ML18004B797: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 25: Line 25:


SHEAROH HARRIS NUCLEAR POWER PLANT UNIT 1 ANNUAL ENVIRONMENTAL (NOHRADIOLOGICAL)
SHEAROH HARRIS NUCLEAR POWER PLANT UNIT 1 ANNUAL ENVIRONMENTAL (NOHRADIOLOGICAL)
OPERATIHG REPORT for October 24-December 31, 1986 CAROLINA POWER&LIGHT COMPANY Docket No.50-400 Facility Operating License No.HPF-53 8704300522 Sbl231 PDR ADOCK 05000400 R PDR  
OPERATIHG REPORT for October 24-December 31, 1986 CAROLINA POWER&LIGHT COMPANY Docket No.50-400 Facility Operating License No.HPF-53 8704300522 Sbl231 PDR ADOCK 05000400 R PDR 1.0 Introduction Carolina Power E Light Company (CPEL)received the Facility 0==rating Li cense (Ho.NPF-53)for the Shearon Harri s Huc1 ear Powe;Plant, Unit 1 (SHHPP), from the U.S.Nuclear Regulatory Commission f4RC)on October 24, 1986.Appendix B of the license, the Environmen==-1 Pro-tection Plan (nonradiological), requires submittal of an Annual Environmental (nonradiological)
 
Operating Report to HRC des"ribing the.implementation of the plan during the previous year.The purpose of this document is to fulfil that requirement for the pe-iod of October 24, 1986, through December 31, 1986.2.0 Environmental Monitorin[EPP Section".2j 2.1 Aquatic Monitoring Under the authority of the Clean Water Act, the state=North Carolina issued a National Pollutant Discharge Elirination System (NPDES)Permit (No.NC 0039586)on July 12, 1982.This permit is in effect until midnight on June 30, 1987.Routine effluent monitoring was conducted and reported to the North Carolina Division of Environmental Management (NCi=M)as required by the permit.Monitoring adequate to dern:nstrate compliance with cooling tower blowdown minimizatior., water quality standards for temperature outside of the mixi.-q zone, and prohibitions within the mixing zone will be initiate" during 1987 following approval by the NCDEM.-2.2 Terrestrial Monitoring Terrestrial monitoring is not required.2.3 Noise Monitoring Noise monitoring is not required.
==1.0 Introduction==
3.0 Unusual or Im o tant Environmental Events[EPP Section 4.1]No occurrence of an unusual or important env-ronmental event that would indicate or could result in a significan=
Carolina Power E Light Company (CPEL)received the Facility 0==rating Li cense (Ho.NPF-53)for the Shearon Harri s Huc1 ear Powe;Plant, Unit 1 (SHHPP), from the U.S.Nuclear Regulatory Commission f4RC)on October 24, 1986.Appendix B of the license, the Environmen==-1 Pro-tection Plan (nonradiological), requires submittal of an Annual Environmental (nonradiological)
environmental impact causally related to plant operation occurred during the reporting period.4.0 Plant Consistenc Re uirements[EPP Section 3.0]4.1 Plant Design and Operation There were no changes in plant design o.operation plans, and there were no tests or experiments performed which were con-sidered to involve an unreviewed environ.",ental question during the reporting period.t 4.2 Reporting Related to the NPOES Permit There were no changes to, or renewals of, the HPDES permit or the state certification during the reporting period.5.0 Plant Re ortina Re uirements[EPP Section 5.4]5.1 EPP Honcom~liances There were no EPP noncompliances identifie" during the reporting period.5.2 Changes in Station Design There were no changes in plant design or operation plans, and there were no tests or experiments per."rmed which involved a potentially significant unreviewed enviromental question during the repor:ing period.
Operating Report to HRC des"ribing the.implementation of the plan during the previous year.The purpose of this document is to fulfil that requirement for the pe-iod of October 24, 1986, through December 31, 1986.2.0 Environmental Monitorin[EPP Section".2j 2.1 Aquatic Monitoring Under the authority of the Clean Water Act, the state=North Carolina issued a National Pollutant Discharge Elirination System (NPDES)Permit (No.NC 0039586)on July 12, 1982.This permit is in effect until midnight on June 30, 1987.Routine effluent monitoring was conducted and reported to the North Carolina Division of Environmental Management (NCi=M)as required by the permit.Monitoring adequate to dern:nstrate compliance with cooling tower blowdown minimizatior., water quality standards for temperature outside of the mixi.-q zone, and prohibitions within the mixing zone will be initiate" during 1987 following approval by the NCDEM.-2.2 Terrestrial Monitoring Terrestrial monitoring is not required.2.3 Noise Monitoring Noise monitoring is not required.  
5.3 Nonroutine Reports There were no EPP nonroutine reports submitted to the HRC d.ring the reporting period.6.0 EPP Audit[EPP Section 5.1j During initial implementation of the requirements of the EPP in 1986, no audit of compliance was performed.
 
