|
|
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of ENTERGY NUCLEAR OPERATIONS, INC. | | {{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of ENTERGY NUCLEAR OPERATIONS, INC., Docket No. 50-293-LT ENTERGY NUCLEAR GENERATION 72-1044 COMPANY, HOLTEC INTERNATIONAL, and HOLTEC DECOMMISSIONING INTERNATIONAL, LLC (Pilgrim Nuclear Power Station) |
| , ENTERGY NUCLEAR GENERATION COMPANY, HOLTEC INTERNATIONAL, and HOLTEC DECOMMISSIONING INTERNATIONAL, LLC | | NOTIFICATION OF ISSUANCE In accordance with 10 C.F.R. § 2.1316(a), the U.S. Nuclear Regulatory Commission Staff is filing this notification to inform the Commission and litigants that on August 22, 2019, the Staff issued an order approving (1) the direct transfer of control of the Renewed Facility Operating License No. DPR-35 for the Pilgrim Nuclear Power Station (Pilgrim), and its general license for the Pilgrim Independent Spent Fuel Storage Installation, from Entergy Nuclear Operations, Inc. (ENOI), to Holtec Decommissioning International, LLC (HDI) as the operator for decommissioning; and (2) the indirect transfer of Entergy Nuclear Generation Companys (ENGC) (to be renamed Holtec Pilgrim, LLC) ownership interests in the facility to Holtec International (Holtec). The Staff also issued a regulatory exemption to Holtec Pilgrim, LLC and HDI related to the use of funds from the Pilgrim decommissioning trust fund for spent fuel management and site restoration activities simultaneously with the license transfer order. |
|
| |
|
| Docket No. 50
| | The license transfer order, exemption, and related documents are attached. The documents will be made publicly available in ADAMS. |
| -29 3-L T 72-1044 (Pilgrim Nuclear Power Station
| | Respectfully submitted, |
| ) NOTIFICATION OF ISSUANCE In accordance with 10 C.F.R. § 2.1316(a), the U.S. Nuclear Regulatory Commission Staff is filing this notification to inform the Commission and litigants that on August 22, 2019, the Staff issue d an order approving (1) the direct transfer of control of the Renewed Facility Operating License No. DPR
| | /Signed (electronically) by/ |
| -35 for the Pilgrim Nuclear Power Station (Pilgrim), and its general license for the Pilgrim Independent Spent Fuel Storage Installation, from Entergy Nuclear Operations, Inc. (ENO I), to Holtec Decommissioning International, LLC (HDI) as the operator for decommissioning
| | Anita Ghosh Naber Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O14-A44 Washington, DC 20555 Telephone: (301) 415-0764 E-mail: anita.ghoshnaber@nrc.gov |
| ; and (2) the indirect transfer of Entergy Nuclear Generation Company's (ENGC) (to be renamed Holtec Pilgrim, LLC) ownership interests in the facility to Holtec International (Holtec). The Staff also issued a regulatory exemption t o Holtec Pilgrim, LLC and HDI related to the use of funds from the Pilgrim decommissioning trust fund for spent fuel management and site restoration activities simultaneously with the license transfer order.
| |
| The license transfer order, exemption, and related documents are attached. The documents will be made publicly available in ADAM S. Respectfully submitted, /Signed (electronically) by/ | |
| Anita Ghosh Naber Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O14 | |
| -A44 Washington, DC 20555 Telephone: (301) 415 | |
| -0764 E-mail: anita.ghoshnaber@nrc.gov | |
|
| |
|
| UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of ENTERGY NUCLEAR OPERATIONS, INC. | | UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of ENTERGY NUCLEAR OPERATIONS, INC. Docket No. 50-293-LT ENTERGY NUCLEAR GENERATION 72-1044 COMPANY, HOLTEC INTERNATIONAL, and HOLTEC DECOMMISSIONING INTERNATIONAL, LLC (Pilgrim Nuclear Power Station) |
| ENTERGY NUCLEAR GENERATION COMPANY, HOLTEC INTERNATIONAL, and HOLTEC DECOMMISSIONING INTERNATIONAL, LLC | | CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing notification, dated August 22, 2019, and attachments have been filed through the Electronic Information Exchange, the NRCs E-Filing System, in the captioned proceeding, this 22nd day of August 2019. |
| | | /Signed (electronically) by/ |
| Docket No.
