Line 1: |
Line 1: |
| #REDIRECT [[NL-08-1300, Request for Additional Information- MD9746 (RR-66) and MD9748 (RR-68) (Farley, Unit 1)]]
| | {{Adams |
| | | number = ML083151124 |
| | | issue date = 11/10/2008 |
| | | title = Request for Additional Information- MD9746 (RR-66) and MD9748 (RR-68) (Farley, Unit 1) |
| | | author name = Feintuch K D |
| | | author affiliation = NRC/NRR/DORL/LPLII-1 |
| | | addressee name = McKinney B D |
| | | addressee affiliation = Southern Nuclear Operating Co, Inc |
| | | docket = 05000348 |
| | | license number = |
| | | contact person = Feintuch K D, NRR/DORL/LPL2-1, 415-3079 |
| | | case reference number = ALA1-1100-1, ALA1-1100-8, NL-08-1300, RR-37, RR-56, RR-66, RR-68, TAC MB0738, TAC MB98858, TAC MB98859, TAC MC2559, TAC MD9746, TAC MD9748 |
| | | document type = E-Mail, Request for Additional Information (RAI) |
| | | page count = 2 |
| | | project = TAC:MB0738, TAC:MB9885, TAC:MC2559, TAC:MD9746, TAC:MD9748 |
| | | stage = RAI |
| | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:From: Karl Feintuch Sent: Monday, November 10, 2008 11:17 AM To: McKinney, B. Doug Cc: Daniel Widrevitz; Carlyleamaryllis Nelson-Wilson |
| | |
| | ==Subject:== |
| | Request for additional information - MD9746 (RR-66) and MD9748 (RR-68) (Farley, Unit 1) |
| | In reviewing your letter NL-08-1300 dated September 22, 2008, specifically enclosure 4 (for relief request RR-66) and enclosure 6 (for RR-68), the NRC staff has determined the need to review the drawings identified below in boldface. |
| | |
| | Unfortunately, the scanning technology and resulting resolution for the drawings previously docketed is not adequate for the intended review. We therefore request hardcopy (paper) media for the purposes of the review. |
| | The supplemental submittal of the drawings indicated in boldface will be issued current ADAMS Accession Numbers for reference as docketed information for the subject licensing actions. A description of the requested information follows. |
| | Sketches indicating the locations and interferences for weld numbers: |
| | : 1. ALA1-1100-1 The earlier submittal of this information was as ALA1-1100-1 as part of RR-37, approved per NRC Letter dated 01/12/99 (reference TACs MB98858 and MB98859) and |
| | : 2. ALA1-1100-8 The earlier submittal of this information was part of RR-56, approved per NRC Letter dated 05/19/05 (reference TACs MB0738 and MC2559). |
| | |
| | Drawings associated with the replaced reactor vessel are not requested. |
| | At this time the reviewer who requested this information is ready to use it. Therefore, please propose a response date that is as soon as practical. |
| | |
| | Thank you for your assistance in providing previously docketed documentation from which the reviewer can obtain current information for processing the subject licensing action. |
| | Karl Feintuch Project Manager USNRC 301-415-3079 E-mail Properties Mail Envelope Properties (3D27D29AB75BCD4BAE913B63CBFBBEDFAF010EDAD8) |
| | |
| | ==Subject:== |
| | Request for additional information - MD9746 (RR-66) and MD9748 (RR-68) (Farley, Unit 1) |
| | Sent Date: 11/10/2008 11:17:00 AM Received Date: 11/10/2008 11:17:00 AM From: Karl Feintuch |
| | |
| | Created By: Karl.Feintuch@nrc.gov |
| | |
| | Recipients: |
| | BDMCKINN@southernco.com (McKinney, B. Doug) |
| | Tracking Status: None Daniel.Widrevitz@nrc.gov (Daniel Widrevitz) |
| | Tracking Status: None Carlyleamaryllis.Nelson-Wilson@nrc.gov (Carlyleamaryllis Nelson-Wilson) |
| | Tracking Status: None |
| | |
| | Post Office: |
| | HQCLSTR01.nrc.gov |
| | |
| | Files Size Date & Time |
| | |
| | MESSAGE 12506 11/10/2008 |
| | |
| | Options Expiration Date: |
