05000440/FIN-2013404-01: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 1: | Line 1: | ||
{{finding | {{finding | ||
| title = Security | | title = Security | ||
| docket = 05000440 | | docket = 05000440 | ||
| inspection report = IR 05000440/2013404 | | inspection report = IR 05000440/2013404 |
Latest revision as of 22:19, 29 May 2018
Site: | Perry |
---|---|
Report | IR 05000440/2013404 Section 3S01 |
Date counted | Mar 31, 2013 (2013Q1) |
Type: | NCV: Green |
cornerstone | Physical Protection |
Identified by: | NRC identified |
Inspection Procedure: | IP 71130.01 |
Violation of: | 10 CFR 73, PHYSICAL PROTECTION OF PLANTS AND MATERIALS |
CCA | H.8, Procedure Adherence |
INPO aspect | WP.4 |
' | |