| title = IR 05000482-12-009, Wolf Creek Nuclear Operating Corporation - NRC Augmented Inspection Team Follow-up Inspection Planning Letter | |||
| author name = O'Keefe N | |||
| author affiliation = NRC/RGN-IV/DRP/RPB-B | |||
| addressee name = Sunseri M | |||
| addressee affiliation = Wolf Creek Nuclear Operating Corp | |||
| docket = 05000482 | |||
| license number = NPF-042 | |||
| contact person = O'Keefe N | |||
| document report number = IR-12-009 | |||
| document type = Letter | |||
| page count = 5 | |||
}} | |||
See also: [[see also::IR 05000482/2012009]] | |||
=Text= | |||
{{#Wiki_filter:May 9, 2012 | |||
Mr. Matthew W. Sunseri | |||
President and Chief Executive Officer | |||
Wolf Creek Nuclear Operating Corporation | |||
P.O. Box 411 | |||
Burlington, KS | |||
66839 SUBJECT: WOLF CREEK NUCLEAR OPERATING CORPORATION | |||
- NRC AUGMENTED INSPECTION TEAM FOLLOW-UP INSPECTION PLANNING LETTER, INSPECTION REPORT 05000482/2012009 | |||
Dear Mr. Sunseri: | |||
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV staff will conduct the augmented inspection team follow | |||
-up inspection at your Wolf Creek Generating Station. | |||
The inspection will be comprised of one senior resident, one resident and two regional reactor inspector | |||
s from the NRC Region | |||
IV office. The inspection will be conducted in accordance with Inspection Procedure | |||
93800 and multiple reactor oversight process baseline inspection procedures. | |||
The schedule for the inspection is as follows: | |||
In-office preparation | |||
: May 21 - 25, 2012 Onsite inspection | |||
: May 28 - June 1, 2012 | |||
Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. | |||
In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. Please note that the documents | |||
are requested to be provided by May 14, 2012. We request that during the onsite inspection week, you ensure that copies of analyses, evaluations, or | |||
documentation regarding the root cause of the failures of the main generator output breaker and the startup transformer | |||
are available. Also, appropriate personnel knowledgeable | |||
of each of the unresolved items documented in Inspection Report 0500482/2012008 | |||
should be available to support the inspector s at the site during the inspection. | |||
We have discussed the schedule for th | |||
is inspection activit | |||
y with your staff and understand that our regulatory contact for this inspection will be | |||
William Muilenburg of your licensing organization. If there are any questions about this inspection or the material requested, please contact the team lead , John Dixon | |||
, at 361-972-2507 or by email , john.dixon@nrc.gov | |||
. U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O N R E G I O N I V1600 EAST LAMAR BLVD | |||
A R L I N G T O N , T E X A S 7 6 0 1 1-4511 | |||
M. Sunseri - 2 - This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, C ontrol No. 3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget | |||
Control No. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC' | |||
s document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | |||
-rm/adams.html | |||
(the Public Electronic Reading Room). | |||
Sincerely, /RA/ Neil O'Keefe, Chief Project Branch B Division of Reactor Projects | |||
Dockets: 50-482 Licenses: NPF-42 Enclosure: Augmented Inspection Team Follow | |||
-up Inspection Document Request | |||
cc: Electronic distribution | |||
for Wolf Creek Nuclear Operating Corporation | |||
M. Sunseri | |||
- 3 - Electronic distribution by RIV: | |||
Regional Administrator (Elmo.Collins@nrc.gov | |||
) Deputy Regional Administrator (Art.Howell@nrc.gov | |||
) DRP Director (Kriss.Kennedy@nrc.gov | |||
) DRP Deputy Director (Troy.Pruett@nrc.gov | |||
) Acting DRS Director (Tom.Blount@nrc.gov | |||
) Acting DRS Deputy Director (Patrick.Louden@nrc.gov | |||
) Senior Resident Inspector (Chris.Long@nrc.gov | |||
) Resident Inspector (Charles.Peabody@nrc.gov | |||
) Branch Chief, DRP/ | |||
B (Neil.Okeefe@nrc.gov | |||
) Senior Project Engineer, DRP/ | |||
B (Leonard.Willoughby@nrc.gov , Project Engineer, DRP/ | |||
B (Nestor.Makris@nrc.gov | |||
) WC Administrative Assistant (Shirley.Allen@nrc.gov | |||
) Public Affairs Officer (Victor.Dricks@nrc.gov | |||
) Public Affairs Officer (Lara.Uselding@nrc.gov | |||
) Project Manager (Randy.Hall@nrc.gov | |||
