copy of Affected Pages of OL for Plant, Encl ML17292B6441999-04-20020 April 1999 Application for Amend to License NPF-21,revising TS 3.4.11 to Replace Existing Reactor Pressure Temp Limit Curves by 000630 ML17292B6321999-04-0707 April 1999 Application for Amend to License NPF-21,requesting Mod to MCPR Safety Limits by 990930 to Allow Continued Power Operation at Plant Following Restart from R-14 RFO ML17292B4861998-12-17017 December 1998 Application for Amend to License NPF-21,revising TS SR 3.8.1.8 to Allow for Capability to Manually Transfer Between Preferred & Alternate Offsite Power Sources During Modes 1 & 2 by 990125 ML17284A8071998-11-0909 November 1998 Supplemental Application for Amend to License NPF-21, Requesting Minor Wording Changes to Clarify Intent of Proposed New License Section 2.B.(6).Addl Info That Describes Physical Storage of Matls,Encl ML17284A7161998-08-0505 August 1998 Application for Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 1 & 3,125 Vdc Batteries E-B1-1 & HPCS-B1-DG3 & Div 1,250 Vdc Battery E-B2-1 ML17284A7051998-07-17017 July 1998 Application for Exigent Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc, Battery E-B1-2 ML17292B3401998-04-16016 April 1998 Application for Amend to License NPF-21,modifying Requirement That cold-worked Austenitic Stainless Steel Used in Newly Designed ECCS Pump Suction Strainers Must Have Yield Strength Not Greater than 90,000 Psi ML17292B1301997-12-0404 December 1997 Application for Amend to License NPF-21,modifying Min Critical Power Ratio Safety Limits by 980515 to Allow Continued Power Operation at WNP-2 Following Restart from R-13 Refueling Outage ML17292B0261997-08-14014 August 1997 Application for Amend to License NPF-21,modifying Inservice Testing Requirements Specified in TS 5.5.6 for Inboard Primary Containment Isolation Valve on Transvering in-core Probe (TIP) Sys Nitrogen Purge Line ML17292A9401997-07-16016 July 1997 Application for Amend to License NPF-21,adding New Min Reactor Vessel Pressure Versus Reactor Vessel Metal Temp (P/T) Curves,Applicable Up to 12 Efpys.Changes Support Vessel Leak Testing ML17292A8631997-05-20020 May 1997 Application for Amend to License NPF-21,requesting Mod of Minimum Critical Power Ratio Safety Limits by 970615 ML17292A7561997-03-22022 March 1997 Application for Amend to License NPF-21,modifying Response Time Testing Surveillance Requirements for RPS Instrumentation,Primary Containment Isolation Actuation Instrumentation & ECCS Actuation Instrumentation ML17292A5491996-10-15015 October 1996 Application for Amend to License NPF-21 to Modify TS for Secondary Containment & Standby Gas Treatment Sys to Reflect Revised Secondary Containment Drawdown & post-accident Analyses Results.Affidavit,Encl ML17292A5381996-10-10010 October 1996 Application for Amend to License NPF-21,requesting Addition of Section 2B(6) Re Allowance of Storage of Byproduct, Source & Special Nuclear Materials ML17292A4081996-08-0909 August 1996 Requests Amend to License NPF-21,revising TS Section 6.3 Re Unit Staff Qualifications,By Changing Operations Manager Qualification Requirements Associated W/Operations Knowledge from Meeting Ansi/Ans N18.1-1971 GO2-96-089, Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage1996-04-24024 April 1996 Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage ML17291B2781996-03-19019 March 1996 Application for Amend to License NPF-21,revising Containment Leakage Testing ML17291B2071996-01-19019 January 1996 Application for Amend to License NPF-21 Re Primary Containment Leakage Testing GO2-95-265, Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC1995-12-0808 December 1995 Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC ML17291B0921995-10-26026 October 1995 Application for Amend to License NPF-21,revising TS to Reflect Replacement of Existing Reactor Recirculation Flow Control Sys W/Adjustable Speed Drive Sys ML17291A8421995-06-0606 June 1995 Application for Amend to License NPF-21,changing TS 6.0, Administrative Controls by Revising Assistant Managing Director,Operations & Plant Manager Position Titles ML17291A8381995-06-0606 June 1995 Application for Amend to License NPF-21,modifying Index of TS by Deleting Ref to Bases Pages.Future Changes to Bases Info Will Be Evaluated Per 10CFR50.59 ML17291A8321995-06-0606 June 1995 Application for Amend to License NPF-21,modifying TS 6.9.3.2 by Adding Re to