NRC Regulatory Issue Summary 2011-04, "Preparation and Scheduling of Operator licensing Examinations," dated May 26, 2011 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2013 through 2016, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2013 and 2014. Attachments 1 through 11 provide responses to RIS 2011-04forthe EGC plants identified above. The requested information for each facility Is provided on a separate NRC Form 536. In calendar year 2013, six candidates are expected to take the dual-site limited Senior Reactor Operator (LSRO) Initial license examination as Indicated on Attachment | NRC Regulatory Issue Summary 2011-04, "Preparation and Scheduling of Operator licensing Examinations," dated May 26, 2011 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2013 through 2016, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2013 and 2014. Attachments 1 through 11 provide responses to RIS 2011-04forthe EGC plants identified above. The requested information for each facility Is provided on a separate NRC Form 536. In calendar year 2013, six candidates are expected to take the dual-site limited Senior Reactor Operator (LSRO) Initial license examination as Indicated on Attachment | ||
: 7. The schedule for the indicated examination Is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination Is a dual-site examination that Involves LGS and PBAPS, rather than repeating the same Information on both attachments, the examination scheduling information is provided on Attachment 7 for LGS. Attachment 9 for PBAPS references Attachment 7 where appropriate. | : 7. The schedule for the indicated examination Is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination Is a dual-site examination that Involves LGS and PBAPS, rather than repeating the same Information on both attachments, the examination scheduling information is provided on Attachment 7 for LGS. Attachment 9 for PBAPS references Attachment 7 where appropriate. | ||
* June 29, 2011 U. S. Nuclear Regulatory Commission Page3 There are no regulatory commitments contained within this Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819. | * June 29, 2011 U. S. Nuclear Regulatory Commission Page3 There are no regulatory commitments contained within this Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819. | ||
Line 120: | Line 120: | ||
* or bfc rn'teniei EXAMINATION DATA e-mail to In callecta@nrc-gov, and to the Desk Officer, Office of In ormation and Regurato:y, Affairs, NE B*10202, (3150-o131), Office of and Wash ngton DC 20603. If a means usad to Impose an nformaHon caDacUon does net dlaplay a currently valid OMB control number, the NRC may not conduct or and a parson fa not required to respond to, the Information colact n. FACIUTY NRC REGION ' Peach Bottom Atomic Power Station, Units 2 and 3 Fadllty Operating License Nos. DPR-12, (Renewed) | * or bfc rn'teniei EXAMINATION DATA e-mail to In callecta@nrc-gov, and to the Desk Officer, Office of In ormation and Regurato:y, Affairs, NE B*10202, (3150-o131), Office of and Wash ngton DC 20603. If a means usad to Impose an nformaHon caDacUon does net dlaplay a currently valid OMB control number, the NRC may not conduct or and a parson fa not required to respond to, the Information colact n. FACIUTY NRC REGION ' Peach Bottom Atomic Power Station, Units 2 and 3 Fadllty Operating License Nos. DPR-12, (Renewed) | ||
DPR-44, and DPR-56 I NRC Docket Nos. S0-277 and 50-178 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2014 CY 2015 CY 2016 ----ESTIMATED NUMBER OF l LICENSEE-PREPARED 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 cvzot4 cv2o1s cv2ot6 ----NUMBER OF REACTOR 4 OPERATORS 0 6 0 NUMBER OF SENIOR REACT.OR s OPERATORS -INSTANT 0 6 0 NUMBER OF SENIOR REACTOR 3 0 2 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR *See LGS 1r * | DPR-44, and DPR-56 I NRC Docket Nos. S0-277 and 50-178 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2014 CY 2015 CY 2016 ----ESTIMATED NUMBER OF l LICENSEE-PREPARED 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 cvzot4 cv2o1s cv2ot6 ----NUMBER OF REACTOR 4 OPERATORS 0 6 0 NUMBER OF SENIOR REACT.OR s OPERATORS -INSTANT 0 6 0 NUMBER OF SENIOR REACTOR 3 0 2 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR *See LGS 1r * | ||
* OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 3/lS/2013 N/A 3/23/:ZOJS N/A ALTERNATE DATE 4/1/2013 N/A 3/30/2015 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION | * OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 3/lS/2013 N/A 3/23/:ZOJS N/A ALTERNATE DATE 4/1/2013 N/A 3/30/2015 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION | ||
{GFE) SCHEDULE CY 2013 CY 2014 PROPOSED ----NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0 12 0 0 0 0 0 NUMBER OF 0 CANDIDATES NRC FOAM 5311 j1D-20081 PRINTED ON RECYCLED PAPER Attachment 10 Exelon Generation Company. LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRCFORMS38 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10131/2011 (10.2008) | {GFE) SCHEDULE CY 2013 CY 2014 PROPOSED ----NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0 12 0 0 0 0 0 NUMBER OF 0 CANDIDATES NRC FOAM 5311 j1D-20081 PRINTED ON RECYCLED PAPER Attachment 10 Exelon Generation Company. LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRCFORMS38 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10131/2011 (10.2008) | ||
Estimated burden .fer to comply with thla voluntary Information collection request: hour. his lnfonnaUon collection Is used to plan budgeta OPERATOR LICENSING and resources for operator examinations. | Estimated burden .fer to comply with thla voluntary Information collection request: hour. his lnfonnaUon collection Is used to plan budgeta OPERATOR LICENSING and resources for operator examinations. | ||
Line 245: | Line 245: | ||
==Reference:== | ==Reference:== | ||
NRC Regulatory Issue Summary 2009-11, "Preparation and Scheduling of Operator Licensing Examinations," dated July 16, 2009 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2010 through 2013, and the number of candidates requiring Generic Fundamentals Examinations (GFEs) for calendar years 2010 and 2011. Attachments 1 through 10 provide responses to RIS 2009-11 for the Exelon Generation Company, LLC (EGC) plants identified above. The requested information for each facility is provided on a separate NRC Form 536. In calendar year 2010, eight candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment | NRC Regulatory Issue Summary 2009-11, "Preparation and Scheduling of Operator Licensing Examinations," dated July 16, 2009 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2010 through 2013, and the number of candidates requiring Generic Fundamentals Examinations (GFEs) for calendar years 2010 and 2011. Attachments 1 through 10 provide responses to RIS 2009-11 for the Exelon Generation Company, LLC (EGC) plants identified above. The requested information for each facility is provided on a separate NRC Form 536. In calendar year 2010, eight candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment | ||
: 6. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on Attachment 6 for LGS. Attachment 8 for PBAPS references Attachment 6 where appropriate. | : 6. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on Attachment 6 for LGS. Attachment 8 for PBAPS references Attachment 6 where appropriate. | ||
There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819. | There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819. | ||
Line 290: | Line 290: | ||
Estimated burden per to comply with this voluntary information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. | Estimated burden per to comply with this voluntary information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. | ||
Send comments burden OPERA TOR LICENSING estimate to the Records and FOIA/Privacy Services Branch -5 F 3), U.S. Nuclear Commission, Washington, DC 20555-000 . or Internet EXAMINATION DATA a-mall to in ocollects@nrc.gov, and to the Desk Officer, Office of In ormation and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washrngton, DC 20503. If a means used to impose an information collection does not display a currenHy valid OMB control number. the NRC may not conduct or sponsor, and a person is not required to respond to, the information collecbon. | Send comments burden OPERA TOR LICENSING estimate to the Records and FOIA/Privacy Services Branch -5 F 3), U.S. Nuclear Commission, Washington, DC 20555-000 . or Internet EXAMINATION DATA a-mall to in ocollects@nrc.gov, and to the Desk Officer, Office of In ormation and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washrngton, DC 20503. If a means used to impose an information collection does not display a currenHy valid OMB control number. the NRC may not conduct or sponsor, and a person is not required to respond to, the information collecbon. | ||
FACILITY NRC REGION Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 I NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 -------ESTIMATED NUMBER OF 1 0 0 0 LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF 0 0 0 NRC-PREPARED 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 ----NUMBER OF REACTOR OPERATORS 0 0 0 0 NUMBER OF SENIOR REACTOR 0 OPERATORS-INSTANT 0 0 0 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 8 0 0 0 OPERA TORS -LIMITED PROPOSED DATES PRIMARY DATE 06/14/2010 N/A N/A N/A ALTERNATE DATE 06/0712010 N/A N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION | FACILITY NRC REGION Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 I NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 -------ESTIMATED NUMBER OF 1 0 0 0 LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF 0 0 0 NRC-PREPARED 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 ----NUMBER OF REACTOR OPERATORS 0 0 0 0 NUMBER OF SENIOR REACTOR 0 OPERATORS-INSTANT 0 0 0 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 8 0 0 0 OPERA TORS -LIMITED PROPOSED DATES PRIMARY DATE 06/14/2010 N/A N/A N/A ALTERNATE DATE 06/0712010 N/A N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION | ||
{GFE) SCHEDULE CY 2010 CY 2011 PROPOSED ----NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 0 0 CANDIDATES NRC FORM 536 (10-2008) | {GFE) SCHEDULE CY 2010 CY 2011 PROPOSED ----NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 0 0 CANDIDATES NRC FORM 536 (10-2008) | ||
PRINTED ON RECYCLED PAPER Response to RIS 2009-11 Attachment 7 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10*2008) | PRINTED ON RECYCLED PAPER Response to RIS 2009-11 Attachment 7 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10*2008) | ||
Line 296: | Line 296: | ||
Send comments refrding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch *5 F 3), U.S. Nuclear Commission, Washington, DC 20555-000 , or blc internet EXAMINATION DATA e-mail to 1n ocollects@nrc.gov, and to the Desk Officer, Office of In ormation and Regulato;y, Affairs, NE B-10202, (3150-0131 | Send comments refrding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch *5 F 3), U.S. Nuclear Commission, Washington, DC 20555-000 , or blc internet EXAMINATION DATA e-mail to 1n ocollects@nrc.gov, and to the Desk Officer, Office of In ormation and Regulato;y, Affairs, NE B-10202, (3150-0131 | ||
), Office of Management and Budget, Wash ngton, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the information collection. | ), Office of Management and Budget, Wash ngton, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the information collection. | ||
