ENS 52381
ENS Event | |
---|---|
08:42 Nov 20, 2016 | |
Title | Automatic Reactor Scram During Main Turbine Testing |
Event Description | At 0342 EST, an automatic reactor scram was processed during turbine valve testing. All rods inserted into the core as expected and all systems functioned as expected during the scram.
The event is reportable within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per 10 CFR 50.72(b)(2)(iv)(B) - any event or condition that results in actuation of the Reactor Protection System (RPS) when the reactor is critical except when the actuation results from and is part of a preplanned sequence during testing or reactor operation. The plant response to the reactor scram was uncomplicated. The main feedwater system is maintaining reactor water level and decay heat is being removed by the main turbine bypass valves to the main condenser. The unit is in a normal shutdown electrical lineup. No SRVs lifted during the scram. The licensee was testing the main turbine trip function just prior to the scram. The cause is under investigation. The licensee notified the NRC Resident Inspector. |
Where | |
---|---|
Oyster Creek New Jersey (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
Time - Person (Reporting Time:+-2.68 h-0.112 days <br />-0.016 weeks <br />-0.00367 months <br />) | |
Opened: | Josh Mcguire 06:01 Nov 20, 2016 |
NRC Officer: | Jeff Rotton |
Last Updated: | Nov 20, 2016 |
52381 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 52381\u003C/a\u003E - \u003Ca href=\"/Oyster_Creek\" title=\"Oyster Creek\"\u003EOyster Creek\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EAutomatic Reactor Scram During Main Turbine Testing\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 52381 - Oyster Creek\n","link":"","lat":39.81436111111111,"lon":-74.20560833333333,"icon":""}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | A/R |
Before | Power Operation (90 %) |
After | Hot Shutdown (0 %) |
Oyster Creek with 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation | |
WEEKMONTHYEARENS 528392017-07-03T14:15:0003 July 2017 14:15:00
[Table view]10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram on Low Condenser Vacuum ENS 523812016-11-20T08:42:00020 November 2016 08:42:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram During Main Turbine Testing ENS 518952016-04-30T22:04:00030 April 2016 22:04:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Scram During Reactor Startup Due to Increase in Unidentified Leak Rate ENS 510552015-05-07T21:27:0007 May 2015 21:27:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Due to Turbine Trip ENS 509162015-03-22T18:14:00022 March 2015 18:14:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Reactor Scram Due to Aprm Hi Hi Signal ENS 505242014-10-12T06:51:00012 October 2014 06:51:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Due to Decreasing Reactor Water Level ENS 502702014-07-11T07:14:00011 July 2014 07:14:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Scram Due to Loss of Main Condenser Vacuum ENS 496332013-12-14T08:37:00014 December 2013 08:37:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Scram Due to Rise in Reactor Pressure During Turbine Valve Testing ENS 494142013-10-06T15:30:0006 October 2013 15:30:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Due to Degraded Condenser Vacuum ENS 494042013-10-03T10:43:0003 October 2013 10:43:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram During Startup ENS 481252012-07-23T07:29:00023 July 2012 07:29:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unusual Event Due to Loss of Offsite Power ENS 465072010-12-23T19:07:00023 December 2010 19:07:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Reactor Scram During Startup ENS 451962009-07-12T05:48:00012 July 2009 05:48:00 10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unusual Event Declared Due to a Loss of Offsite Power ENS 450212009-04-25T22:05:00025 April 2009 22:05:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Scram Following Loss of Cooling to Main Transformer ENS 448222009-02-02T02:56:0002 February 2009 02:56:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event and Reactor Scram Due to Main Transformer Fire ENS 446882008-11-29T02:01:00029 November 2008 02:01:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram Due to Main Transformer Fault ENS 438542007-12-19T16:45:00019 December 2007 16:45:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Due to Lowering Reactor Level ENS 434952007-07-17T09:22:00017 July 2007 09:22:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram on Low Reactor Vessel Water Level (Rvwl) ENS 417412005-06-02T01:09:0002 June 2005 01:09:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Reactor Scram Due to Generator Trip/Turbine Trip Following Offsite Electical Transient ENS 407782004-05-27T04:33:00027 May 2004 04:33:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram While Performing Scheduled Shutdown ENS 400952003-08-22T06:59:00022 August 2003 06:59:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Turbine Trip Causes Automatic Reactor Scram at Oyster Creek 2017-07-03T14:15:00 | |