Three TRs Describing Analytical Methods That May Be Used in Determining Reactor Core Operating Limits for Reload Licensing Applications,Consistent W/Gl 88-16 ML17291A7551995-04-25025 April 1995 Application for Amend to License NPF-21,adding RWCU Sys High Blowdown Containment Isolation Trip Function & Associated LCO & SRs to Tables 3.3.2-1,3.3.2-2 & 4.3.2.1-1 ML17291A4791994-10-31031 October 1994 Application for Amend to License NPF-21,revising TSs to Relocate Safety/Relief Valve Position Indication Instrumentation Requirements ML17291A4741994-10-31031 October 1994 Application for Amend to License NPF-21,revising TS 3/4.1.3.1, Reactivity Control Sys. ML17291A4201994-09-26026 September 1994 Suppl to 930709 Application for Amend to License NPF-21 Re Increase in Power Operation,Changing Power/Flow Maps in TS 3/4.2.6,3/4.2.7,3/4.2.8 & 3/4.4.1 & Bases to Reflect Use of Siemens Power Corp Staif Code for Stability Analysis ML17291A3941994-09-18018 September 1994 Application for Amend to License NPF-21,changing TS Table 3.6.3-1 Re Primary Containment Isolation Valve Requirements ML17291A3171994-08-0808 August 1994 Application for Amend to License NPF-21,amending TS 4.0.5, Surveillance Requirements for Inservice Insp & Testing Program. ML17291A2151994-07-12012 July 1994 Application for Amend to License NPF-21,requesting Amend to Ts,Relocating TS Table for Instrument Response Time Limits ML17291A2201994-07-0808 July 1994 Application for Amend to License NPF-21,revising TS W/Regard to Control Rod Scram Insertion Testing Under Emergency Circumstances ML17290B1711994-05-0606 May 1994 Application for Amend to License NPF-21,revising TSs 3/4.3.7.5,3/4.4.2 & 3/4.5.1 for Main Steam Relief Valve Position Indication ML17290B1551994-05-0505 May 1994 Application for Amend to License NPF-21,requesting Mod of Three Equipment Piece Numbers Included in Table 3.6.3-1, Primary Containment Isolation Valves. ML17290A9631994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS to Support Hydrostatic Testing ML17290A9601994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS Section 6.0, Administrative Controls, Including Changing Reporting Relationship for QA Functions in Section 6.2.1.e of TS from Managing Director to Assistant Managing Director,Operations ML17290A9551994-02-0808 February 1994 Application for Amend to License NPF-21,consisting of Changes to TS Table 3.6.3-1,for RCIC-V-8,increasing Stroke Time from 13 Seconds to 26 Seconds & Deleting Note (J) Reference from RCIC-V-8 & RCIC-V-63 ML17290A9031994-01-13013 January 1994 Application for Amend to License NPF-21,requesting Continued Plant Operation W/Eccs Functional,But Not in Strict Compliance W/Requirements for Demonstrating That Response Time within Limits of TS 3/4.3.3, ECCS Instrumentation. ML17290A8961994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Changes to TS to Clarify Instrumentation Testing Requirements ML17290A8781994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Rev to TS to Relocate Requirements for Seismic Monitoring Instrumentation to FSAR & Plant Procedures ML17290A8921994-01-0606 January 1994 Suppl to 930709 Application for Amend to License NPF-21, Increasing Licensed Power Level from 3,323 Mwt to 3,486 Mwt W/Extended Load Line Limit & Changing SRV Setpoint Tolerance to Include Changes to TS Paragraph 6.9.3.2 ML17290A8391993-12-20020 December 1993 Application for Amend to License NPF-21,revising TS 3/4.6.1.8, Drywell & Suppression Chamber Purge Sys. ML17290A8181993-12-0606 December 1993 Application for Amend to License NPF-21,requesting TS Surveillance Requirement 4.6.6.1.b.3 Be Revised to Provide Appropriate Acceptance Criteria for Demonstrating Operability of Primary Containment Hydrogen Recombiner Sys ML17290A8221993-12-0606 December 1993 Application for Amend to License NPF-21,adding Footnote to TS Table 4.3.7.5-1, Accident Monitoring Instrumentation Srs, Exempting Channel Calibr of Safety/Relief Valve Position Indicators from Spec 4.0.4 for 24 H 1999-07-29
[Table view] |
Text
5'-/i'.r u'4 REGULATOR1 INFORMATION DISTRIBUTION b STEM (RIDS)
~
NBR:8502050078 DOC ~ DATE: 85/01/30, NOTARIZED: NO DOCKET Nuclear Pro.lect'nit 2i Washington Public
'CCESSION FACIL:50-397 NPPSS Powe 05000397 AUTH INANE A/THOR AFFILIATION SORENSENiG.C. Washington Public Power Supply System RECIP ~ NAME RECIPIENT AFFILIATION SCH'AENCERgA ~ Licensing Branch 2
SUBJECT:
