Category:Letter
MONTHYEARIR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 L-24-025, Submittal of the Updated Final Safety Analysis Report, Revision 352024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 the Associated Independent Spent Fuel Storage Installations IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) 2024-09-06
[Table view] |
Text
May 1, 2007Mr. Mark B. BezillaSite Vice President FirstEnergy Nuclear Operating Company Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
PERIOD OF ENFORCEMENT DISCRETION DURING IMPLEMENTATIONOF NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805, DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1
Dear Mr. Bezilla:
In a letter dated February 27, 2007 (Agencywide Documents Access and Management System(ADAMS) Accession No. ML070590517), you informed the U.S. Nuclear Regulatory Commission (NRC) that FirstEnergy Nuclear Operating Company will begin the transition to National Fire Protection Association (NFPA) Standard 805, "NFPA 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Electric Generating Plants," 2001 Edition, pursuant to Title 10 of the Code of Federal Regulations, Section 50.48(c), for Davis-BesseNuclear Power Station (Davis-Besse), Unit No. 1.In your letter, you stated that the transition will begin on March 1, 2007, and requestedenforcement discretion for a period of 3 years for existing identified incidents of noncompliances in accordance with the NRC's Interim Enforcement Policy for Davis-Besse.
The transition will be conducted in two phases:Phase I - Perform project planning and assessmentsPhase II - Perform engineering reviews and analysesA licensing amendment request (LAR) would be submitted at the end of Phase II, followed byimplementing activities, including finalizing program documentation, implementing configuration control, and monitoring.The NRC published in the Federal Register on April 18, 2006, (71 FR 19905) a revision to itsenforcement policy extending the NFPA 805 transition discretion period from 24 to 36 months.
As such, I am informing you that your request for a 3-year enforcement discretion period is granted. The discretion period for Davis-Besse is considered to begin on March 1, 2007, and will expire on March 1, 2010. The enforcement discretion period, however, will continue while the NRC staff is reviewing your LAR.As you are aware, in order to receive enforcement discretion, you must: (a) evaluate the risksignificance of all noncompliances to assure that they do not constitute "Red" (or a Severity Level I) findings under the reactor oversight process, (b) enter them into your corrective action program, and (c) implement and maintain appropriate compensatory measures until you M. B. Bezilla complete your corrective actions, or until the NRC staff approves your LAR and issues its safetyevaluation. You should refer to NRC's Regulatory Issue Summary 2005-07, "Compensatory Measures to Satisfy the Fire Protection Program Requirements," for additional NRC staff guidance on appropriate compensatory measures.If you have any questions regarding this matter, please contact Thomas Wengert, ProjectManager, at 301-415-4037 or TJW2@nrc.gov.Sincerely,/RA/Catherine Haney, DirectorDivision of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-346 cc: See next page
ML071000033OfficeLPL3-2/PMLPL3-2/LALPL3-2/BCDRA/FPB/BCNameTWengertEWhittRGibbsSWeerakkody Date04/11/07 04/10/07 04/11/0704/17/07 OfficeOER-III/DRS/EB3/BCNRR/DRA/DNRR/DORL/DNameDSolorioJLaraCHoldenCHaney Date04/24/0704/27/0704/27/0705/1/07 Davis-Besse Nuclear Power Station, Unit 1 cc:Manager, Site Regulatory ComplianceFirstEnergy Nuclear Operating CompanyDavis-Besse Nuclear Power StationMail Stop A-DB-30655501 North State Route 2Oak Harbor, OH 43449-9760Director, Ohio Department of CommerceDivision of Industrial ComplianceBureau of Operations & Maintenance6606 Tussing RoadP.O. Box 4009Reynoldsburg, OH 43068-9009Regional Administrator, Region IIIU.S. Nuclear Regulatory CommissionSuite 2102443 Warrenville RoadLisle, IL 60532-4352Resident InspectorU.S. Nuclear Regulatory Commission5503 North State Route 2Oak Harbor, OH 43449-9760Stephen HelmerSupervisor, Technical Support SectionBureau of Radiation ProtectionOhio Department of Health35 East Chestnut Street, 7th FloorColumbus, OH 43215Carol O'Claire, Chief, Radiological BranchOhio Emergency Management Agency2855 West Dublin Granville RoadColumbus, OH 43235-2206Zack A. Clayton DERROhio Environmental Protection AgencyP.O. Box 1049Columbus, OH 43266-0149State of OhioPublic Utilities Commission180 East Broad StreetColumbus, OH 43266-0573Attorney General Office of Attorney General30 East Broad StreetColumbus, OH 43216President, Board of CountyCommissioners of Ottawa CountyPort Clinton, OH 43252 President, Board of CountyCommissioners of Lucas CountyOne Government Center, Suite 800Toledo, OH 43604-6506The Honorable Dennis J. KucinichUnited States House of RepresentativesWashington, D.C. 20515The Honorable Dennis J. Kucinich United States House of Representatives14400 Detroit AvenueLakewood, OH 44107 Joseph J. HaganPresident and Chief Nuclear OfficerFirstEnergy Nuclear Operating CompanyMail Stop A-GO-1976 South Main StreetAkron, OH 44308David W. Jenkins, AttorneyFirstEnergy CorporationMail Stop A-GO-1876 South Main StreetAkron, OH 44308Danny L. PaceSenior Vice President, Fleet EngineeringFirstEnergy Nuclear Operating CompanyMail Stop A-GO-1476 South Main StreetAkron, OH 44308Manager, Fleet LicensingFirstEnergy Nuclear Operating CompanyMail Stop A-GO-276 South Main StreetAkron, OH 44308 Davis-Besse Nuclear Power Station, Unit 1 cc:
Director, Fleet Regulatory AffairsFirstEnergy Nuclear Operating CompanyMail Stop A-GO-276 South Main StreetAkron, OH 44308Jeannie M. RinckelVice President, Fleet OversightFirstEnergy Nuclear Operating CompanyMail Stop A-GO-1476 South Main StreetAkron, OH 44308Richard AndersonVice President, Nuclear SupportFirstEnergy Nuclear Operating CompanyMail Stop A-GO-1476 South Main StreetAkron, OH 44308 James H. LashSenior Vice President of Operations and Chief Operating OfficerFirstEnergy Nuclear Operating CompanyMail Stop A-GO-1476 South Main StreetAkron, OH 44308