| {{#Wiki_filter:... consumers Power company General Offices: Z12 West Michigan Avenue, Jackson, Michigan 49201 | | {{#Wiki_filter:... |
| * Area Code 517 788-0550 November 11, 1977 Director of N11clear Reactor Regulation . Att: Mr Albert Schwencer, Chief .. | | consumers Power company General Offices: Z12 West Michigan Avenue, Jackson, Michigan 49201 |
| * Operating Reactors Branch No 1 US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 -LICENSE DPR-20 -PALISADES PLANT -T/S -DELETION . OF ANNUAL OPERATING REPORT Transmitted herewith are thre*e ( 3) original and thirty-severi ( 37) conformed copies of a proposed change to the Technical Specifications for the Palisades Plant, Docket 50-255, License DPR-20. The purpose of this change is to delete the Technical Specifications ment for an Annual Operating Report as described in your letter dated September 16, 1977. Further, Consumers Power Company will modify the Monthly Operating | | * Area Code 517 788-0550 November 11, 1977 Director of N11clear Reactor Regulation . |
| *Report in accordance with the revised format effective January 1, 1978. David P Hoffman Assistant Nuclear Licensing Administrator CC: JGKeppler, USNRC | | Att: Mr Albert Schwencer, Chief . |
| ... CONSUMERS POWER Docket 50-255 Request for Change to the Technical Specifications License DPR-20 *For the reasons hereinafter set forth, it is requested that the Technical Specifications contained in Provisional Operating License DPR-20, Docket 50-255, issued to Consumers Power Company on October 16, 1972 for the Palisades Plant be changed as described in Section I below: I. Changes A. Delete existing Specification 6.9.1.b and substitute the following: "b. Annual Report -An annual report covering occupational exposure during the calendar year to supplement require!:C.ents of 10 CFR 20.407 should be submitted prior to March 1 of each year. This annual report shall include: A tabulation on an annual basis of the number of station, utility and other personnel (including contractors) receiving exposures greater than 100 m.Rem/year and their associated man Rem exposure according to work and job functions, eg, reactor operations and surveillance, inservice inspection, routine maintenance, special maintenance (describe m.aintenan,ce), waste processing and refueling. | | * Operating Reactors Branch No 1 US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - T/S - DELETION |
| The dose to various duty may be estimates based on pocket dosimeter, TLD or film badge measurements. | | . OF ANNUAL OPERATING REPORT Transmitted herewith are thre*e ( 3) original and thirty- severi ( 37) conformed copies of a proposed change to the Technical Specifications for the Palisades Plant, Docket 50-255, License DPR-20. |
| Small exposures totaling less than 20% of the individual total dose need not be accounted for. In the aggregate, at least 80% of the total whole body dose received from external sources shall be assigned to specific major work functions." B. Delete the footnotes following Section | | The purpose of this change is to delete the Technical Specifications require-ment for an Annual Operating Report as described in your letter dated September 16, 1977. Further, Consumers Power Company will modify the Monthly Operating *Report in accordance with the revised format effective January 1, 1978. |
| : c. Section 6.9.i.c, replace "Office of Inspection and Enforcement" with "Director, Office of Management Information and Program Control." NOTE: Corrected Technical Specifications pages are enclosed. | | David P Hoffman Assistant Nuclear Licensing Administrator CC: JGKeppler, USNRC |
| / _.,; ,._:. . -. -*-..; J ---:** 2 tr. Discussion By letter dated September 16, 1977, Consumers Power Company was requested*
| | |
| to submit a change to the Palisades Plant Technical Specifications deleting the requirement for an Annual Operating Report. Changes A, B and C are mitted reflecting this request. III. Conclusion Based on the foregoing, the Palisades Plant Review Committee has concluded that this change does not involve an unreviewed safety question and the Safety and Audit Review Board finds this change acceptable. | | ... |
| CONSUMERS POWER COMPANY By C R Bilby, Production | | CONSUMERS POWER COMPANY-Docket 50-255 Request for Change to the Technical Specifications License DPR-20 |
| & Transmission Sworn and subscribed to before me this 11th day of November 1Linda Notary Public _ *. _Jackson County_, Michigan '0Y" eicpires June 10, 1981. / / ...... | | *For the reasons hereinafter set forth, it is requested that the Technical Specifications contained in Provisional Operating License DPR-20, Docket 50-255, issued to Consumers Power Company on October 16, 1972 for the Palisades Plant be changed as described in Section I below: |