FACILITY NRC REGION Oyster Creek Nuclear Generating Station I Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 -------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 cv2o11 CY 2012 cv2o13 ----NUMBER OF REACTOR 6 OPERATORS 6 6 0 NUMBER OF SENIOR REACTOR 7 OPERATORS-INSTANT 7 8 0 NUMBER OF SENIOR REACTOR 2 1 2 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERA TORS -LIMITED PROPOSED DATES PRIMARY DATE 05/17/2010 0711112011 05/28/2012 N/A ALTERNATE DATE 05/24/2010 07/18/2011 06/04/2012 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION | FACILITY NRC REGION Oyster Creek Nuclear Generating Station I Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 -------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 cv2o11 CY 2012 cv2o13 ----NUMBER OF REACTOR 6 OPERATORS 6 6 0 NUMBER OF SENIOR REACTOR 7 OPERATORS-INSTANT 7 8 0 NUMBER OF SENIOR REACTOR 2 1 2 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERA TORS -LIMITED PROPOSED DATES PRIMARY DATE 05/17/2010 0711112011 05/28/2012 N/A ALTERNATE DATE 05/24/2010 07/18/2011 06/04/2012 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION | ||
{GFE) SCHEDULE CY 2010 CY 2011 PROPOSED ----NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 13 0 0 0 14 0 0 0 CANDIDATES NRC FORM 536 (10-2008) | {GFE) SCHEDULE CY 2010 CY 2011 PROPOSED ----NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 13 0 0 0 14 0 0 0 CANDIDATES NRC FORM 536 (10-2008) | ||
PRINTED ON RECYCLED PAPER Response to RIS 2009-11 Attachment 8 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) | PRINTED ON RECYCLED PAPER Response to RIS 2009-11 Attachment 8 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) |
Revision as of 16:37, 28 April 2019
ML13231A203 | |
Person / Time | |
---|---|
Site: | Clinton |
Issue date: | 08/19/2013 |
From: | Hironori Peterson NRC/RGN-III/DRS/OLB |
To: | Pacilio M J Exelon Generation Co, Exelon Nuclear |
Shared Package | |
ML13099a404 | List: |
References | |
Download: ML13231A203 (56) | |
Text
{{#Wiki_filter:2013 CLINTON POWER STATION INITIAL LICENSE EXAMINATION MISCELLANEOUS CORRESPONDENCE Mr. Michael J. Pacilio UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 August 14, 2013 Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
OPERATOR LICENSING EXAMINATION APPROVAL
Dear Mr. Pacilio:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Clinton Power Station. The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and will separately provide a list of approved applicants to Mr. Christopher Dunn, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence. The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9, Supplement 1, of NUREG-1 021, "Operator Licensing Examination Standards for Power Reactors," one day during the week of August 26, 2013. The NRC staff will administer the operating tests during the week of August 19, 2013. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate ,for licensing operators at your facility, do not administer the examination and contact me at (630) 829-9707. Please contact Mr. David W. Reeser, Chief Examiner, at (630) 829-9859 if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents M. Pacilio Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Docket No. 50-461 License No. NPF-62 cc: Distribution via ListServ TM Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety M. Pacilio Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Docket No. 50-461 License No. NPF-62 cc: Distribution via ListServ TM DISTRIBUTION: Vivian Campbell RidsNrrDorllpl3-2 Resource RidsNrrPMCiinton Resource RidsNrrDirslrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRSIII DRPIII Patricia Buckley Tammy Tomczak Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety DOCUMENT NAME: Ltr 8 13 Clinton Operator Licensing Exam Approval JRK.docx Available D Non-Publicly AvailableD Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Co with attach/encl "N" = No co OFFICE Rill a. Rill Rill Rill NAME G ... Mr. Michael J. Pacilio UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 2 1 0 LISLE, ILLINOIS 60532-4352 February 28, 2013 Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
Dear Mr. Pacilio:
CLINTON POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION In a telephone conversation on February 20, 2013, between Mr. T. Jennings, Lead Regulatory Examination Author and Mr. D. Reeser, Region Ill Examiner, arrangements were made for the administration of licensing examinations at the Clinton Power Station during the week(s) of August 19 and August 26, 2013. In addition, the U. S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of July 29, 2013. As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered. It will be necessary for your staff to furnish the examination outlines by May 31, 2013, to meet the above schedule. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by June 28, 2013. Pursuant to Title 10 of the Code of Federal Regulations, Section 55.40(b)(3), (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the.written examinations and operating tests are being administered. M. Pacilio Your staff should submit the preliminary reactor operator and senior reactor operator license applications (e.g., Office of Management and Budget (OMS) approval No. 3150-0090), medical certifications (OMS approval No. 3150-0024), and waiver requests (if any OMS approval No. 3150-0090) at least 30 days before the first examination date, so as to ensure a timely NRC review and evaluation process. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S. C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, Approval Number 3150-0018. The public reporting burden for this collection is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to infocollects@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMS control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. Mr. T. Jennings has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact D. Reeser at 630-829-9859, or me at 630-829-9707. Docket No. 50-461 License No. NPF-62 cc: Distribution via ListServ Ž Hironori Peterson, Chief Operations Branch Division of Reactor Safety , M. Pacilio Your staff should submit the preliminary reactor operator and senior reactor operator license applications (e.g., Office of Management and Budget (OMB) approval No.r 3150-0090), medical certifications (OMB approval No. 3150-0024), and waiver requests (if any OMB approval No. 3150-0090) at least 30 days before the first examination date, so as to ensure a timely NRC review and evaluation process. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, Approval Number 3150-0018. The public reporting burden for this collection is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOINPrivacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/readinq-rm/adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. Mr. T. Jennings has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact D. Reeser at 630-829-9859, or me at 630-829-9707 Division of Reactor Safety Docket No. 50-461 License No. NPF-62 cc: Distribution via ListServ DISTRIBUTION: John Cassidy RidsNrrDorllp13-2 Resource RidsNrrPMCiinton Resource RidsNrrDirslrib Resource Chuck Casto Cynthia Pederson Steven Orth Allan Barker Carole Ariana Christine Lipa Linda Linn DRSIII DRPIII Tammy Tomczak John McHale, NRR ff}LIJtJt3ASf() Sincerely, Hironori Peterson, Chief Operations Branch DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 02_13 Clinton Confirmation of Initial License Exam.docx 0 Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Co without attach/encl "E" = Co with attach/encl "N" = No co OFFICE Rill Mr. Michael J. Pacilio UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 November 4, 2011 Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555
SUBJECT:
CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS: CLINTON POWER STATION
Dear Mr. Pacilio:
We have received your corporate letter RS-11-11 0 dated June 29, 2011. In that letter, you previously requested an initial operator licensing examination be scheduled at the Clinton Power Station for August 2013 and August 2015. In response, we had previously scheduled an initial licensing examination for the weeks of August 19 and 26, 2013, with an onsite validation the week of July 29, 2013. Similarly, we note that you were previously scheduled for an initial operator licensing exam the weeks of August 17 and 24, 2015. This date has been moved one week later to the weeks of August 24 and 31, 2015, to allow flexibility in the operator licensing schedule. The on-site validation is scheduled for the week of August 3, 2015. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date. We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were each scheduled for two weeks. Please inform us if the number of candidates change for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations. A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program. M. Pacilio In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Docket Nos. 50-461 License Nos. NPF-62 cc: Distribution via ListServŽ Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety
M. Pacilio In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Docket Nos. 50-461 License Nos. NPF-62 cc: Distribution via ListServŽ DISTRIBUTION: Amy Snyder RidsNrrDorllpl3-2 Resource RidsNrrPMCiinton Resource RidsNrrDirslrib Resource Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRS III DRPIII Patricia Buckley Tammy Tomczak ROPreports Resource Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety DOCUMENT NAME: G:\DRSIII\DRS\WORK IN PROGRESS\L TR 110411 CLINTON EXAM 2011.DOCX D Non-Sensitive DATE 10/31/11 11/04/11 OFFICIAL RECORD COPY Exelon Exelon Generation 4300 Winfield Road Warrenville,IL 6osss www.exeloncorp.com RS-11-110 June 29, 2011 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-Q001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50--456 and STN 50--457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Pocket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 FacUlty Operating License Nos. DPR-2, (Renewed} DPR-19 and DPR-25 NRC Docket Nos. 50-10. 50-237. and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50.;374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Pocket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Nuclear Facility Operating License Nos. DPR-12, (Renewed) DPR-44, and OPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 Docket No. 50-289 June 29, 2011 U. S. Nuclear Regulatory Commission Page2
Subject:
Exelon Generation Company, LLC (EGC) Response to NRC Regulatory Issue Summary 2011-04, "Preparation and Scheduling of Operator licensing Examinations"
Reference:
NRC Regulatory Issue Summary 2011-04, "Preparation and Scheduling of Operator licensing Examinations," dated May 26, 2011 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2013 through 2016, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2013 and 2014. Attachments 1 through 11 provide responses to RIS 2011-04forthe EGC plants identified above. The requested information for each facility Is provided on a separate NRC Form 536. In calendar year 2013, six candidates are expected to take the dual-site limited Senior Reactor Operator (LSRO) Initial license examination as Indicated on Attachment
- 7. The schedule for the indicated examination Is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination Is a dual-site examination that Involves LGS and PBAPS, rather than repeating the same Information on both attachments, the examination scheduling information is provided on Attachment 7 for LGS. Attachment 9 for PBAPS references Attachment 7 where appropriate.