Application for; amend to License NPF,2iichanging, Condition 28 deadline for envirop qual,ification of electrical equipment per 10CpR50.49 from 850331 to 1130 ~
Equipment .Justification CODE: A048D, COPIES RECEIVED:LTR encl'ISTRIBUTION
'NCL SI E'o TITLE: OR/Licensing Submittal: Equipment Qual ification NOTES: 05000397 OL: 12/20/83 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME NRR LB2 BC LTTR ENCL 1 0 ID CODE/NAtdE AULUCKiR 01 1,1 LTTR ENCL ADM/LFMB 12'NTERNAL:
ACRS 15 8 8 1= 0 ELD/HDS2 12 1 1 GC ,
13 NRR KARSCHiR 1 1 ,NRR/DE/EQB 07 2 2 NRR/DL DIR 14 1 1 NRR/DL/ORAB 06 1 1 NRR/DS I /AEB 1 1 04 1 1 RGN5 1 1 EXTERNAL: LPDR 03 1 1 NRC PDR NSIC 05- 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL, 22
C 1 4
g 3
p 4
3 H It 4 I
C
Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 January 30, 1985 G02-85-048 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Schwencer:
Subject:
NUCLEAR PLANT NO. 2 OPERATING LICENSE NPF-21, RE/VEST FOR AMENDMENT TO LICENSE CONDITION (28)
Reference:
- 1) Letter, UL NRC-1006, D. F. Schnell (Union Electric Company} to H. R. Denton (NRC), "Callaway Plant Unit 1, Revision to License Condition 2.C.(3)(a)",
dated December. 28, 1984.
=2} Letter, G02-85-021, G. C. Sorensen (SS) to A.
Schwencer (NRC), "Operating License NPF-21, Request for Amendment to License Condition (28) and Environ-mental gualification '10 CFR 50.49(h) Notification",
dated January 17, 1985 This amendment application requests that the March 31, 1985 deadline stated in the subject license condition be changed to November 30, 1985. At present, License Condition .(28} requires that "prior to March 31, 1985, the licensee shall environmentally qualify all electrical equipment according to the provisions of 10 CFR 50.49". Recent discussions with the Staff indicate that the appropriate section of'he rule applicable to WNP-2 is 10 CFR 50.49(i) which does not stipulate a qualification deadline for applicants granted licenses on or after February 22, 1983. (The WNP-2 license was issued
,December. 20, 1983.}
The March,31, 1985 date is mentioned in 10 CFR 50.49(g) which is applicable to "each holder'f an operating license issued prior to February 22, 1983".
Since the rule, does not appear to impose the March 31, 1985 deadline on the WNP-2 license, the requested amendment does not involve an exemption to 10 CFR 50.49. In fact, consistent with the request, 10 CFR 50.49(g) permits the Staff to extend the compliance deadline to November 30, 1985, for those operating licenses issued prior to February 22, 1983, where appropriate JIO's are provided.
8502050078 850i30 PDR ADOCK 05000397 p PDR
/
l f
$ l, I
( 5
~
I
A. Schwencer Page Two January 30, 1985 REQUEST FOR AMENDMENT TO LICENSE CONDITION (28)
Although the deadlines given in 10 CFR 50.49(g) are not expressly applicable to WNP-2, it is understood that:
a) explicit Commission approval is required for extensions past November 30, 1985; and, b) precedents have been established in recently issued operating licenses that included the November 30, 1985 qualification deadline.
Specifically, NPF-23 issued to Byron Station Unit 1 has November 30, 1985 as the environmental qualification deadline. Additionally, Callaway Plant Unit 1, NPF-30, has recently requested the same change to the license condition addressing environmental qualification in the Callaway license (Reference 1).
In support of this amendment request, the Supply System has reviewed all the JIO's applicable to WNP-2 and concluded that they will remain valid and effective through November, 30, 1985. The Supply System review of the Justifi-cation for Interim Operation reveals that Table A, Page 3 should include CIA-V-39A. Equipment Justification,82 discusses and includes justification for this valve. Further justification is not necessary. Additionally, Page A-27 should include REA-E/P-1A.- A 'Justification for Interim Operation is attached for this device. The discussions provided by these JIO's ensure that the plant can be safely operated, pending completion of equipment qualification.
The issue at question ls.not one, of compliance with the regulation, rather it is the date by which the compliance is achieved. It is noted that the Staff has concluded that the Supply System has demonstrated conformance with the qualification requirements of 10 CFR 50.49 (Supplement 4 to WPPSS Nuclear Project No. 2 Safety Evaluation, Report, NUREG-0892, Section 3.11.5).