| | Anita Ghosh Naber Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O14-A44 Washington, DC 20555 Telephone: (301) 415-0764 E-mail: anita.ghoshnaber@nrc.gov}} |
| 50-293-LT 72-1044 (Pilgrim Nuclear Power Station)
| |
| CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing notification, dated August 22, 2019 , and attachments have been filed through the Electronic Information Exchange, the NRC's E | |
| -Filing System, in the captioned proceeding, this 22nd day of August 2019. /Signed (electronically) by/ | |
| Anita Ghosh Naber Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O14 | |
| -A44 Washington, DC 20555 Telephone: (301) 415 | |
| -0764 E-mail: anita.ghoshnaber@nrc.gov}} | |
Letter Sequence Approval |
---|
EPID:L-2018-LLE-0020, Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment; and Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) (Approved, Closed) |
|
|
|
---|
Category:Legal-Correspondence/Miscellaneous
MONTHYEARML20171A6762020-06-19019 June 2020 Commonwealth of Massachusetts' Notice of Withdrawal of Its Petition for Leave to Intervene and Hearing Request ML20167A3352020-06-15015 June 2020 Joint Status Report ML20063M9722020-02-26026 February 2020 2-26-20 Docketing Statement (DC Cir.)(Case No. 20-1019) ML19296A0192019-10-23023 October 2019 Notice of Appearance for Jeremy L. Wachutka ML19296A0492019-10-23023 October 2019 Notice of Withdrawal for Jennifer Scro ML19239A4102019-08-27027 August 2019 Notification of Issuance of Conforming Amendment ML19235A2962019-08-23023 August 2019 NRC Staff Notification Re License Transfer Documents ML19235A3022019-08-23023 August 2019 Attachment 6 - Exemption ML19235A3012019-08-23023 August 2019 Attachment 5 - Exemption Letter ML19235A3002019-08-23023 August 2019 Attachment 4 - License Transfer Safety Evaluation ML19235A2992019-08-23023 August 2019 Attachment 3 - Draft Conforming Amendment ML19235A2982019-08-23023 August 2019 Attachment 2 - License Transfer Order ML19235A2972019-08-23023 August 2019 Attachment 1 - License Transfer Cover Letter ML19234A3652019-08-22022 August 2019 Attachment 5 - Exemption Cover Letter ML19234A3632019-08-22022 August 2019 Attachment 3 - Draft Conforming Amendment ML19234A3622019-08-22022 August 2019 Attachment 2 - License Transfer Order ML19234A3612019-08-22022 August 2019 Attachment 1 - License Transfer Cover Letter ML19234A3602019-08-22022 August 2019 NRC Staff Notification Re Issuance of License Transfer ML19234A3642019-08-22022 August 2019 Attachment 4 - License Transfer Safety Evaluation ML19234A3662019-08-22022 August 2019 Attachment 6 - Exemption ML19225D0062019-08-13013 August 2019 NRC Staff Notification Re Nsla ML19225C2422019-08-13013 August 2019 Notice of Appearance for Jennifer Scro ML19120A5002019-04-30030 April 2019 Notice of Appearance for Meghan C. Hammond ML19080A2042019-03-21021 March 2019 Notice of Appearance of Peter D. Lejeune, Alan D. Lovett, and Andrew R. Ryan ML19074A2862019-03-15015 March 2019 Notice of Appearance for Joseph Dorfler ML19074A2892019-03-15015 March 2019 Notice of Appearance for Seth Schofield ML19072A3122019-03-0404 March 2019 Comments from Guy Page on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19072A3132019-03-0404 March 2019 Comments from Brad Ferland on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19072A3142019-03-0404 March 2019 Comments from Commonwealth of Massachusetts on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1772019-03-0404 March 2019 Comments from Catherine Berkey on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19064B3312019-03-0404 March 2019 Comments from the Cape Downwinders and Boston Downwinders on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1732019-03-0404 March 2019 Comments from Barbara Clark on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19064B3322019-03-0404 March 2019 Comment from Pilgrim Watch on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19064B3452019-03-0404 March 2019 Comment from Pine Dubois on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1652019-03-0404 March 2019 Comments Received from Concerned