- June 29, 2011 U. S. Nuclear Regulatory Commission Page3 There are no regulatory commitments contained within this Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819.
Attachment 1 -Completed NRC Form 536 for Braidwood Station Attachment 2 -Completed NRC Form 536 for Byron Station Attachment 3 -Completed NRC Form 536 for Clinton Power Station Attachment 4 -Completed NRC Form 536 for Dresden Nuclear Power Station Attachment 5 -Completed NRC Form 536 for LaSalle County Station Attachment 6 -Completed NRC Form 536 for Limerick Generating Station -IL T Attachment 7 -Completed NRC Form 536 for Limerick Generating Station -LSRO Attachment 8 -Completed NRC Form 536 for Oyster Creek Nuclear Generating Station Attachment 9 -Completed NRC Form 536 for Peach Bottom Atomic Power Station Attachment 10 -Completed NRC Form 536 for Quad Cities Nuclear Power Station Attachment 11 -Completed NRC Form 536 for Three Mile Island Nuclear Station Attachment 1 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRCFORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 C10o2D08) S.llmaled burden per to comply with this voluntary Information collection request 1 llour. his Information collection Is usaillo plan budgets and resources for aperetor examtnallcna. Send comments burden OPERATOR LICENSING estimate to the Recorda and FOIA/Prlvacy S!I!VIcas Branch t -5 F 3). U.S. Nudear Commlaalan, Washington, DC 20555-000 , or bft Internet EXAMINATION DATA a-mal to In and to the Daak omcar. omce of In ormaUon and Regutat:r, Affairs, NE B-10202, (3150-0131), omce of Management and Budget. Wa ngton, DC 20503. If a means used to Impose an Information colleCtion does not display 11 cur111nUy v11lkl OMB control number, lha may not conduct or :,onsor, and a person Is not required to respond to, tha Information coRa on. FACILITY NRC REGION Braidwood Station, Units land l FaciUty operating License Nos. NPF-71 and Ill Docket .NCII. STN 50-4S6 and STN S0-4S7 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CV 2013 cv 2014 cv 2015 cv 2016 ----ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 I I EXAMINATIONS ESTIMATED NUMBER OF 0 0 NRC-PREPARED 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER cv 2013 cy2014 cv 2015 CY 2016 ----NUMBER OF REACTOR 6 0 6 6 OPERATORS NUMBER OF SENIOR REACTOR 10 -INSTANT 0 tO 6 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERA 'TORS-LIMITED PROPOSED DATES PRIMARY DATE J/25/2013 N/A 1/5/2015 10/J/2016 ALTERNATE DATE 4/8/2013 12/8/2014 10fl7/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 20JJ CY 2014 PROPOSED ,, __ .._ NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0 NUMBER OF I) 16 0 0 0 0 0 CANDIDATES FORM 5:1& 1 !?*20081 Dqi!IITI!D m1 qi!CVCLED PAPER Attachment 2 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRCFORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden fer to comply wlth thla voluntary Information collecllon request: hour. Ia Information collection Ia uaad to plan budgets OPERA TOR LICENSING and resources for operator axamlnallona. sand comments burden eallmale to the Recorda and FOIA/Prlvacy Services Branch -5 F 3), U.S. Nuclear ReCtory Commllllllon, Waahtngton, oc 20555-000 , lntemet EXAMINATION DATA IHllallto In llacta@nrcsov* and to the Desk Officer, omce of I ormation and Regulato=lrS, NE B-10202, (3150..0131), Olftce of and Budget, Wash , DC 20503. If a means used to Impose an nformallon coUIK:IIon does not display a c:urrantly valid OMB control number, the NRC may not conduct or and a parson is not required to respond to the Information collect n. ' FACIUTV NRC REGION Byroa Station, Units 1 and 2 FaciHty Operating License Nos. NPF-37 and NPF-66 Ill NRC Docket Nos. STN S0-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 1013 CY 2014 CY 2015 CY 2016 ----ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF . c NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS ' PROPOSED NUMBER CY 2013 CY 2014 cv2o1s CY 2016 ----NUMBER OF REACTOR 2 9 0 7 OPERATORS NUMBER OF SENIOR REACTOR 9 OPERATORS
- INSTANT 6 0 7 NUMBER OF SENIOR REACTOR 1 1 0 l OPERATORS*
UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS
- LIMITED PROPOSED DATES PRIMARY DATE 4/29/2013 9/15/2014 N/A 3/21/2016 ALTERNATE DATE 5/13/2013 9/2912014 N/A 4/4/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED ----NUMBER MARCH JUNE DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 11 NUMBER OF 0 0 0 0 0 14 0 CANDIDATES
' NRC FORM 538 (10-2008) PRINTED ON RECYCLED PAPER Attachment 3 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRC FORM !131 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO, 3150-0131 EXPIRES: 10131/2011 (1WOOII) Eatlmatad burden per 10 compllf with thla voluntal}' infonnatlon COIIIctlon raqueat: 1 hour, hla '*nnatkin coltac:lton is used to plan budgets OPERATOR LICENSING .tnd '"ourcea for operator examinlllona. Sand comments buriien Nllmata to the Recorda and FOIAJPrlvacy Services Bram:h -15 F 3), u.s. Huclur Commllllon, Wllhlngiq!l, DC 20556-0110 , ot EXAMINATION DATA *mal to In and to the Oeak omcer, Ollll>> of 1 nnatlon and Reguhl.:t All'altti 0 NE B-10202. (3150-0131), Office of Mana'rnment and W gton, C 20503. I a mnna used to lmposa an nbmatlon collei:tiOn doal not dlllplay a valid OMS c:ontro1 numbllr, tha NRC may not conduct or :naor, and a pa,.on Is ROt required to respond to, tha ;.,rarmallon colla
- fACILITY NRC REGION Clflltoa Power Statfoa Faelllty Operating Lleease No. NPF-6Z Ill NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 1013 CY 1014 CY 2015 CY 2016 ----ESTIMATED NUMBER OF 1 LICENSEE-PREPARED 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 1013 cy:ZOI4 cv:zo1s cv:zol6 ----NUMBER OF REACTOR 6 0 6 0 OPERATORS NUMBER OF SENIOR REACTOR 4 0 4 0 OPERATORS
- INSTANT NUMBER OF SENIOR ReACTOR l 0 2 0 OPERATORS
- UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 8-1!)-13 N/A 8-17-15 N/A ALTERNATE DATE 8-16-13 N/A 8-24-15 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY lOll CY 2014 PROPOSED ----NUMBER MARCH JUNE !sEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0 0 0 0 I) 10 0 0 NUMBER OF CANDIDATES
,.RC FORM 531 (1G-ZOOI) PRINTED ON RECYCLED PAPER Attachment 4 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRCFORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 10/3112011 (111-2008) Estimated burden fer to comply with this voltmtary Information collection request: hour. Ia Information collection Ia used to plan budgets and raaourcea for operator examinations. Send comments burden OPERATOR LICENSING estimate to the RBGOrds and FOINP11vacy Services Branch -5 F 3), u.s. Nuclear Commlealon, Waehlngton, DC 20555..()00 , or lntemot EXAMINATION DATA e-mail to In ocollecls@nrc&lv, and to the Desk OMcer, Office of tn ormation and Alfalra NE 8*10202, (3150..0131), Offlce of Management ancl Budget, Wash 20503. If a means used to Impose an Information collection does not d lay a currenlly valid OMS control number, the NRC may not conduct or seonsor, and a person Is not required to respond to, the Information coftect on. FACILITY NRC REGION Dresdea Naelear Power Station, Units 2 and 3 Reaewed Faeillty Operating License Nos. DPR-19 and DPR-25 Ill NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 cv2o14 CY 2015 CY 2016 ----ESTIMATED NUMBER OF 0 LICENSEE-PREPARED 0 1 1 EXAMINATIONS ESTIMATED NUMBER OF 0 NRC-PREPARED 1 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 cy2014 cv2o1s CY 2016 ----NUMBER OF REACTOR 2 0 6 4 OPERATORS NUMBER OF SENIOR REACTOR 2 0 5 7 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0 0 I 1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS* UMITED ' PROPOSED DATES PRIMARY DATE 10114/2013 N/A 03/0212015 08/08/2016 AlTERNATE DATE 10128/2013 NIA 03/23/2015 08/22/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED ----NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0 0 ll 0 0 0 NUMBER OF 0 0 CANDIDATES NRC FORM 538 (11).2008) PRINTED ON RECYCLED PAPER Exelon Generation Company,, LLC Response to Regulatory Issue Summary 2011-04 Attachment 5 Page 1 of 1 NRCFORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/3112011 110*20081 Estimated burden f: to comply with this voluntary Information collection request: hour. fa Information colfecUon fa used to plan budgets and raaourcea for operator examinations. Send comments buri:lan OPERATOR LICENSING estimate to the Records and FOfNPrlvacy Services Branch -5 F 3), u.s. Nuclear Commission, Washington, DC 20555..()00 , or bfc Internet EXAMINATION DATA a-mall to In and to tha Desk Offlcer, Offics of In Olmatlon and Ragulato7, Affaire, NE B*10202, (3150-D131), omca of Management and Budget, Wash nglionlfC 20503. If a means used to Impose an Information conectton does not d play a currently vand OMB control number, tha NRC may not conduct or and a parson Is not required to respond to, the Information COllect on. FACIUTY NRC REGION LaSalle County Statton, Units 1 and 2 FacUlty Operating License Nos. NPF-11 and NPF-18 Ill NRC Doeket Nos. STN 50-373 and STN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2014 CY 2015 CY 2016 ----' ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF 0 0 0 NRC-PREPARED 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 cv2ot4 CY 2015 cv2o16 -----NUMBER OF REACTOR 0 4 0 6 OPERATORS NUMBER OF SENIOR REACTOR 0 9 0 5 OPERATORS p INSTANT NUMBER OF SENIOR REACTOR 0 1 0 1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERA TORS** UMITED PROPOSED DATES PRIMARY DATE N/A 10/13/2014 N/A 10/10/2016 ALTERNATE DATE N/A 10/20/2014 N/A 10/17/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED ----NUMBER MARCH JtJNE !SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0 NUMBER OF 13 0 0 0 0 0 0 CANDIDATES NRC FORM 538 110-2008) PRINTED ON RECYCLED PAPER Attachment 6 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRCFORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES; 10131/2011 (1D-21108) Estimated burden fer re,.onse to comply with this voluntary Information collection request: hour. his lnfonnaUon collection Is uBBd to plan bUdgets OPERATOR LICENSING and resources for operator axamlnaUons. Send comments r1.i'dlnN buroen esUmate to the Records and FOINPrlvacy Services Branch *5 F 3), U.S. Nuclear Commlaalon, Washington, DC 20555-000 , or blc lntemet EXAMINATION DATA a-maH to I ocollei:ta@nrc.gov, and to the Desk Officer, Office of In ormation and Affairs, NE B-10202, (3150.0131 ), Office of and Budget, Waah gton DC 20503. If a maana used to Impose an nfonnatton coU8cllon does not display a currently valid OMB control number, the NRC may not conduct or :conaor, end a person Is not required to respond to, the lnfonnatlon colle on. FACILilY NRCRE:OION Llmertek Generadng Station, Units 1 and 2 FaeiUty Operadng License Nos. NPF-39 and NPF-85 I NRC Docket Nos. S0-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 cv20t4 CY 2015 CY 2016 ----ESTIMATED NUMBER OF 0 1 0 LICENSEE-PREPARED l EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY Z013 cvzo14 CY 2015 CY 2016 ----NUMBER OF REACTOR 0 OPERATORS 8 0 8 NUMBER OF SENIOR REACTOR 0 OPERATORS-INSTANT 6 0 6 NUMBER OF SENIOR REACTOR 0 2 0 2 OPERATORS-UPGRADE .,., NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS
- LIMITED PROPOSED DATES PRIMARY DATE NIA 10/6/2014 N/A 10/3/2016 ALTERNATE DATE N/A 10/13/2014 N/A 10110/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 2013 CY 2014 PROPOSED --NUMBER MARCH JUNE !sEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0 NUMBER OF 14 0 0 0 0 0 0 CANDIDATES NRC FORM 5311 (10..2008)
PRINTEil ON RECYCLED PAPER Attachment 7 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRCFORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 315().0131 EXPIRES: 10/31/2011 (10.20081 Estimated burden par to comply wtth this voluntary Information coDactlon 1 hour. Ia lnfonnatlon collection Ia used to plan budgets OPERATOR LICENSING and resources for operator examinations. Send commente re!fidln§ buri:len estimate to the Recorda and FOINPrlvacy Services Branch t *5 F 3} U s Nuclear R:?:latory Commlalon, Washington, DC 20555-000 , a lnieniei EXAMINATION DATA a-mall to In collectsl&!lnrc.8t, and to the Desk Officer, Office olin onnatlon and Regula:l:, 10202, (3150-0131), Office of and Budget, Wash glon 20503, If a means used to Impose an nfonnaUon coii8CIIon doal not display a curranlly valid OMB control number, the NRC may not conduct or sconaor, and a person Is not required to respond to, the Information collect on. FACIUTY NRC REGION Limerick Generating Units 1 and 2 Faellity Operating Lleease Nos. NPF-39 and NPF-85 I NRC Docket Nos. 50-351 and 50-353 A.. PROPOSED EXAMINAnON PREPARATION SCHEDULE PROPOSED NUMBER cv 2013 cv 2014 CY 2015 CY 2016 ----ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRCaPREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER cv 2013 cv2o14 cyl01S cv2o16 ------NUMBER OF REACTOR 0 0 0 0 OPERATORS NUMBER OF SENIOR REACTOR ' 0 0 0 0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 6 0 0 0 OPERATORS -LIMITED PROPOSED DATES PRIMARY DATE 7/15/1013 NIA N/A N/A ALTERNATE DATE 7/22/2013 N/A N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED ----NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE !sEPTEMBER DECEMBER ESTIMATED 0 0 0 0 0 0 0 NUMBER OF 0 CANDIDATES NRC FORM 1138 (1Q.2008) PRINTED ON RECYCLED PAPER Attachment 8 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRCFORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES: 10/31i2011 1CJ.2001) Estimated burden to comply with this voluntary Information collecUon request hour. Is Information collection Is used to plan budgets OPERATOR LICENSING and resources for operator axamlnallona. Send comments reltardlnB buraen estimate to the Records and FOIA/Prlva:t,Servlcaa Branch \ -5 F 3}, U.S. Nuclear Retlatory Commlaalon, Washing , DC 20555-000 , or bfulntemet EXAMINATION DATA a-mall to In ocollects@nrc&v, and to lha Desk Offlcar, Ofllce of In rmatlon and Regulato:t:ffalra, NE -10202, (3150.0131), omca of and Budget, Waah ton DC 20503. If a maane uSed to Impose an nformatlon collection does not display a currently valid OMB control number, the NRC may not conduct or stonaor, and a parson Ia not required to respond to, the lnfonnatlon collect n. FACIUTY NRC REGION Oyster Creek Nuclear Generating Station ReneWed Faclllty Operating License No. DPR-16 I NRC Doeket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2014 CY 2015 CY 2016 ----ESTIMATED NUMBER OF 0 1 0 l LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF 0 0 0 NRC-PREPARED 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY .2013 cv2o14 cv.zotS CY 2016 ----NUMBER OF REACTOR 0 6 0 6 OPERATORS < NUMBER OF SENIOR REACTOR 0 OPERATORS -INSTANT 5 0 3 0 2 0 3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 05/26/2014 N/A OS/2312016 ALTERNATE DATE N/A 06/0.212014 N/A OS/30/2016 ' C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED ----NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 13 NUMBER OF 0 0 0 0 0 0 0 CANDIDATES NRC FORM 538 111J.2001) PRINTED ON RECYCLED PAPER Attachment 9 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRCFORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 10/31/2011 (10.20081 Estimated burden far to comply with this voluntary Information collection request: hour. Ia intormatloil collection Is used to plan budgets OPERATOR LICENSING end resources tor operator axamlnallona. Send commen Is re'fi'dinH burden estimate to the ReCorda and FOtAIPrlvaWc Services Branch ..S F 3) u s Nuclear Commission, Washing en, DC 20555-ooo
- or bfc rn'teniei EXAMINATION DATA e-mail to In callecta@nrc-gov, and to the Desk Officer, Office of In ormation and Regurato:y, Affairs, NE B*10202, (3150-o131), Office of and Wash ngton DC 20603. If a means usad to Impose an nformaHon caDacUon does net dlaplay a currently valid OMB control number, the NRC may not conduct or and a parson fa not required to respond to, the Information colact n. FACIUTY NRC REGION ' Peach Bottom Atomic Power Station, Units 2 and 3 Fadllty Operating License Nos. DPR-12, (Renewed)
DPR-44, and DPR-56 I NRC Docket Nos. S0-277 and 50-178 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2014 CY 2015 CY 2016 ----ESTIMATED NUMBER OF l LICENSEE-PREPARED 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 cvzot4 cv2o1s cv2ot6 ----NUMBER OF REACTOR 4 OPERATORS 0 6 0 NUMBER OF SENIOR REACT.OR s OPERATORS -INSTANT 0 6 0 NUMBER OF SENIOR REACTOR 3 0 2 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR *See LGS 1r *
- OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 3/lS/2013 N/A 3/23/:ZOJS N/A ALTERNATE DATE 4/1/2013 N/A 3/30/2015 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION
{GFE) SCHEDULE CY 2013 CY 2014 PROPOSED ----NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0 12 0 0 0 0 0 NUMBER OF 0 CANDIDATES NRC FOAM 5311 j1D-20081 PRINTED ON RECYCLED PAPER Attachment 10 Exelon Generation Company. LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRCFORMS38 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10131/2011 (10.2008) Estimated burden .fer to comply with thla voluntary Information collection request: hour. his lnfonnaUon collection Is used to plan budgeta OPERATOR LICENSING and resources for operator examinations. Sand comments ralfrdinB buroan estimate to the Recorda and FOIA/Prlvacy Services Branch -5 F 3) u.s Nuclear Commission, Washington, DC 20555-000 , or lnismai EXAMINATION DATA e-mail to In ocollecta@nn:.gov, and 10 the Deak Officer, Office of In ormaUon and Regula!Oa;, Affaire, NE B-10202, (315().{)131), Office of and Budget, Walh gton 1 DC 20503. If a means used to Impose an nformatlon collliCtlon does not d splay a valid OMB control number, the NRC may not conduct or and a parson Is not required to respond to. the lnfonnaUon conac on. FACILilY NRC REGION Quad Cities Nuclear Power Statton, Units 1 and 2 Renewed FadUty Operating License Nos. DPR-29 and DPR-30 III NRC Docket Nos. 50-2S4 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 1013 CY 2014 CY 2015 CY 2016 ----ESTIMATED NUMBER OF LICENSEE-PREPARED 0 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS < PROPOSED NUMBER cy2ou cvzot4 CY 2015 CY 2016 ----NUMBER OF REACTOR 0 0 2 0 OPERATORS NUMBER OF SENIOR REACTOR ... o OPERATORS-INSTANT 0 4 0 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS* LIMITED PROPOSED DATES PRINARV DATE N/A NIA 2/23/2015 N/A ALTERNATE DATE N/A N/A 3/9/2015 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED ----NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 6 0 0 0 0 0 CANDIDATES NRC FORM 1138 (10.2008) PRINTED ON RECYCLED PAPER Attachment 11 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2011-04 Page 1 of 1 NRCFORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..()131 EXPIRES: 10131/2011 (10-2008) Eallmatad burden far to comply wtlh this voluntary Information collection request: hour. Ia lnformalloil Ccjlectlon Is used to plan budgets OPERATOR LICENSING and reaoun:ea for operator axamlnallona. Send comments buri:len estimate to the Recorda and FOINPrlvacy Services Branch *5 F 3), U.S. Nuc:lear Razutatory Commission, Washington, DC 20555-ooo
- or bk Internet EXAMINATION DATA a-mall Ia In and to the Desk Officer, Office of In onnatlan and Affairs, NE 10202, (3150..()131), Ofllce of and Budget, Wash ngtoni DC 20503. If a means used to Impose an nformellon collection does not d splay a curranUy valid OMB control number, the NRC may not conduc:t or and a person Ia not required to respond to, the Information collect n. FACII.fiY NRC REGION Three MUe Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-SO I NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2014 CY 2015 CY 2016 ----ESTIMATED NUMBER OF UCENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRCoPREPARED 0 0 0 0 EXAMINATIONS B. INmAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER " CY 2013 cvzot4 cvzots CY 2016 ----NUMBER OF REACTOR 0 4 0 4 OPERATORS NUMBER OF SENIOR REACTOR 0 OPERATORS
