{{#Wiki_filter:SRRS: 3D.105 (when utilized for operator initial or continuing training)
Job Performance Measure Perform 1BwOS RF
-1  JPM Number:
R-113  Revision Number: 151  Date: 03 / 28 / 20 16 Developed By:
Eric Steinberg 03/28/2016 Instructor Date  Validated By:
Dan Burton 04/22/2016 SME or Instructor Date  Reviewed By:
Kevin Lueshen 04/2 2/2016  Operations Representative Date  Approved By:
Eric Steinberg 04/2 6/2016  Training Department Date Braidwood R-113 rev 151 ii SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision: Procedure 1BwOS RF-1  Rev: 14  Procedure Rev:  Procedure Rev:  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date        SME / Instructor Date        SME / Instructor Date Braidwood R-113 rev 151 iii SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary) Revision 151 , New RO admin JPM for ILT 151 NRC exam.
 
Braidwood R-113 rev 151 iv SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC 21 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Verify PPC screens are not setup with PC002 and PC003 data present. 3. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
: 4. This completes the setup for this JPM.
: 5. To repeat, ensure PP C screens are not setup with PC002 and PC003 data present.
Braidwood R-113 rev 151 v SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
: 1. Unit 1 is 100% power.
: 2. The 1RF008 flow indicator is spiking and suspected to be failing
. 3. A leak rate was just complete d in support of 1BwOS RF
-1 step 5a.
: 4. The identified leak rate of 0.15 GPM and an unidentified leak rate of 0.035 GPM. INITIATING CUE
: 1. You are the unit 1 admin NSO.
: 2. Using the 8 hours for PC002 (L2001) and PC003 (L2002) provided, the unit supervisor directs you to perform 1BwOS RF
-1, Unit One Containment Floor Drain Monitoring System Non Routine Surveillance, steps 1 through
: 9. 3. Report t he results to the unit supervisor when step 9 is complete.
 
Provide 1BwOS RF
-1 and data print out once examinee acknowledges the cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
 
1 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM Start Time:
STEP ELEMENT STANDARD SAT UNSAT Comment Number *1 Determine initial total leakage. o Record starting date and time on Table A. Determine TOTAL LEAKAGE into sump per appendix A:
o Find and Record the low level date, and time.
o Find and Record the high level, date, and time.
Calculate the level change
 
for each channel
: o High - Low L2001 28.845
-28.423=0.422 +/- 0.1. L2002 28.573
-28.187= 0.386 +/- 0.1. o Calculate the time change:
o End time - start time.
8 hours or 4 8 0 minutes. Calculate the RF sump total leakage for each indicator:
o Level change/time change L2001 0.015 +/- 0.01. L2002 0.014 +/- 0.01. ___ ___ ___ 2 Record data on table A
. Record total leakage from appendix A on table A
. Determine time requirement for next total leakage determination
: o Add 72 hours to time the leakage was recorded and record on table A
. Record the unidentified leak rate from the leak rate
. surveillance
. Record the flow instrument used to track leakage.
Record the flow reading used to track leakage.
___ ___ ___
2 SRRS: 3D.105 (when utilized for operator initial or continuing training)
STEP ELEMENT STANDARD SAT UNSAT Comment Number *3 Determine Limit #1.
Subtract the unidentified leak rate from 0.8 GPM: 0.8-.035=0.765. Add the leakage determined from step 7 to the sum from the previous step 0.765+0.0 15=0.78 +/-.01. o Determine if Limit #1 > 15 GPM. o Record the results as limit #1 on table A.
___ ___ ___ *4 Determine Limit #2 Subtract 0.2 GPM from the flow determined in step 7: .015-0.2=-0.185 +/- .01. o Record the results as limit #2 on table A.
___ ___ ___ 5 Report the results to the Unit Supervisor.
o Results reported to US.
___ ___ ___ CUE Another operator will continue to trend data.
That completes this JPM.
JPM Stop Time:
 
3 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM
 
==SUMMARY==
 
Operator's Name
:  Emp. ID#: ____________
Job Title:  EO  RO  SRO    FS    STA/IA    SRO Cert JPM Title:
Perform 1BwOS RF
-1 JPM Number:
R-113 Revision Number:
151 Task Number and Title:
4C.AM-05 Perform Common Shiftly and Daily Operating Surveillance.
K/A Number and Importance:
016000G2.1.19 3.9 Suggested Testing Environment:
Simulator Alternate Path:
Yes  No SRO Only:  Yes  No Time Critical:
Yes  No Reference(s):
1BwOS RF-1, rev 14, UNIT ONE CONTAINMENT FLOOR DRAIN MONTIORING SYSTEM NON ROUTINE SURVEILLANCE.
Technical Specification 3.4.15, Leakage Detection Instrumentation.
Actual Testing Environment:  Simulator  Control Room In-Plant  Other Testing Method:
Simulate  Perform Estimated Time to Complete:
20 minutes Actual Time Used:
minutes EVALUATION
 
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                    Evaluator's Name (Print):  Evaluator's Signature
:  Date:
Braidwood R-113 rev 151 4 SRRS: 3D.105 (when utilized for operator initial or continuing training)
APPENDIX A OBTAINING TOTAL LEAKAGE FROM A COMPUTER TERMINAL
: 1. OBTAIN a computer trend of the Containment Floor Drain Sump Level as follows:
: a. START applicable computer trending program.
: b. VERIFY computer trend is for Braidwood Station Unit 1. 
: c. OBTAIN trend for "L2001".
: d. OBTAIN trend for "L2002".
1.0 NOTE In the following step, the sump level trend must be stable for a minimum of two hours, however a longer time period is preferable to give more accurate results. Verify no maintenance activities are in
-
progress that adds water into the RF sump.
: e. USE the slide bar to obtain exact level and time value in the following steps.
: 2. CALCULATE the RF SUMP TOTAL LEAKAGE as follows:
: a. FIND the first level change from the right of the computer screen that either indicates the sump was pumped down or stable input for at least the previous two hours.
: b. RECORD the level and the time of the level reading for each channel:
L2001 LOW LEVEL: 28.423____    TIME: 8 hours ago DATE: Today_____
L2002 LOW LEVEL: 28.187____    TIME: 8 hours ago DATE: Today_____  c. FIND the current level reading for the sump.
 
Braidwood R-113 rev 151 5 SRRS: 3D.105 (when utilized for operator initial or continuing training)
APPENDIX A  (Contd)
: 2. d. RECORD the current level and the time of the level reading for each channel:
L2001 HIGH LEVEL: 28.8 45____    TIME: NOW_____    DATE: Today____  L2002 HIGH LEVEL:
28.57 3____    TIME: NOW_____    DATE: Today____  e. CALCULATE the level change for each channel:
L2001: 28.845__    - 28.423___    = .422 +/- .1__  HIGH (2.d)
LOW (2.b)  LEVEL DIFF
 
L2002: 28.57 3__    - 28.187____    = .386 +/- .1__  HIGH (2.d)
LOW (2.b)  LEVEL DIFF
: f. CALCULATE the time change (in minutes) for each level difference:
L2001: _ NOW ____    - 8 hours ago
    = 480 min ___  TIME (2.d)
TIME (2.b)
TIME DIFF  L2002: _ NOW ____    - 8 hours ago
    = 480 min _  _  TIME (2.d)
TIME (2.b)
TIME DIFF  g. CALCULATE the RF SUMP TOTAL LEAKAGE for each channel using the following equation:
LEVEL DIFF (2.e) x 17.56    = TOTAL LEAKAGE TIME  DIFF (2.f)
 
L2001: ( .422 +/- .1 )  x  17.56  =  .015 +/- .01  gpm (      480               
)  L2002: ( .386 +/- .1 )  x  17.56  =  .014 +/- .01  gpm (      480               
 
