ML17278A383: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 09/11/1985
| issue date = 09/11/1985
| title = Application for Amend to License NPF-21,changing Tech Spec 6.5.2.2 Re Administrative Controls for Corporate Nuclear Safety Review Board.Fee Paid
| title = Application for Amend to License NPF-21,changing Tech Spec 6.5.2.2 Re Administrative Controls for Corporate Nuclear Safety Review Board.Fee Paid
| author name = SORENSEN G C
| author name = Sorensen G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name = BUTLER W R
| addressee name = Butler W
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000397
| docket = 05000397

Revision as of 01:10, 19 June 2019

Application for Amend to License NPF-21,changing Tech Spec 6.5.2.2 Re Administrative Controls for Corporate Nuclear Safety Review Board.Fee Paid
ML17278A383
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/11/1985
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Butler W
Office of Nuclear Reactor Regulation
Shared Package
ML17278A384 List:
References
GO2-85-552, TAC-59673, NUDOCS 8509170235
Download: ML17278A383 (6)


Text

REGUL INFORMATION DISTRIBUTI YSTEM (RIDS)ACCESSION NBR:8509170235 DOC~DATE: 85/09/11, NOTARIZED YES DOCKET FACIL:50 37 NPPSS Nuclear Project~Unit 2i Washington Public Powe'5000397 AUTH BYNAME AUTHOR-AFFILIATION SORENSEN<G.C, Hashingtan Public Power Supply System RECIP~NAME RECIPIENT AFFILIATION BUTLERiltl

~R, Licensing Branch 2"

SUBJECT:

Application for amend to License NPF-21ichanging 6>S~2~2 re administrative controls for corporate safety review board,Fee paid, DISTRIBUTION CODE~A001D COPIES RECEIVED:LTR ENCL/TITLE'.OR Submittal:

General Distribution NOTES: OL:12/20/83:

Tech Spec nuclear SIZE;,4~ck 05000397 RECIP IENT ID CODE/NAME" NRR LB2 BC 01 INTERNAL: ACRS 09 ELD/HDS2 NRR/DL DIR NRR/Dl/TSRG NRR/DSI/RAB RGN5 COPIES LTTR ENCL 7 7 6 6 1 0 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME ADM/LFMB NRR/DE/MTEB NRR/DL/ORAB TB 04 ,COPIES LTTR ENCL 0 1 0, 1 EXTERNAL: 24X LPDR NSIC 1 1 1-1 1 1 EGS,G-BRUSKEgS NRC PDR 02 P p'Jl+)P l CO.TOTAL NUMBER OF COPIES REQUIRED::

LTTR 28 ENCL 25

~~I N~1 N 1 I~~i FP~~

Washington Public Power Supply System 3000 George Washington Way P.O.Box 968 Richland, Washington 99352-0968 (509)372-5000 Docket No.50-397 G02-85-552 September 11, 1985 Director of Nuclear Reactor Regulation Attention:

Mr.W.R.Butler, Chief Licensing Branch No.2 Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555

Dear Mr.Butler:

Subject:

NUCLEAR PLANT NO.2 OPERATING LICENSE NPF-21, REtlUEST FOR AMENDMENT TO ADMINISTRATIVE CONTROLS FOR CORPORATE NUCLEAR SAFETY REVIEW BOARD (CNSRB)6.5.2.2 In accordance with the Code of Federal Regulations, Title 10, Parts 50.90 and 2.101, the Supply System hereby requests an amendment to the"Adminis-trative Controls" section of the subject Technical Specifications.

The proposed amendment involves the Corporate Nuclear Safety Review Board (CNSRB 6.5.2.2).Technical Specification (TS)6.5.2.2, as presently written (see attached), states in part, that"The plant organization and the Directorates of Engi-neering, Support Services, and Licensing and Assurance shall be represented on the CNSRB.The Supply System proposes this sentence be deleted from the subject specification to provide increased flexibility in choosing the best technical representative, independent of organizational constraints.

Thus, the highest level of technical expertise can be insured as required in Sec-tion 4.7 of ANSI/ANS 3.1-1981 and Specification 6.5.2.1.In addition, this change is consistent with current industry practice, as indicated in the same technical specification sections for Limerick No.1, Shoreham No.1, Susquehanna No.1, Fermi No.2 and the General Electric Standard.BSD9170235 8509f i~J PDR ADOCK 05000397.P PDR

~1 V>Hr.W.R.Butler Page Two September ll, 1985 The Supply System has reviewed this change per 10 CFR 50.59 and determined that no unreviewed safety questions will'result from this amendment.

This TS change has been reviewed and approved by the WNP-2 Plant Operations Com-mittee and the Supply System Corporate Nuclear Safety Review Board.n, t On April 6, 1983, the NRC,published gui,dance in the Federal'Re ister (48 FR 14870)concerning examples'of ameridments that are not likely to in-volve significant hazards consideration.

One such example, (i)involves a"...purely administrative change to technical specifications:

for example, a change to achieve consistency throughout the technical specifica-tions, correction of an error, or a change in nomenclature." Accordingly, this proposed change to the technical specifications involves no significant hazards consideration.

\The Supply System has evaluated this request in accordance with 10 CFR 170.21 and has included a warrant for One hundred fifty dollars ($150.00)as initial payment for this application for amendment under Facility Category A (Power Reactors).

In accordance with 10 CFR 50.91, the State of Washington has been provided a copy of this letter.Should you have any questions, please contact Hr.P.L.Powell, Hanager, WNP-2 Licensing.

Very truly yours, G.C.Sorensen, Hanager Regulatory Programs SIS/kjt Attachments cc: JO Bradfute WS Chin C.Eschels JB Hartin E.Revell AD Toth-NRC-BPA-EFSEC-NRC RV-BPA-NRC Site I Il