- INSTANT 7 0 8 NUMBER OF SENIOR REACTOR 0 3 0 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 06/23/2014 N/A 06/13/2016 ALTERNATE DATE N/A 07114/2014 N/A 07111/2016 C.' PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED ----NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE DECEMBER ESTIMATED 0 17 0 0 0 15 0 ,NUMBER OF 0 CANDIDATES NRC FORM 538 (10.2008)
PRINTED ON RECYCLED PAPER Mr. Michael J. Pacilio UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 1, 2011 Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555
SUBJECT:
CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS: CLINTON POWER STATION
Dear Mr. Pacilio:
We have received your corporate letter RS-10-130. In that letter, you requested an initial operator licensing examination be scheduled at the Clinton Power Station for August 2015. In response, we have scheduled an initial licensing examination for the weeks of August 17 and 24,2015, at the Clinton Power Station. On-site validation of this examination is tentatively scheduled to occur the week of July 27, 2015. We note that you were previously scheduled for an initial operator licensing exam the weeks of August 19 and 26, 2013. These dates have not changed. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date. We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were each scheduled for two weeks. Please inform us if the number of candidates change for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations. A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program. M. Pacilio In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Docket Nos. 50-461 License Nos. NPF-62 cc: Distribution via ListServ Sincerely, IRA by D. McNeil for/ Hironori Peterson, Chief Operations Branch Division of Reactor Safety
M. Pacilio In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Docket Nos. 50-461 License Nos. NPF-62 cc: Distribution via ListSer.v DISTRIBUTION: Daniel Merzke RidsNrrDoriLpl3-2 Resource RidsNrrPMCiinton Resource RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRS III DRPIII Patricia Buckley Tammy Tomczak Sincerely, IRA by D. McNeil for/ Hironori Peterson, Chief Operations Branch Division of Reactor Safety DOCUMENT NAME: G:\DRSIII\DRS\WORK IN PROGRESS\OL EXAM CONFIRMATION LETTERS\CLI 060111 DRS OL.DOCX 0 Sensitive 0 Non-Sensitive NAME RKWalton:co HPeterson OM for DATE 05/13/2010 06/01/2011
- .;
- .;_-+-----t--------Il Fxelon Generat1on 4300 Winfield Road warrenville, IL 60555 RS-10-130 July 28, 2010 www.exeloncorp.com U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Exelon Nuclear Facility Operating License Nos. DPR-2, (Renewed)
DPR-19 and DPR-25 NRC Docket Nos. 50-10. 50-237. and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating license Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 limerick Generating Station, Units 1 and 2 Facility Operating license Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating license No. DPR-16 NRC Docket Nos. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating license Nos. DPR-12, (Renewed) DPR-44, and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating license Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating license No. DPR-50 NRC Docket No. 50-289 /) . . f;u.: 1{' Z ._ tt t '-4* c-AUG 2-2010 July 28, 2010 U.S. Nuclear Regulatory Commission Page 2
Subject:
Exelon Generation Company, LLC (EGC) Response to NRC Regulatory Issue Summary 2010-08, "Preparation and Scheduling of Operator Licensing Examinations" '
Reference:
NRC Regulatory Issue Summary 2010-08, "Preparation and Scheduling of Operator Licensing Examinations," dated June 28, 2010 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2012 through 2015, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2012 and 2013. Attachments 1 through 10 provide responses to RIS 2010-08 for the EGC plants identified above. The requested information for each facility is provided on a separate NRC Form 536. There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819. Attachment 1-Completed NRC Form 536 for Braidwood Station Attachment 2-Completed NRC Form 536 for Byron Station Attachment 3-Completed NRC Form 536 for Clinton Power Station Attachment 4-Completed NRC Form 536 for Dresden Nuclear Power Station Attachment 5-Completed NRC Form 536 for LaSalle County Station Attachment 6 -Completed NRC Form 536 for Limerick Generating Station Attachment 7 -Completed NRC Form 536 for Oyster Creek Nuclear Generating Station Attachment 8-Completed NRC Form 536 for Peach Bottom Atomic Power Station Attachment 9 -Completed NRC Form 536 for Quad Cities Nuclear Power Station Attachment 10-Completed NRC Form 536 for Three Mile Island Nuclear Station-Unit 1 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Attachment 1 Page 1 of 1 NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10131/2011 (t0-2008) Estimated burden per to comply with this voluntary information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments rfardlng burden OPERA TOR LICENSING estimate to the Records and FOINPrivacy Services Branch -5 F 3), U.S. Nuclear Commission, Washington, DC 20555-000 , or bY. Internet EXAMINATION DATA e-mail to in ocollects@nrc-sov, and to the Desk Officer, Office of In ormation and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washmgton, DC 20503. If a means used to impose an information collection does not display a currently valid OMS control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. FACILITY NRC REGION Braidwood Station, Units I and 2 Facility Operating License Nos. NPF-72 and NPF-77 Ill NRC Docket Nos. STN 50-456 and STN 50-457 a A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 -----ESTIMATED NUMBER OF LICENSEE-PREPARED 0 I 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 -----NUMBER OF REACTOR 0 8 6 0 OPERATORS NUMBER OF SENIOR REACTOR 0 12 6 0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 3/25/2013 12/08/2014 N/A ALTERNATE DATE N/A 4/8/2013 115/2015 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE} SCHEDULE CY 2012 CY 2013 PROPOSED ---*--NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 CANDIDATES 0 0 0 12 0 NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Attachment 2 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..()131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per to comply with this voluntary information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments burden OPERA TOR LICENSING estimate to the Records and FOIA/Privacy Services Branch -5 F 3), U.S. Nuclear Commission, Washington, DC 20555-000 , or br, internet EXAMINATION DATA e-mail to in ocollects@nrc.gev. and to the Desk Officer, Office of In ormation and Regulatory Affairs, NE B-10202, (3150..()131), Office of Management and Budget, Washongton, DC 20503. If a means used to impose an information collection does not display a currenuy valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection. FACit...ITY NRC REGION Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 Ill NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 -----ESTIMATED NUMBER OF LICENSEE-PREPARED 1 I 1 J EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 ----NUMBER OF REACTOR OPERATORS 2 6 6 0 NUMBER OF SENIOR REACTOR 6 OPERATORS -INSTANT 6 6 6 NUMBER OF SENIOR REACTOR 0 0 1 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE l/23/2012 l/21/2013 l/27/2014 1119/2015 ALTERNATE DATE 1116/2012 1/28/2013 1/20/2014 l/26/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED ---NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 12 0 0 0 6 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Attachment 3 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per response to comply with this voluntary information collection request: 1 hour. This information collection is used to plan budgets and resources for operator e*aminatlons. Send comments burden OPERA TOR LICENSING estimate to the Records and FOINPrivacy Services Branch l -5 F 3), U.S. Nuclear Commission, Washington, DC 20555-000 , or internet EXAMINATION DATA e-mail to in ocollects@nrc-sov, and to the Desk Officer, Office of In ormation and Regulatory Affairs. NE B-10202, (3150-0131), Office of Management and Budget, Washongton, DC 20503. If a means used to impose an information collection does not display a currently valid OMS control number, the NRC may not conduct or seonsor' and a person is not required to respond to, the informe11on collect on. FACILITY NRC REGION Clinton Power Station Facility Operating License No. NPF-62 III NRC Docket NO. 50..461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER cv2o12 CY 2013 CY 2014 CY 2015 ----ESTIMATED NUMBER OF I 0 I LICENSEE-PREPARED 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER cv2ou cv2o13 CY 2014 CY 2015 ----NUMBER OF REACTOR 0 OPERATORS 6 0 6 NUMBER OF SENIOR REACTOR 0 4 0 4 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0 2 0 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS -LIMITED PROPOSED OATES PRIMARY DATE N/A 08/19/13 N/A 08/17115 ALTERNATE DATE N/A 08/26/13 N/A 08/24/15 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED ------NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 lO 0 0 0 0 0 0 CANDIDATES NRC FORM 536 ( 10-2006) PRINTED ON RECYCLED PAPER Attachment 4 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 E.XP1RES; 10/3112011 (10.2008) Estlmatad burden nr to comply with this voluntary Information collection request: hOur. hia information cotlect.ion is used to plan budgets and resources for operator examlnaUons. Send commanla raPrardlnR burden OPERA TOR LICENSING estimate 1o the Records and FOIA/Pnvacy Services Branch l -5 F 3), U.S. Nuclear Commission. Washington. DC 20555-000
- or bfc Internet EXAMINATION DATA e-mail to In and to lhe Desk Officer, Office of In ormauon and Affaltl, NE B-10202, (3150-0131), Ofllce of Management and Budget, Wash ngton, DC 20503. If a means used to impose an information collection do8S not display a curranUy 11alld OMB control number, the NRC may not conduct or sponsor, and a parson Is not required to respond to, the information collectJOn.