(Final)
Braidwood R-113 rev 151 6 SRRS: 3D.105 (when utilized for operator initial or continuing training)
DATA SHEET UNIT ONE CONTAINMENT FLOOR DRAIN MONITORING SYSTEM NON ROUTINE SURVEILLANCE TABLE A  F.1 SURVEILLANCE START TIME/DATE Today's date and current time F.2 TOTAL LEAKAGE
  .015 +/-.01 GPM F.3 TIME/DATE TOTAL LEAKAGE DETERMINED Current time F.4.b NEXT TOTAL LEAKAGE DETERMINATION DUE Current time plus 72 hours (3 days)
F.5.b UNIDENTIFIED RCS LEAK RATE (PER 1BwOSR 3.4.13.1)  .035 GPM F.6 FLOW INSTRUMENT BEING USED L2001 F.7 FLOW READING
  .015 +/- .01 F.8.d LIMIT #1 (0.8 GPM
- STEP F.5.b + STEP F.7)
  .78 +/- .01  F.9.b LIMIT #2 (STEP F.7
- 0.2)  -0.185 +/- .01  TABLE B  Flow Instrument Being Used  _______________
DATE TIME INDICATED FLOW  LIMIT  #1  LIMIT  #2  DATE TIME INDICATED FLOW  LIMIT  #1  LIMIT  #2    Y      N  Y      N      Y      N  Y      N    Y      N  Y      N      Y      N  Y      N    Y      N  Y      N      Y      N  Y      N    Y      N  Y      N      Y      N  Y      N    Y      N  Y      N      Y      N  Y      N    Y      N  Y      N      Y      N  Y      N    Y      N  Y      N      Y      N  Y      N    Y      N  Y      N      Y      N  Y      N    Y      N  Y      N      Y      N  Y      N    Y      N  Y      N      Y      N  Y      N    Y      N  Y      N      Y      N  Y      N    Y      N  Y      N      Y      N  Y      N    Y      N  Y      N      Y      N  Y      N    Y      N  Y      N      Y      N  Y      N    Y      N  Y      N      Y      N  Y      N Braidwood R-113 rev 151 SRRS: 3D.100; There are no retention requirements for this section
 
Braidwood R-113 rev 151 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
: 1. Unit 1 is 100% power.
: 2. The 1RF008 flow indicator is spiking and suspected to be failing
. 3. A leak rate was just complete with an identified leak rate of 0.15 GPM and an unidentified leak rate of 0.035 GPM. INITIATING CUE
: 1. You are the unit 1 admin NSO.
: 2. Using the 8 hours for PC002 (L2001) and PC003 (L2002) provided, the unit supervisor directs you to perform 1BwOS RF
-1, Unit One Containment Floor Drain Monitoring System Non Routine Surveillance, steps 1 through 9. 3. Report the results to the unit supervisor when step 9 is complete.
 
SRRS: 3D.105 (when utilized for operator initial or continuing training) i  Job Performance Measure Perform a QPTR Calculation w/o Process Computer
 
JPM Number:
R-102  Revision Number: 151 a  Date: 0 6 / 23 / 20 1 6 Developed By:
Eric Steinberg 06/23/2016  Instructor Date  Validated By:
Eric Steinberg SME or Instructor Dat e  Reviewed By:
Kevin Lueshen Operations Representative Date  Approved By:
Eric Steinberg Training Department Date Braidwood R-102 - rev 151 a  SRRS: 3D.105 (when utilized for operator initial or continuing training) ii  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________  ________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure 1BwOSR 3.2.4.1 Rev:    9  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then
 
revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date        SME / Instructor Date        SME / Instructor Date Braidwood R-102 - rev 151 a  SRRS: 3D.105 (when utilized for operator initial or continuing training) iii Revision Record (Summary)
Revisio n 151 , Revision includes current revisions of referenced procedures and current revision of TQ
-A A-150-J 02 0 JPM Template.
Revision 151a, updated JPM to include pictures of NIs and operator aid
. This eliminated the error trap of having multiple attachments that had to be hand out at different times based on operator actions.
Braidwood R-102 - rev 151  SIMULATOR SETUP INSTRUCTIONS
: 1. Not required if pictures will be used, if not continue with step 2
: 2. Reset the simulator to IC
-21 or equivalent 100% power IC. 3. Simulator needs to run for at least 10 minutes.
: 4. Ensure PPC screens are not set up to go to calorimetric screen with options filled in.
: 5. Ensure rods in auto.
: 6. Verify that the NIS front panel detector currents are equal to the values recorded below , prior to each occurrence of this JPM.
: 7. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
: 8. This completes the setup for this JPM.
Answer KEY  Date: TODAY Time: NOW Channel N41 N42 N43 N44 Is the channel operable?
Y  N  Y  N  Y  N  Y  N Instrument reading 100% 100% 100% 100% UPPER DETECTORS (A)
Present upper detector current 190 +/-10 185+/-10 190+/-10 185+/-10 100% upper detector current 194 179 1 92 186 Normalized detector current
.979  +/-.06 1.03  +/-.06 .990  +/-.06 .99 5  +/-.06 Average normalized current
.99 9 +/-.05 Upper power tilt ratio (¢ 1.02) ¢ .980 +/-.01 ¢ 1.03 4 +/-.0 1 ¢ .99 1 +/-.0 1 ¢ .996 +/-.01 LOWER DETECTORS (B)
Present lower d etector current 170+/-10 150+/-10 165+/-10 165+/-10 100% lower detector current 170 153 165 168 Normalized detector current 1.00  +/-.06 .980 +/-.06 1.00  +/-.06 .982  +/-.06 Average normalized current
.990 +/- .1 Lower power tilt ratio (¢ 1.02) ¢ 1.01 0 +/-.01 ¢ .989 +/-.01 ¢ 1.01 0 +/-.0 1 ¢ .991 +/-.01 Braidwood R-102 - rev 151  SRRS: 3D.105 (when utilized for operator initial or continuing training) 1 INITIAL CONDITIONS
: 1. You are an extra NSO.
: 2. Unit 1 is at full power.
: 3. All four NIS detector power meters read 100% reactor power. INITIATING CUE 1. The US has directed you to perform, the weekly QPTR calculation using NIS meters per 1BwOSR 3.2.4.1. 
: 2. Digital voltmeter will not be used for this surveillance.
: 3. The process computer is inoperable only for the purpose of this surveillance.
Provide student copy of 1BwOSR 3.2.4.1 and inform them that all prerequisites, precautions, limitations and actions are met.
Answer key available in setup instructions.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
 
Braidwood R-102 - rev 151  SRRS: 3D.105 (when utilized for operator initial or continuing training) 2  JPM Start Time:
STEP ELEMENT STANDARD SAT UNSAT Comment Number 1 Indicate the applicability of this surveillance on Data Sheet D
-3. Determine NIS meters must be used to perform this surveillance and INDICATE on Data Sheet D
-3:  CHECK 7-day block.
___ ___ ___ 2 Record Date and Time on Data Sheet D-3. RECORD Date and Time on data sheet D-3. ___ ___ ___ 3 Record power range NIs operability status.
On Data Sheet D
-3, RECORD the following for power range NIs 41-44:  'Y' block checked for each channel indication reliable.
100% (or present power reading from each channel at 1PM07J).
___ ___ ___ CUE If asked, the Unit has NO LCOARs in progress at this time.
CUE Provide the examinee with the attached pictures of N
-41, N-42, N-43 and N-44 upper and lower detector currents to record readings from.
NOTE: JPM steps 4 through 8 may be done for the upper section then repeated for the lower detecto rs or steps 4 and 5 may be recorded for both upper and lower detectors before proceeding to step 6.
Braidwood R-102 - rev 151  SRRS: 3D.105 (when utilized for operator initial or continuing training) 3 STEP ELEMENT STANDARD SAT UNSAT Comment Number *4 Record each present detector current reading from 1PM07J on Data Sheet D
-3. 
 
