ENS 48125: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 07/23/2012 03:29 EDT
| event date = 07/23/2012 03:29 EDT
| last update date = 09/12/2012
| last update date = 09/12/2012
| title = Unusual Event Due To Loss Of Offsite Power
| title = Unusual Event Due to Loss of Offsite Power
| event text = At 0329 EDT, Oyster Creek experienced a loss of offsite power.  As a result of the loss of offsite power, the unit automatically scrammed from 100% with all control rods fully inserting and all safety systems functioning as required.  Both Emergency Diesel Generators automatically started and are carrying loads on the safety buses.  
| event text = At 0329 EDT, Oyster Creek experienced a loss of offsite power.  As a result of the loss of offsite power, the unit automatically scrammed from 100% with all control rods fully inserting and all safety systems functioning as required.  Both Emergency Diesel Generators automatically started and are carrying loads on the safety buses.  
At 0341 EDT, Oyster Creek declared an Unusual Event based on a loss of offsite power for greater than 15 minutes. The unit is stable in Hot Shutdown with decay heat removal via the Isolation Condenser.  The cause of the loss of offsite power is currently under investigation by JCP&L.
At 0341 EDT, Oyster Creek declared an Unusual Event based on a loss of offsite power for greater than 15 minutes. The unit is stable in Hot Shutdown with decay heat removal via the Isolation Condenser.  The cause of the loss of offsite power is currently under investigation by JCP&L.

Latest revision as of 21:03, 1 March 2018

ENS 48125 +/-
Where
Oyster Creek
New Jersey (NRC Region 1)
Reporting
Emergency class: Unusual Event
10 CFR 50.72(a) (1) (i), Emergency Class Declaration

10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-3.08 h-0.128 days <br />-0.0183 weeks <br />-0.00422 months <br />)
Opened: Robert Sales
04:24 Jul 23, 2012
NRC Officer: Dong Park
Last Updated: Sep 12, 2012
48125 - NRC Website
Loading map...