Pursuant to the above information, this amendment request does not adversely affect or endanger the health of the general public and does not involve an unreviewed safety .question.
The Supply System has reviewed this change per 10 CFR 50.92 and the guidance provided by the Staff in applying the standards of 10 CFR 50.92 (48 FR 14870) and determined that this change does not involve a significant hazard. This change is similar to the example of an action involving no significant hazards consideration which relates to a change to make the license conform to regula-tions, where the license amendment, results in very minor changes to facility operations clearly in. keeping with the regulations.
0 4
~ iP p%
Il>g
'g
)
A. Schwencer Page Three January 30, 1985 RE(VEST FOR AMENDMENT TO LICENSE CONDITION (28)
This amendment request does not involve a significant increase in the prob-ability or consequences of an accident or other adverse condition over previous evaluations (the requested amendment does not constitute a significant change to the licensing basis of the plant); nor create the possibility of a new or different kind of accident or condition over previous evaluations (no changes are being made to any equipment and/or systems, and therefore no new or different kinds of accidents would be made possible); nor involve a signifi-cant reduction in a margin of safety (no original design parameters are being reduced). Based on the foregoing, the requested amendment does not present a significant hazard.
It should be noted that this request supercedes that requested in Reference 2 and the warrant provided with Reference 2 should be applied as initial payment for this amendment request per 10 CFR 170.21 Category A (Power Reactors).
In accordance with 10 CFR 50.91, the State of Washington has been provided a copy of this letter.
Should you have any questions, please contact Hr. P. L. Powell, Manager, WNP-2 Licensing. As you are aware, prompt attention to this amendment is necessary; continued operation of WNP-2.requires approval of this amendment no later than Harch 31, 1985.
Yery truly yours,
~.Regulatory C. Sorensen, Manager Programs PLP/tmh cc: R Auluck - NRC WS Chin - BPA N Lewis - EFSEC JB Hartin NRC RV A Masciantonio - NRC AD Toth - NRC Site
II 1
I k 9
, il,~>>
~ ~
~ Q E UIPMENT JUSTIFICATION
- 1. 0 COMPONENT IDENTIFICATION EPN: REA- E/P-1A
Description:
Fan Damper Electro-Pneumatic Converter Manufacturer/Model: Moore Industries/77-16 2.0 ACCIDENT CONDITIONS Tem erature Relative Humidit Accident Profile: 1/4, 21X Use Code: 2Gl Operability Time: 4320 Hours Radiation Zone: 572C Zone Dose: 3.0 x 104 3.0 COMPONENT SAFETY FUNCTION This passive device must maintain electrical integrity during a high humidity condition resulting from a high energy line break for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- 4. 0 UALI F I CATI ON STATUS 4.1 Summar of uglification Status REA-E/P-1A is located in a relatively mild environment for temperature and pressure. It is exposed to 1005 relative humidity due to High Energy Line Break. The equipment has not been tested for 100'A relative humidity.
The equipment is to be replaced with equipment with available qualification documentation.
- 4. 2 Parameters Re uirin Jus ti fi cati on Humi di ty.
I e ~
I
'1 I
K
~g C
g r
5.0 JUSTIFICATION FOR INTERIM OPERATION',
The component is rated as NEMA 3R, which means it can be applied in outdoor use and has passed rain tests. Additionally, the transducer's exhaust provides an air purge of the terminal enclosure. The duration of the accident during which it would experience high relative humidity is short (i.e., 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />). The equipment is required only to maintain electrical integrity for this period. No significant degradation is likely to occur which would compromise this minimal function during this period.
6.0 CONCLUSION
Interim operation is justified on the following basis:
The device housing is resistant to ivater, the duration of the high humidity condition is short, and the required function is likely to be protected.
WNP-2 OL NPF-21 RE(}UEST FOR LICENSE AMENDMENT TO LICENSE STATE OF WASHINGTON )
Subject:
CONDITION (28)
)
County of Benton )
I, R. B. GLASSCOCK, being duly sworn, subscribe to and say that I am the Manager, Regulatory Programs, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true.
DATE , 1985 asscoc , iree or Licensing and Assurance On this day personally appeared before me R. B. GLASSCOCK to me known to be the individual who executed the foregoing instrument and acknowledge that he signed the same as his free act and deed for the uses and purposes therein mentioned.
GIVEN under my hand and seal this 3 / day of , 1985.
otary Public in and for the State of Washington Residing at
fl ~
1 1
ar l
r II 14
~
y
~pa>
'$l 1 l, I, g J /g
.V 4 .//
ql 1 L ~ 'I'I