All present Upper and Lower Detector Currents recorded within + 10 amps of actual values on Data Sheet D
-3. (Procedural Adherence)
UPPERS:  N41  190  N42  185  N43  190  N44  185 LOWERS:  N41  170  N42  150  N43  165  N44  165 ___ ___ ___ CUE Provide the examinee with the attached operator aid page for N
-41, N-42, N-43 and N-44 upper and lower normalized detector currents.
NOTE Prior to commencing this JPM, the actual readings should be logged here
 
Braidwood R-102 - rev 151  SRRS: 3D.105 (when utilized for operator initial or continuing training) 4 STEP ELEMENT STANDARD SAT UNSAT Comment Number 5 Record 100% Detector Currents from Operator Aid Book on data Sheet D-3. Record the 100% Detector Currents from the Operator Aid Book for each upper and lower detector on Data Sheet D
-3: (Procedural Adherence)
UPPERS:  N41  194  N42  179  N43  192  N44  186 LOWERS:  N41  170  N42  153  N43  165  N44  168 ___ ___ ___ *6 Using the D
-3 Data Sheet, perform the calculations to obtain the normalize d detector currents and log them on the data sheet.
(Key for data sheet D
-3 available on setup sheet)
Calculate the Normalized Detector Currents for each detector by dividing its present detector current reading by the 100% detector current value from the operator aid and log on the D
-3 Data Sheet:
(Procedural Adherence)
Each Upper  Each Lower ___ ___ ___
Braidwood R-102 - rev 151  SRRS: 3D.105 (when utilized for operator initial or continuing training) 5 STEP ELEMENT STANDARD SAT UNSAT Comment Number *7 Using the D
-3 Data Sheet, perform the calculations to obtain the average normalized currents and log them on the data sheet.
  (Key for data sheet D
-3 available on setup sheet)
Calculate the Average Normalized Current by summing the upper (lower) normalized detector currents and dividing by 4 and log on the D-3 Data Sheet:
(Procedural Adherence)
Upper Average  Lower Average
___ ___ ___ *8 Using the D
-3 Data Sheet, perform the calculations to determine the QPTR for each detector and log them on the data sheet.
  (Key for data sheet D
-3 available on setup sheet)
Determine the QPTR for each detector by dividing each Normalized Detector Current by the Average Normalized Current and log on the D
-3 data sheet:
(Procedural Adherence)
Each Upper Ea ch Lower ___ ___ ___ *9 Identify N42 Upper Detector QPTR is unacceptable.
Determine if QPTR is acceptable:
Identify N42 Upper Detector QPTR is >1.02 and is unacceptable.
(Regulatory Compliance
) o Immediately notify the Shift Manager or Designee to initiate LCOAR (1BwOL 3.2.4). ___ ___ ___ CUE As SM, acknowledge the required initiation of LCOAR 1BwOL 3.2.4 JPM Stop Time:
 
Braidwood R-102 - rev 151  SRRS: 3D.105 (when utilized for operator initial or continuing training) 6 JPM
 
==SUMMARY==
 
Operator's Name
:  Emp. ID#: ____________  Job Title:  EO  RO  SRO    FS    STA/IA    SRO Cert  JPM Title:
Perform a QPTR Calculation w/o Process Computer JPM Number:
R-102 Revision Number: 151 Task Number and Title:
R-RK-003, Perform a QPTR calc and Evaluate TS limits K/A Number and Importance:
015000G2.1.7 , 4.4 Suggested Testing Environment:
Simulator Alternate Path:
Yes  No SRO Only:  Yes  No Time Critical:
Yes  No Reference(s):
1BwOSR 3.2.4.1, Rev. 9, Unit One Quadrant Power Tilt Ratio Calculation Operator Aid for 100% Power NIS Detector Currents Actual Testing Environment:
Simulator  Control Room In-Plant  Other Testing Method:
Simulate  Perform Estimated Time to Complete:
22 minutes Actual Time Used:
minutes EVALUATION
 
==SUMMARY==
: Were all the Critical Elements performed satisfactorily?
Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                        Evaluator's Name
:  (Print) Evaluator's Signature
:  Date:   
 
INITIAL CONDITIONS
: 1. You are an extra NSO.
: 2. Unit 1 is at full power.
INITIATING CUE 1. The US has provided you a copy of, and directed you to perform, the weekly QPTR calculation using NIS meters per 1BwOSR 3.2.4.1. The process computer is inoperable only for the purpose of this surveillance.
 
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Job Performance Measure Identify leak isolation point from station drawings.
JPM Number:
R-204  Revision Number: 151  Date: 03 / 29 / 20 16 Developed By:
Eric Steinberg 03/29/2016 Instructor Date  Validated By:
Dan Burton 04/22/2016 SME or Instructor Date  Reviewed By:
Kevin Lueshen 04/22/2016 Operations Representative Date  Approved By:
Eric Steinberg 04/26/2016 Training Department Date Braidwood R-204 rev 151 ii SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure 0BwOA SEC-4  Rev: 103  Procedure M-55-sheet 2A  Rev: A W  Procedure M-55-sheet 2D  Rev: K  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date        SME / Instructor Date        SME / Instructor Date Braidwood R-204 rev 151 iii SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)
Revision 151 , Updated to current revisions of the procedure s and TQ-AA-150-J020 template.
Braidwood R-204 rev 151 iv SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS
: 1. Not required, but if used set up any at power I C. 2. Ensure the simulator ready to run checklist is complete.
: 3. Ensure all required procedures and prints are cleaned and put away.
: 4. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
: 5. This completes the setup for this JPM.
 
Braidwood R-204 rev 151 v SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
: 1. You are an extra NSO.
: 2. BOTH units are at 100% power.
: 3. An EO was re
-positioning 2FW094, MAIN FEEDWATER H.P. CLEANUP LINE FLOW CONTROL VALVE, to adjust Steam Generator Blowdown Hotwell Pump discharge pressure. 4. An instrument air line broke at the 1" to 1/2" reducer upstream of the 2FW094, HP FLUSH LINE FLOW CONT VLV.
: 5. The EO reports the header goes into 401' elevation overhead and the EO cannot trace the header back to an isolation valve.
: 6. The crew entered 0BwOA SEC
-4 LOSS OF INSTRUMENT AIR UNIT 0 due to dropping instrument air pressure and is currently at step 6.c.
: 7. Instrument air pressure is 87 psig and stable.
INITIATING CUE
: 1. The US has directed you to determine an acceptable isolation point that will allow the unit to remain at power. Report your recommendation to the US.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
 
Braidwood R-204 rev 151 1 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM Start Time:
STEP ELEMENT STANDARD SAT UNSAT Comment Number 1 Refer to 0BwOA SEC
-4. (table A page 15 for unit 2 turbine building)
Refers to 0BwOA SEC
-4, table A. Determine 0IA907 valve is on P&ID M-55-2A. ___ ___ ___ CUE When P&ID is located in the books on back table in simulator (or in the classroom), provide examinee a copy of P&ID M
-55 sheet 2A.
If performed in the classroom
, confirm where the examinee would locate the drawing (EDMS is also acceptable) and provide P&ID M
-55 sheet 2A.
2 Refer to P&ID M
-55 sheet 2A.
(pipe will transition to another print at grid D and 4) o Refers to P&ID 55 sheet 2A.
o Determines instrument air line 2IA100A is continued on P&ID M-55-2D. ___ ___ ___ CUE When P&ID M
-55 sheet 2D is identified as a needed print
, provide examinee a copy of P&ID M-55 sheet 2D
. 3 Refer to P&ID M
-55 sheet 2D.
(The broken valve is at Grid location E and 3)
Refers to P&ID 55 sheet 2D.
Determines that instrument air  header line number 2IA100A also supplies the feed reg vlaves and feed pump recirc valves.
___ ___ ___ *4 Determines isolation point.
Determines that 2IA1008 (or 2IA1007) is an acceptable isolation point.
Recomends to US that 2IA1008 (or 2IA1007) should be closed to isolate the leak.
o Recommends that steam generator blowdown be secured or re
-directed to the blowdown monitor tanks due to the loss of air to 2FW094.
___ ___ ___
Braidwood R-204 rev 151 2 SRRS: 3D.105 (when utilized for operator initial or continuing training)
STEP ELEMENT STANDARD SAT UNSAT Comment Number CUE As the unit supervisor
, acknowledge recommended isolation point, and inform examinee an EO is being dispatched to close the recommended valve.
CUE As the unit supervisor acknowledge the recommendation to re
-direct or secure blowdown. CUE The EO reports that the first recommended isolation point (2IA1008 or 2IA1007) is inaccessible and an alternate isolation point is required.
*5 Determines alternate isolation point. Determines that 2IA100 7 (or 2IA100
: 8) is an acceptable alternate isolation point.
Recomends to US that 2IA100 7 (or 2IA100
: 8) should be closed to isolate the leak.
___ ___ ___ CUE As the unit supervisor acknowledge recommended isolation point, and inform examinee an EO is being dispatched to close the recommended valve.
CUE This completes this JPM. JPM Stop Time:
 