) Acting Branch Chief, DRS/TSB (Dale.Powe r s@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov | |||
) Regional Counsel (Karla.Fuller@nrc.gov | |||
) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource | |||
Only inspection reports to the following: | |||
RIV/ETA: OEDO | |||
(Michael.McCoppin@nrc.gov | |||
) R:\_REACTORS\WC\2012\WC2012009 Inspection Planning Ltr.doc SUNSI Rev Compl. | |||
Yes No ADAMS Yes No Reviewer Initials | |||
NFO Publicly Avail | |||
Yes No Sensitive Yes No Sens. Type Initials | |||
NFO RIV:SRI:DRP/B D:DRP/B JDixon NO'Keefe /RA/ /RA/ 05/9/2012 05/9/2012 OFFICIAL RECORD COPY | |||
T=Telephone E=E | |||
-mail F=Fax | |||
Augmented Inspection Team Follow | |||
-up Inspection Document Request | |||
Inspection Dates: | |||
In-office preparation: May 2 1 - 2 5, 2012 Onsite : May 28, 2012 | |||
- June 1, 2012 | |||
Inspection Procedures: | |||
IP 93800 , Augmented Inspection Team | |||
Various Reactor Oversight Process | |||
Baseline Inspection Procedures | |||
Inspecto r s: John Dixon, Senior Resident Inspector, South Texas Project | |||
Mica Baquera, Resident Inspector, Palo Verde | |||
John Watkins, Reactor Inspector | |||
Nnaerika Okonkwo, Reactor Inspector | |||
Information Requested for the In | |||
-Office Preparation Week | |||
The following information should be sent to the Region IV office in hard copy or electronic format (ims.certrec.com database preferred), in care of John Dixon, by May 14, 2012. The inspector s will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week. Also, we request that you categorize the documents in your response with the numbered list below. | |||
Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector | |||
s and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding | |||
this information request, please call the lead inspector as soon as possible. | |||
For the following items as related to the Augmented Inspection Team inspection, as documented in Inspection Report 05000482/2012008, please provide associated condition reports, work orders, root cause and/or apparent cause investigations, design basis documents, UFSAR descriptions, technical specification requirements, plans of actions, and risk profiles: | |||
1. Main generator output breaker fault | |||
2. Startup transformer fault | |||
3. Turbine driven auxiliary feedwater pump operation at low flow, pressure, and speed | |||
4. Turbine driven auxiliary feedwater mechanical overspeed trip device settings | |||
5. Emergency diesel generator B ground | |||
6. ESW water hammer | |||
7. ESW piping corrosion | |||
8. Source range nuclear instrument NI | |||
-31 response on loss of cavity cooling | |||
9. Failure to maintain fire water pressure | |||
10. Training/Operation/Procedures for temporary diesel-driven fire pump | |||
11. Diesel-driven fire pump and temporary diesel | |||
-driven fire pump differences | |||
12. Diesel-driven fire pump unavailability | |||
13. Security issue | |||
Inspector Contact Information: | |||
John Dixon | |||
Sr. Resident Inspector 361-972-2507 john.dixon@nrc.gov | |||
Mailing Address: | |||
US NRC Region IV | |||
Attn: John Dixon | |||
1600 East Lamar Blvd. | |||
Arlington, TX 76011 | |||
-4511 | |||
}} |
Revision as of 16:35, 15 July 2019
ML12131A459 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 05/09/2012 |
From: | O'Keefe N NRC/RGN-IV/DRP/RPB-B |
To: | Matthew Sunseri Wolf Creek |
O'Keefe N | |
References | |
IR-12-009 | |
Download: ML12131A459 (5) | |
See also: IR 05000482/2012009
Text
May 9, 2012
Mr. Matthew W. Sunseri
President and Chief Executive Officer
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS
66839 SUBJECT: WOLF CREEK NUCLEAR OPERATING CORPORATION
- NRC AUGMENTED INSPECTION TEAM FOLLOW-UP INSPECTION PLANNING LETTER, INSPECTION REPORT 05000482/2012009
Dear Mr. Sunseri:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV staff will conduct the augmented inspection team follow
-up inspection at your Wolf Creek Generating Station.
The inspection will be comprised of one senior resident, one resident and two regional reactor inspector
s from the NRC Region
IV office. The inspection will be conducted in accordance with Inspection Procedure
93800 and multiple reactor oversight process baseline inspection procedures.
The schedule for the inspection is as follows:
In-office preparation
- May 21 - 25, 2012 Onsite inspection
- May 28 - June 1, 2012
Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff.