Citizens of Massachusetts on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1682019-03-0303 March 2019 Comments from Joan Holt on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19064B3302019-03-0303 March 2019 Comment from James B. Lampert on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1642019-03-0303 March 2019 Comments from Diana Maher on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1692019-03-0303 March 2019 Comments from Lesley Phillips on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1702019-03-0303 March 2019 Comments from Lillia Frantin on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1712019-03-0303 March 2019 Comments from Nicola Blake on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1722019-03-0303 March 2019 Comments from Alex Bally on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1742019-03-0303 March 2019 Comments from Barbara Clark on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1752019-03-0303 March 2019 Comments from Betsy Smith on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1672019-03-0202 March 2019 Comments from Irene Paine on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1662019-03-0202 March 2019 Comments from Gertrude Carter on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1622019-03-0202 March 2019 Comments from David Agnew on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19065A2582019-03-0202 March 2019 Comment from James Sinclair on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19065A2572019-03-0202 March 2019 Comments from William Stewart on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19072A3102019-03-0101 March 2019 Comments from David Noyes on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) 2020-06-19
[Table view] |
Text
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of ENTERGY NUCLEAR OPERATIONS, INC., Docket No. 50-293-LT ENTERGY NUCLEAR GENERATION 72-1044 COMPANY, HOLTEC INTERNATIONAL, and HOLTEC DECOMMISSIONING INTERNATIONAL, LLC (Pilgrim Nuclear Power Station)
NOTIFICATION OF ISSUANCE In accordance with 10 C.F.R. § 2.1316(a), the U.S. Nuclear Regulatory Commission Staff is filing this notification to inform the Commission and litigants that on August 22, 2019, the Staff issued an order approving (1) the direct transfer of control of the Renewed Facility Operating License No. DPR-35 for the Pilgrim Nuclear Power Station (Pilgrim), and its general license for the Pilgrim Independent Spent Fuel Storage Installation, from Entergy Nuclear Operations, Inc. (ENOI), to Holtec Decommissioning International, LLC (HDI) as the operator for decommissioning; and (2) the indirect transfer of Entergy Nuclear Generation Companys (ENGC) (to be renamed Holtec Pilgrim, LLC) ownership interests in the facility to Holtec International (Holtec). The Staff also issued a regulatory exemption to Holtec Pilgrim, LLC and HDI related to the use of funds from the Pilgrim decommissioning trust fund for spent fuel management and site restoration activities simultaneously with the license transfer order.
The license transfer order, exemption, and related documents are attached. The documents will be made publicly available in ADAMS.
Respectfully submitted,
/Signed (electronically) by/
Anita Ghosh Naber Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O14-A44 Washington, DC 20555 Telephone: (301) 415-0764 E-mail: anita.ghoshnaber@nrc.gov
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of ENTERGY NUCLEAR OPERATIONS, INC. Docket No. 50-293-LT ENTERGY NUCLEAR GENERATION 72-1044 COMPANY, HOLTEC INTERNATIONAL, and HOLTEC DECOMMISSIONING INTERNATIONAL, LLC (Pilgrim Nuclear Power Station)
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing notification, dated August 22, 2019, and attachments have been filed through the Electronic Information Exchange, the NRCs E-Filing System, in the captioned proceeding, this 22nd day of August 2019.
/Signed (electronically) by/
Anita Ghosh Naber Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O14-A44 Washington, DC 20555 Telephone: (301) 415-0764 E-mail: anita.ghoshnaber@nrc.gov