| 6.9 Reporting Requirements In,addition to the applicable reporting requirements of Title 10, Code of'.Federal Regulations, the following identified reports shall .be mitted to the Director of the appropriate Regional Office of Inspection an4 Enforcement unless otherwise noted. 6.9.1 Routine Reports a. Start-Up Report -A summary report *or plant start-up and power escalation testing shall be submitted following (1) receipt of an operating license, (2) amendment to the license involving a planned increase in power level, (3) installation of fuel that has a different design or has been.manufactured by a different fuel supplier and, (4) modifications that may have significantly altered the nuclear, thermal or hydraulic performance of the plant. The report.shall address each. of the required tests and shall, in general, include a description of the measured values of the erating conditions or characteristics obtained during the test program and a comparison of these values with design predictions and specifications | | I. Changes A. Delete existing Specification 6.9.1.b and substitute the following: |
| *. Any corrective actions that were required to obtain satisfactory operation shall also be described. | | "b. Annual Report - An annual report covering occupational exposure during the calendar year to supplement require!:C.ents of 10 CFR 20.407 should be submitted prior to March 1 of each year. |
| Any ditional specific details required in license conditions based on other co:ri:imitments shall be included in this report. Start-up reports shall be submitted within (1) 90 days following completion of the start-up test program, ( 2) .90 days following resumptiqn. | | This annual report shall include: |
| or commencement of commercial power operation or, (3) 9 months following initial criticality, whichever is earliest. | | A tabulation on an annual basis of the number of station, utility and other personnel (including contractors) receiving exposures greater than 100 m.Rem/year and their associated man Rem exposure according to work and job functions, eg, reactor operations and surveillance, inservice inspection, routine maintenance, special maintenance (describe m.aintenan,ce), waste processing and refueling. The dose ~ssignment to various duty fun~tions may be estimates based on pocket dosimeter, TLD or film badge measurements. Small exposures totaling less than 20% of the individual total dose need not be accounted for. |
| If the Start-Up Report does not cover all three events (ie, initial criticality, completion of start-up test program and re-*; sumption or commencement of commercial power operation), mentary reports shall be submitted at least every three months until all three events have been completed. | | In the aggregate, at least 80% of the total whole body dose received from external sources shall be assigned to specific major work functions." |
| : b. Annual Report -An annual report covering occupational exposure during the current calendar year to-supplement requirements of 10 CFR 20.407 should be submitted prior.to March 1 of each year. This annual report shall include: A tabulation on an annual basis of the number of station, utility and other personnel (including contractors) receiving exposures greater than 100 mRem/year and their associated man Rem exposure according to work and job functions, eg, reactor operations and surveillance, service inspection, routine maintenance, special maintenance (describe maintenance), waste processing and refueling. -The dose assignment to various duty functions may be estimates based on pocket dosimeter, TLD or film badge measurements. | | B. Delete the footnotes following Section 6~9.2. |
| Small exposures totaling less than 20% of the individual total dose need not be accounted for. In the aggregate, at least 80% of the total whole body dose received from external sources shall be assigned to specific major work functions. | | : c. Section 6.9.i.c, replace "Office of Inspection and Enforcement" with "Director, Office of Management Information and Program Control." |
| | NOTE: Corrected Technical Specifications pages are enclosed. |
| | |
| | 2 tr. Discussion By letter dated September 16, 1977, Consumers Power Company was requested* |
| | to submit a change to the Palisades Plant Technical Specifications deleting the requirement for an Annual Operating Report. Changes A, B and C are sub-mitted reflecting this request. |
| | III. Conclusion Based on the foregoing, the Palisades Plant Review Committee has concluded that this change does not involve an unreviewed safety question and the Safety and Audit Review Board finds this change acceptable. |