Braidwood R-204 rev 151 3 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM
 
==SUMMARY==
 
Operator's Name
:  Emp. ID#: ____________
Job Title:  EO  RO  SRO    FS    STA/IA    SRO Cert JPM Title:
Identify leak isolation point from station mechanical drawings.
JPM Number:
R-204 Revision Number:
151 Task Number and Title:
R-AM-134, Troubleshoot plant equipment using plant mechanical & electrical drawings.
K/A Number and Importance:
078000G2.2.41 3.5/3.9 Suggested Testing Environment:
Classroom or Simulator Alternate Path:
Yes  No SRO Only:  Yes  No Time Critical:
Yes  No Reference(s): 0BwOA SEC
-4, rev 103, LOSS OF INSTRUMENT AIR UNIT 0, M
-55 Sheet 2A, rev AW, DIAGRAM OF TURBINE ROOM INSTRUMENT AIR, M
-55 Sheet 2D, rev K, DIAGRAM OF INSTRUMENT AIR UNIT 2 Actual Testing Environment:
Simulator  Control Room In-Plant  Other Testing Method:
Simulate  Perform Estimated Time to Complete: 13 minutes Actual Time Used:
minutes EVALUATION
 
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                    Evaluator's Name (Print):  Evaluator's Signature
:  Date:
Braidwood R-204 rev 151 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
: 1. You are an extra NSO.
: 2. BOTH units are at 100% power.
: 3. An EO was re
-positioning 2FW094, MAIN FEEDWATER H.P. CLEANUP LINE FLOW CONTROL VALVE, to adjust Steam Generator Blowdown Hotwell Pump discharge pressure. 4. An instrument air line broke at the 1" to 1/2" reducer upstream of the 2FW094, HP FLUSH LINE FLOW CONT VLV.
: 5. The EO reports the header goes into 401' elevation overhead and the EO cannot trace the header back to an isolation valve.
: 6. The crew entered 0BwOA SEC
-4 LOSS OF INSTRUMENT AIR UNIT 0 due to dropping instrument air pressure and is currently at step 6.c.
: 7. Instrument air pressure is 87 psig and stable.
INITIATING CUE
: 1. The US has directed you to determine an acceptable isolation point that will allow the unit to remain at power. Report your recommendation to the US.
 
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Job Performance Measure Perform Offsite Notification (NARS Form Transmittal) for Unusual Event JPM Number:
R-401  Revision Number: 151  Date: 03 / 22 / 20 16 Developed By:
Eric Steinberg  03/22/2016 Instructor Date  Validated By:
Dan Burton 04/22/2016 SME or Instructor Date  Reviewed By:
Kevin Lueshen 04/23/2016 Operations Representative Date  Approved By:
Eric Steinberg 04/23/2016 Training Department Date Braidwood R-401 rev 151 ii SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure EP-MW-114-100 Rev: 016  Procedure EP-MW-114-100-F01  Rev: H  Procedure
 
Rev:  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date        SME / Instructor Date        SME / Instructor Date Braidwood R-401 rev 151 iii SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)
Revision 151 , Updated JPM to current template format and revised procedures.
 
Braidwood R-401 rev 151 iv SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS
: 1. Not required, if used ensure the booth operator is present and able to answer the NARS phone. NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. If the simulator NARS phones are going to be used, ensure they are setup to transmit to the bo oth operator
, not the NARS line
. 3. When the above steps are completed for this and other JPMs to be run concurrently then
 
validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
: 4. This completes the setup for this JPM.
 
Braidwood R-401 rev 151 v SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
: 1. You are an extra NSO.
: 2. Unit 1 reactor trip has occurred.
: 3. An unusual event was declared two minutes ago.
: 4. E P-MW-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM has been filled out and approved.
: 5. The NARS phone is operable.
: 6. This is a TIME CRITICAL JPM.
INITIATING CUE
: 1. The Shift Manager directs you to transmit the NARS form per EP
-MW-114-100, MW Region Offsite Notifications.
: 2. Inform the Shift Manager when the NARS form has been transmitted.
: 3. This is a TIME CRITICAL JPM.
Fill out or have the exam fill out the time for 2 minutes before the current time and todays date on EP
-MW-114-100-F-01 before acknowledging the cue and starting the clock on the JPM.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
 
Braidwood R-401 rev 151 1 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM Start Time:
STEP ELEMENT STANDARD SAT UNSAT Comment Number NOTE: JPM critical time (13 minutes) starts when the initiating cue has been read to the examinee and stops after the initial roll call is made.
1 Determine correct communications method
. Refer to EP
-MW-114-100 and determine step 4.
3 needs to be performed Refer to EP
-MW-114-100-F-01 and determine NARS Code 20 to be used to transmit NARS form.
___ ___ ___ NOTE: If performed in the simulator, ensure the booth operator is prepared to answer the NARS phone and give the cues.
Braidwood R-401 rev 151 2 SRRS: 3D.105 (when utilized for operator initial or continuing training)
  *2 Establish communications Establish communications as follows:  Pick up the NARS phone
. Use code BW 20. o Read the following message: "This is the Exelon Nuclear Braidwood Station Main Control Room. Please Standby for a NARS message."  Read the following message again as agencies pick up: "This is the Exelon Nuclear Braidwood Station Main Control Room. Please Standby to receive a NARS message and respond as the roll is called."  TAKE initial roll call. Mark initial Boxes for IEMA and Illinois REAC Record time and date initial roll call complete.
___ ___ ___ CUE After using code BW 20 and reading initial roll call
: Respond IEMA online when IEMA is called
. Respond REAC online when Illinois REAC is called.
NOTE: Critical time is met when the examinee completes roll call. Record completion TIME:_____________.
 
Braidwood R-401 rev 151 3 SRRS: 3D.105 (when utilized for operator initial or continuing training)
  *3 Verbally transmit the NARS Form. Verbally transmit the NARS Form:  Utility Message No:
1_ o State Message No: N/A 1. Status - [B] Drill/Exercise
: 2. Station - [A] Braidwood
: 3. Onsite Condition
- [A] Unusual Event
: 4. Accident Classified:
o Time: Two minutes ago.
o Date: Today's date. o EAL # : MU 6 o Accident Terminated Date and Time: N/A 5. Release Status: [A] None 6. Type of Release: [A] Not Applicable
: 7. Wind Dir: 270 8. Wind Speed:
o  [A] is N/A o  [B] 4.5 Miles/Hr
: 9. Recommended Actions: Utility Recommendation: [A] None 10. Additional Information: None Verified With: U. Supervisor Approved By: S. Manager
___ ___ ___ 4 Complete the NARS form. Fill in the following information on the NARS form after transmitting info in blocks 1
-10:  Mark 11A, EXELON Examinee Name Outside line number Current time/ Date Request and record name and organization of the person receiving the message. Current time/date
___ ___ ___ CUE When asked for name and organization respond John Smith, IEMA.
 
Braidwood R-401 rev 151 4 SRRS: 3D.105 (when utilized for operator initial or continuing training) 5 Perform final roll call
. Perform final roll call and records by marking boxes IEMA  Illinois REAC Asks if there are any question about the information provided. ___ ___ ___ CUE When called on for roll call respond IEMA, and Illinois REAC.
Respond no questions when asked.
6 Complete call.
State "NARS communication is complete."
___ ___ ___ NOTE: Critical time stopped after initial roll call was complete JPM step 3.
Determine critical time:
_________________________    -    ____________________  __    =    _ ______________________
(Time initial roll call complete)                  (JPM start time)                                       
< 13 minutes
  *7 Critical time met.
Initial roll call complete
< 13 minutes. ___ ___ ___ CUE That completes the JPM.
JPM Stop Time:
 
Braidwood R-401 rev 151 5 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM
 
==SUMMARY==
 
Operator's Name
:  Emp. ID#: ____________
Job Title:  EO  RO  SRO    FS    STA/IA    SRO Cert JPM Title:
Perform Offsite Notification (NARS form transmittal) for Unusual Event JPM Number:
R-401 Revision Number:
151 Task Number and Title:
R-ZP-004, Transmit NARS form K/A Number and Importance:
R-002 000G2.4.39, 3.9 Suggested Testing Environment:
Simulator Alternate Path:
Yes  No SRO Only:  Yes  No Time Critical:
Yes  No Reference(s):
EP-MW-114-100, Rev. 1 6, MW Region Offsite Notifications EP-MW-114-100-F-01, Rev. H, Nuclear Accident Reporting System (NARS) Form  Actual Testing Environment:
Simulator  Control Room In-Plant  Other Testing Method:
Simulate  Perform Estimated Time to Complete:
10 minutes Actual Time Used:
minutes EVALUATION
 