In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. Please note that the documents
are requested to be provided by May 14, 2012. We request that during the onsite inspection week, you ensure that copies of analyses, evaluations, or
documentation regarding the root cause of the failures of the main generator output breaker and the startup transformer
are available. Also, appropriate personnel knowledgeable
of each of the unresolved items documented in Inspection Report 0500482/2012008
should be available to support the inspector s at the site during the inspection.
We have discussed the schedule for th
is inspection activit
y with your staff and understand that our regulatory contact for this inspection will be
William Muilenburg of your licensing organization. If there are any questions about this inspection or the material requested, please contact the team lead , John Dixon
, at 361-972-2507 or by email , john.dixon@nrc.gov
. U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O N R E G I O N I V1600 EAST LAMAR BLVD
A R L I N G T O N , T E X A S 7 6 0 1 1-4511
M. Sunseri - 2 - This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, C ontrol No. 3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget
Control No. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC'
s document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely, /RA/ Neil O'Keefe, Chief Project Branch B Division of Reactor Projects
Dockets: 50-482 Licenses: NPF-42 Enclosure: Augmented Inspection Team Follow
-up Inspection Document Request
cc: Electronic distribution
for Wolf Creek Nuclear Operating Corporation
M. Sunseri
- 3 - Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov
) Deputy Regional Administrator (Art.Howell@nrc.gov
) DRP Director (Kriss.Kennedy@nrc.gov
) DRP Deputy Director (Troy.Pruett@nrc.gov
) Acting DRS Director (Tom.Blount@nrc.gov
) Acting DRS Deputy Director (Patrick.Louden@nrc.gov
) Senior Resident Inspector (Chris.Long@nrc.gov
) Resident Inspector (Charles.Peabody@nrc.gov
) Branch Chief, DRP/
B (Neil.Okeefe@nrc.gov
) Senior Project Engineer, DRP/
B (Leonard.Willoughby@nrc.gov , Project Engineer, DRP/
B (Nestor.Makris@nrc.gov
) WC Administrative Assistant (Shirley.Allen@nrc.gov
) Public Affairs Officer (Victor.Dricks@nrc.gov
) Public Affairs Officer (Lara.Uselding@nrc.gov
) Project Manager (Randy.Hall@nrc.gov
) Acting Branch Chief, DRS/TSB (Dale.Powe r s@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov
) Regional Counsel (Karla.Fuller@nrc.gov
) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource
Only inspection reports to the following:
RIV/ETA: OEDO
(Michael.McCoppin@nrc.gov
) R:\_REACTORS\WC\2012\WC2012009 Inspection Planning Ltr.doc SUNSI Rev Compl.
Yes No ADAMS Yes No Reviewer Initials
NFO Publicly Avail
Yes No Sensitive Yes No Sens. Type Initials
NFO RIV:SRI:DRP/B D:DRP/B JDixon NO'Keefe /RA/ /RA/ 05/9/2012 05/9/2012 OFFICIAL RECORD COPY
T=Telephone E=E
-mail F=Fax
Augmented Inspection Team Follow
-up Inspection Document Request
Inspection Dates:
In-office preparation: May 2 1 - 2 5, 2012 Onsite : May 28, 2012
- June 1, 2012
Inspection Procedures:
IP 93800 , Augmented Inspection Team
Various Reactor Oversight Process
Baseline Inspection Procedures
Inspecto r s: John Dixon, Senior Resident Inspector, South Texas Project
Mica Baquera, Resident Inspector, Palo Verde
John Watkins, Reactor Inspector
Nnaerika Okonkwo, Reactor Inspector
Information Requested for the In
-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic format (ims.certrec.com database preferred), in care of John Dixon, by May 14, 2012. The inspector s will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week. Also, we request that you categorize the documents in your response with the numbered list below.
Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector
s and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding
this information request, please call the lead inspector as soon as possible.
For the following items as related to the Augmented Inspection Team inspection, as documented in Inspection Report 05000482/2012008, please provide associated condition reports, work orders, root cause and/or apparent cause investigations, design basis documents, UFSAR descriptions, technical specification requirements, plans of actions, and risk profiles:
1. Main generator output breaker fault
2. Startup transformer fault
3. Turbine driven auxiliary feedwater pump operation at low flow, pressure, and speed
4. Turbine driven auxiliary feedwater mechanical overspeed trip device settings
5. Emergency diesel generator B ground
6. ESW water hammer
7. ESW piping corrosion
8. Source range nuclear instrument NI
-31 response on loss of cavity cooling
9. Failure to maintain fire water pressure
10. Training/Operation/Procedures for temporary diesel-driven fire pump
11. Diesel-driven fire pump and temporary diesel
-driven fire pump differences
12. Diesel-driven fire pump unavailability
13. Security issue