| | CONSUMERS POWER COMPANY By C R Bilby, Production & Transmission Sworn and subscribed to before me this 11th day of November 1977~ |
| | ~~_A:C~ |
| | 1Linda ~~Carstens, Notary Public |
| | -.,._:. |
| | / |
| | _.,; |
| | . _*. _Jackson County_, Michigan |
| | - *-..; |
| | J |
| | --:** |
| | - |
| | '0Y" .commis~*ion eicpires June 10, 1981. |
| | / |
| | / |
| | ...... |
| | |
| | 6.9 Reporting Requirements In,addition to the applicable reporting requirements of Title 10, Code of'.Federal Regulations, the following identified reports shall .be sub-mitted to the Director of the appropriate Regional Office of Inspection an4 Enforcement unless otherwise noted. |
| | 6.9.1 Routine Reports |
| | : a. Start-Up Report - A summary report *or plant start-up and power escalation testing shall be submitted following (1) receipt of an operating license, (2) amendment to the license involving a planned increase in power level, (3) installation of fuel that has a different design or has been.manufactured by a different fuel supplier and, (4) modifications that may have significantly altered the nuclear, thermal or hydraulic performance of the plant. |
| | The report.shall address each. of the required tests and shall, in general, include a description of the measured values of the op-erating conditions or characteristics obtained during the test program and a comparison of these values with design predictions and specifications *. Any corrective actions that were required to obtain satisfactory operation shall also be described. Any ad-ditional specific details required in license conditions based on other co:ri:imitments shall be included in this report. |
| | Start-up reports shall be submitted within (1) 90 days following completion of the start-up test program, ( 2) .90 days following resumptiqn. or commencement of commercial power operation or, (3) 9 months following initial criticality, whichever is earliest. |
| | If the Start-Up Report does not cover all three events (ie, initial criticality, completion of start-up test program and re- |
| | *; sumption or commencement of commercial power operation), supple-mentary reports shall be submitted at least every three months until all three events have been completed. |
| | : b. Annual Report - An annual report covering occupational exposure during the current calendar year to-supplement requirements of 10 CFR 20.407 should be submitted prior.to March 1 of each year. |
| | This annual report shall include: |
| | A tabulation on an annual basis of the number of station, utility and other personnel (including contractors) receiving exposures greater than 100 mRem/year and their associated man Rem exposure according to work and job functions, eg, reactor operations and surveillance, in-service inspection, routine maintenance, special maintenance (describe maintenance), waste processing and refueling. -The dose assignment to various duty functions may be estimates based on pocket dosimeter, TLD or film badge measurements. Small exposures totaling less than 20% of the individual total dose need not be accounted for. In the aggregate, at least 80% of the total whole body dose received from external sources shall be assigned to specific major work functions. |
| 6-11 | | 6-11 |
| (* . _) I *'" | | |
| -* , . c. Monthly Operating Report -Routine reports of operating statistics and shutdown experience shall be .submitted-on a monthly basis to the Director, Office of Management.Information and Program Control, US Nuclear Regulatory Commission, Washington, DC *20555, with a copy to the appropriate Regional Office to arrive no later than the tenth of each month following the calendar month covered by the 6.9.2 Reportable Occurrences Reportable occurrences, including corrective actions and measures to prevent reoccurrence, shall be reported to the NRC. Supplemental reports may be to fully describe final resolution of rence. In case of corrected or supplemental reports, a licensee event report shall be completed and reference shall be to the original report date. 6-13 RECl:IVtD DOCUMENT UNIT 19Tf NOV 14 ML II 03 e. . (}} | | (* |
| | . _) |
| | I |
| | *'" |
| | |
| | , . -* |
| | : c. Monthly Operating Report - Routine reports of operating statistics and shutdown experience shall be .submitted-on a monthly basis to the Director, Office of Management.Information and Program Control, US Nuclear Regulatory Commission, Washington, DC *20555, with a copy to the appropriate Regional Office to arrive no later than the tenth of each month following the calendar month covered by the repo~t. |
