ML18260A089: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML18260A089
| number = ML18260A089
| issue date = 09/13/2018
| issue date = 09/13/2018
| title = Pilgrim Nuclear Power Station - Registration of Spent Fuel Cask Use
| title = Registration of Spent Fuel Cask Use
| author name = Miner P J
| author name = Miner P J
| author affiliation = Entergy Nuclear Operations, Inc
| author affiliation = Entergy Nuclear Operations, Inc

Revision as of 00:43, 1 April 2019

Registration of Spent Fuel Cask Use
ML18260A089
Person / Time
Site: Pilgrim, Holtec
Issue date: 09/13/2018
From: Miner P J
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
2.18.050
Download: ML18260A089 (4)


Text

'-----Letter Number 2.18.050 September 13, 2018 ATTN: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Peter J. Miner Manager, Regulatory Assurance

SUBJECT:

Pilgrim Nuclear Power Station Registration of Spent Fuel Cask Use Pilgrim Nuclear Power Station Docket No. 50-293 Docket No. 72-1044 , , 2.. -1 "' f Renewed License No. DPR-35 -5

Dear Sir or Madam:

In accordance with the requirements of Title10, Code of Federal Regulations 72.212(b)(2), ./ Entergy Nuclear Operations, Inc. is providing the attached information to register the use of approved spent fuel casks at the Pilgrim Nuclear Power Station Independent Spent Fuel Storage Installation.

If you have any questions or require additional information, please contact me at (508) 830-7127. There are no regulatory commitments contained in this letter. Sincerely, Attachment 1 -Cask Registration Information rJM5S z_O µ;11f>S z_t,, ,J~IL fJMSS Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station cc: Mr. David C. Lew Regional Administrator, Region I U. S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-2713 Mr. John Lamb, Senior Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8C2A Washington, DC 20555 NRG Senior Resident Inspector Pilgrim Nuclear Power Station Mr. John Giarrusso, Jr. Planning and Preparedness Section Chief Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702 Mr. John Priest, Director Massachusetts Department of Public Health Radiation Control Program Commonwealth of Massachusetts 529 Main Street, Suite 1 M2A Charlestown, MA 02129-1121 Letter No. 2.18.050 Page 2 of 2 Attachment 1 Letter Number 2.18.050 Cask Registration Information (1 Page) _J CASK REGISTRATION INFORMATION Licensee's Name: Licensee's Address: Reactor License Number: Reactor Docket No.: ISFSI Docket No.: Cask Model No.: Cask Certificate No.: Holtec Cask FSAR Revision No.: Contact for Additional Information:

Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 DPR-35 50-293 72-1044 HI-STORM 100S 1014, Amendment 7 Revision9 PaulJ. Kristian Sr. Project Manager (508) 830-8894 Multi-Purpose Canister Hi-Storm Overpack Placed inService Serial Number Serial Number 610 1132 August16,2018 606 1126 September 7, 2018 Letter Number 2.18.050, Attachment 1 Page 1 of 1