ML19234A360: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of ENTERGY NUCLEAR OPERATIONS, INC.
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of ENTERGY NUCLEAR OPERATIONS, INC.,                           Docket No. 50-293-LT ENTERGY NUCLEAR GENERATION                                               72-1044 COMPANY, HOLTEC INTERNATIONAL, and HOLTEC DECOMMISSIONING INTERNATIONAL, LLC (Pilgrim Nuclear Power Station)
, ENTERGY NUCLEAR GENERATION COMPANY, HOLTEC INTERNATIONAL, and HOLTEC DECOMMISSIONING INTERNATIONAL, LLC
NOTIFICATION OF ISSUANCE In accordance with 10 C.F.R. § 2.1316(a), the U.S. Nuclear Regulatory Commission Staff is filing this notification to inform the Commission and litigants that on August 22, 2019, the Staff issued an order approving (1) the direct transfer of control of the Renewed Facility Operating License No. DPR-35 for the Pilgrim Nuclear Power Station (Pilgrim), and its general license for the Pilgrim Independent Spent Fuel Storage Installation, from Entergy Nuclear Operations, Inc. (ENOI), to Holtec Decommissioning International, LLC (HDI) as the operator for decommissioning; and (2) the indirect transfer of Entergy Nuclear Generation Companys (ENGC) (to be renamed Holtec Pilgrim, LLC) ownership interests in the facility to Holtec International (Holtec). The Staff also issued a regulatory exemption to Holtec Pilgrim, LLC and HDI related to the use of funds from the Pilgrim decommissioning trust fund for spent fuel management and site restoration activities simultaneously with the license transfer order.


Docket No. 50
The license transfer order, exemption, and related documents are attached. The documents will be made publicly available in ADAMS.
-29 3-L T 72-1044  (Pilgrim Nuclear Power Station
Respectfully submitted,
)    NOTIFICATION OF ISSUANCE In accordance with 10 C.F.R. § 2.1316(a), the U.S. Nuclear Regulatory Commission Staff is filing this notification to inform the Commission and litigants that on August 22, 2019, the Staff issue d an order approving (1) the direct transfer of control of the Renewed Facility Operating License No. DPR
                                                    /Signed (electronically) by/
-35 for the Pilgrim Nuclear Power Station (Pilgrim), and its general license for the Pilgrim Independent Spent Fuel Storage Installation, from Entergy Nuclear Operations, Inc. (ENO I), to Holtec Decommissioning International, LLC (HDI) as the operator for decommissioning
Anita Ghosh Naber Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O14-A44 Washington, DC 20555 Telephone: (301) 415-0764 E-mail: anita.ghoshnaber@nrc.gov
; and (2) the indirect transfer of Entergy Nuclear Generation Company's (ENGC) (to be renamed Holtec Pilgrim, LLC) ownership interests in the facility to Holtec International (Holtec). The Staff also issued a regulatory exemption t o Holtec Pilgrim, LLC and HDI related to the use of funds from the Pilgrim decommissioning trust fund for spent fuel management and site restoration activities simultaneously with the license transfer order.
The license transfer order, exemption, and related documents are attached. The documents will be made publicly available in ADAM S. Respectfully submitted, /Signed (electronically) by/
Anita Ghosh Naber Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O14
-A44 Washington, DC 20555 Telephone: (301) 415
-0764 E-mail: anita.ghoshnaber@nrc.gov


UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of ENTERGY NUCLEAR OPERATIONS, INC.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of ENTERGY NUCLEAR OPERATIONS, INC.                         Docket No. 50-293-LT ENTERGY NUCLEAR GENERATION                                           72-1044 COMPANY, HOLTEC INTERNATIONAL, and HOLTEC DECOMMISSIONING INTERNATIONAL, LLC (Pilgrim Nuclear Power Station)
ENTERGY NUCLEAR GENERATION COMPANY, HOLTEC INTERNATIONAL, and HOLTEC DECOMMISSIONING INTERNATIONAL, LLC
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing notification, dated August 22, 2019, and attachments have been filed through the Electronic Information Exchange, the NRCs E-Filing System, in the captioned proceeding, this 22nd day of August 2019.
 
                                                      /Signed (electronically) by/
Docket No.
Anita Ghosh Naber Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O14-A44 Washington, DC 20555 Telephone: (301) 415-0764 E-mail: anita.ghoshnaber@nrc.gov}}
50-293-LT 72-1044  (Pilgrim Nuclear Power Station)
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing notification, dated August 22, 2019 , and attachments have been filed through the Electronic Information Exchange, the NRC's E
-Filing System, in the captioned proceeding, this 22nd day of August 2019.         /Signed (electronically) by/
Anita Ghosh Naber Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O14
-A44       Washington, DC 20555 Telephone: (301) 415
-0764       E-mail: anita.ghoshnaber@nrc.gov}}

Latest revision as of 23:03, 7 October 2019

NRC Staff Notification Re Issuance of License Transfer
ML19234A360
Person / Time
Site: Pilgrim
Issue date: 08/22/2019
From: Naber A
NRC/OGC
To:
NRC/OCM
SECY RAS
References
50-293-LT, 72-1044-LT, EPID L-2018-LLE-0020, License Transfer, RAS 55191
Download: ML19234A360 (3)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of ENTERGY NUCLEAR OPERATIONS, INC., Docket No. 50-293-LT ENTERGY NUCLEAR GENERATION 72-1044 COMPANY, HOLTEC INTERNATIONAL, and HOLTEC DECOMMISSIONING INTERNATIONAL, LLC (Pilgrim Nuclear Power Station)

NOTIFICATION OF ISSUANCE In accordance with 10 C.F.R. § 2.1316(a), the U.S. Nuclear Regulatory Commission Staff is filing this notification to inform the Commission and litigants that on August 22, 2019, the Staff issued an order approving (1) the direct transfer of control of the Renewed Facility Operating License No. DPR-35 for the Pilgrim Nuclear Power Station (Pilgrim), and its general license for the Pilgrim Independent Spent Fuel Storage Installation, from Entergy Nuclear Operations, Inc. (ENOI), to Holtec Decommissioning International, LLC (HDI) as the operator for decommissioning; and (2) the indirect transfer of Entergy Nuclear Generation Companys (ENGC) (to be renamed Holtec Pilgrim, LLC) ownership interests in the facility to Holtec International (Holtec). The Staff also issued a regulatory exemption to Holtec Pilgrim, LLC and HDI related to the use of funds from the Pilgrim decommissioning trust fund for spent fuel management and site restoration activities simultaneously with the license transfer order.

The license transfer order, exemption, and related documents are attached. The documents will be made publicly available in ADAMS.

Respectfully submitted,

/Signed (electronically) by/

Anita Ghosh Naber Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O14-A44 Washington, DC 20555 Telephone: (301) 415-0764 E-mail: anita.ghoshnaber@nrc.gov

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of ENTERGY NUCLEAR OPERATIONS, INC. Docket No. 50-293-LT ENTERGY NUCLEAR GENERATION 72-1044 COMPANY, HOLTEC INTERNATIONAL, and HOLTEC DECOMMISSIONING INTERNATIONAL, LLC (Pilgrim Nuclear Power Station)

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing notification, dated August 22, 2019, and attachments have been filed through the Electronic Information Exchange, the NRCs E-Filing System, in the captioned proceeding, this 22nd day of August 2019.

/Signed (electronically) by/

Anita Ghosh Naber Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O14-A44 Washington, DC 20555 Telephone: (301) 415-0764 E-mail: anita.ghoshnaber@nrc.gov