| | 6.9.2 Reportable Occurrences Reportable occurrences, including corrective actions and measures to prevent reoccurrence, shall be reported to the NRC. Supplemental reports may be re~uired to fully describe final resolution of occur-rence. In case of corrected or supplemental reports, a licensee event report shall be completed and reference shall be ma~e to the original report date. |
| | 6-13 |
| | : e. . ( |
| | RECl:IVtD DOCUMENT Pi~OCESS!/'!G UNIT 19Tf NOV 14 ML II 03}} |
|
---|
Category:Letter
MONTHYEARPNP 2024-014, Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances2024-10-0909 October 2024 Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances PNP 2024-037, Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-0202024-10-0404 October 2024 Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-020 ML24267A2962024-10-0101 October 2024 Summary of Conference Call Regarding Steam Generator Tube Inspections ML24263A1712024-09-20020 September 2024 Environmental Request for Additional Information ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24219A4202024-09-12012 September 2024 Change in Estimated Hours and Review Schedule for Licensing Actions Submitted to Support Resumption of Power Operations (Epids L-2023-LLE-0025, L-2023-LLM-0005, L-2023-LLA-0174, L-2024-LLA-0013, L-2024-LLA-0060, L-2024-LLA-0071) IR 05000255/20244022024-09-0606 September 2024 Public: Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2024402 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant IR 05000255/20240022024-08-0909 August 2024 NRC Inspection Report No. 05000255/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations ML24206A0572024-07-25025 July 2024 PRM-50-125 - Letter to Alan Blind; Docketing of Petition for Rulemaking and Sufficiency Review Status (10 CFR Part 50) PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-07-24024 July 2024 Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-031, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-07-18018 July 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000255/20240112024-07-15015 July 2024 Nuclear Plant - Restart Inspection Report 05000255/2024011 PNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24183A1382024-07-0202 July 2024 Tribal Letter - Lac Du Flambeau Band of Lake Superior Chippewa Indians ML24137A0142024-07-0202 July 2024 OEDO-24-00011 - 2.206 Petition for Misuse of Palisades Decommissioning Trust Fund (EPID L-2023-CRS-0008) - Letter ML24183A1492024-07-0101 July 2024 Tribal Letter - Pokagon Band of Potawatomi Indians ML24156A0222024-07-0101 July 2024 Initiation of Scoping Process to Prepare an Environmental Assessment for the Environmental Review of Holtec Decommissioning International, Llc’S Licensing and Regulatory Requests for Reauthorization of Power Operations at Palisades EPID L-2 ML24183A1552024-07-0101 July 2024 Tribal Letter - Red Lake Band of Chippewa Indians ML24183A1542024-07-0101 July 2024 Tribal Letter Red Cliff Band of Lake Superior Chippewa Indians ML24172A0032024-07-0101 July 2024 Letter to L. Powers, Mackinac Bands of Chippewa and Ottawa Indians Re Initiation of Scoping Process for Environ Review Holtec Decommissioning Intl, LLC Request for Reauthorization of Power Ops-Palisades ML24183A1332024-07-0101 July 2024 Tribal Letter-Forest County Potawatomi Community ML24183A1582024-07-0101 July 2024 Tribal Letter Sault Ste. Marie Tribe of Chippewa Indians ML24183A1302024-07-0101 July 2024 Tribal Letter-Chippewa Cree Indians of the Rocky Boys Reservation ML24183A1282024-07-0101 July 2024 Tribal letter-Bay Mills Indian Community ML24183A1532024-07-0101 July 2024 Tribal Letter Quechan Tribe of the Fort Yuma Indian Reservation ML24183A1572024-07-0101 July 2024 Tribal Letter - Saint Croix Chippewa Indians of Wisconsin ML24183A1462024-07-0101 July 2024 Tribal letter-Mille Lacs Band of Ojibwe ML24183A1422024-07-0101 July 2024 Tribal Letter-Little Traverse Bay Bands of Odawa Indians ML24183A1312024-07-0101 July 2024 Tribal Letter-Citizen Potawatomi Nation ML24163A0552024-07-0101 July 2024 Rebecca Held Knoche NOAA-Palisades-NOI to Conduct Scoping Process and Prepare an EA - EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24163A2392024-07-0101 July 2024 Sara Thompson, Michigan DNR-Palisades-NOI to Conduct Scoping Process and Prepare an EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24155A0102024-07-0101 July 2024 Quentin L. Messer Jr., Michigan Econ-Palisades-NOI to Conduct Scoping Process and Prep an EA-EPID No. L-2024-LNE-0003 Docket No.50-0255P ML24155A0032024-07-0101 July 2024 Kathy Kowal, Us EPA Region 5-Palisades-NOI to Cibdyct Scoping Process and Prepare an EA EPID L-2024-LNE-0003 ML24163A0832024-07-0101 July 2024 Ltr to R Schumaker SHPO Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24183A1342024-07-0101 July 2024 Tribal