{{#Wiki_filter:April 28, 1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 DOCKET 50-255 -LICENSE DPR-20 -PALISADES PLANT
{{#Wiki_filter:April 28, 1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 DOCKET 50-255 -LICENSE DPR-20 -PALISADES PLANT
* Thoma* J. Palm/uao Site Vice President 30-DAY RESPONSE -GENERIC LETTER 97-01, "DEGRADATION OF CONTROL ROD DRIVE MECHANISM NOZZLE AND OTHER VESSEL CLOSURE HEAD PENETRATIONS" On April 1, 1997, the NRG issued Generic Letter (GL) 97-01, "Degradation of Control Rod Drive Mechanism Nozzle and Other Vessel Closure Head Penetrations".
* Thoma* J. Palm/uao Site Vice President 30-DAY RESPONSE -GENERIC LETTER 97-01, "DEGRADATION OF CONTROL ROD DRIVE MECHANISM NOZZLE AND OTHER VESSEL CLOSURE HEAD PENETRATIONS" On April 1, 1997, the NRG issued Generic Letter (GL) 97-01, "Degradation of Control Rod Drive Mechanism Nozzle and Other Vessel Closure Head Penetrations".
A written response was required within 30 days of the date of the letter indicating:  
A written response was required within 30 days of the date of the letter indicating:
(1) Whether or not the requested information will be submitted and, (2) Whether or not the requested information will be submitted within the requested time period. This letter provides that response.
(1) Whether or not the requested information will be submitted and, (2) Whether or not the requested information will be submitted within the requested time period. This letter provides that response.
Consumers Energy Company (Consumers Energy) is working with industry groups and the Combustion Engineering Owners Group (GEOG) in addressing reactor vessel head nozzle cracking issues. Consumers Energy is continuing this participation in order to assemble and analyze the relevant information in formulating the report requested by GL 97-01. _ The information requested by GL 97-01 will be submitted within the 120-day period. Where appropriate, the submittal may consist of references to previously submitted f r 9705020270:
Consumers Energy Company (Consumers Energy) is working with industry groups and the Combustion Engineering Owners Group (GEOG) in addressing reactor vessel head nozzle cracking issues. Consumers Energy is continuing this participation in order to assemble and analyze the relevant information in formulating the report requested by GL 97-01. _ The information requested by GL 97-01 will be submitted within the 120-day period. Where appropriate, the submittal may consist of references to previously submitted f r 9705020270:

Revision as of 20:12, 25 April 2019

Provides 30-day Response to GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations.
ML18067A510
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/28/1997
From: PALMISANO T J
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-01, GL-97-1, NUDOCS 9705020270
Download: ML18067A510 (3)


Text

April 28, 1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 DOCKET 50-255 -LICENSE DPR-20 -PALISADES PLANT

  • Thoma* J. Palm/uao Site Vice President 30-DAY RESPONSE -GENERIC LETTER 97-01, "DEGRADATION OF CONTROL ROD DRIVE MECHANISM NOZZLE AND OTHER VESSEL CLOSURE HEAD PENETRATIONS" On April 1, 1997, the NRG issued Generic Letter (GL) 97-01, "Degradation of Control Rod Drive Mechanism Nozzle and Other Vessel Closure Head Penetrations".

A written response was required within 30 days of the date of the letter indicating:

(1) Whether or not the requested information will be submitted and, (2) Whether or not the requested information will be submitted within the requested time period. This letter provides that response.

Consumers Energy Company (Consumers Energy) is working with industry groups and the Combustion Engineering Owners Group (GEOG) in addressing reactor vessel head nozzle cracking issues. Consumers Energy is continuing this participation in order to assemble and analyze the relevant information in formulating the report requested by GL 97-01. _ The information requested by GL 97-01 will be submitted within the 120-day period. Where appropriate, the submittal may consist of references to previously submitted f r 9705020270:

970428 . 1 l---, PDR . ADOCK' 05000255 _

y *

  • 2 information.

Some requested information may not be available and will be duly noted in the submittal.

If the schedule for submittal or the content of the report needs to be revised from that requested in GL 97-01, Consumers Energy will provide appropriate notification to the NRC. SUM.MARY OF COMMITMENTS This letter contains one new commitment and no revisions to existing commitments.

The commitment is: The information requested by GL 97-01 will be submitted within 120 days from April 1, 1997. If the schedule for submittal or the content of the report needs to be revised from that requested in GL 97-01, Consumers Energy will provide appropriate notification to the NRC.

Thomas J. Palmisano Site Vice President, Palisades CC Administrator, Region Ill, USNRC Project Manager, NRR, USNRC NRC Resident Inspector

-Palisades

. ,( '** *

  • CONSUMERS ENERGY CQMPANY To the best of my knowledge, the contents of this 30-day response to Generic Letter 97-01, are truthful and complete.

By }"" ...{. ">...

Palmisano Site Vice President, Palisades Sworn and subscribed to before me this Mary Arin Engle, Notary Public Berrien County, Michigan (Acting in Van Buren County, Michigan)