| | Priority: olImportanceNormal ReplyRequested: False Return Notification: False |
| | |
| | Sensitivity: olNormal Recipients received:}} |
Letter Sequence RAI |
---|
|
|
MONTHYEARNL-04-0237, ASME Section XI Request for Relief No. RR-56, Examination of Reactor Pressure Vessel Circumferential Weld2004-03-31031 March 2004 ASME Section XI Request for Relief No. RR-56, Examination of Reactor Pressure Vessel Circumferential Weld Project stage: Request ML0411202312004-04-20020 April 2004 Technical Specification Pages for Limerick Generating Station, Units 1 and 2, License Amendment, Issuance of Amendment Generic Letter 88-01 Requirements Project stage: Approval ML0511604142005-05-19019 May 2005 Relief, RR-56, Examination of RPV Lower Shell to Bottom Head Circumferential Weld No. APRI-1-1100-8 Project stage: Other NL-08-1300, Proposed Relief Requests for the Third ISI Interval2008-09-22022 September 2008 Proposed Relief Requests for the Third ISI Interval Project stage: Request ML0831511242008-11-10010 November 2008 Request for Additional Information- MD9746 (RR-66) and MD9748 (RR-68) (Farley, Unit 1) Project stage: RAI ML0902101792009-01-29029 January 2009 Request for Additional Information Third 10-year Interval Inservice Inspection Program Plan Requests for Relief Project stage: RAI ML0917300752009-06-29029 June 2009 (Fnp), Units 1 and 2, Evaluation of Third 10-Year Interval Inservice Inspection Program Plan Requests for Relief Project stage: Other 2008-11-10
[Table View] |
Request for Additional Information- MD9746 (RR-66) and MD9748 (RR-68) (Farley, Unit 1)ML083151124 |
Person / Time |
---|
Site: |
Farley |
---|
Issue date: |
11/10/2008 |
---|
From: |
Feintuch K D Plant Licensing Branch II |
---|
To: |
McKinney B D Southern Nuclear Operating Co |
---|
Feintuch K D, NRR/DORL/LPL2-1, 415-3079 |
References |
---|
ALA1-1100-1, ALA1-1100-8, NL-08-1300, RR-37, RR-56, RR-66, RR-68, TAC MB0738, TAC MB98858, TAC MB98859, TAC MC2559, TAC MD9746, TAC MD9748 |
Download: ML083151124 (2) |
|
|
---|
Category:E-Mail
MONTHYEARML24297A6042024-10-22022 October 2024 Acceptance Review - License Amendment Request to Revise TS SR 3.4.14.3 and Correct Admin Oversight ML24290A1572024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds (L-2024-LLR-0047) ML24290A1552024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley, Hatch, and Vogtle 1 and 2 - Proposed Alternative Request for Code Case N-572 ML24276A1132024-10-0202 October 2024 Acceptance Review - License Amendment Request to Revise TS SR 3.4.14.3 and Correct Administrative Oversight ML24271A0052024-09-26026 September 2024 NRR E-mail Capture - for Your Response - RAI - Farley and Vogtle 1 and 2 - Proposed Alternative Request for Steam Generator Welds (L-2024-LLR-0041) ML24227A0512024-08-14014 August 2024 August 14, 2024 - Request for Additional Information - Farley, Units 1 and 2 - Proposed LAR to Revise TS SR 3.6.6.8 Frequency ML24212A2232024-07-30030 July 2024 Acceptance Review - License Amendment Request to Adopt TSTF-500, Rev 2 DC Electrical Rewrite (EPID L-2024-LLA-0091) - Email ML24205A2142024-07-23023 July 2024 Acceptance Review - License Amendment Request to Change TS 3.6.5, Containment Air Temperature ML24197A1572024-07-15015 July 2024 NRR E-mail Capture - Acceptance Review - Farley and Vogtle 1 and 2, LAR - TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML24197A0172024-07-12012 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds ML24194A0032024-07-11011 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley, Hatch, and Vogtle 1 and 2 - Alternative Request for Code Case N-572 ML24180A0012024-06-26026 June 2024 NRR E-mail Capture - Acceptance Review Farley 1 and 