Letter-Grand Portage Band of Lake Superior Chippewa ML24183A1392024-07-0101 July 2024 Tribal Letter-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24183A1272024-07-0101 July 2024 Tribal Letter-Bad River Band of the Lake Superior Tribe of Chippewa ML24183A1412024-07-0101 July 2024 Tribal Letter-Little River Band of Ottawa Indians ML24163A1922024-07-0101 July 2024 Jeremy Rubio, Dept of Env, Great Lakes and Energy, Kalamazoo District-Palisades-NOI to Conduct Scoping Process and Prepare an EA EPID No. L-2024-LNE-0003 Docket No.50-0255 ML24183A1322024-07-0101 July 2024 Tribal Letter-Fond Du Lac Band of Lake Superior Chippewa ML24183A1592024-07-0101 July 2024 Tribal letter-Sokaogon Chippewa Community ML24163A0822024-07-0101 July 2024 Ltr to J Loichinger Achp Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24183A1252024-07-0101 July 2024 Letter to G. Gould, Swan Creek Black River Confederated Ojibwa-Init of Scoping Process for the Env Rev of Holtec Decommissioning Intl, LLC Request for Reauth of Power Ops at Palisades ML24183A1352024-07-0101 July 2024 Tribal Letter-Hannahville Indian Community ML24183A1442024-07-0101 July 2024 Tribal Letter - Menominee Indian Tribe of Wisconsin ML24183A1502024-07-0101 July 2024 Tribal Letter - Prarie Band Potawatomi Nation ML24183A1452024-07-0101 July 2024 Tribal Letter - Miami Tribe of Oklahoma 2024-09-06
[Table view] Category:Technical Specification
MONTHYEARPNP 2024-001, License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-02-0909 February 2024 License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML22102A2482022-04-14014 April 2022 Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML21152A1112021-06-0101 June 2021 Proposed Changes (mark-up) to Palisades Plant - Appendix a Technical Specifications, and Appendix B Environmental Protection Plan Pages ML21152A1132021-06-0101 June 2021 Palisade Nuclear Plant - Proposed Technical Specifications Bases Changes RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls PNP 2019-017, Submittal of Changes to Technical Specifications Bases2019-03-21021 March 2019 Submittal of Changes to Technical Specifications Bases PNP 2018-052, Supplement to License Amendment Request -Application to Revise Technical Specifications to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- Risk Informed Technical Specification Task Force.2018-11-16016 November 2018 Supplement to License Amendment Request -Application to Revise Technical Specifications to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- Risk Informed Technical Specification Task Force. ML18270A3222018-09-27027 September 2018 Attachment 1: Description and Evaluation of Technical Specifications Changes ML18270A3242018-09-27027 September 2018 Attachment 3: Proposed Changes and Appendix a Technical Specifications Pages ML18270A3252018-09-27027 September 2018 Attachment 4: Page Change Instructions and Revised Pages, and Appendix a Technical Specifications ML18270A3262018-09-27027 September 2018 Attachment 5: Proposed Technical Specification Bases Changes PNP 2017-067, Submittal of Changes to Palisades Nuclear Plant Technical Specifications Bases2017-11-0808 November 2017 Submittal of Changes to Palisades Nuclear Plant Technical Specifications Bases PNP 2016-046, License Amendment Request for Editorial and Administrative Changes to Technical Specifications2016-11-0909 November 2016 License Amendment Request for Editorial and Administrative Changes to Technical Specifications PNP 2014-088, Report to NRC of Changes to Technical Specifications Bases2014-09-15015 September 2014 Report to NRC of Changes to Technical Specifications Bases PNP 2014-042, License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process2014-06-11011 June 2014 License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process PNP 2012-097, Report to NRC of Changes to Technical Specifications Bases2012-11-0909 November 2012 Report to NRC of Changes to Technical Specifications Bases PNP 2011-032, Report to NRC of Changes of Technical Specifications Bases2011-04-25025 April 2011 Report to NRC of Changes of Technical Specifications Bases PNP 2011-018, Regarding License Amendment Request to Extend the Containment Type a Leak Rate Test Frequency to 15 Years2011-04-0606 April 2011 Regarding License Amendment Request to Extend the Containment Type a Leak Rate Test Frequency to 15 Years ML1020105792010-07-20020 July 2010 License Amendment Request for Emergency Diesel Generator Fuel Oil and Lube Oil Systems ML0930604142009-11-0202 November 2009 Report of Changes to Technical Specifications Bases ML0913501812009-05-14014 May 2009 Supplement to License Amendment Request: Changes to Technical Specification Administrative Controls Section ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions ML0901602382009-02-0606 February 2009 Issuance of Amendment Spent Fuel Pool Region I Storage Requirements ML0827404452008-11-20020 November 2008 Issuance of Amendment Eliminate License Condition 2.F ML0822703122008-08-14014 August 2008 Report of Changes to Technical Specifications Bases ML0723203952007-08-16016 August 2007 Report of Changes to Technical Specifications Bases ML0722201032007-07-25025 July 2007 Submittal of Technical Specifications Bases Changes ML0718002162007-06-28028 June 2007 License Amendment Request: Replacement of Containment Sump Buffer ML0714501052007-05-31031 May 2007 Technical Specifications Pages Re Programs and Manuals for Steam Generator ML0631803592006-11-0606 November 2006 License Amendment Request: Realistic Large Break Loss-of-Coolant Accident ML0628303852006-09-25025 September 2006 Alternative Source Term- Proposed License Amendment ML0623000332006-08-17017 August 2006 Report of Changes to Technical Specifications Bases ML0524102132005-08-22022 August 2005 Report of Changes to Technical Specifications Bases ML0425904452004-09-0202 September 2004 Report of Changes to Technical Specifications Bases ML0421604082004-08-0202 August 2004 Tech Spec Pages for Amendment No. 217 Regarding the Relocating of the Primary Coolant System Pressure, Cold-Leg Temperature and Flow Departure from Nucleate Boiling Limits to the Core Operating Limits Report ML0404204242004-01-30030 January 2004 Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process ML0330001112003-10-17017 October 2003 Report of Changes to Technical Specifications Bases ML0328900502003-10-0606 October 2003 License Amendment Request: Increase Rated Thermal Power, Response to Request for Additional Information ML0316110532003-06-0303 June 2003 License Amendment Request: Increase Rated Thermal Power ML0303805792003-01-22022 January 2003 Technical Specifications and Bases ML0231701012002-10-31031 October 2002 Report of Changes to Technical Specifications Bases ML0207201012002-03-0101 March 2002 License Amendment Request, Surveillance Requirement Frequency for Containment Spray Nozzle Inspections ML0205901512002-02-26026 February 2002 Amendment No. 207 Retechnical Specification on Spent Fuel Pool Boron Concentration ML18344A3791978-06-15015 June 1978 Proposed Technical Specification Changes on Power Distribution Limits ML18353B1461978-03-0909 March 1978 Iodine Removal System - Proposed Technical Specification Changes ML18353A8671978-02-22022 February 1978 Letter Proposed Technical Specifications Change on Heatup and Cooldown Curves for Cycle 3 Operation ML18353A8741978-02-21021 February 1978 Letter Proposed Technical Specifications Change on Steam Generator Operating Allowance ML18347A1881978-01-0303 January 1978 Proposed Technical Specifications Changes Relating to Overpressure Protection System ML18353B1451977-11-11011 November 1977 Transmittal of Technical Specification - Deletion of Annual Operating Report 2024-02-09
[Table view] Category:Bases Change
MONTHYEARML21152A1132021-06-0101 June 2021 Palisade Nuclear Plant - Proposed Technical Specifications Bases Changes PNP 2019-017, Submittal of Changes to Technical Specifications Bases2019-03-21021 March 2019 Submittal of Changes to Technical Specifications Bases ML18270A3242018-09-27027 September 2018 Attachment 3: Proposed Changes and Appendix a Technical Specifications Pages ML18270A3222018-09-27027 September 2018 Attachment 1: Description and Evaluation of Technical Specifications Changes ML18270A3252018-09-27027 September 2018 Attachment 4: Page Change Instructions and Revised Pages, and Appendix a Technical Specifications ML18270A3262018-09-27027 September 2018 Attachment 5: Proposed Technical Specification Bases Changes PNP 2017-067, Submittal of Changes to Palisades Nuclear Plant Technical Specifications Bases2017-11-0808 November 2017 Submittal of Changes to Palisades Nuclear Plant Technical Specifications Bases PNP 2016-046, License Amendment Request for Editorial and Administrative Changes to Technical Specifications2016-11-0909 November 2016 License Amendment Request for Editorial and Administrative Changes to Technical Specifications PNP 2014-088, Report to NRC of Changes to Technical Specifications Bases2014-09-15015 September 2014 Report to NRC of Changes to Technical Specifications Bases PNP 2014-042, License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process2014-06-11011 June 2014 License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process PNP 2012-097, Report to NRC of Changes to Technical Specifications Bases2012-11-0909 November 2012 Report to NRC of Changes to Technical Specifications Bases PNP 2011-032, Report to NRC of