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                    Evaluator's Name (Print):  Evaluator's Signature
:  Date:
Braidwood R-401 rev 151 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
: 1. You are an extra NSO.
: 2. Unit 1 reactor trip has occurred.
: 3. An unusual event was declared two minutes ago.
: 4. E P-MW-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM has been filled out and approved.
: 5. The NARS phone is operable.
: 6. This is a TIME CRITICAL JPM.
INITIATING CUE
: 1. The Shift Manager directs you to transmit the NARS form per EP
-MW-114-100, MW Region Offsite Notifications.
: 2. Inform the Shift Manager when the NARS form has been transmitted.
: 3. This is a TIME CRITICAL JPM.}}

Revision as of 00:47, 19 October 2018

2016 Braidwood Initial License Examination Administered RO Admin JPMs
ML16307A193
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 09/21/2016
From: Walton R K
NRC/RGN-III/DRS/OLB
To:
Shared Package
ML16306A161 List:
References
Download: ML16307A193 (48)


Text

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Job Performance Measure Perform 1BwOS RF

-1 JPM Number:

R-113 Revision Number: 151 Date: 03 / 28 / 20 16 Developed By:

Eric Steinberg 03/28/2016 Instructor Date Validated By:

Dan Burton 04/22/2016 SME or Instructor Date Reviewed By:

Kevin Lueshen 04/2 2/2016 Operations Representative Date Approved By:

Eric Steinberg 04/2 6/2016 Training Department Date Braidwood R-113 rev 151 ii SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in

-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision: Procedure 1BwOS RF-1 Rev: 14 Procedure Rev: Procedure Rev: ________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Braidwood R-113 rev 151 iii SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary) Revision 151 , New RO admin JPM for ILT 151 NRC exam.

Braidwood R-113 rev 151 iv SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 21 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. Verify PPC screens are not setup with PC002 and PC003 data present. 3. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
4. This completes the setup for this JPM.
5. To repeat, ensure PP C screens are not setup with PC002 and PC003 data present.

Braidwood R-113 rev 151 v SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS

1. Unit 1 is 100% power.
2. The 1RF008 flow indicator is spiking and suspected to be failing

. 3. A leak rate was just complete d in support of 1BwOS RF

-1 step 5a.

4. The identified leak rate of 0.15 GPM and an unidentified leak rate of 0.035 GPM. INITIATING CUE
1. You are the unit 1 admin NSO.
2. Using the 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for PC002 (L2001) and PC003 (L2002) provided, the unit supervisor directs you to perform 1BwOS RF

-1, Unit One Containment Floor Drain Monitoring System Non Routine Surveillance, steps 1 through

9. 3. Report t he results to the unit supervisor when step 9 is complete.

Provide 1BwOS RF

-1 and data print out once examinee acknowledges the cue.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

1 SRRS: 3D.105 (when utilized for operator initial or continuing training)

JPM Start Time:

STEP ELEMENT STANDARD SAT UNSAT Comment Number *1 Determine initial total leakage. o Record starting date and time on Table A. Determine TOTAL LEAKAGE into sump per appendix A:

o Find and Record the low level date, and time.

o Find and Record the high level, date, and time.

Calculate the level change

for each channel

o High - Low L2001 28.845

-28.423=0.422 +/- 0.1. L2002 28.573

-28.187= 0.386 +/- 0.1. o Calculate the time change:

o End time - start time.

8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or 4 8 0 minutes. Calculate the RF sump total leakage for each indicator:

o Level change/time change L2001 0.015 +/- 0.01. L2002 0.014 +/- 0.01. ___ ___ ___ 2 Record data on table A

. Record total leakage from appendix A on table A

. Determine time requirement for next total leakage determination

o Add 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to time the leakage was recorded and record on table A

. Record the unidentified leak rate from the leak rate

. surveillance

. Record the flow instrument used to track leakage.

Record the flow reading used to track leakage.

___ ___ ___

2 SRRS: 3D.105 (when utilized for operator initial or continuing training)

STEP ELEMENT STANDARD SAT UNSAT Comment Number *3 Determine Limit #1.

Subtract the unidentified leak rate from 0.8 GPM: 0.8-.035=0.765. Add the leakage determined from step 7 to the sum from the previous step 0.765+0.0 15=0.78 +/-.01. o Determine if Limit #1 > 15 GPM. o Record the results as limit #1 on table A.

___ ___ ___ *4 Determine Limit #2 Subtract 0.2 GPM from the flow determined in step 7: .015-0.2=-0.185 +/- .01. o Record the results as limit #2 on table A.

___ ___ ___ 5 Report the results to the Unit Supervisor.

o Results reported to US.

___ ___ ___ CUE Another operator will continue to trend data.

That completes this JPM.

JPM Stop Time:

3 SRRS: 3D.105 (when utilized for operator initial or continuing training)

JPM

SUMMARY

Operator's Name

Emp. ID#: ____________

Job Title: EO RO SRO FS STA/IA SRO Cert JPM Title:

Perform 1BwOS RF

-1 JPM Number:

R-113 Revision Number:

151 Task Number and Title:

4C.AM-05 Perform Common Shiftly and Daily Operating Surveillance.

K/A Number and Importance:

016000G2.1.19 3.9 Suggested Testing Environment:

Simulator Alternate Path:

Yes No SRO Only: Yes No Time Critical:

Yes No Reference(s):

1BwOS RF-1, rev 14, UNIT ONE CONTAINMENT FLOOR DRAIN MONTIORING SYSTEM NON ROUTINE SURVEILLANCE.

Technical Specification 3.4.15, Leakage Detection Instrumentation.

Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete:

20 minutes Actual Time Used:

minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments: Evaluator's Name (Print): Evaluator's Signature

Date:

Braidwood R-113 rev 151 4 SRRS: 3D.105 (when utilized for operator initial or continuing training)

APPENDIX A OBTAINING TOTAL LEAKAGE FROM A COMPUTER TERMINAL

1. OBTAIN a computer trend of the Containment Floor Drain Sump Level as follows:
a. START applicable computer trending program.
b. VERIFY computer trend is for Braidwood Station Unit 1.
c. OBTAIN trend for "L2001".
d. OBTAIN trend for "L2002".

1.0 NOTE In the following step, the sump level trend must be stable for a minimum of two hours, however a longer time period is preferable to give more accurate results. Verify no maintenance activities are in

-

progress that adds water into the RF sump.

e. USE the slide bar to obtain exact level and time value in the following steps.
2. CALCULATE the RF SUMP TOTAL LEAKAGE as follows:
a. FIND the first level change from the right of the computer screen that either indicates the sump was pumped down or stable input for at least the previous two hours.
b. RECORD the level and the time of the level reading for each channel:

L2001 LOW LEVEL: 28.423____ TIME: 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> ago DATE: Today_____

L2002 LOW LEVEL: 28.187____ TIME: 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> ago DATE: Today_____ c. FIND the current level reading for the sump.

