Line 30: |
Line 30: |
| P.O. Box 411 / Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNET Als (Z WO 13-0014 Page 2 of 4 Security-Related Information | | P.O. Box 411 / Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNET Als (Z WO 13-0014 Page 2 of 4 Security-Related Information |
| -Withhold Under 10 CFR 2.390 Gentlemen: | | -Withhold Under 10 CFR 2.390 Gentlemen: |
| On March 12, 2012, the Nuclear Regulatory Commission issued an order (Reference | | On March 12, 2012, the Nuclear Regulatory Commission issued an order (Reference |
| : 1) to Wolf Creek Nuclear Operating Corporation (WCNOC). Reference 1 was immediately effective and directs WCNOC to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities in the event of a beyond-design-basis external event. Specific requirements are outlined in Attachment 2 of Reference 1.Section IV, Condition C.l.a of Reference 1 requires submission of an Overall Integrated Plan by February 28, 2013. The NRC Interim Staff Guidance (ISG) (Reference | | : 1) to Wolf Creek Nuclear Operating Corporation (WCNOC). Reference 1 was immediately effective and directs WCNOC to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities in the event of a beyond-design-basis external event. Specific requirements are outlined in Attachment 2 of Reference 1.Section IV, Condition C.l.a of Reference 1 requires submission of an Overall Integrated Plan by February 28, 2013. The NRC Interim Staff Guidance (ISG) (Reference |
| : 2) was issued August 29, 2012 which endorses industry guidance document NEI 12-06, Revision 0 (Reference | | : 2) was issued August 29, 2012 which endorses industry guidance document NEI 12-06, Revision 0 (Reference |
| : 3) with clarifications and exceptions identified in Reference | | : 3) with clarifications and exceptions identified in Reference |
| : 2. Reference 3 provides direction regarding the content of the Overall Integrated Plan.Reference 4 provided WCNOC's initial status report for Wolf Creek Generating Station (WCGS)regarding mitigation strategies, as required by Reference 1.The purpose of this letter is to provide the Overall Integrated Plan pursuant to Section IV, Condition C.1.a of Reference | | : 2. Reference 3 provides direction regarding the content of the Overall Integrated Plan.Reference 4 provided WCNOC's initial status report for Wolf Creek Generating Station (WCGS)regarding mitigation strategies, as required by Reference 1.The purpose of this letter is to provide the Overall Integrated Plan pursuant to Section IV, Condition C.1.a of Reference |
| : 1. This letter confirms WCNOC has received Reference 2 and has an Overall Integrated Plan developed in accordance with the guidance for defining and deploying strategies that will enhance the ability to cope with conditions resulting from beyond-design-basis external events.The information in the enclosure provides WCNOC's Overall Integrated Plan for mitigation strategies at WCGS pursuant to Reference | | : 1. This letter confirms WCNOC has received Reference 2 and has an Overall Integrated Plan developed in accordance with the guidance for defining and deploying strategies that will enhance the ability to cope with conditions resulting from beyond-design-basis external events.The information in the enclosure provides WCNOC's Overall Integrated Plan for mitigation strategies at WCGS pursuant to Reference |
| : 3. The enclosure to this letter contains Security-Related information that should be withheld from public disclosure in accordance with the requirements of 10 CFR 2.390. The pages have been marked accordingly with the notation"Security-Related Information | | : 3. The enclosure to this letter contains Security-Related information that should be withheld from public disclosure in accordance with the requirements of 10 CFR 2.390. The pages have been marked accordingly with the notation"Security-Related Information |
| -Withhold Under 10 CFR 2.390." The enclosed integrated plan is based on conceptual design information. | | -Withhold Under 10 CFR 2.390." The enclosed integrated plan is based on conceptual design information. |
Revision as of 22:39, 28 April 2019
Letter Sequence Other |
---|
|
Results
Other: ET 13-0027, Operating Corporation'S First Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, ET 14-0011, Second Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, ET 14-0024, Third Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, ET 15-0005, Operating Corporation'S Fourth Six - Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, ET 15-0020, Operating Corporation'S Fifth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, ET 16-0008, Sixth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events., ET 16-0018, Seventh Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events., ET 17-0003, Operating Corporation'S Compliance Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Final Integrated Plan, ML13070A026, ML16168A254
|
MONTHYEARML13070A0262013-02-28028 February 2013 Operating Corporation Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other ET 13-0027, Operating Corporation'S First Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2013-08-28028 August 2013 Operating Corporation'S First Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other ET 14-0011, Second Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-02-26026 February 2014 Second Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other WO 14-0023, Request for Schedule Relaxation of NRC Order EA-12-049, Requirement IV.A.22014-03-31031 March 2014 Request for Schedule Relaxation of NRC Order EA-12-049, Requirement IV.A.2 Project stage: Request ET 14-0024, Third Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-08-28028 August 2014 Third Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other ET 15-0005, Operating Corporation'S Fourth Six - Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-02-24024 