Changes of Technical Specifications Bases2011-04-25025 April 2011 Report to NRC of Changes of Technical Specifications Bases ML1020105792010-07-20020 July 2010 License Amendment Request for Emergency Diesel Generator Fuel Oil and Lube Oil Systems ML0930604142009-11-0202 November 2009 Report of Changes to Technical Specifications Bases ML0913501812009-05-14014 May 2009 Supplement to License Amendment Request: Changes to Technical Specification Administrative Controls Section ML0822703122008-08-14014 August 2008 Report of Changes to Technical Specifications Bases ML0723203952007-08-16016 August 2007 Report of Changes to Technical Specifications Bases ML0722201032007-07-25025 July 2007 Submittal of Technical Specifications Bases Changes ML0623000332006-08-17017 August 2006 Report of Changes to Technical Specifications Bases ML0524102132005-08-22022 August 2005 Report of Changes to Technical Specifications Bases ML0425904452004-09-0202 September 2004 Report of Changes to Technical Specifications Bases ML0330001112003-10-17017 October 2003 Report of Changes to Technical Specifications Bases ML0303805792003-01-22022 January 2003 Technical Specifications and Bases ML0231701012002-10-31031 October 2002 Report of Changes to Technical Specifications Bases ML0207201012002-03-0101 March 2002 License Amendment Request, Surveillance Requirement Frequency for Containment Spray Nozzle Inspections ML18353B1461978-03-0909 March 1978 Iodine Removal System - Proposed Technical Specification Changes ML18353A8671978-02-22022 February 1978 Letter Proposed Technical Specifications Change on Heatup and Cooldown Curves for Cycle 3 Operation ML18353A8741978-02-21021 February 1978 Letter Proposed Technical Specifications Change on Steam Generator Operating Allowance ML18353B1451977-11-11011 November 1977 Transmittal of Technical Specification - Deletion of Annual Operating Report ML18348A7721977-09-19019 September 1977 Transmittal of Proposed Technical Specification Changes ML18353A8891977-05-17017 May 1977 Letter Request for Change to Technical Specifications on Minimum Qualification Requirements for Radiation Protection Manager (Health Physicist) ML18348A6861977-05-17017 May 1977 Letter Request for Change to Technical Specifications on Minimum Qualification Requirements for Radiation Protection Manager (Health Physicist) ML18353A8681977-03-0101 March 1977 Letter Technical Specifications Changes for Inservice Inspection and Testing Requirements 2021-06-01
[Table view] |
Text
...
consumers Power company General Offices: Z12 West Michigan Avenue, Jackson, Michigan 49201
- Area Code 517 788-0550 November 11, 1977 Director of N11clear Reactor Regulation .
Att: Mr Albert Schwencer, Chief .
- Operating Reactors Branch No 1 US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - T/S - DELETION
. OF ANNUAL OPERATING REPORT Transmitted herewith are thre*e ( 3) original and thirty- severi ( 37) conformed copies of a proposed change to the Technical Specifications for the Palisades Plant, Docket 50-255, License DPR-20.
The purpose of this change is to delete the Technical Specifications require-ment for an Annual Operating Report as described in your letter dated September 16, 1977. Further, Consumers Power Company will modify the Monthly Operating *Report in accordance with the revised format effective January 1, 1978.
David P Hoffman Assistant Nuclear Licensing Administrator CC: JGKeppler, USNRC
...
CONSUMERS POWER COMPANY-Docket 50-255 Request for Change to the Technical Specifications License DPR-20
- For the reasons hereinafter set forth, it is requested that the Technical Specifications contained in Provisional Operating License DPR-20, Docket 50-255, issued to Consumers Power Company on October 16, 1972 for the Palisades Plant be changed as described in Section I below:
I. Changes A. Delete existing Specification 6.9.1.b and substitute the following:
"b. Annual Report - An annual report covering occupational exposure during the calendar year to supplement require!:C.ents of 10 CFR 20.407 should be submitted prior to March 1 of each year.
This annual report shall include:
A tabulation on an annual basis of the number of station, utility and other personnel (including contractors) receiving exposures greater than 100 m.Rem/year and their associated man Rem exposure according to work and job functions, eg, reactor operations and surveillance, inservice inspection, routine maintenance, special maintenance (describe m.aintenan,ce), waste processing and refueling. The dose ~ssignment to various duty fun~tions may be estimates based on pocket dosimeter, TLD or film badge measurements. Small exposures totaling less than 20% of the individual total dose need not be accounted for.