2 and Vogtle 1 and 2 - Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) (L-2024-LLR-0041) ML24170A9362024-06-18018 June 2024 NRR E-mail Capture - Fyi - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24142A4992024-05-21021 May 2024 NRR E-mail Capture - Acceptance Review - Farley and Hatch - LAR to Revise TS 1.1 and Add Online Monitoring (OLM) Program (L-2024-LLA-0058) ML24114A2452024-04-23023 April 2024 Acceptance Review - Farley, Units 1 and 2-Proposed LAR to Revise TS SR 3.6.6.8 ML24037A1352024-02-0505 February 2024 e-mail ML23335A0122023-12-0101 December 2023 FNP - IP95001 Inspection Notification and Request for Information (Email to Farley) ML23243A9952023-08-31031 August 2023 Request for Baseline RP Inspection ML23236A0022023-08-22022 August 2023 NRR E-mail Capture - Request for Additional Information - Farley, Units 1&2, Emergency TS 3.6.5 LAR ML23223A0142023-08-10010 August 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23135A0922023-05-11011 May 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Request to Use Specific Provision of a Later Edition of the ASME BPV Code, Section XI (L-2023-LLR-0016) ML23095A0832023-04-0505 April 2023 NRR E-mail Capture - for Your Action - RAI - Farley - Containment Isolation Valves, Surveillance Requirement 3.6.3.5 LAR (L-2022-LLA-0189) ML23086A0232023-03-24024 March 2023 NRR E-mail Capture - for Your Action - Draft RAIs - Farley Surveillance Requirement (SR) 3.6.3.5 License Amendment Request (LAR) (L-2022-LLA-0189) ML23073A0252023-03-13013 March 2023 NRR E-mail Capture - Fyi - Closeout the Evacuation Time Estimate (ETE) Reviews for SNC Fleet ML23045A0782023-02-13013 February 2023 NRR E-mail Capture - Fyi - Revised Estimated Hours - Farley - TS 3.4.10 LAR, Psv Setpoint (L-2022-LLA-0098) ML23009A0062023-01-0606 January 2023 NRR E-mail Capture - Corrected - Acceptance Review - Farley Surveillance Requirement (SR) 3.6.3.5 LAR ML23009A0152023-01-0606 January 2023 NRR E-mail Capture - Acceptance Review - Farley Surveillance Requirement (SR) 3.6.3.5 LAR ML23003A8092023-01-0303 January 2023 NRR E-mail Capture - for Your Action - RAI - Farley - ISI Alternative FNP-ISI-ALT-05-05 (L-2022-LLR-0068) ML22354A0112022-12-19019 December 2022 NRR E-mail Capture - Acceptance Review - Requested Licensing Action Regarding TS Revision to Adopt WCAP-17661-P-A, Improved Relaxed Axial Offset Control and Constant Axial Offset Control Fq Surveillance TS (L-2022-LLA-0148 and L-2022-LLA-01 ML22334A1482022-11-30030 November 2022 NRR E-mail Capture - for Your Action - RAI - Farley - TS 3.4.10 LAR, Psv Setpoint (L-2022-LLA-0098) ML22285A2532022-10-12012 October 2022 NRR E-mail Capture - Acceptance Review - Farley Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.0 ML22285A0082022-10-11011 October 2022 NRR E-mail Capture - Acceptance Review - Farley TS 4.3 LAR (L-2022-LLA-0138) ML22229A4792022-08-15015 August 2022 HP Baseline Inspection Document Request ML22213A2692022-08-0101 August 2022 NRR E-mail Capture - Joseph M. Farley Nuclear Plant Units 1 and 2 - Acceptance of Requested Licensing Action Revise Technical Specification 3.4.10, Pressurizer Safety Valves ML22123A1802022-05-0303 May 2022 NRR E-mail Capture - Correction - RAIs for Farley LAR Re. TS 5.5.17 Containment Leakage Rate Testing Program ML22123A1782022-05-0303 May 2022 NRR E-mail Capture - RAIs for Farley LAR Re. TS 5.5.17 Containment Leakage Rate Testing Program ML22112A0892022-04-22022 April 2022 NRR E-mail Capture - Draft RAIs for Farley LAR Re. TS 5.5.17 ML22104A1312022-04-14014 April 2022 NRR E-mail Capture - Request for Additional Information - Farley and Vogtle - Relocate Piping Inspection License Amendment Request (L-2021-LLA-0235) ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22020A0662022-01-13013 January 2022 NRR E-mail Capture - Acceptance Review - Farley and Vogtle TSTF-269-A LAR (L-2021-LLA-0234) ML22012A0632022-01-11011 January 2022 NRR E-mail Capture - Acceptance Review - Farley and Vogtle TS 5.5.16 LAR (L-2021-LLA-0235) ML22010A2402022-01-10010 January 2022 NRR E-mail Capture - Farley 1 and 2 - Acceptance of Requested Licensing Action Revise TS 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure ML21321A3772021-11-16016 November 2021 NRR E-mail Capture - RAIs for Farley LAR Sump Recirculation Valve Encapsulation Vessel Removal ML21321A3752021-11-10010 November 2021 NRR E-mail Capture - Draft RAIs for Farley LAR Sump Recirculation Valve Encapsulation Vessel Removal ML21292A1562021-10-19019 October 2021 NRR E-mail Capture - Acceptance Review - SNC Operating Fleet TSTF-554 LAR ML21274A0462021-10-0101 October 2021 NRR E-mail Capture - Acceptance Review - Farley and Vogtle TSTF-577 LAR (L-2021-LLA-0163) ML21236A3142021-08-24024 August 2021 NRR E-mail Capture - Joseph M. Farley Nuclear Plant Units 1 and 2 - Acceptance of Requested Licensing Action Amendment to Remove Sump Recirculation Valve Encapsulation ML21180A2002021-06-28028 June 2021 NRR E-mail Capture - Acceptance Review - Farley and Vogtle - Voluntary License Amendment Request to Use Beacon Power Distribution Monitoring System (L-2021-LLA-0109) ML21174A1182021-06-23023 June 2021 NRR E-mail Capture - Acceptance Review - SNC Fleet - Remove Table of Contents LAR (L-2021-LLA-0115) 2024-09-26
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24290A1552024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley, Hatch, and Vogtle 1 and 2 - Proposed Alternative Request for Code Case N-572 ML24290A1572024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds (L-2024-LLR-0047) ML24271A0052024-09-26026 September 2024 NRR E-mail Capture - for Your Response - RAI - Farley and Vogtle 1 and 2 - Proposed Alternative Request for Steam Generator Welds (L-2024-LLR-0041) ML24227A0512024-08-14014 August 2024 August 14, 2024 - Request for Additional Information - Farley, Units 1 and 2 - Proposed LAR to Revise TS SR 3.6.6.8 Frequency ML24179A1242024-06-27027 June 2024 ISFSI Request for Information (2024) ML24143A0412024-05-28028 May 2024 Supplemental Information Needed for Using the Risk-Informed Process for Evaluation for the LAR to Change Technical Specification 3.6.5, Containment Air Temperature, Actions ML24037A1362024-02-0606 February 2024 RP DLR Feb. 2024 ML24037A1352024-02-0505 February 2024 e-mail ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23243A9952023-08-31031 August 2023 Request for Baseline RP Inspection ML23236A0022023-08-22022 August 2023 NRR E-mail Capture - Request for Additional Information - Farley, Units 1&2, Emergency TS 3.6.5 LAR ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23095A0832023-04-0505 April 2023 NRR E-mail Capture - for Your Action - RAI - Farley - Containment Isolation Valves, Surveillance Requirement 3.6.3.5 LAR (L-2022-LLA-0189) ML23086A0232023-03-24024 March 2023 NRR E-mail Capture - for Your Action - Draft RAIs - Farley Surveillance Requirement (SR) 3.6.3.5 License Amendment Request (LAR) (L-2022-LLA-0189) ML23003A8092023-01-0303 January 2023 NRR E-mail Capture - for Your Action - RAI - Farley - ISI Alternative FNP-ISI-ALT-05-05 (L-2022-LLR-0068) ML22334A1482022-11-30030 November 2022 NRR E-mail Capture - for Your Action - RAI - Farley - TS 3.4.10 LAR, Psv Setpoint (L-2022-LLA-0098) ML22123A1782022-05-0303 May 2022 NRR E-mail Capture - RAIs for Farley LAR Re. TS 5.5.17 Containment Leakage Rate Testing Program ML22123A1802022-05-0303 