FACILITY NRC FI£GION Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 Ill NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 20U CY 2013 CY 2014 CY 2015 ------ESTIMATED NUMBER OF 1 I 0 1 LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF 0 0 NRC-PREPARED 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 cv:zou CY 2014 cv2ots ----NUMBER OF REACTOR OPERATORS 5 4 0 4 NUMBER OF SENIOR REACTOR 7 7 0 7 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0 I 0 J OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 816/12 10/14/13 NIA 3/2/JS ALTERNATE DATE 8/20112 10/28/13 N/A 3/23/lS C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 1013 PROPOSED --------NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0 12 0 NUMBER OF 0 0 0 0 12 CANDIDATES NRC 538 (10..2008) PRIIIITEO ON RECYCLED PAPER Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Attachment 5 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10*2008) Estimated burden per to comply with this voluntary information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch ( -5 F 3), U.S. Nuclear Commission. Washington, DC 20555-0001. orb(. Internet EXAMINATION DATA e-mail to in ocollects@nrc. 0 ov, and to the Desk Officer, Office of In ormation and Regulatory Affairs, NE B-1 0202, (3150-0 131 ). Office of Management and Budget, Washrngton. DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number. the NRC may not conduct or sponsor, and a person is not required to respond to, the information collectron. FACILITY NRC REGION LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. STN 50-373 and STN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 -----ESTIMATED NUMBER OF LICENSEE-PREPARED I 0 I 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 ----NUMBER OF REACTOR 8 0 6 0 OPERATORS NUMBER OF SENIOR REACTOR 5 0 6 0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 2 0 2 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 9/24/2012 N/A 10/13/2014 N/A ALTERNATE DATE 10/112012 N/A 10/20/2014 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED --- NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 12 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Attachment 6 Page 1 of 1 NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 1 0/31/2011 (10-2006) Estimated burden per to comply with this voluntary Information collection request: 1 hour. his information collection Is used to plan budgets and resources for operator examinations. Send comments burden OPERA TOR LICENSING estimate to the Records and FOINPrivacy Services Branch -5 F 3), U.S. Nuclear Commission, Washington, DC 20555-000 , or bk internet EXAMINATION DATA e-mail to in ocollects@nrc-gov, and to the Desk Officer, Office of In ormation and Regulatory Affairs, NE B-10202, (3150-0t31), Office of Management and Budget. Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to. the Information collect1on. FACILITY NRC REGION Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 1 NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 ------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 ----NUMBER OF REACTOR 8 OPERATORS 0 8 0 NUMBER OF SENIOR REACTOR 7 0 6 0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 2 0 2 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 10/08/2012 N/A 10/06/2014 N/A ALTERNATE DATE 10/15/2012 N/A 10/13/2014 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED -----NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 14 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Attachment 7 Page 1 of 1 NRC FORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150.0131 EXPIRES: 1013112011 (11).2()()8) Estimated burden per to comply with this voluntary 111formaUon COllection request: 1 hour. his information collechon Is used to plan budgets OPERA TOR LICENSING and resources for oparator examinations. Sand comments burden estimate to the Records and FOIA/Prlvecy Services Branch -5 F 3), U.S. NUClear R::Ory Commi8&ion. Washington, DC 20555.000 . or ::fc internet EXAMINATION DATA IHT1ail to 1 and to the Desk Officer. Ol!lc:e of I ormation and Affairs. NE B-10202, (3150-0131). Ol!lc:e of Management and Budget, Washington, DC 20503. If a means used to *mpoae an information colluction dolls not a currently vallcl OMB contrOl number, !he NRC may not conduct or sponsor, and a person is not required to respond to, the information collectiOO. FACILITY NRC REGION Oyster Creek Nuclear Generating Station Renewed Fatlllty Operating Litense No. DPR-16 I NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 ----ESTIMATED NUMBER OF LICENSEE-PREPARED I 0 I 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 ----NUMBER OF REACTOR 6 0 6 0 OPERATORS NUMBER OF SENIOR REACTOR 3 OPERA TORS-INSTANT 0 2 0 NUMBER OF SENIOR REACTOR 2 0 5 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERA TORS
- LIMITED PROPOSED DATES PRIMARY DATE 05/2912012 N/A 06/02/2014 N/A ALTERNATE DATE 06/04/2012 N/A 06/09/2014 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED ' ... NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 13 0 0 0 CANDIDATES NRC FORM 536 ( 10.2008) PRINTED ON RECYCI.EO PAPeR Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Attachment 8 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)
Estimated burden per to comply with this voluntary information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments r'ifrdtng burden OPERA TOR LICENSING estimate to the Records and FOIA!Prlvacy Services Branch j -5 F 3), U.S. Nuclear R:;?,ulatory Commission, Washington, DC 20555-000
- or blc internet EXAMINATION DATA e-mail to in ocollects@nrc.&jv, and to the Desk Officer, Office of In onmatlon and Regulatory Affairs, NE 8-10202, (3150-0131), Office of Management and Budget, Washmgton, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Peacb Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos. DPR-12, (Renewed) DPR-44, and DPR-56 I NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 ------ESTIMATED NUMBER OF LICENSEE-PREPARED 0 I 0 I EXAMINATIONS ESTIMATI:D NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 -----NUMBER OF REACTOR 0 8 0 6 OPERATORS NUMBER OF SENIOR REACTOR 0 10 0 6 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0 2 0 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR *See LGS *See LGS
- SeeLGS *See LGS OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 2/ll/2013 N/A 2/9/2015 ALTERNATE DATE N/A 3/25/2013 N/A 3/23/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE DECEMBER ESTIMATED NUMBER OF 0 0 0 CANDIDATES 0 0 0 12 0 NRC FORM 536 (10-2008)
PRINTED ON RECYCLED PAPER Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Attachment 9 Page 1 of 1 NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per to comply with this voluntary information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments burden OPERA TOR LICENSING estimate to the Records and FOIA/Privacy Services Branch -5 F 3), U.S. Nuclear Commission, Washington, DC 20555-000 , or bX Internet EXAMINATION DATA e-mail to in ocollec1s@nrc.gov, and to the Desk Officer, Office of In ormation and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the Information collec1ton. FACILITY NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 ----ESTIMATED NUMBER OF LICENSEE-PREPARED 1 I 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 cy20l3 CY 2014 CY 2015 ----NUMBER OF REACTOR 4 5 0 5 OPERATORS NUMBER OF SENIOR REACTOR 9 OPERATORS -INSTANT 5 0 5 NUMBER OF SENIOR REACTOR 0 1 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 3/26/2012 9/23/2013 N/A 2/9/2015 ALTERNATE DATE 4/23/2012 10/14/2013 N/A 2/23/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED ---*-------NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 10 0 0 0 0 0 10 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Attachment 1 0 Page 1 of 1 NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-()131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per to comply with this voluntary information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments burden OPERA TOR LICENSING estimate to the Records and FOIA/Privacy Services Branch -5 F 3), U.S. Nuclear Commission, Washington, DC 20555-()00 , or Internet EXAMINATION DATA e-mail to in ocollects@nrc.gov, and to the Desk Officer, Office of I orn1atlon and Regulatory Affairs, NE B-10202, (3150-()131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the information collection. FACILITY NRC REGION Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 I NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 ------ESTIMATED NUMBER OF LICENSEE-PREPARED I I I I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 cy2otJ CY 2014 cy20t5 -----NUMBER OF REACTOR OPERATORS 4 5 4 6 NUMBER OF SENIOR REACTOR 5 OPERATORS -INSTANT 5 5 6 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 02/6/2012 6/10/2013 6/16/2014 6/15/2015 ALTERNATE DATE 02/13/2012 6/17/2013 6/23/2014 6/22/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED -----*-NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 10 0 0 0 9 0 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER Mr. Charles G. Pardee UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 February 19, 2010 Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555
SUBJECT:
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION Ill EXELON STATIONS
Dear Mr. Pardee:
In a letter dated August 13, 2009 (RS-09-1 09), your staff responded to Regulatory Issue Summary (RIS) 2009-11, and requested we schedule initial license operator examinations for the Exelon Nuclear Plants. In a separate letter dated March 19, 2009 (U-603882), Clinton Power Station requested an examination be administered in October or November 2010 that was not included in your RIS response letter. That examination has been added to your examination schedule. In a separate letter dated November 18, 2009 (U-603924), Clinton Power Station requested we not schedule the examination requested in December 2011 per your Jetter, but retain an August 2011 examination scheduled from your response to the 2008 RJS for examination scheduling. In a separate letter dated January 6, 2010 (Byron 201 0-0003), Byron Station requested we change the dates of their examinations proposed for 2011, 2012, and 2013 to other dates. We were unable to accommodate the April 2013 examination requested for Quad Cities Nuclear Power Station. It is currently listed as "To Be Determined" as we are currently negotiating a mutually acceptable examination date with Quad Cities training department personnel. This letter confirms scheduling of the requested examinations at the Region Ill Exelon power plants and incorporates the changes requested by Clinton Power Station and Byron Station. We have tentatively scheduled the requested examinations to occur as follows: Station 201 0 2011 2012 2013 2014 Braidwood N/R 06/20 N/R 03/25 N/R Byron 9/2 7 N/R 01/16 01/14 01/27 Clinton 1111 8/22 N/R 8/19 N/R Dresden 03/0 8 03/07 3/05 3/04 N/R LaSalle 09/1 3 N/R 09/24 N/R N/R Quad Cities N/R 5/30 3/26 TBD N/R N/R -None Requested TBD -To Be Determined On-site validation of the examinations is tentatively scheduled to occur approximately three weeks before each scheduled examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you and the affected station's training department immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date. C. Pardee We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. If an examination anticipates greater than nine anticipated applicants for the examination, the examination is scheduled for two weeks. Otherwise, the examination is scheduled for one week. Please inform us if the number of candidates declines below ten for any examination as this will impacfthe examination schedule. Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations. A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS}, accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Docket No. 50-461 License No. NPF-62 Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServ Sincerely, IRA/ Hironori Peterson, Chief Operations Branch Division of Reactor Safety C. Pardee We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. If an examination anticipates greater than nine anticipated applicants for the examination, the examination is scheduled for two weeks. Otherwise, the examination is scheduled for one week. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations. A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Docket No. 50-461 License No. NPF-62 Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServ DISTRIBUTION: See next page Sincerely, IRA/ Hironori Peterson, Chief Operations Branch Division of Reactor Safety DOCUMENT NAME: G:\DRS\Work in Progress\Exelon 021910 DRS OL.doc To receive a con' of this document, indicate in the box "C"-Copy w/o attach/encl "E"-Copy with attach/encl "N"-No coov OFFICE RIII:DRS I RIII:DRS I RIII:DRS I NAME JKweiser:co DMcNeil HPeterson DATE 01/25/10 02/17/10 02/19/10 OFFICIAL RECORD COPY I Letter to Mr. Charles G. Pardee from Mr. Hironori Peterson, dated February 19, 2010.
