IR 05000528/2012403: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 10/31/2012
| issue date = 10/31/2012
| title = IR 05000528-12-403, 0500529-12-403, 0500530-12-403; 09/07/2012; Palo Verde Nuclear Generating Station, Units 1, 2, and 3 NRC Security Inspection Report
| title = IR 05000528-12-403, 0500529-12-403, 0500530-12-403; 09/07/2012; Palo Verde Nuclear Generating Station, Units 1, 2, and 3 NRC Security Inspection Report
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Edington R K
| addressee name = Edington R
| addressee affiliation = Arizona Public Service Co
| addressee affiliation = Arizona Public Service Co
| docket = 05000528, 05000529, 05000530
| docket = 05000528, 05000529, 05000530
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:" " October 31, 2012  
{{#Wiki_filter:October 31, 2012


Randall K. Edington, Executive Vice President, Nuclear/CNO Arizona Public Service Company P.O. Box 52034, Mail Stop 7602 Phoenix, AZ 85072-2034
==SUBJECT:==
 
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -NRC SECURITY INSPECTION REPORT 05000528/2012403, 05000529/2012403 AND 05000530/2012403
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -NRC SECURITY INSPECTION REPORT 05000528/2012403, 05000529/2012403 AND 05000530/2012403


==Dear Mr. Edington:==
==Dear Mr. Edington:==

Revision as of 14:03, 22 June 2019

IR 05000528-12-403, 0500529-12-403, 0500530-12-403; 09/07/2012; Palo Verde Nuclear Generating Station, Units 1, 2, and 3 NRC Security Inspection Report
ML12307A231
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/31/2012
From: Mark Haire
Plant Support Branch-1
To: Edington R
Arizona Public Service Co
References
IR-12-403
Download: ML12307A231 (3)


Text

October 31, 2012

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -NRC SECURITY INSPECTION REPORT 05000528/2012403, 05000529/2012403 AND 05000530/2012403

Dear Mr. Edington:

On September 27, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on September 27, 2012, with Mr. D. Mims, Vice President, Nuclear Regulatory Affairs and Oversight, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings were identified during this inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511 However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. If Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with

10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/ Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety

Docket Nos.: 50-528, 50-529, 50-530 License Nos.: NPF-41, NPF-51, NPF-74 Nonpublic Enclosure:

NRC Inspection Report 05000528/2012403, 05000529/2012403, and 05000530/2012403 w/Attachment: Supplemental Information cc w/enclosure:

Mr. Randall Bramlett Department Leader, Nuclear Security Programs

Arizona Public Service Co.

P.O. Box 52034, MS 7002 Phoenix, AZ 85072-2034

cc: Electronic Distribution for Palo Verde w/o enclosure - SECURITY-RELATED INFORMAT ION