May 2022 NRR E-mail Capture - Correction - RAIs for Farley LAR Re. TS 5.5.17 Containment Leakage Rate Testing Program ML22112A0892022-04-22022 April 2022 NRR E-mail Capture - Draft RAIs for Farley LAR Re. TS 5.5.17 ML22104A1312022-04-14014 April 2022 NRR E-mail Capture - Request for Additional Information - Farley and Vogtle - Relocate Piping Inspection License Amendment Request (L-2021-LLA-0235) ML21321A3772021-11-16016 November 2021 NRR E-mail Capture - RAIs for Farley LAR Sump Recirculation Valve Encapsulation Vessel Removal ML21321A3752021-11-10010 November 2021 NRR E-mail Capture - Draft RAIs for Farley LAR Sump Recirculation Valve Encapsulation Vessel Removal ML21127A1132021-05-0606 May 2021 Notification of Conduct of a Triennial Fire Protection Baseline Inspection - U.S. Nuclear Regulatory Commission Inspection Report Nos. 05000348/2021012 and 05000364/2021012 ML21012A3242021-01-12012 January 2021 NRR E-mail Capture - Request for Additional Information - Farley, 1 and 2 - Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML20351A4042020-12-16016 December 2020 NRR E-mail Capture - Draft RAIs for Farley 50.69 (ML20170B114) ML20293A0752020-10-14014 October 2020 NRR E-mail Capture - RAIs for SNC Fleet EP LAR (L-2020-LLA-0150 and L-2020-LLA-0151) ML20254A1912020-09-10010 September 2020 004 Radiation Safety Baseline Inspection Information Request ML20174A5812020-06-22022 June 2020 Notification of Inspection and Request for Information ML20149K6252020-05-27027 May 2020 NRR E-mail Capture - RAIs for SNC Fleet Fire Protection Exemption Requests ML20149K4392020-05-21021 May 2020 NRR E-mail Capture - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Measurement Uncertainty Recapture Power Uprate RAI Sfnb RAI No. 2 ML20121A1472020-04-29029 April 2020 NRR E-mail Capture - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Measurement Uncertainty Recapture Power Uprate Follow-up RAI Emib No. 1 ML20115E3922020-04-24024 April 2020 NRR E-mail Capture - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Request for Additional Information Regarding TS 3.3.1 and TS 3.3.7 License Amendment Request ML20084G5272020-03-23023 March 2020 NRR E-mail Capture - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Request for Additional Information Measurement Uncertainty Recapture Power Uprate ML20055E9752020-02-28028 February 2020 Request for Additional Information Update the Spent Fuel Pool Criticality Safety Analysis (EPID L-2019-LLA-0212) Non-Proprietary Version ML19150A1022019-05-29029 May 2019 Request for Additional Information Regarding Relief Request FNP-ISI-05-04, Version 1.0 (L-2019-LLR-0020) ML19066A0422019-03-0707 March 2019 NRR E-mail Capture - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Request for Additional Information Regarding Relief Request FNP-ISI-RR-03, Version 1.0 ML19056A2142019-02-25025 February 2019 NRR E-mail Capture - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Request for Additional Information Regarding Relief Request FNP-ISI-RR-02, Version 1.0 ML19052A1712019-02-20020 February 2019 Rad Safety Inspection Document Request ML18355A4772019-01-0404 January 2019 Request for Additional Information Revise TS 5.2.2.g and Update Emergency Plan Minimum On-Shift Staff Tables ML18337A4032018-12-0606 December 2018 Request for Additional Information Revise Technical Specification 5.2.2.G and Updating Emergency Plan Minimum On-Shift Staff Tables ML18239A1542018-08-24024 August 2018 Emergency Preparedness Inspection and Request for Information ML18087A1462018-05-0101 May 2018 Request for Additional Information TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML18058B1522018-02-27027 February 2018 Emailed