SUBJECT:
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION Ill EXELON STATIONS DISTRIBUTION: RidsNrrDoriLp13-2 Resource Susan Bagley RidsNrrPMBraidwood Resource RidsNrrPMByron Resource RidsNrrPMCiinton Resource RidsNrrPMDresden Resource RidsNrrPMLaSalle RidsNrrPMQuad Cities RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DR Sill Carole Ariano Linda Linn Patricia Buckley Tammy Tomczak Exelon Nuclear 4300 Wmfleld Road Warrenville, IL 60555 www.exeloncorp.com
- f, ,_-'(_t RS-09-109 August 13, 2009 U.S. Nuclear Regulatory Commission AITN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating license Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 t:'t 13 Facility Operating license No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289 Nuclear I. :_ .. -.,_ AUG 1 7 2009 August 13, 2009 U.S. Nuclear Regulatory Commission Page 2
Subject:
Response to NRC Regulatory Issue Summary 2009-11, "Preparation and Scheduling of Operator Licensing Examinations"
Reference:
NRC Regulatory Issue Summary 2009-11, "Preparation and Scheduling of Operator Licensing Examinations," dated July 16, 2009 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2010 through 2013, and the number of candidates requiring Generic Fundamentals Examinations (GFEs) for calendar years 2010 and 2011. Attachments 1 through 10 provide responses to RIS 2009-11 for the Exelon Generation Company, LLC (EGC) plants identified above. The requested information for each facility is provided on a separate NRC Form 536. In calendar year 2010, eight candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment
- 6. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on Attachment 6 for LGS. Attachment 8 for PBAPS references Attachment 6 where appropriate.
There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819. ger-Licensing and Regulatory Affairs Attachment 1 -Completed NRC Form 536 for Braidwood Station Attachment 2-Completed NRC Form 536 for Byron Station Attachment 3 -Completed NRC Form 536 for Clinton Power Station Attachment 4-Completed NRC Form 536 for Dresden Nuclear Power Station Attachment 5-Completed NRC Form 536 for LaSalle County Station Attachment 6-Completed NRC Form 536 for Limerick Generating Station Attachment 7 -Completed NRC Form 536 for Oyster Creek Nuclear Generating Station Attachment 8 -Completed NRC Form 536 for Peach Bottom Atomic Power Station Attachment 9 -Completed NRC Form 536 for Quad Cities Nuclear Power Station Attachment 10 -Completed NRC Form 536 for Three Mile Island Nuclear Station -Unit 1 Response to RIS 2009-11 Attachment 1 Page 1 of 1 NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.{)131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per to comply with this voluntary mformation collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments rfardlng burden OPERATOR LICENSING estimate to the Records and FOINPrlvacy Services Branch -5 F 3), U.S. Nuclear Commission, Washington, DC 20555.QOO , or blc internet EXAMINATION DATA e-mail to in ocollects@nrc.8ov, and to the Desk Officer, Office of In ormation and Regulatory Affairs, NE B-10202, (3150.{)131), Office of Management and Budget, Wash1ngton, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number. the NRC may not conduct or sponsor, and a person Is not required to respond to. the Information collection. FACILITY NRC REGION Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 III NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 -------ESTIMATED NUMBER OF 0 1 0 1 LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF 0 0 0 NRC-PREPARED 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 cv2on CY 2012 CY 2013 ----NUMBER OF REACTOR OPERATORS 0 7 0 s NUMBER OF SENIOR REACTOR 0 12 0 12 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0 2 0 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 06/20/2011 N/A 03/24/2013 AlTERNATE DATE N/A 07/11/2011 N/A 04/08/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED ----NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 21 0 0 0 0 0 0 19 CANDIDATES NRC FORM 536 (1().2008) PRINTED ON RECYCLED PAPER Response to RIS 2009-11 Attachment 2 Page 1 of 1 NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EX PI RES: 1 0/3112011 (10-2008) Estimated burden per to comply with this voluntary Information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Sand comments burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch -5 F 3), U.S. Nuclear Commission, Washington, DC 20555-000 , or blt internet EXAMINATION DATA e-mail to in ocollects@nrc.gov, and to the Desk Officer, Office of In ormation and Regulatory Affairs, NE B-10202, (3150-0131 ), Office of Management and Budget, Wash1ngton, DC 20503. If a means used to impose an information collec11on does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. FACILITY NRC REGION Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 Ill NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 -----ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 -----NUMBER OF REACTOR 8 OPERATORS 0 0 6 NUMBER OF SENIOR REACTOR 8 OPERATORS-INSTANT 6 6 6 NUMBER OF SENIOR REACTOR 1 1 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 09/27/2010 09/26/2011 09/24/2012 09/23/2013 ALTERNATE DATE N/A 10/03/2011 10/0l/2012 10/07/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED ----NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 6 0 0 0 6 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER
Response to RIS 2009-11 Attachment 3 Page 1 of 1 NRCFORM531 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150-0131 EXPIRES: 0813112008 (8-2005) EtUmeted burden nr to comply wtlh tlda voluntary lnformetion CXlllectlon requeat: hour. lllnloll!lllllon coii<<:Uon il ueed to plain budget1 and resourcea for operator eqmlnlllonl. Send cornmenlll bure1en OPERATOR LICENSING e1t1mate to the Recordl end Services B111nch -5 F 3), U.S. Nudeer Commlaaion, Wuhlngton, DC , lilternat EXAMINATION DATA &omaN to In ocoNectaOnrc"Sr, and 1o the Calk Ofllcer, Ofllce oil ormation and Regul= Affairs, NE -10202, Ofllce of Management and Budget, Walh gton, OC 20503. If a meana used to lmpoee an Information collection doea not dllplly a currenlly valid OMS conllol number, the NAC may not conduct and a peraon Is not required to reapond to, the lnformlllon col n. FACIUTY NRCReGIOH Clinton Power Station, Unit 1 Facility Operating Ucense No. NPF-62 Ill NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2010 CY2011 CY2012 CY2013 -----ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2010 CY2011 CY2012 CY2013 ------NUMBER OF REACTOR 6 6 0 6 OPERATORS NUMBER OF SENIOR REACTOR 0 OPERATORS -INSTANT 4 0 4 NUMBER OF SENIOR REACTOR 0 2 0 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS* UMfTED PROPOSED DATES PRIMARY DATE 10125/2010 12/05/2011 N/A 08/19/2013 ALTERNATE DATE 11/01/2010 12/11/2011 N/A 08126/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED ----NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 9 0 0 0 0 0 CANDIDATES NRC FORM 531 (WOO!!) PRINTED ON RECYCLED PAPER Response to RIS 2009-11 Attachment 4 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 1013112011 (1CJ.2008) Estimated burden per to comply with this voluntary information collection request: 1 hour. his information collection is used to plan budgets and resources lor operator examinations. Send comments burden OPERA TOR LICENSING estimate to the Records and FOIA/Privacy Services Branch -5 F 3), U.S. Nuclear Commission, Washington. DC 20555-000 , or b(. Internet EXAMINATION DATA e-mail to in ocollects@nrc.gov, and to the Desk Officer, Office or In ormation and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washmgton, DC 20503. If a means used to Impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the information collection. FACILITY NRC REGION Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 Ill NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 -------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 l l EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY 2011 CY 2012 cv2o13 -----NUMBER OF REACTOR 2 3 3 3 OPERATORS NUMBER OF SENIOR REACTOR 6 9 9 9 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 1 l 1 1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 03/08/2010 03/07/2011 03/05/2012 03/04/2013 ALTERNATE DATE 04/05/2010 04/04/2011 04/02/2012 04/01/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED ----NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 12 0 0 0 12 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER Response to RIS 2009-11 Attachment 5 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (1().2008) Estimated burden per to comply with this voluntary information collection request: 1 hour. his Information collection is used to plan budgets and resources for operator examinations. Send comments reffrding burden OPERATOR LICENSING estimate to the Records and FOINPrlvacy Services -5 F 3). U.S. Nuclear Commission, Washington, DC 20555-000 , or b(, internet EXAMINATION DATA e-mail to in ocollects@nrc.gov. and to the Desk Officer, Office of In ormation and Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Wash ngton, DC 20503. If a means used to impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not requirad to respond to. the Information collection. FACILITY NRC REGION LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 III NRC Docket Nos. STN 50-373 and STN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 ------ESTIMATED NUMBER OF 1 0 1 0 LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF 0 0 0 NRC-PREPARED 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 ----NUMBER OF REACTOR 3 0 6 0 OPERATORS NUMBER OF SENIOR REACTOR ll 0 8 0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0 0 2 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 09/14/2010 N/A 09/24/2012 N/A ALTERNATE DATE 09/2l/2010 N/A 10/01/2012 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED ----NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 14 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER Response to RIS 2009-11 Attachment 6 Page 1 of 2 U.S. NUCLEAR REGULATORY COIIIMIIIION APPROVEO BY OMB: NO. 31eo.413t EXPIRES: 10/3112011 10.:11001) e.um.IIICI bwdetl f: to comply will! IIIIa 1101unl8ry lllforiNIIIon callecdDn IWII*'t haur. lnbiNdon allecllaft ....... tiJ piM lludoMI ....... OPERATOR UCENSING ......_ 1o tile R.c:ordl_, s.r.tc. 8nlnch -3 F ). U.S. DC , EXAMINATION DATA ._. tiJ ... Ill lllil Delli Olllcw, Olllcf t:ll lnCI 10202. 0111ce W , 20503. It * ,_. UMd tiJ mpc.e M lion collei:IIDn dae8 IIIII dllrpl8y 1 c:urNnlly Ylllld OM8 -*al numblr, 1118 HAC mey not 8lld