Braidwood R-113 rev 151 5 SRRS: 3D.105 (when utilized for operator initial or continuing training)

APPENDIX A (Contd)

2. d. RECORD the current level and the time of the level reading for each channel:

L2001 HIGH LEVEL: 28.8 45____ TIME: NOW_____ DATE: Today____ L2002 HIGH LEVEL:

28.57 3____ TIME: NOW_____ DATE: Today____ e. CALCULATE the level change for each channel:

L2001: 28.845__ - 28.423___ = .422 +/- .1__ HIGH (2.d)

LOW (2.b) LEVEL DIFF

L2002: 28.57 3__ - 28.187____ = .386 +/- .1__ HIGH (2.d)

LOW (2.b) LEVEL DIFF

f. CALCULATE the time change (in minutes) for each level difference:

L2001: _ NOW ____ - 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> ago

= 480 min ___ TIME (2.d)

TIME (2.b)

TIME DIFF L2002: _ NOW ____ - 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> ago

= 480 min _ _ TIME (2.d)

TIME (2.b)

TIME DIFF g. CALCULATE the RF SUMP TOTAL LEAKAGE for each channel using the following equation:

LEVEL DIFF (2.e) x 17.56 = TOTAL LEAKAGE TIME DIFF (2.f)

L2001: ( .422 +/- .1 ) x 17.56 = .015 +/- .01 gpm ( 480

) L2002: ( .386 +/- .1 ) x 17.56 = .014 +/- .01 gpm ( 480

)

(Final)

Braidwood R-113 rev 151 6 SRRS: 3D.105 (when utilized for operator initial or continuing training)

DATA SHEET UNIT ONE CONTAINMENT FLOOR DRAIN MONITORING SYSTEM NON ROUTINE SURVEILLANCE TABLE A F.1 SURVEILLANCE START TIME/DATE Today's date and current time F.2 TOTAL LEAKAGE

.015 +/-.01 GPM F.3 TIME/DATE TOTAL LEAKAGE DETERMINED Current time F.4.b NEXT TOTAL LEAKAGE DETERMINATION DUE Current time plus 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> (3 days)

F.5.b UNIDENTIFIED RCS LEAK RATE (PER 1BwOSR 3.4.13.1) .035 GPM F.6 FLOW INSTRUMENT BEING USED L2001 F.7 FLOW READING

.015 +/- .01 F.8.d LIMIT #1 (0.8 GPM

- STEP F.5.b + STEP F.7)

.78 +/- .01 F.9.b LIMIT #2 (STEP F.7

- 0.2) -0.185 +/- .01 TABLE B Flow Instrument Being Used _______________

DATE TIME INDICATED FLOW LIMIT #1 LIMIT #2 DATE TIME INDICATED FLOW LIMIT #1 LIMIT #2 Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Braidwood R-113 rev 151 SRRS: 3D.100; There are no retention requirements for this section

Braidwood R-113 rev 151 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS

1. Unit 1 is 100% power.
2. The 1RF008 flow indicator is spiking and suspected to be failing

. 3. A leak rate was just complete with an identified leak rate of 0.15 GPM and an unidentified leak rate of 0.035 GPM. INITIATING CUE

1. You are the unit 1 admin NSO.
2. Using the 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for PC002 (L2001) and PC003 (L2002) provided, the unit supervisor directs you to perform 1BwOS RF

-1, Unit One Containment Floor Drain Monitoring System Non Routine Surveillance, steps 1 through 9. 3. Report the results to the unit supervisor when step 9 is complete.

SRRS: 3D.105 (when utilized for operator initial or continuing training) i Job Performance Measure Perform a QPTR Calculation w/o Process Computer

JPM Number:

R-102 Revision Number: 151 a Date: 0 6 / 23 / 20 1 6 Developed By:

Eric Steinberg 06/23/2016 Instructor Date Validated By:

Eric Steinberg SME or Instructor Dat e Reviewed By:

Kevin Lueshen Operations Representative Date Approved By:

Eric Steinberg Training Department Date Braidwood R-102 - rev 151 a SRRS: 3D.105 (when utilized for operator initial or continuing training) ii JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in

-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ ________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure 1BwOSR 3.2.4.1 Rev: 9 ________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then

revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Braidwood R-102 - rev 151 a SRRS: 3D.105 (when utilized for operator initial or continuing training) iii Revision Record (Summary)

Revisio n 151 , Revision includes current revisions of referenced procedures and current revision of TQ

-A A-150-J 02 0 JPM Template.

Revision 151a, updated JPM to include pictures of NIs and operator aid

. This eliminated the error trap of having multiple attachments that had to be hand out at different times based on operator actions.

Braidwood R-102 - rev 151 SIMULATOR SETUP INSTRUCTIONS

1. Not required if pictures will be used, if not continue with step 2
2. Reset the simulator to IC

-21 or equivalent 100% power IC. 3. Simulator needs to run for at least 10 minutes.

4. Ensure PPC screens are not set up to go to calorimetric screen with options filled in.
5. Ensure rods in auto.
6. Verify that the NIS front panel detector currents are equal to the values recorded below , prior to each occurrence of this JPM.
7. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
8. This completes the setup for this JPM.

Answer KEY Date: TODAY Time: NOW Channel N41 N42 N43 N44 Is the channel operable?

Y N Y N Y N Y N Instrument reading 100% 100% 100% 100% UPPER DETECTORS (A)

Present upper detector current 190 +/-10 185+/-10 190+/-10 185+/-10 100% upper detector current 194 179 1 92 186 Normalized detector current

.979 +/-.06 1.03 +/-.06 .990 +/-.06 .99 5 +/-.06 Average normalized current

.99 9 +/-.05 Upper power tilt ratio (¢ 1.02) ¢ .980 +/-.01 ¢ 1.03 4 +/-.0 1 ¢ .99 1 +/-.0 1 ¢ .996 +/-.01 LOWER DETECTORS (B)

Present lower d etector current 170+/-10 150+/-10 165+/-10 165+/-10 100% lower detector current 170 153 165 168 Normalized detector current 1.00 +/-.06 .980 +/-.06 1.00 +/-.06 .982 +/-.06 Average normalized current

.990 +/- .1 Lower power tilt ratio (¢ 1.02) ¢ 1.01 0 +/-.01 ¢ .989 +/-.01 ¢ 1.01 0 +/-.0 1 ¢ .991 +/-.01 Braidwood R-102 - rev 151 SRRS: 3D.105 (when utilized for operator initial or continuing training) 1 INITIAL CONDITIONS

1. You are an extra NSO.
2. Unit 1 is at full power.
3. All four NIS detector power meters read 100% reactor power. INITIATING CUE 1. The US has directed you to perform, the weekly QPTR calculation using NIS meters per 1BwOSR 3.2.4.1.
2. Digital voltmeter will not be used for this surveillance.
3. The process computer is inoperable only for the purpose of this surveillance.

Provide student copy of 1BwOSR 3.2.4.1 and inform them that all prerequisites, precautions, limitations and actions are met.

Answer key available in setup instructions.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Braidwood R-102 - rev 151 SRRS: 3D.105 (when utilized for operator initial or continuing training) 2 JPM Start Time:

STEP ELEMENT STANDARD SAT UNSAT Comment Number 1 Indicate the applicability of this surveillance on Data Sheet D

-3. Determine NIS meters must be used to perform this surveillance and INDICATE on Data Sheet D

-3: CHECK 7-day block.

___ ___ ___ 2 Record Date and Time on Data Sheet D-3. RECORD Date and Time on data sheet D-3. ___ ___ ___ 3 Record power range NIs operability status.

On Data Sheet D

-3, RECORD the following for power range NIs 41-44: 'Y' block checked for each channel indication reliable.

100% (or present power reading from each channel at 1PM07J).

___ ___ ___ CUE If asked, the Unit has NO LCOARs in progress at this time.

CUE Provide the examinee with the attached pictures of N

-41, N-42, N-43 and N-44 upper and lower detector currents to record readings from.

NOTE: JPM steps 4 through 8 may be done for the upper section then repeated for the lower detecto rs or steps 4 and 5 may be recorded for both upper and lower detectors before proceeding to step 6.

Braidwood R-102 - rev 151 SRRS: 3D.105 (when utilized for operator initial or continuing training) 3 STEP ELEMENT STANDARD SAT UNSAT Comment Number *4 Record each present detector current reading from 1PM07J on Data Sheet D

-3.

All present Upper and Lower Detector Currents recorded within + 10 amps of actual values on Data Sheet D

-3. (Procedural Adherence)

UPPERS: N41 190 N42 185 N43 190 N44 185 LOWERS: N41 170 N42 150 N43 165 N44 165 ___ ___ ___ CUE Provide the examinee with the attached operator aid page for N

-41, N-42, N-43 and N-44 upper and lower normalized detector currents.

NOTE Prior to commencing this JPM, the actual readings should be logged here

Braidwood R-102 - rev 151 SRRS: 3D.105 (when utilized for operator initial or continuing training) 4 STEP ELEMENT STANDARD SAT UNSAT Comment Number 5 Record 100% Detector Currents from Operator Aid Book on data Sheet D-3. Record the 100% Detector Currents from the Operator Aid Book for each upper and lower detector on Data Sheet D

-3: (Procedural Adherence)

UPPERS: N41 194 N42 179 N43 192 N44 186 LOWERS: N41 170 N42 153 N43 165 N44 168 ___ ___ ___ *6 Using the D

-3 Data Sheet, perform the calculations to obtain the normalize d detector currents and log them on the data sheet.

