|
|
Line 5: |
Line 5: |
| | author name = Nguyen J | | | author name = Nguyen J |
| | author affiliation = NRC/NMSS/SFST/LID/LB | | | author affiliation = NRC/NMSS/SFST/LID/LB |
| | addressee name = Simpson P R | | | addressee name = Simpson P |
| | addressee affiliation = Exelon Generation Co, LLC | | | addressee affiliation = Exelon Generation Co, LLC |
| | docket = 05000277, 05000278, 07200029, 07201027 | | | docket = 05000277, 05000278, 07200029, 07201027 |
|
---|
Category:Letter
MONTHYEARIR 05000277/20240032024-11-0404 November 2024 Integrated Inspection Report 05000277/2024003 and 05000278/2024003 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) IR 05000277/20240022024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval 05000277/LER-2024-002, Uncoordinated DC Circuits Cause Unanalyzed Condition2024-04-0808 April 2024 Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. IR 05000277/20244022024-03-12012 March 2024 Cybersecurity Inspection Report 05000277/2024402 and 05000278/2024402 (Cover Letter Only) ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners ML24060A1192024-02-29029 February 2024 Notification of Conduct of a Fire Protection Team Inspection 2024-09-06
[Table view] |
Text
January 14, 2014
Mr. Patrick R. Simpson, Manager-Licensing Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
EXEMPTION REQUEST FOR TRANSNUCLEAR, INC. TN-68 CASKS LOADED WITH FUEL BUNDLES WITH INCORRECT COOLING TIMES AT THE PEACH BOTTOM INDEPENDENT SPENT FUEL STORAGE INSTALLATION - ACKNOWLEDGEMENT OF WITHDRAWAL (TAC NO. L24749)
Dear Mr. Simpson:
By letter dated May 23, 2013 (ML13144A219), Ex elon Generation Company, LLC (EGC) submitted an exemption request for the four Peach Bottom Power Station (PBAPS) Unit 3 fuel assemblies that were loaded into four TN - 68 casks (i.e., one assembly per cask) with cooling times less than the minimum cooling time specified in the Certificate of Compliance (CoC) No.
1027, Amendment No. 0, Appendix A, Technical Specification (TS) 2.1.1, Table 2.1.1-1, "Minimum Acceptable Cooling Time as a Function of Max. Burnup and Min. Initial Enrichment".
By letter dated January 06, 2014 (ML14006A355), EGC requested to withdraw the application from NRC review. The NRC acknowledges your request to withdraw the application. NRC staff activities on the review have ceased and the associated Technical Assignment Control number has been closed.
If you have any questions, please contact me at (301) 287-9202.
Sincerely, /RA/
John-Chau Nguyen, Sr. Project Manager Licensing Branch Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety
and Safeguards
Docket Nos.: 72-29, 50-277, 50-278, 72-1027 TAC No.: L24749
cc: See attached list
Mr. Patrick R. Simpson, Manager-Licensing Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
EXEMPTION REQUEST FOR TRANSNUCLEAR, INC. TN-68 CASKS LOADED WITH FUEL BUNDLES WITH INCORRECT COOLING TIMES AT THE PEACH BOTTOM INDEPENDENT SPENT FUEL STORAGE INSTALLATION - ACKNOWLEDGEMENT OF WITHDRAWAL (TAC NO. L24749)
Dear Mr. Simpson:
By letter dated May 23, 2013 (ML13144A219), Exelon Generation Company, LLC (EGC) submitted an exemption request for the four Peach Bottom Power Station (PBAPS) Unit 3 fuel assemblies that were loaded into four TN - 68 casks (i.e., one assembly per cask) with cooling times less than the minimum cooling time specified in the Certificate of Compliance (CoC) No. 1027, Amendment No. 0, Appendix A, Technical Specification (TS) 2.1.1, T able 2.1.1-1, "Minimum Acceptable Cooling Time as a Function of Max. Burnup and Min. Initial Enrichment".
By letter dated January 06, 2014 (ML14006A355), EGC requested to withdraw the application from NRC review. The NRC acknowledges your request to withdraw the application. NRC staff activities on the review have ceased and the associated Technical Assignment Control number has been closed.
If you have any questions, please contact me at (301) 287-9202.
Sincerely,
/RA/
John-Chau Nguyen, Sr. Project Manager Licensing Branch Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards
Docket Nos.: 72-29, 50-277, 50-278, 72-1027 TAC No.: L24749 cc: See attached list Close out TAC# L24749 Distribution: SFST r/f MLombard SCoffin DMarcano AGendelman JDavis (SFST) BDean/RI MFerdas/RI JNicholson/RI REnnis/NRR SHansell/RI RRolph/RI RMcCullum/NEI JBorowsky DForsyth CAraguas MRahimi ADAMS: ML14015A010 File location:G:\SFST\Nguyen\Peach Bottom TN68\withdrawal of exemption request-acknowled gement letter.docx DIVISION SFST SFST SFST NAME: JCNguyen WWheatley (via email)
BJDavis for MSampson DATE: 01/13/2014 01/13/2014 1/14/14 OFFICIAL RECORD COPY
LETTER FOR PEACH BOTTOM EXEMPTION Mr. Donis Shaw Transnuclear, Inc.
7135 Minstrel Way Columbia, MD 21045
Mr. John Schrage Exelon Generation Company, LLC
4300 Winfield Road
Warrenville, IL 60555