===3.0 Unusual===
or Im o tant Environmental Events[EPP Section 4.1]No occurrence of an unusual or important env-ronmental event that would indicate or could result in a significan=
environmental impact causally related to plant operation occurred during the reporting period.4.0 Plant Consistenc Re uirements[EPP Section 3.0]4.1 Plant Design and Operation There were no changes in plant design o.operation plans, and there were no tests or experiments performed which were con-sidered to involve an unreviewed environ.",ental question during the reporting period.t 4.2 Reporting Related to the NPOES Permit There were no changes to, or renewals of, the HPDES permit or the state certification during the reporting period.5.0 Plant Re ortina Re uirements[EPP Section 5.4]5.1 EPP Honcom~liances There were no EPP noncompliances identifie" during the reporting period.5.2 Changes in Station Design There were no changes in plant design or operation plans, and there were no tests or experiments per."rmed which involved a potentially significant unreviewed enviromental question during the repor:ing period.  
 
===5.3 Nonroutine===
Reports There were no EPP nonroutine reports submitted to the HRC d.ring the reporting period.6.0 EPP Audit[EPP Section 5.1j During initial implementation of the requirements of the EPP in 1986, no audit of compliance was performed.
A compliance audit will be conducted for the 1987 reporting year.
A compliance audit will be conducted for the 1987 reporting year.
HARRIS NUCLEAR PROJECT P.0.Box 165 New Hill, NC 27562 APR 2 4 1987 File Number: SHF/10-10000 Letter Number'HO-870410 (0)United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 HARRIS NUCLEAR PROJECT UNIT 1 DOCKET NO.50-400 LICENSE NO.NPF-63 ANNUAL ENVIRONMENTAL OPERATING REPORT Gentlemen:
HARRIS NUCLEAR PROJECT P.0.Box 165 New Hill, NC 27562 APR 2 4 1987 File Number: SHF/10-10000 Letter Number'HO-870410 (0)United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 HARRIS NUCLEAR PROJECT UNIT 1 DOCKET NO.50-400 LICENSE NO.NPF-63 ANNUAL ENVIRONMENTAL OPERATING REPORT Gentlemen:
In accordance with Section 5.4.1 of the Environmental Protection Plan (EPP)for the Shearon Harris Nuclear Power Plant Unit No.1, Carolina Power 6 Light Company hereby submits the Annual Environmental Operating Report for 1986.The period of the report begins with October 24, 1986, the date of issuance of the operating license.The attached report describes the implementation of the EPP for 1986.Very truly yours, R.A.Watson Vice President Harris Nuclear Project RAW:ONH:skm Attachment cc: Dr.J.N.Grace (NRC-RII)Mr.G;F.Maxwell (NRC-SHNPP)
In accordance with Section 5.4.1 of the Environmental Protection Plan (EPP)for the Shearon Harris Nuclear Power Plant Unit No.1, Carolina Power 6 Light Company hereby submits the Annual Environmental Operating Report for 1986.The period of the report begins with October 24, 1986, the date of issuance of the operating license.The attached report describes the implementation of the EPP for 1986.Very truly yours, R.A.Watson Vice President Harris Nuclear Project RAW:ONH:skm Attachment cc: Dr.J.N.Grace (NRC-RII)Mr.G;F.Maxwell (NRC-SHNPP)
Mr.B.Buckley (NRR)MEM/HO-8704100/Page 1/OS1 Xv}}
Mr.B.Buckley (NRR)MEM/HO-8704100/Page 1/OS1 Xv}}

Revision as of 23:49, 5 May 2019

Annual Environ (Nonradiological) Operating Rept, 861024-1231. W/870424 Ltr
ML18004B797
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/31/1986
From: WATSON R A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
HO-870410-(O), NUDOCS 8704300522
Download: ML18004B797 (8)


Text

REGUL Y INFORNAT I ON DI STR I BUT I SYSTEM'1 (R I DB>-ACCESSION NBR: 8704300522 DOC.DATh,: 86/12/31 NOTARIZED:

NO FACIL: 50-400 6>earon Harris Nuclear Pover Planti Unit ii Car olina U TH Nh>~1E AUTHOR AFFILIATION WATSON'.A.Carol ina Power Zc Light Co.RECIP.NANE RECIPIENT AFFILIATION DOCKET 05000400 I

SUBJECT:

"Annual Environ (Nonradiological

>Operating Rept, 861024-1231.