(Key for data sheet D

-3 available on setup sheet)

Calculate the Normalized Detector Currents for each detector by dividing its present detector current reading by the 100% detector current value from the operator aid and log on the D

-3 Data Sheet:

(Procedural Adherence)

Each Upper Each Lower ___ ___ ___

Braidwood R-102 - rev 151 SRRS: 3D.105 (when utilized for operator initial or continuing training) 5 STEP ELEMENT STANDARD SAT UNSAT Comment Number *7 Using the D

-3 Data Sheet, perform the calculations to obtain the average normalized currents and log them on the data sheet.

(Key for data sheet D

-3 available on setup sheet)

Calculate the Average Normalized Current by summing the upper (lower) normalized detector currents and dividing by 4 and log on the D-3 Data Sheet:

(Procedural Adherence)

Upper Average Lower Average

___ ___ ___ *8 Using the D

-3 Data Sheet, perform the calculations to determine the QPTR for each detector and log them on the data sheet.

(Key for data sheet D

-3 available on setup sheet)

Determine the QPTR for each detector by dividing each Normalized Detector Current by the Average Normalized Current and log on the D

-3 data sheet:

(Procedural Adherence)

Each Upper Ea ch Lower ___ ___ ___ *9 Identify N42 Upper Detector QPTR is unacceptable.

Determine if QPTR is acceptable:

Identify N42 Upper Detector QPTR is >1.02 and is unacceptable.

(Regulatory Compliance

) o Immediately notify the Shift Manager or Designee to initiate LCOAR (1BwOL 3.2.4). ___ ___ ___ CUE As SM, acknowledge the required initiation of LCOAR 1BwOL 3.2.4 JPM Stop Time:

Braidwood R-102 - rev 151 SRRS: 3D.105 (when utilized for operator initial or continuing training) 6 JPM

SUMMARY

Operator's Name

Emp. ID#: ____________ Job Title: EO RO SRO FS STA/IA SRO Cert JPM Title:

Perform a QPTR Calculation w/o Process Computer JPM Number:

R-102 Revision Number: 151 Task Number and Title:

R-RK-003, Perform a QPTR calc and Evaluate TS limits K/A Number and Importance:

015000G2.1.7 , 4.4 Suggested Testing Environment:

Simulator Alternate Path:

Yes No SRO Only: Yes No Time Critical:

Yes No Reference(s):

1BwOSR 3.2.4.1, Rev. 9, Unit One Quadrant Power Tilt Ratio Calculation Operator Aid for 100% Power NIS Detector Currents Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete:

22 minutes Actual Time Used:

minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments: Evaluator's Name

(Print) Evaluator's Signature
Date:

INITIAL CONDITIONS

1. You are an extra NSO.
2. Unit 1 is at full power.

INITIATING CUE 1. The US has provided you a copy of, and directed you to perform, the weekly QPTR calculation using NIS meters per 1BwOSR 3.2.4.1. The process computer is inoperable only for the purpose of this surveillance.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Job Performance Measure Identify leak isolation point from station drawings.

JPM Number:

R-204 Revision Number: 151 Date: 03 / 29 / 20 16 Developed By:

Eric Steinberg 03/29/2016 Instructor Date Validated By:

Dan Burton 04/22/2016 SME or Instructor Date Reviewed By:

Kevin Lueshen 04/22/2016 Operations Representative Date Approved By:

Eric Steinberg 04/26/2016 Training Department Date Braidwood R-204 rev 151 ii SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in

-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure 0BwOA SEC-4 Rev: 103 Procedure M-55-sheet 2A Rev: A W Procedure M-55-sheet 2D Rev: K ________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Braidwood R-204 rev 151 iii SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)

Revision 151 , Updated to current revisions of the procedure s and TQ-AA-150-J020 template.

Braidwood R-204 rev 151 iv SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS

1. Not required, but if used set up any at power I C. 2. Ensure the simulator ready to run checklist is complete.
3. Ensure all required procedures and prints are cleaned and put away.
4. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
5. This completes the setup for this JPM.

Braidwood R-204 rev 151 v SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS

1. You are an extra NSO.
2. BOTH units are at 100% power.
3. An EO was re

-positioning 2FW094, MAIN FEEDWATER H.P. CLEANUP LINE FLOW CONTROL VALVE, to adjust Steam Generator Blowdown Hotwell Pump discharge pressure. 4. An instrument air line broke at the 1" to 1/2" reducer upstream of the 2FW094, HP FLUSH LINE FLOW CONT VLV.

5. The EO reports the header goes into 401' elevation overhead and the EO cannot trace the header back to an isolation valve.
6. The crew entered 0BwOA SEC

-4 LOSS OF INSTRUMENT AIR UNIT 0 due to dropping instrument air pressure and is currently at step 6.c.

7. Instrument air pressure is 87 psig and stable.

INITIATING CUE

1. The US has directed you to determine an acceptable isolation point that will allow the unit to remain at power. Report your recommendation to the US.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Braidwood R-204 rev 151 1 SRRS: 3D.105 (when utilized for operator initial or continuing training)

JPM Start Time:

STEP ELEMENT STANDARD SAT UNSAT Comment Number 1 Refer to 0BwOA SEC

-4. (table A page 15 for unit 2 turbine building)

Refers to 0BwOA SEC

-4, table A. Determine 0IA907 valve is on P&ID M-55-2A. ___ ___ ___ CUE When P&ID is located in the books on back table in simulator (or in the classroom), provide examinee a copy of P&ID M

-55 sheet 2A.

If performed in the classroom

, confirm where the examinee would locate the drawing (EDMS is also acceptable) and provide P&ID M

-55 sheet 2A.

2 Refer to P&ID M

-55 sheet 2A.

(pipe will transition to another print at grid D and 4) o Refers to P&ID 55 sheet 2A.

o Determines instrument air line 2IA100A is continued on P&ID M-55-2D. ___ ___ ___ CUE When P&ID M

-55 sheet 2D is identified as a needed print

, provide examinee a copy of P&ID M-55 sheet 2D

. 3 Refer to P&ID M

-55 sheet 2D.

(The broken valve is at Grid location E and 3)

Refers to P&ID 55 sheet 2D.

Determines that instrument air header line number 2IA100A also supplies the feed reg vlaves and feed pump recirc valves.

___ ___ ___ *4 Determines isolation point.

Determines that 2IA1008 (or 2IA1007) is an acceptable isolation point.

Recomends to US that 2IA1008 (or 2IA1007) should be closed to isolate the leak.

o Recommends that steam generator blowdown be secured or re

-directed to the blowdown monitor tanks due to the loss of air to 2FW094.

___ ___ ___

Braidwood R-204 rev 151 2 SRRS: 3D.105 (when utilized for operator initial or continuing training)

STEP ELEMENT STANDARD SAT UNSAT Comment Number CUE As the unit supervisor

, acknowledge recommended isolation point, and inform examinee an EO is being dispatched to close the recommended valve.

CUE As the unit supervisor acknowledge the recommendation to re

-direct or secure blowdown. CUE The EO reports that the first recommended isolation point (2IA1008 or 2IA1007) is inaccessible and an alternate isolation point is required.

  • 5 Determines alternate isolation point. Determines that 2IA100 7 (or 2IA100
8) is an acceptable alternate isolation point.

Recomends to US that 2IA100 7 (or 2IA100

8) should be closed to isolate the leak.

___ ___ ___ CUE As the unit supervisor acknowledge recommended isolation point, and inform examinee an EO is being dispatched to close the recommended valve.

CUE This completes this JPM. JPM Stop Time:

Braidwood R-204 rev 151 3 SRRS: 3D.105 (when utilized for operator initial or continuing training)

JPM

SUMMARY

Operator's Name

Emp. ID#: ____________

Job Title: EO RO SRO FS STA/IA SRO Cert JPM Title:

Identify leak isolation point from station mechanical drawings.

JPM Number:

R-204 Revision Number:

151 Task Number and Title:

R-AM-134, Troubleshoot plant equipment using plant mechanical & electrical drawings.