- J18IWOII Ia not requlr.d to f81pond to, ltMI lnfomwllon
- FI'CUfY NAC REOICIH Umertck Geaenda1 Statio., Ualta 1 ud 2 FuiUty OperadJia LlceaH NOlL NPF-39 ud NPF-85 I NRC Docket N01. 50-352 ud 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 1010 cvztu cvzou CY 1813 ----ESTIMATED NUMBER OF 1 0 1
- UCENSEE-PR£PARED EXAMINATIONS ESTIMATED NUMBER OF 8 0
- NRC-PREPARED 0 EXAMINATIONS B. INITIAL OPERATOR UCENSE EXAMINATIONS PROPOSED NUMBER cvzo11 cvzou cylOU cvzou ----NUMBER OF REACTOR 6 0 11 0 OPERATORS NUMBER OF SENIOR REACTOR 7 OPERATORS
- INSTANT 0 5 0 NUMBER OF SENIOR REACTOR 5 0 l 0 OPERATORS*
UPGRADE NUMBER OF SENIOR REACTOR
- 0 0 0 OPeRATORS
- UMITED PROPOSED DATES PRIMARY DATE 10/0412010 N/A 10/01/lOU N/A AI. TERNATE DATE 1011812011 N/A 09/2412012 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2110 CY 2011 PROPOSED ----NUMBER MARCH JUNE DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0 NUMBER OF 0 0 0 0 16 0 0 CANDIDATES NRC FOAM 1131 (11J.3101)
Response to RJS 2009-11 Attachment 6 Page 2 of 2 NRC FORM 538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per to comply with this voluntary information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments burden OPERA TOR LICENSING estimate to the Records and FOIA/Privacy Services Branch -5 F 3), U.S. Nuclear Commission, Washington, DC 20555-000 . or Internet EXAMINATION DATA a-mall to in ocollects@nrc.gov, and to the Desk Officer, Office of In ormation and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washrngton, DC 20503. If a means used to impose an information collection does not display a currenHy valid OMB control number. the NRC may not conduct or sponsor, and a person is not required to respond to, the information collecbon. FACILITY NRC REGION Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 I NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 -------ESTIMATED NUMBER OF 1 0 0 0 LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF 0 0 0 NRC-PREPARED 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 ----NUMBER OF REACTOR OPERATORS 0 0 0 0 NUMBER OF SENIOR REACTOR 0 OPERATORS-INSTANT 0 0 0 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 8 0 0 0 OPERA TORS -LIMITED PROPOSED DATES PRIMARY DATE 06/14/2010 N/A N/A N/A ALTERNATE DATE 06/0712010 N/A N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION {GFE) SCHEDULE CY 2010 CY 2011 PROPOSED ----NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER Response to RIS 2009-11 Attachment 7 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10*2008) Estimated burden per to comply with this voluntary Information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments refrding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch *5 F 3), U.S. Nuclear Commission, Washington, DC 20555-000 , or blc internet EXAMINATION DATA e-mail to 1n ocollects@nrc.gov, and to the Desk Officer, Office of In ormation and Regulato;y, Affairs, NE B-10202, (3150-0131 ), Office of Management and Budget, Wash ngton, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the information collection. FACILITY NRC REGION Oyster Creek Nuclear Generating Station I Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 -------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 cv2o11 CY 2012 cv2o13 ----NUMBER OF REACTOR 6 OPERATORS 6 6 0 NUMBER OF SENIOR REACTOR 7 OPERATORS-INSTANT 7 8 0 NUMBER OF SENIOR REACTOR 2 1 2 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERA TORS -LIMITED PROPOSED DATES PRIMARY DATE 05/17/2010 0711112011 05/28/2012 N/A ALTERNATE DATE 05/24/2010 07/18/2011 06/04/2012 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION {GFE) SCHEDULE CY 2010 CY 2011 PROPOSED ----NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 13 0 0 0 14 0 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER Response to RIS 2009-11 Attachment 8 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per to comply with this voluntary information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments rfrdlng burden OPERATOR LICENSING estimate to the Records and FOIA/Prlvacy Services Branch -5 F 3), U.S. Nuclear Re?.ulatory Commission, Washington, DC 20555-000
- or br. internet EXAMINATION DATA e-mail to In ocollects@nrc-gov.
and to the Desk Officer, Office of In ormation and Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Wash ngton, DC 20503. If a means used to impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or and a person is not required to respond to, the information colle on. FACILITY NRC REGION Peach Bottom Atom Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 I NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 ------ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF 0 0 0 NRC-PREPARED 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY 2011 CY 2012 cv2o13 ------NUMBER OF REACTOR 0 6 0 8 OPERATORS NUMBER OF SENIOR REACTOR 0 8 0 10 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0 3 0 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR
- 0 0 0 OPERATORS*
LIMITED PROPOSED DATES PRIMARY DATE
- 0113112011 N/A 02/1112013 ALTERNATE DATE
- 03/2112011 N/A 02/04/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED ----NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 18 0 CANDIDATES NRC FORM 536 (10-2006)
PRINTED ON RECYCLED PAPER *See Attachment 6 (Limerick Generating Station) for Limited SRO numbers and exam dates Response to RIS 2009-11 Attachment 9 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-{1131 EXPIRES: 10/31/2011 (1()..2008) Estimated burden per to comply with this voluntary information colleclion request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments rerardlng burden OPERA TOR LICENSING estimate to the Records and FOINPrivacy Services Branch -5 F 3). U.S. Nuclear Commission, Washington, DC 20555..()00 , or br. internet EXAMINATION DATA e-mail to 1n ocollects@nrc.gov, and to the Desk Officer, Office of In ormation and Regulatory Affairs, NE B-10202, (3150..()131 ). Office of Management and Budget, Washmgton. DC 20503. If a means used to impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is nol required to respond to, the information collection. FACILITY NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 Renewed FaciUty Operating License Nos. DPR-29 and DPR-30 III NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 -------ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 l 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 ----NUMBER OF REACTOR 0 6 4 3 OPERATORS NUMBER OF SENIOR REACTOR 0 OPERA TORS -INSTANT 11 10 10 NUMBER OF SENIOR REACTOR 0 0 1 1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERA TORS -LIMITED PROPOSED DATES PRIMARY DATE N/A 05/30/2011 03/12/2012 04/15/2013 ALTERNATE DATE N/A 06/13/2011 03/26/2012 04/29/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 20ll PROPOSED ----NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 14 0 0 0 0 CANDIDATES NRC FORM 538 (10.2008) PRINTED ON RECYCLED PAPER Response to RIS 2009-11 Attachment 1 0 Page 1 of 1 NRCFORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150.0131 EXPIRES: 1013112011 (1(1.2001) E*Umated burden per to comply with thle voluntery informetlon oo118c:tlon requaat 1 hour. Is lnfonnatlon colectlon Is used to plan budgem and reaourcea for operator axamlnatlona. Sand commenll burden OPERATOR LICENSING alllmete to the Recorda and FOIAIPrlvacy Servleea Branch -5 F 3), u.s. Nuclear Commlulon, WIShlngton, DC 20555-000 , or lntennet EXAMINATION DATA .-melt to In lnd to the Delk Olllcer, Ofllce of I rmllllon and Regula:r, Affln, NE 10202, (3150-0131), OIIICI ol Budget, Wa ngtcn, DC 20503. If a meene uNCI to lmpoa an formation coiiiC:tlon ctoea not dleplay a cunanUy valid OMS control number, lhe NRC mey not conduct and a peraon is not required to respond to, the Information col . FACIUTY NRC REGION Three Mile Island Nuclear Station, Unit I I Facility OperadDI License no. DPR-50 NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 cv:zon CY 2012 cv:zou ----ESTIMATED NUMBER OF 1 1 0 I LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF 0 0 0 NRc-PREPARED 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 cv:zou CY2012 cy2013 ----NUMBER OF REACTOR 1 OPERATORS 10 0 ' NUMBER OF SENIOR REACTOR 1 OPERATORS -INSTANT 10 0 8 NUMBER OF SENIOR REACTOR 0 I 0 I OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 01/2112010 09/ll/2011 N/A 09/0912013 ALTERNATE DATE 0112812010 09/19/2011 N/A 09/1612013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY lOU PROPOSED __ ..,_._ -*-* NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 21 0 0 0 18 0 0 0 CANDIDATES NRC FORM 538 (1 G-2001) PRINTED Oft RECYCI.ED PAPER}}