" N/870424 ltr.DISTRIBUTION CODE: IE25D COPIES RECEIVED: LTR ENCL SIZE: TITLE: Environmental Yionitoring Rept (per Tech Specs>NOTES: Application For permit rene@!al filed.05000400 RECIPIENT ID CODE/NAI'lE PD2-1 L*pUCKLEY 9 INTERNAL: ACRS AEOD/DSP/TPAB LPDR NRR/DREP/RPB RES SPEI S, T RGN2/DRSB/EPRPB EXTERNAL: NRC PDR COPIES LTTR ENCL 1 0 1 1 1 1 1 1 1 1 1 1 1 1 REC IP I ENT ID CODE/MANE PD2-1 PD AEOD/DOA ARti TECH ADV NRR/DEB/ADE 02 RGN2 FILE Oi COPIES LTTR ECCL 5 5 1 1 1 1 1 1 1 1 1 1 TOTAL NUi'>HER OF COPIES REQUIRED: LT iR 22 ENCL 21

SHEAROH HARRIS NUCLEAR POWER PLANT UNIT 1 ANNUAL ENVIRONMENTAL (NOHRADIOLOGICAL)

OPERATIHG REPORT for October 24-December 31, 1986 CAROLINA POWER&LIGHT COMPANY Docket No.50-400 Facility Operating License No.HPF-53 8704300522 Sbl231 PDR ADOCK 05000400 R PDR 1.0 Introduction Carolina Power E Light Company (CPEL)received the Facility 0==rating Li cense (Ho.NPF-53)for the Shearon Harri s Huc1 ear Powe;Plant, Unit 1 (SHHPP), from the U.S.Nuclear Regulatory Commission f4RC)on October 24, 1986.Appendix B of the license, the Environmen==-1 Pro-tection Plan (nonradiological), requires submittal of an Annual Environmental (nonradiological)

Operating Report to HRC des"ribing the.implementation of the plan during the previous year.The purpose of this document is to fulfil that requirement for the pe-iod of October 24, 1986, through December 31, 1986.2.0 Environmental Monitorin[EPP Section".2j 2.1 Aquatic Monitoring Under the authority of the Clean Water Act, the state=North Carolina issued a National Pollutant Discharge Elirination System (NPDES)Permit (No.NC 0039586)on July 12, 1982.This permit is in effect until midnight on June 30, 1987.Routine effluent monitoring was conducted and reported to the North Carolina Division of Environmental Management (NCi=M)as required by the permit.Monitoring adequate to dern:nstrate compliance with cooling tower blowdown minimizatior., water quality standards for temperature outside of the mixi.-q zone, and prohibitions within the mixing zone will be initiate" during 1987 following approval by the NCDEM.-2.2 Terrestrial Monitoring Terrestrial monitoring is not required.2.3 Noise Monitoring Noise monitoring is not required.

3.0 Unusual or Im o tant Environmental Events[EPP Section 4.1]No occurrence of an unusual or important env-ronmental event that would indicate or could result in a significan=

environmental impact causally related to plant operation occurred during the reporting period.4.0 Plant Consistenc Re uirements[EPP Section 3.0]4.1 Plant Design and Operation There were no changes in plant design o.operation plans, and there were no tests or experiments performed which were con-sidered to involve an unreviewed environ.",ental question during the reporting period.t 4.2 Reporting Related to the NPOES Permit There were no changes to, or renewals of, the HPDES permit or the state certification during the reporting period.5.0 Plant Re ortina Re uirements[EPP Section 5.4]5.1 EPP Honcom~liances There were no EPP noncompliances identifie" during the reporting period.5.2 Changes in Station Design There were no changes in plant design or operation plans, and there were no tests or experiments per."rmed which involved a potentially significant unreviewed enviromental question during the repor:ing period.

5.3 Nonroutine Reports There were no EPP nonroutine reports submitted to the HRC d.ring the reporting period.6.0 EPP Audit[EPP Section 5.1j During initial implementation of the requirements of the EPP in 1986, no audit of compliance was performed.

A compliance audit will be conducted for the 1987 reporting year.

HARRIS NUCLEAR PROJECT P.0.Box 165 New Hill, NC 27562 APR 2 4 1987 File Number: SHF/10-10000 Letter Number'HO-870410 (0)United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 HARRIS NUCLEAR PROJECT UNIT 1 DOCKET NO.50-400 LICENSE NO.NPF-63 ANNUAL ENVIRONMENTAL OPERATING REPORT Gentlemen:

In accordance with Section 5.4.1 of the Environmental Protection Plan (EPP)for the Shearon Harris Nuclear Power Plant Unit No.1, Carolina Power 6 Light Company hereby submits the Annual Environmental Operating Report for 1986.The period of the report begins with October 24, 1986, the date of issuance of the operating license.The attached report describes the implementation of the EPP for 1986.Very truly yours, R.A.Watson Vice President Harris Nuclear Project RAW:ONH:skm Attachment cc: Dr.J.N.Grace (NRC-RII)Mr.G;F.Maxwell (NRC-SHNPP)

Mr.B.Buckley (NRR)MEM/HO-8704100/Page 1/OS1 Xv