February 2015 Operating Corporation'S Fourth Six - Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other ET 15-0020, Operating Corporation'S Fifth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-08-25025 August 2015 Operating Corporation'S Fifth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other ET 16-0008, Sixth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.2016-02-17017 February 2016 Sixth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. Project stage: Other ML16168A2542016-07-0606 July 2016 Report for the Audit Regarding Implementation of Mitigating Strategies Related to Order EA-12-049 Project stage: Other ET 16-0018, Seventh Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.2016-08-18018 August 2016 Seventh Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. Project stage: Other ET 17-0003, Operating Corporation'S Compliance Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Final Integrated Plan2017-01-19019 January 2017 Operating Corporation'S Compliance Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Final Integrated Plan Project stage: Other ML17171A2332017-06-12012 June 2017 Response to Request for FLEX Audit Documentation Project stage: Request ML17144A0092017-08-0202 August 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Approval 2015-08-25
[Table View] |
|
---|
Category:Letter
MONTHYEARML24025A0992024-01-25025 January 2024 Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML24018A0792024-01-22022 January 2024 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd and Opportunity for a Hearing (EPID L-2024-LLA-0007) (Letter) ML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information ML24018A2482024-01-18018 January 2024 License Amendment Request to Modify the Implementation Date of License Amendment No. 238 IR 05000482/20230042024-01-11011 January 2024 Integrated Inspection Report 05000482/2023004 ML23356A0722024-01-0404 January 2024 Supplemental Information Needed for Acceptance of Requested Licensing Actions Exemption from Specific 10 CFR Part 73N Requirements (EPID L-2023-LLE-0048) (Redacted Version) WO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023 Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 ML23348A3662023-12-18018 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482 2024012) and Request for Information ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23299A2662023-11-29029 November 2023 Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 ML23331A4972023-11-27027 November 2023 Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23325A2112023-11-20020 November 2023 Submittal of Request for Exemption from Specific Provisions in 10 CFR 73.55 ML23320A2772023-11-16016 November 2023 License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML23292A3592023-10-19019 October 2023 License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23277A2772023-10-11011 October 2023 Regulatory Audit Summary Concerning Review of Request Number CI3R-01 for Proposed Alternative Inspection Frequency for Containment Unbonded Post Tensioning System Components ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23276B4552023-10-0303 October 2023 Technical Specification 5.6.8 Post Accident Monitoring (PAM) Report ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L ML23256A2062023-09-14014 September 2023 Withdrawal of Requested Licensing Action Exemption from Specific 10 CFR Part 73 Requirements ML23165A2502023-08-31031 August 2023 Issuance of Amendment No. 237 Request for Deviation from Fire Protection Requirements ML23243A0002023-08-31031 August 2023 Wolf Generating Station - Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 ML23221A3932023-08-0909 August 2023 Submittal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML23220A4222023-08-0808 August 2023 Supplement to License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ML23201A1212023-08-0707 August 2023 Issuance of Amendment No. 236 Revision to Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML23130A2902023-07-26026 July 2023 Issuance of Amendment No. 235 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000482/20230022023-07-11011 July 2023 Integrated Inspection Report 05000482/2023002 ML23167A0042023-06-26026 June 2023 Audit Plan to Support Review of Request for Alternative Containment Inservice Inspection Frequency IR 05000482/20234012023-06-21021 June 2023 Security Baseline Inspection Report 05000482/2023401 ML23171B1312023-06-20020 June 2023 Additional Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) ML23135A1172023-05-0808 May 2023 Redacted Version of Revision 36 to Updated Safety Analysis Report ML23117A2112023-04-27027 April 2023 Annual Exposure Report (2022) ML23117A1342023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report Report 46 2024-01-04
[Table view] |
Text
W..?LF CREEK NUCLEAR OPERATING CORPORATION Security-Related Information
-Withhold Under 10 CFR 2.390 Russell A. Smith Site Vice President and Chief Nuclear Operating Officer February 28, 2013 WO 13-0014 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
References:
1)Letter dated March 12, 2012, from E. J. Leeds and M. R. Johnson, USNRC, to M. W. Sunseri, WCNOC, "Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" 2) NRC Interim Staff Guidance JLD-ISG-2012-01, "Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," Revision 0, August 29, 2012 (ADAMS Accession Number ML1 2229A1 74)3) NEI 12-06, "Diverse and Flexible Coping Strategies (FLEX)Implementation Guide," Revision 0, August 2012 (ADAMS Accession No. ML12242A378)
- 4) Letter ET 12-0029, dated October 29, 2012, from J. P. Broschak, WCNOC, to USNRC Docket No. 50-482: Wolf Creek Nuclear Operating Corporation Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
Subject:
NOTE: THE ENCLOSURE CONTAINS SENSITIVE UNCLASSIFIED NON-SAFEGUARDS INFORMATION; UPON SEPARATION THIS COVER LETTER IS DECONTROLLED.