In the aggregate, at least 80% of the total whole body dose received from external sources shall be assigned to specific major work functions."
B. Delete the footnotes following Section 6~9.2.
- c. Section 6.9.i.c, replace "Office of Inspection and Enforcement" with "Director, Office of Management Information and Program Control."
NOTE: Corrected Technical Specifications pages are enclosed.
2 tr. Discussion By letter dated September 16, 1977, Consumers Power Company was requested*
to submit a change to the Palisades Plant Technical Specifications deleting the requirement for an Annual Operating Report. Changes A, B and C are sub-mitted reflecting this request.
III. Conclusion Based on the foregoing, the Palisades Plant Review Committee has concluded that this change does not involve an unreviewed safety question and the Safety and Audit Review Board finds this change acceptable.
CONSUMERS POWER COMPANY By C R Bilby, Production & Transmission Sworn and subscribed to before me this 11th day of November 1977~
~~_A:C~
1Linda ~~Carstens, Notary Public
-.,._:.
/
_.,;
. _*. _Jackson County_, Michigan
- *-..;
J
--:**
-
'0Y" .commis~*ion eicpires June 10, 1981.
/
/
......
6.9 Reporting Requirements In,addition to the applicable reporting requirements of Title 10, Code of'.Federal Regulations, the following identified reports shall .be sub-mitted to the Director of the appropriate Regional Office of Inspection an4 Enforcement unless otherwise noted.
6.9.1 Routine Reports
- a. Start-Up Report - A summary report *or plant start-up and power escalation testing shall be submitted following (1) receipt of an operating license, (2) amendment to the license involving a planned increase in power level, (3) installation of fuel that has a different design or has been.manufactured by a different fuel supplier and, (4) modifications that may have significantly altered the nuclear, thermal or hydraulic performance of the plant.
The report.shall address each. of the required tests and shall, in general, include a description of the measured values of the op-erating conditions or characteristics obtained during the test program and a comparison of these values with design predictions and specifications *. Any corrective actions that were required to obtain satisfactory operation shall also be described. Any ad-ditional specific details required in license conditions based on other co:ri:imitments shall be included in this report.
Start-up reports shall be submitted within (1) 90 days following completion of the start-up test program, ( 2) .90 days following resumptiqn. or commencement of commercial power operation or, (3) 9 months following initial criticality, whichever is earliest.
If the Start-Up Report does not cover all three events (ie, initial criticality, completion of start-up test program and re-
- sumption or commencement of commercial power operation), supple-mentary reports shall be submitted at least every three months until all three events have been completed.
- b. Annual Report - An annual report covering occupational exposure during the current calendar year to-supplement requirements of 10 CFR 20.407 should be submitted prior.to March 1 of each year.
This annual report shall include:
A tabulation on an annual basis of the number of station, utility and other personnel (including contractors) receiving exposures greater than 100 mRem/year and their associated man Rem exposure according to work and job functions, eg, reactor operations and surveillance, in-service inspection, routine maintenance, special maintenance (describe maintenance), waste processing and refueling. -The dose assignment to various duty functions may be estimates based on pocket dosimeter, TLD or film badge measurements. Small exposures totaling less than 20% of the individual total dose need not be accounted for. In the aggregate, at least 80% of the total whole body dose received from external sources shall be assigned to specific major work functions.
6-11
(*
. _)
I
, . -*
- c. Monthly Operating Report - Routine reports of operating statistics and shutdown experience shall be .submitted-on a monthly basis to the Director, Office of Management.Information and Program Control, US Nuclear Regulatory Commission, Washington, DC *20555, with a copy to the appropriate Regional Office to arrive no later than the tenth of each month following the calendar month covered by the repo~t.
6.9.2 Reportable Occurrences Reportable occurrences, including corrective actions and measures to prevent reoccurrence, shall be reported to the NRC. Supplemental reports may be re~uired to fully describe final resolution of occur-rence. In case of corrected or supplemental reports, a licensee event report shall be completed and reference shall be ma~e to the original report date.
6-13
- e. . (
RECl:IVtD DOCUMENT Pi~OCESS!/'!G UNIT 19Tf NOV 14 ML II 03