IR 05000498/2018301: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML18029A157
| number = ML18348B084
| issue date = 01/29/2018
| issue date = 12/14/2018
| title = Project Electric Generating Station - Notification of NRC Initial Operator Licensing Examination 05000498/2018301 and 05000499/2018301
| title = Project, Unit 1 and 2, NRC Initial Operator Licensing Examination Report 05000498/2018301 and 05000499/2018301
| author name = Gaddy V G
| author name = Gaddy V G
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS
| addressee name = Powell G T
| addressee name = Powell G T
| addressee affiliation = South Texas Project Nuclear Operating Co
| addressee affiliation = South Texas Project Nuclear Operating Co
Line 10: Line 10:
| license number = NPF-076, NPF-080
| license number = NPF-076, NPF-080
| contact person =  
| contact person =  
| case reference number = 50-498/18-301, 50-499/18-301
| document report number = ER 2018301
| document report number = 50-498/OL-18, 50-499/OL-18
| document type = Letter, License-Operator Examination Report
| document type = Letter, License-Operator, Part 55 Examination Related Material
| page count = 9
| page count = 4
}}
}}


Line 19: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:Code of Federal Regulations
[[Issue date::January 29, 2018]]


Mr. G. Executive Vice President and CNO STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483
/RA/


SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000498/2018301 AND 05000499/2018301
/RA/ /RA/ /RA/ /RA/ /RA/ /RA/ /RA/  


==Dear Mr. Powell:==
*
In a telephone conversation on January 11, 2018, between Ms. Melissa Ripple, Lead Regulatory Exam Author, and Mr. John Kirkland, Chief Examiner, arrangements were made for the administration of operator licensing examinations at South Texas Project Electric Generating Station, Units 1 and 2, during the weeks of October 22 and October 29, 2018.
***
 
****
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 11 of NUREG-1021, "O perator Licensing Examination Standards for Power Reactors." The Nuclear Regulatory Commission's (NRC's) regional office will discuss
 
with your staff any changes that might be necessary before the examinations are administered.
 
To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by May 25, 2018. The written examination outline was provided to your staff on January 11, 2018. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by August 8, 2018. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the examinations and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.
 
We request that any personal, proprietary, sensitive unclassified, or Safeguards Information in your response be contained in a separate enclosure and appropriately marked. Delays in receiving the required materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be cancelled or rescheduled. In addition, your support for on-site validation of the examinations is required during the week of September 17, 2018.
 
To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests along with any video and audio recordings of the dynamic operating tests until the NRC takes its licensing action on all of the applications and any adjudicatory actions on any hearing demands are complete. Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
 
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) approval number 3150-0090) at least 60 days before the first examination date (if able). Mr. Kirkland should be contacted to determine the method for submission of the waiver and/or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB approval number 3150-0090) and, medical certifications (OMB approval number 3150-0024) should be submitted at least 30 days before the first examination date. If the preliminary applications are not received at least 30 days before the examination date, a postponement may be necessary. Final, signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date.
 
Although the minimum guidelines for receiving waiver or excusal requests is 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early in the process as possible (see the 60-day guideline, above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding. Submittals addressing waivers and/or excusals should be in writing (i.e., on NRC Form 398, or as directed when Mr. Kirkland is contacted to determine the method for submission). The NRC's final decision on whether to grant a waiver or excusal will be documented on the final (not preliminary) NRC Form 398 submitted for the applicant and will not be provided until the final application is submitted to the NRC.
 
Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.
 
The burden to the public for these [mandatory information collections is estimated to average 400 hours per examination including the time for re viewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collection. You may submit comments on any aspect of the information collection, including suggestions for reducing the burden, to the FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to INFOCOLLECTS.RESOURCE@NRC.GO V; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
 
Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number. In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice and Procedure," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. Thank you for your cooperation in this matter. Ms. Ripple has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact John Kirkland at 817-200-1771 or me at 817-200-1159.
 
Sincerely,/RA/
Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80
 
cc: Electronic Distribution
 
ML18029A157 SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: JKirkland Yes No Publicly Available Sensitive NRC-002 OFFICE SOE: OB C: OB NAME JKirkland VGaddy SIGNATURE /RA/ /RA/ DATE 1/24/18 1/29/18
}}
}}

Revision as of 22:19, 7 April 2019

Project, Unit 1 and 2, NRC Initial Operator Licensing Examination Report 05000498/2018301 and 05000499/2018301
ML18348B084
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 12/14/2018
From: Vincent Gaddy
Division of Reactor Safety IV
To: Powell G T
South Texas
References
ER 2018301
Download: ML18348B084 (9)


Text

Code of Federal Regulations

/RA/

/RA/ /RA/ /RA/ /RA/ /RA/ /RA/ /RA/