K/A Number and Importance:

078000G2.2.41 3.5/3.9 Suggested Testing Environment:

Classroom or Simulator Alternate Path:

Yes No SRO Only: Yes No Time Critical:

Yes No Reference(s): 0BwOA SEC

-4, rev 103, LOSS OF INSTRUMENT AIR UNIT 0, M

-55 Sheet 2A, rev AW, DIAGRAM OF TURBINE ROOM INSTRUMENT AIR, M

-55 Sheet 2D, rev K, DIAGRAM OF INSTRUMENT AIR UNIT 2 Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete: 13 minutes Actual Time Used:

minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments: Evaluator's Name (Print): Evaluator's Signature

Date:

Braidwood R-204 rev 151 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS

1. You are an extra NSO.
2. BOTH units are at 100% power.
3. An EO was re

-positioning 2FW094, MAIN FEEDWATER H.P. CLEANUP LINE FLOW CONTROL VALVE, to adjust Steam Generator Blowdown Hotwell Pump discharge pressure. 4. An instrument air line broke at the 1" to 1/2" reducer upstream of the 2FW094, HP FLUSH LINE FLOW CONT VLV.

5. The EO reports the header goes into 401' elevation overhead and the EO cannot trace the header back to an isolation valve.
6. The crew entered 0BwOA SEC

-4 LOSS OF INSTRUMENT AIR UNIT 0 due to dropping instrument air pressure and is currently at step 6.c.

7. Instrument air pressure is 87 psig and stable.

INITIATING CUE

1. The US has directed you to determine an acceptable isolation point that will allow the unit to remain at power. Report your recommendation to the US.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Job Performance Measure Perform Offsite Notification (NARS Form Transmittal) for Unusual Event JPM Number:

R-401 Revision Number: 151 Date: 03 / 22 / 20 16 Developed By:

Eric Steinberg 03/22/2016 Instructor Date Validated By:

Dan Burton 04/22/2016 SME or Instructor Date Reviewed By:

Kevin Lueshen 04/23/2016 Operations Representative Date Approved By:

Eric Steinberg 04/23/2016 Training Department Date Braidwood R-401 rev 151 ii SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in

-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure EP-MW-114-100 Rev: 016 Procedure EP-MW-114-100-F01 Rev: H Procedure

Rev: ________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Braidwood R-401 rev 151 iii SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)

Revision 151 , Updated JPM to current template format and revised procedures.

Braidwood R-401 rev 151 iv SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS

1. Not required, if used ensure the booth operator is present and able to answer the NARS phone. NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. If the simulator NARS phones are going to be used, ensure they are setup to transmit to the bo oth operator

, not the NARS line

. 3. When the above steps are completed for this and other JPMs to be run concurrently then

validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.

4. This completes the setup for this JPM.

Braidwood R-401 rev 151 v SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS

1. You are an extra NSO.
2. Unit 1 reactor trip has occurred.
3. An unusual event was declared two minutes ago.
4. E P-MW-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM has been filled out and approved.
5. The NARS phone is operable.
6. This is a TIME CRITICAL JPM.

INITIATING CUE

1. The Shift Manager directs you to transmit the NARS form per EP

-MW-114-100, MW Region Offsite Notifications.

2. Inform the Shift Manager when the NARS form has been transmitted.
3. This is a TIME CRITICAL JPM.

Fill out or have the exam fill out the time for 2 minutes before the current time and todays date on EP

-MW-114-100-F-01 before acknowledging the cue and starting the clock on the JPM.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Braidwood R-401 rev 151 1 SRRS: 3D.105 (when utilized for operator initial or continuing training)

JPM Start Time:

STEP ELEMENT STANDARD SAT UNSAT Comment Number NOTE: JPM critical time (13 minutes) starts when the initiating cue has been read to the examinee and stops after the initial roll call is made.

1 Determine correct communications method

. Refer to EP

-MW-114-100 and determine step 4.

3 needs to be performed Refer to EP

-MW-114-100-F-01 and determine NARS Code 20 to be used to transmit NARS form.

___ ___ ___ NOTE: If performed in the simulator, ensure the booth operator is prepared to answer the NARS phone and give the cues.

Braidwood R-401 rev 151 2 SRRS: 3D.105 (when utilized for operator initial or continuing training)

  • 2 Establish communications Establish communications as follows: Pick up the NARS phone

. Use code BW 20. o Read the following message: "This is the Exelon Nuclear Braidwood Station Main Control Room. Please Standby for a NARS message." Read the following message again as agencies pick up: "This is the Exelon Nuclear Braidwood Station Main Control Room. Please Standby to receive a NARS message and respond as the roll is called." TAKE initial roll call. Mark initial Boxes for IEMA and Illinois REAC Record time and date initial roll call complete.

___ ___ ___ CUE After using code BW 20 and reading initial roll call

Respond IEMA online when IEMA is called

. Respond REAC online when Illinois REAC is called.

NOTE: Critical time is met when the examinee completes roll call. Record completion TIME:_____________.

Braidwood R-401 rev 151 3 SRRS: 3D.105 (when utilized for operator initial or continuing training)

  • 3 Verbally transmit the NARS Form. Verbally transmit the NARS Form: Utility Message No:

1_ o State Message No: N/A 1. Status - [B] Drill/Exercise

2. Station - [A] Braidwood
3. Onsite Condition

- [A] Unusual Event

4. Accident Classified:

o Time: Two minutes ago.

o Date: Today's date. o EAL # : MU 6 o Accident Terminated Date and Time: N/A 5. Release Status: [A] None 6. Type of Release: [A] Not Applicable

7. Wind Dir: 270 8. Wind Speed:

o [A] is N/A o [B] 4.5 Miles/Hr

9. Recommended Actions: Utility Recommendation: [A] None 10. Additional Information: None Verified With: U. Supervisor Approved By: S. Manager

___ ___ ___ 4 Complete the NARS form. Fill in the following information on the NARS form after transmitting info in blocks 1

-10: Mark 11A, EXELON Examinee Name Outside line number Current time/ Date Request and record name and organization of the person receiving the message. Current time/date

___ ___ ___ CUE When asked for name and organization respond John Smith, IEMA.

Braidwood R-401 rev 151 4 SRRS: 3D.105 (when utilized for operator initial or continuing training) 5 Perform final roll call

. Perform final roll call and records by marking boxes IEMA Illinois REAC Asks if there are any question about the information provided. ___ ___ ___ CUE When called on for roll call respond IEMA, and Illinois REAC.

Respond no questions when asked.

6 Complete call.

State "NARS communication is complete."

___ ___ ___ NOTE: Critical time stopped after initial roll call was complete JPM step 3.

Determine critical time:

_________________________ - ____________________ __ = _ ______________________

(Time initial roll call complete) (JPM start time)

< 13 minutes

  • 7 Critical time met.

Initial roll call complete

< 13 minutes. ___ ___ ___ CUE That completes the JPM.

JPM Stop Time:

Braidwood R-401 rev 151 5 SRRS: 3D.105 (when utilized for operator initial or continuing training)

JPM

SUMMARY

Operator's Name

Emp. ID#: ____________

Job Title: EO RO SRO FS STA/IA SRO Cert JPM Title:

Perform Offsite Notification (NARS form transmittal) for Unusual Event JPM Number:

R-401 Revision Number:

151 Task Number and Title:

R-ZP-004, Transmit NARS form K/A Number and Importance:

R-002 000G2.4.39, 3.9 Suggested Testing Environment:

Simulator Alternate Path:

Yes No SRO Only: Yes No Time Critical:

Yes No Reference(s):

EP-MW-114-100, Rev. 1 6, MW Region Offsite Notifications EP-MW-114-100-F-01, Rev. H, Nuclear Accident Reporting System (NARS) Form Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete:

10 minutes Actual Time Used:

minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments: Evaluator's Name (Print): Evaluator's Signature

Date:

Braidwood R-401 rev 151 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS

1. You are an extra NSO.
2. Unit 1 reactor trip has occurred.
3. An unusual event was declared two minutes ago.
4. E P-MW-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM has been filled out and approved.
5. The NARS phone is operable.
6. This is a TIME CRITICAL JPM.

INITIATING CUE

1. The Shift Manager directs you to transmit the NARS form per EP

-MW-114-100, MW Region Offsite Notifications.

2. Inform the Shift Manager when the NARS form has been transmitted.
3. This is a TIME CRITICAL JPM.