P.O. Box 411 / Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNET Als (Z WO 13-0014 Page 2 of 4 Security-Related Information
-Withhold Under 10 CFR 2.390 Gentlemen:
On March 12, 2012, the Nuclear Regulatory Commission issued an order (Reference
- 1) to Wolf Creek Nuclear Operating Corporation (WCNOC). Reference 1 was immediately effective and directs WCNOC to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities in the event of a beyond-design-basis external event. Specific requirements are outlined in Attachment 2 of Reference 1.Section IV, Condition C.l.a of Reference 1 requires submission of an Overall Integrated Plan by February 28, 2013. The NRC Interim Staff Guidance (ISG) (Reference
- 2) was issued August 29, 2012 which endorses industry guidance document NEI 12-06, Revision 0 (Reference
- 3) with clarifications and exceptions identified in Reference
- 2. Reference 3 provides direction regarding the content of the Overall Integrated Plan.Reference 4 provided WCNOC's initial status report for Wolf Creek Generating Station (WCGS)regarding mitigation strategies, as required by Reference 1.The purpose of this letter is to provide the Overall Integrated Plan pursuant to Section IV, Condition C.1.a of Reference
- 1. This letter confirms WCNOC has received Reference 2 and has an Overall Integrated Plan developed in accordance with the guidance for defining and deploying strategies that will enhance the ability to cope with conditions resulting from beyond-design-basis external events.The information in the enclosure provides WCNOC's Overall Integrated Plan for mitigation strategies at WCGS pursuant to Reference
- 3. The enclosure to this letter contains Security-Related information that should be withheld from public disclosure in accordance with the requirements of 10 CFR 2.390. The pages have been marked accordingly with the notation"Security-Related Information
-Withhold Under 10 CFR 2.390." The enclosed integrated plan is based on conceptual design information.
Final design details and associated changes for implementation, such as procedure guidance, as well as any revisions to the information contained in the Enclosure to this letter, will be provided in the 6-month Overall Integrated Plan updates required by Reference 1.NOTE: THE ENCLOSURE CONTAINS SENSITIVE UNCLASSIFIED NON-SAFEGUARDS INFORMATION; UPON SEPARATION THIS COVER LETTER IS DECONTROLLED.
WO 13-0014 Page 3 of 4 Security-Related Information -Withhold Under 10 CFR 2.390 This letter contains no new commitments.
If you have any questions concerning this matter, please contact me at (620) 364-4156, or Mr. Michael J. Westman at (620) 364-8831 ext. 4009.Sincerely, Russell A. Smith RAS/rlt
Enclosure:
FLEX integrated Plan Submittal cc: E. E. Collins (NRC), w/e E. J. Leeds (NRC), w/e C. F. Lyon (NRC), w/e N. F. O'Keefe (NRC), w/e Senior Resident Inspector (NRC), w/e NOTE: THE ENCLOSURE CONTAINS SENSITIVE UNCLASSIFIED NON-SAFEGUARDS INFORMATION; UPON SEPARATION THIS COVER LETTER IS DECONTROLLED.
WO 13-0014 Page 4 of 4 Security-Related Information
-Withhold Under 10 CFR 2.390 STATE OF KANSAS )SS COUNTY OF COFFEY )Russell A. Smith, of lawful age, being first duly sworn upon oath says that he is Site Vice President and Chief Nuclear Operating Officer of Wolf Creek Nuclear Operating Corporation; that he has read the foregoing document and knows the contents thereof; that he has executed the same for and on behalf of said Corporation with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.By___Russ'ell A. Smith Site Vice President and Chief Nuclear Operating Officer SUBSCRIBED and sworn to before me this day of 'FbraaoLý
,2013.~ JANELLE FULLENN MTA TE O F K AN SA S M "pp .1, Expiration Date i ) IS NOTE: THE ENCLOSURE CONTAINS SENSITIVE UNCLASSIFIED NON-SAFEGUARDS INFORMATION; UPON SEPARATION THIS COVER LETTER IS DECONTROLLED.