RP RFI 2018-02 ML18058A0812018-02-27027 February 2018 Enclosurequest for Additional Information(Rai for Review of Southern Nuclear Operating Company'S Decommissioning Funding Plan Updates for Joseph M. Farley,Unit 1 and 2;Edwin I. Hatch,Units 1 and 2; and Vogtle Electric Generating Plant, Unit ML17360A0552017-12-20020 December 2017 NRR E-mail Capture - Joseph M. Farley, Units 1 and 2 - Supplemental RAI Request No. 7 to License Amendment Request to Revise TS 5.5.17 Containment Leakage Rate Testing Program (CAC Nos. MF8844, MF8845; EPID No. L-2016-LLA-0015) ML17306A0872017-11-0808 November 2017 Request for Additional Information Regarding the Decommissioning Funding Status Reports (EPID L-LRO-2017-0008) ML17219A0012017-08-0303 August 2017 NRR E-mail Capture - Joseph M. Farley, Units 1 and 2 - Supplemental RAI Request No. 5(b), 5(c), and 6 Related to License Amendment Request to Revise TS 5.5.17 Containment Leakage Rate Testing Program ML17194A7872017-07-21021 July 2017 Request for Additional Information ML17095A4152017-04-17017 April 2017 Request for Additional Information ML17065A2012017-03-24024 March 2017 Request for Additional Information 2024-09-26
[Table view] |
Text
From: Karl Feintuch Sent: Monday, November 10, 2008 11:17 AM To: McKinney, B. Doug Cc: Daniel Widrevitz; Carlyleamaryllis Nelson-Wilson
Subject:
Request for additional information - MD9746 (RR-66) and MD9748 (RR-68) (Farley, Unit 1)
In reviewing your letter NL-08-1300 dated September 22, 2008, specifically enclosure 4 (for relief request RR-66) and enclosure 6 (for RR-68), the NRC staff has determined the need to review the drawings identified below in boldface.
Unfortunately, the scanning technology and resulting resolution for the drawings previously docketed is not adequate for the intended review. We therefore request hardcopy (paper) media for the purposes of the review.
The supplemental submittal of the drawings indicated in boldface will be issued current ADAMS Accession Numbers for reference as docketed information for the subject licensing actions. A description of the requested information follows.
Sketches indicating the locations and interferences for weld numbers:
- 1. ALA1-1100-1 The earlier submittal of this information was as ALA1-1100-1 as part of RR-37, approved per NRC Letter dated 01/12/99 (reference TACs MB98858 and MB98859) and
- 2. ALA1-1100-8 The earlier submittal of this information was part of RR-56, approved per NRC Letter dated 05/19/05 (reference TACs MB0738 and MC2559).
Drawings associated with the replaced reactor vessel are not requested.
At this time the reviewer who requested this information is ready to use it. Therefore, please propose a response date that is as soon as practical.
Thank you for your assistance in providing previously docketed documentation from which the reviewer can obtain current information for processing the subject licensing action.
Karl Feintuch Project Manager USNRC 301-415-3079 E-mail Properties Mail Envelope Properties (3D27D29AB75BCD4BAE913B63CBFBBEDFAF010EDAD8)
Subject:
Request for additional information - MD9746 (RR-66) and MD9748 (RR-68) (Farley, Unit 1)
Sent Date: 11/10/2008 11:17:00 AM Received Date: 11/10/2008 11:17:00 AM From: Karl Feintuch
Created By: Karl.Feintuch@nrc.gov
Recipients:
BDMCKINN@southernco.com (McKinney, B. Doug)
Tracking Status: None Daniel.Widrevitz@nrc.gov (Daniel Widrevitz)
Tracking Status: None Carlyleamaryllis.Nelson-Wilson@nrc.gov (Carlyleamaryllis Nelson-Wilson)
Tracking Status: None
Post Office:
HQCLSTR01.nrc.gov
Files Size Date & Time
MESSAGE 12506 11/10/2008
Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False
Sensitivity: olNormal Recipients received: