| Response to Request for Additional Information Regarding Omaha Public Power District's Decommissioning Funding Plan Update for Fort Calhoun Station Independent Spent Fuel Storage Installation | | Response to Request for Additional Information Regarding Omaha Public Power District's Decommissioning Funding Plan Update for Fort Calhoun Station Independent Spent Fuel Storage Installation |
|
| |
|
| ==References:== | | ==References:== |
| : 1. Letter from OPPD (L. P. Cortopassi) to USNRC (Document Control Desk), Fort Calhoun Station, Unit No. 1, 2015 Biennial Decommissioning Funding Status Report and Omaha Public Power District (OPPD) Nuclear Decommissioning Funding Plan for the Fort Calhoun Station Independent Spent Fuel Storage Installation (ISFSI), | | : 1. Letter from OPPD (L. P. Cortopassi) to USNRC (Document Control Desk), Fort Calhoun Station, Unit No. 1, 2015 Biennial Decommissioning Funding Status Report and Omaha Public Power District (OPPD) Nuclear Decommissioning Funding Plan for the Fort Calhoun Station Independent Spent Fuel Storage Installation (ISFSI), dated March 31, 2015 (ADAMS No.:ML 15090A763)(LIC-15-0047) |
| dated March 31, 2015 (ADAMS No.:ML 15090A763)(LIC-15-0047) | | : 2. Letter from USNRC (P. Longmire) to OPPD (M. J. Fisher), Request For Additional Information Regarding Omaha Public Power District's Decommissioning Funding Plan Update For Fort Calhoun Station Independent Spent Fuel Storage Installation, dated March 8, 2018 (CAC No.: 001028)(EPID No.: L-2017-FPR-0027)(ADAMS Package No.: ML 18067A141) (NRC-18-016) |
| : 2. Letter from USNRC (P. Longmire) to OPPD (M. J. Fisher), | |
| Request For Additional Information Regarding Omaha Public Power District's Decommissioning Funding Plan Update For Fort Calhoun Station Independent Spent Fuel Storage Installation, dated March 8, 2018 (CAC No.: 001028)(EPID No.: L-2017-FPR-0027)(ADAMS Package No.: ML 18067A141) | |
| (NRC-18-016) | |
| On March 31, 2015, OPPD submitted decommissioning funding plan update (DFP Update) for the independent spent fuel storage installation (ISFSI) at Fort Calhoun Station (Reference 1 ). On March 8, 2018 (Reference 2), the NRC provided OPPD with Requests for Additional Information (RAI) regarding the DFP Update. Attachment 1 of this letter provides the responses to the RAI. | | On March 31, 2015, OPPD submitted decommissioning funding plan update (DFP Update) for the independent spent fuel storage installation (ISFSI) at Fort Calhoun Station (Reference 1 ). On March 8, 2018 (Reference 2), the NRC provided OPPD with Requests for Additional Information (RAI) regarding the DFP Update. Attachment 1 of this letter provides the responses to the RAI. |
| U. S. Nuclear Regulatory Commission LIC-18-0011 Page 2 This letter contains no regulatory commitments. | | U. S. Nuclear Regulatory Commission LIC-18-0011 Page 2 This letter contains no regulatory commitments. |
Line 37: |
Line 33: |
| ==Attachment:== | | ==Attachment:== |
|
| |
|
| Response to Request for Additional Information c: K. M. Kennedy, NRC Regional Administrator, Region IV J. Kim, NRC Project Manager J. D. Parrott, NRC Senior Project Manager R. S. Browder, NRC Senior Health Physicist, Region IV LIC-18-0011 Attachment Page 1 ATTACHMENT REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING OMAHA PUBLIC POWER DISTRICT'S DECOMMISSIONING FUNDING PLAN UPDATE FOR FORT CALHOUN STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-54 Regulatory Requirement Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 72.30(c), | | Response to Request for Additional Information c: K. M. Kennedy, NRC Regional Administrator, Region IV J. Kim, NRC Project Manager J. D. Parrott, NRC Senior Project Manager R. S. Browder, NRC Senior Health Physicist, Region IV LIC-18-0011 Attachment Page 1 ATTACHMENT REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING OMAHA PUBLIC POWER DISTRICT'S DECOMMISSIONING FUNDING PLAN UPDATE FOR FORT CALHOUN STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-54 Regulatory Requirement Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 72.30(c), at the time of license renewal and at intervals not to exceed 3 years, the decommissioning funding plan (DFP) required to be submitted by 10 CFR 72.30(b) must be resubmitted with adjustments as necessary to account for changes in costs and the extent of contamination. |
| at the time of license renewal and at intervals not to exceed 3 years, the decommissioning funding plan (DFP) required to be submitted by 10 CFR 72.30(b) must be resubmitted with adjustments as necessary to account for changes in costs and the extent of contamination. | |
| The DFP must update the information submitted with the original or prior approved plan. In addition, the DFP must also specifically consider the effect of the following events on decommissioning costs, as required by 10 CFR 72.30(c)(1)-(4): | | The DFP must update the information submitted with the original or prior approved plan. In addition, the DFP must also specifically consider the effect of the following events on decommissioning costs, as required by 10 CFR 72.30(c)(1)-(4): |
| (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface | | (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate. |
| : material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.
| | Background By letter dated March 31 , 2015, Omaha Public Power District (OPPD) submitted for U.S. Nuclear Regulatory Commission (NRC) staff review and approval, a decommissioning funding plan update (DFP Update) for the independent spent fuel storage installation (ISFSI) at Fort Calhoun Station (Agencywide Documents Access and Management System Accession No. ML 15090A763). |
| Background By letter dated March 31, 2015, Omaha Public Power District (OPPD) submitted for U.S. Nuclear Regulatory Commission (NRC) staff review and approval, a decommissioning funding plan update (DFP Update) for the independent spent fuel storage installation (ISFSI) at Fort Calhoun Station (Agencywide Documents Access and Management System Accession No. ML 15090A763). | |
| The NRC staff reviewed OPPD's DFP update for the ISFSI and believes OPPD's submittal was not sufficient to meet the intent of the requirement in 72.30(c). | | The NRC staff reviewed OPPD's DFP update for the ISFSI and believes OPPD's submittal was not sufficient to meet the intent of the requirement in 72.30(c). |
| The DFP update does not provide sufficient information to allow the NRC to determine that the events listed in 10 CFR 72.30(c)(1)-(4) have been specifically considered. | | The DFP update does not provide sufficient information to allow the NRC to determine that the events listed in 10 CFR 72.30(c)(1)-(4) have been specifically considered. |
| RAI1 For the ISFSI, provide a revised DFP that includes information on the occurrence, and the effect on decommissioning costs, of each of the events listed in 10 CFR 72.30(c)(1)-(4): | | RAI1 For the ISFSI, provide a revised DFP that includes information on the occurrence, and the effect on decommissioning costs, of each of the events listed in 10 CFR 72.30(c)(1)-(4): |
| (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface | | (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate. |
| : material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.
| |
| LIC-18-0011 Attachment Page 2 OPPD Response: | | LIC-18-0011 Attachment Page 2 OPPD Response: |
| As noted 10 CFR 72.30(c) defines specific events that must be considered in the subsequent updates. | | As noted 10 CFR 72.30(c) defines specific events that must be considered in the subsequent updates. The submittal of DFP Update of the ISFSI March 31, 2015, should have contained the following: |
| The submittal of DFP Update of the ISFSI March 31, 2015, should have contained the following: | |
| : 1. No spills of radioactive material producing additional residual radioactivity in onsite subsurface material have occurred. | | : 1. No spills of radioactive material producing additional residual radioactivity in onsite subsurface material have occurred. |
| : 2. Facility modifications that affected the ISFSI, including those that were implemented within the licensed area, were assessed and had no impact. 3. There were no changes in authorized possession limits. 4. No active decommissioning occurred during the period encompassed by the referenced submittal (ML 15090A763), | | : 2. Facility modifications that affected the ISFSI, including those that were implemented within the licensed area, were assessed and had no impact. 3. There were no changes in authorized possession limits. 4. No active decommissioning occurred during the period encompassed by the referenced submittal (ML 15090A763), thus, there have not been any actual remediation costs that exceed the previous cost estimate.}} |
| thus, there have not been any actual remediation costs that exceed the previous cost estimate.}} | |
Letter Sequence Response to RAI |
---|
EPID:L-2017-FPR-0027, Package: Request for Additional Information Regarding Omaha Public Power District'S Decommissioning Funding Plan Update for Fort Calhoun Station Independent Spent Fuel Storage Installation (Open) |
|
MONTHYEARML18067A1432018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to M. J. Fisher Request for Additional Information Regarding Omaha Public Power District'S Decommissioning Funding Plan Update for Fort Calhoun Station ISFSI) Project stage: RAI ML18067A1412018-03-0808 March 2018 Package: Request for Additional Information Regarding Omaha Public Power District'S Decommissioning Funding Plan Update for Fort Calhoun Station Independent Spent Fuel Storage Installation Project stage: Request ML18067A1422018-03-0808 March 2018 Letter to M. J. Fisher Request for Additional Information Regarding Omaha Public Power District'S Decommissioning Funding Plan Update for Fort Calhoun Station Independent Spent Fuel Storage Installation Project stage: RAI ML18088B3782018-03-29029 March 2018 Response to Request for Additional Information Regarding Omaha Public Power District'S Decommissioning Funding Plan Update for Fort Calhoun Station Independent Spent Fuel Storage Installation Project stage: Response to RAI ML21055A4942021-05-20020 May 2021 the Nuclear Regulatory Commissions Analysis of Omaha Public Power Districts Initial and Updated Decommissioning Funding Plans for the Fort Calhoun Independent Spent Fuel Storage Installation Project stage: Other 2018-03-08
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000285/20240032024-10-29029 October 2024 NRC Inspection Report 05000285/2024003 LIC-24-0012, Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information2024-10-0707 October 2024 Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information LIC-24-0011, Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-00952024-10-0202 October 2024 Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-0095 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24243A1042024-09-12012 September 2024 Proposed Revision to the OPPD FCS DQAP - Request for Additional Information (License No. DPR-40, Docket Nos. 50-285, 72-054, and 71-0256) ML24255A0962024-09-12012 September 2024 License Amendment Request to Revise the License Termination Plan - Request Supplemental Information (License No. DPR-40, Docket No. 50-285) IR 05000285/20240022024-08-21021 August 2024 NRC Inspection Report 05000285/2024002 ML24235A0822024-08-10010 August 2024 Response to Fort Calhoun Station, Unit No. 1 - Phase 1 Final Status Survey Report to Support Approved License Termination Plan - Request for Additional Information - Request for Additional Information (EPID L-2024-DFR-0002) July 8, 2024 ML24180A2082024-07-0808 July 2024 Phase 1 Final Status Survey Reports Request for Additional Information Letter ML24183A3222024-07-0808 July 2024 Proposed Revision to the Omaha Public Power District Fort Calhoun Station Decommissioning Quality Assurance Plan - Acceptance Review LIC-24-0007, License Amendment Request (LAR) to Revise License Termination Plan (LTP)2024-06-18018 June 2024 License Amendment Request (LAR) to Revise License Termination Plan (LTP) IR 05000285/20240012024-06-0505 June 2024 NRC Inspection Report 05000285/2024001 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities LIC-24-0008, Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI2024-05-16016 May 2024 Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI LIC-24-0003, Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report2024-04-25025 April 2024 Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-24-0006, (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan2024-04-17017 April 2024 (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan ML24079A1702024-03-10010 March 2024 ISFSI, Unit 1 - 10 CFR 50.59 Report, Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, 10 CFR 71.106 Quality Assurance Program Approval, Aging Management Review, Commitment Revisions and Revision of Updated Safe LIC-24-0005, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2024-03-0101 March 2024 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-24-0002, Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report2024-02-27027 February 2024 Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report ML24019A1672024-01-31031 January 2024 Issuance of Amendment to Renewed Facility License to Add License Condition to Include License Termination Plan Requirements IR 05000285/20230062023-12-21021 December 2023 NRC Inspection Report 05000285/2023006 LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information IR 05000285/20230052023-11-0202 November 2023 NRC Inspection Room 05000285/2023005 ML23276A0042023-09-28028 September 2023 U.S. EPA Response Letter to NRC Letter on Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites MOU - Fort Calhoun Station, Unit 1 – (License No. DPR-40, Docket No. 50-285) IR 05000285/20230042023-09-13013 September 2023 NRC Inspection Report 05000285/2023-004 LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 ML23234A2412023-08-18018 August 2023 Email - Letter to M Porath Re Ft Calhoun Unit 1 LTP EA Section 7 Informal Consultation Request ML23234A2392023-08-18018 August 2023 Letter to B Harisis Re Ft Calhoun Unit 1 LTP EA State of Nebraska Comment Request.Pdf IR 05000285/20230032023-07-10010 July 2023 – NRC Inspection Report 05000285/2023003 ML23082A2202023-06-26026 June 2023 Consultation on the Decommissioning of the Fort Calhoun Station Unit 1 Pressurized Water Reactor in Fort Calhoun, Nebraska ML23151A0032023-06-0505 June 2023 – Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 IR 05000285/20230022023-06-0505 June 2023 NRC Inspection Report 05000285/2023002 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000285/20230012023-02-24024 February 2023 NRC Inspection Report 05000285/2023001 LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML23020A0462023-01-19019 January 2023 Threatened and Endangered Species List: Nebraska Ecological Services Field Office IR 05000285/20220062023-01-0505 January 2023 NRC Inspection Report 05000285/2022-006 ML22357A0662022-12-30030 December 2022 Technical RAI Submittal Letter on License Amendment Request for Approval of License Termination Plan IR 05000285/20220052022-10-26026 October 2022 NRC Inspection Report 05000285/2022-005 ML22276A1052022-09-30030 September 2022 Conclusion of Consultation Under Section 106 NHPA for Ft. Calhoun Station LTP ML22258A2732022-09-29029 September 2022 Letter to John Swigart, Shpo; Re., Conclusion of Consultation Under Section 106 Hnpa Fort Calhoun Station Unit 1 ML22265A0262022-09-26026 September 2022 U.S. Nuclear Regulatory Commission'S Analysis of Omaha Public Power District'S Decommissioning Status Report (License No. DPR-40, Docket No. 50-285) IR 05000285/20220042022-09-14014 September 2022 NRC Inspection Report 05000285/2022004 ML22138A1252022-08-0303 August 2022 Letter to Mr. Timothy Rhodd, Chairperson, Iowa Tribe of Kansas and Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1222022-08-0303 August 2022 Letter to Mr. John Shotton, Chairman, Otoe-Missouria Tribe of Indians, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1302022-08-0303 August 2022 Letter to Justin Wood, Principal Chief, Sac and Fox Nation, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22214A0922022-08-0303 August 2022 Letter to Stacy Laravie, Thpo, Ponca Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 2024-09-18
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARML24289A2042024-10-0909 October 2024 Clarification Responses LIC-24-0012, Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information2024-10-0707 October 2024 Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information LIC-24-0011, Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-00952024-10-0202 October 2024 Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-0095 ML24235A0822024-08-10010 August 2024 Response to Fort Calhoun Station, Unit No. 1 - Phase 1 Final Status Survey Report to Support Approved License Termination Plan - Request for Additional Information - Request for Additional Information (EPID L-2024-DFR-0002) July 8, 2024 ML23276A0042023-09-28028 September 2023 U.S. EPA Response Letter to NRC Letter on Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites MOU - Fort Calhoun Station, Unit 1 – (License No. DPR-40, Docket No. 50-285) LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information ML22034A5592022-01-13013 January 2022 Response to Fort Calhoun Station, Unit No. 1 - Acceptance Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Supplemental Information (EPID L-2021-LIT-OOOO) Ml21350A02 ML20202A6542020-07-16016 July 2020 Response for Fort Calhoun Station Fort Calhoun Station, Unit No. 1, Revised Post-Shutdown Decommissioning Activities Report LIC-19-0021, Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme2019-11-20020 November 2019 Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme LIC-18-0018, Independent Spent Fuel Storage Installation - Emergency Plan Update2018-04-18018 April 2018 Independent Spent Fuel Storage Installation - Emergency Plan Update ML18088B3782018-03-29029 March 2018 Response to Request for Additional Information Regarding Omaha Public Power District'S Decommissioning Funding Plan Update for Fort Calhoun Station Independent Spent Fuel Storage Installation ML17348A6232017-12-14014 December 2017 Response for Fort Calhoun Station Specific Questions and Concerns Regarding Omaha Public Power District'S Post-Shutdown Decommissioning Activities Report (PSDAR) LIC-17-0068, Reply to Final Request for Additional Information (RAI) for Fort Calhoun Exemption from 10 CFR 140.11 (a)(4), Off-site Primary and Secondary Liability Insurance (MF9664)2017-10-0404 October 2017 Reply to Final Request for Additional Information (RAI) for Fort Calhoun Exemption from 10 CFR 140.11 (a)(4), Off-site Primary and Secondary Liability Insurance (MF9664) LIC-17-0065, Submittal of Response to Request for Additional Information Re Fort Calhoun Request to Revise Their Technical Specifications to Align to Those Requirements for Decommissioning2017-09-26026 September 2017 Submittal of Response to Request for Additional Information Re Fort Calhoun Request to Revise Their Technical Specifications to Align to Those Requirements for Decommissioning ML17268A2212017-09-25025 September 2017 Response to Request for Additional Information (RAI) Regarding License Amendment Request 16-04 Revising Current Licensing Basis to Use Aci Ultimate Strength Requirements ML17264A7502017-09-21021 September 2017 Response to Request for Additional Information (RAI) License Amendment Request Regarding Removal of Dry Cask Loading Limits Fort Calhoun Station, Unit 1 Docket No.: 50-285 (MF9831) LIC-17-0054, Submission of Corrected Pages for Response to Request for Additional Information, Fort Calhoun Station, Unit No. 1 - Request for Additional Information Certified Fuel Handler Training Program2017-06-0606 June 2017 Submission of Corrected Pages for Response to Request for Additional Information, Fort Calhoun Station, Unit No. 1 - Request for Additional Information Certified Fuel Handler Training Program LIC-17-0047, Final Request for Additional Information Concerning License Amendment Request 16-07: Revise the Emergency Plan to the Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2017-05-15015 May 2017 Final Request for Additional Information Concerning License Amendment Request 16-07: Revise the Emergency Plan to the Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme LIC-17-0048, Response to Request for Additional Information Regarding the Fort Calhoun Station Request to Revise Technical Specifications to Align Staffing Requirements for Permanently Defueled Condition2017-04-27027 April 2017 Response to Request for Additional Information Regarding the Fort Calhoun Station Request to Revise Technical Specifications to Align Staffing Requirements for Permanently Defueled Condition LIC-17-0045, Response to Request for Additional Information Defueled Emergency Plan Exemption Request2017-04-20020 April 2017 Response to Request for Additional Information Defueled Emergency Plan Exemption Request LIC-17-0037, Response to Request for Additional Information, Fort Calhoun Station, Unit No.1 - Final Request for Additional Information Concerning Exemption from the Requirements of 10 CFR 50.47 and Appendix E2017-04-14014 April 2017 Response to Request for Additional Information, Fort Calhoun Station, Unit No.1 - Final Request for Additional Information Concerning Exemption from the Requirements of 10 CFR 50.47 and Appendix E LIC-17-0036, Supplemental Response to Request for Additional Information - Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment2017-04-0505 April 2017 Supplemental Response to Request for Additional Information - Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment ML17089A5442017-03-30030 March 2017 Response to Request for Additional Information Certified Fuel Handler Training Program LIC-17-0020, Response to Request for Additional Information, Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment2017-03-0303 March 2017 Response to Request for Additional Information, Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment ML17041A4442017-02-10010 February 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 2 of 4) ML17041A4432017-02-10010 February 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 1 of 4) LIC-17-0024, Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 4 of 4)2017-02-10010 February 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 4 of 4) LIC-16-0107, Final Response to the Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident and Corresponding Commitments2016-11-18018 November 2016 Final Response to the Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident and Corresponding Commitments LIC-16-0090, Response to Request for Additional Information Regarding Certified Fuel Handler Training Program2016-10-0707 October 2016 Response to Request for Additional Information Regarding Certified Fuel Handler Training Program LIC-16-0078, Revision to Response to Request for Information Regarding Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - Flood Hazard Reevaluation Report2016-09-14014 September 2016 Revision to Response to Request for Information Regarding Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - Flood Hazard Reevaluation Report ML16165A0282016-06-0909 June 2016 Response to NRC Request for Additional Information Revise Current Licensing Basis to Use American Concrete Institute Ultimate Strength Requirements LIC-16-0044, Calculation FC08499 Evaluation of FCS Concrete Compressive Strength Test Data2016-06-0101 June 2016 Calculation FC08499 Evaluation of FCS Concrete Compressive Strength Test Data LIC-16-0025, Ft. Calhoun, Unit 1 - Response to Request for Additional Information Adoption of TSTF-501, Revision 12016-04-0808 April 2016 Ft. Calhoun, Unit 1 - Response to Request for Additional Information Adoption of TSTF-501, Revision 1 LIC-16-0022, Response to NRC Request for Additional Information Revise Current Licensing Basis to Allow Use of Equipment Classification Methodology from ANSI/ANS-58.14-20112016-04-0808 April 2016 Response to NRC Request for Additional Information Revise Current Licensing Basis to Allow Use of Equipment Classification Methodology from ANSI/ANS-58.14-2011 ML16057A0742016-02-26026 February 2016 Response to Regulatory Information Summary (RIS) 2015-16, Planned Licensing Action Submittals for All Power Reactor Licensees. LIC-16-0001, Response to NRC Request for Additional Information Technical Specification Administrative Changes2016-01-27027 January 2016 Response to NRC Request for Additional Information Technical Specification Administrative Changes LIC-15-0147, Response to NRC Request for Additional Information Fifth Lnservice Testing Interval Relief Requests P-1 and P-22016-01-11011 January 2016 Response to NRC Request for Additional Information Fifth Lnservice Testing Interval Relief Requests P-1 and P-2 LIC-15-0139, ISFSI - Supplemental OPPD Response to NRC Request for Additional Information License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 62015-12-0808 December 2015 ISFSI - Supplemental OPPD Response to NRC Request for Additional Information License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 ML15350A0182015-11-30030 November 2015 Transmittal of Response to Remaining Questions from NRC Request for Additional Information (RAI) Regarding Reactor Vessel Internal Component Aging Management Program ML15350A0192015-11-30030 November 2015 Enclosure 6, Response to Remaining Questions from NRC Request for Additional Information (RAI) Regarding Reactor Vessel Internal Component Aging Management Program. (Non-Proprietary) LIC-15-0129, Addendum to Response to Request for Information Regarding Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - Flood Hazard Reevaluation Report2015-11-0404 November 2015 Addendum to Response to Request for Information Regarding Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - Flood Hazard Reevaluation Report LIC-15-0121, ISFSI - Supplemental OPPD Response to NRC Request for Additional Information License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 62015-11-0202 November 2015 ISFSI - Supplemental OPPD Response to NRC Request for Additional Information License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 LIC-15-0113, Response to Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation2015-09-28028 September 2015 Response to Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation LIC-15-0115, ISFSI - Response to NRC Request for Clean Copy of Emergency Action Level Technical Basis Document2015-09-18018 September 2015 ISFSI - Response to NRC Request for Clean Copy of Emergency Action Level Technical Basis Document LIC-15-0102, Response to NRC Request for Additional Information Re License Amendment Request to Adopt Emergency Action Level Scheme Per NEI 99-01, Rev. 62015-09-11011 September 2015 Response to NRC Request for Additional Information Re License Amendment Request to Adopt Emergency Action Level Scheme Per NEI 99-01, Rev. 6 2024-08-10
[Table view] |
Text
LIC-18-0011 March 29, 2018 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Fort Calhoun Station Independent Spent Fuel Storage Installation NRC Docket No.72-054
Subject:
Response to Request for Additional Information Regarding Omaha Public Power District's Decommissioning Funding Plan Update for Fort Calhoun Station Independent Spent Fuel Storage Installation
References:
- 1. Letter from OPPD (L. P. Cortopassi) to USNRC (Document Control Desk), Fort Calhoun Station, Unit No. 1, 2015 Biennial Decommissioning Funding Status Report and Omaha Public Power District (OPPD) Nuclear Decommissioning Funding Plan for the Fort Calhoun Station Independent Spent Fuel Storage Installation (ISFSI), dated March 31, 2015 (ADAMS No.:ML 15090A763)(LIC-15-0047)
- 2. Letter from USNRC (P. Longmire) to OPPD (M. J. Fisher), Request For Additional Information Regarding Omaha Public Power District's Decommissioning Funding Plan Update For Fort Calhoun Station Independent Spent Fuel Storage Installation, dated March 8, 2018 (CAC No.: 001028)(EPID No.: L-2017-FPR-0027)(ADAMS Package No.: ML 18067A141) (NRC-18-016)
On March 31, 2015, OPPD submitted decommissioning funding plan update (DFP Update) for the independent spent fuel storage installation (ISFSI) at Fort Calhoun Station (Reference 1 ). On March 8, 2018 (Reference 2), the NRC provided OPPD with Requests for Additional Information (RAI) regarding the DFP Update. Attachment 1 of this letter provides the responses to the RAI.
U. S. Nuclear Regulatory Commission LIC-18-0011 Page 2 This letter contains no regulatory commitments.
If you should have any questions regarding this submittal or require additional information, please contact Mr. Bradley H. Blome, Director-Licensing and Regulatory Assurance at ( 402) 533-6041. Respectfully, Mary J. Fisher Vice President, Energy Production
& Nuclear Decommissioning MJF/epm
Attachment:
Response to Request for Additional Information c: K. M. Kennedy, NRC Regional Administrator, Region IV J. Kim, NRC Project Manager J. D. Parrott, NRC Senior Project Manager R. S. Browder, NRC Senior Health Physicist, Region IV LIC-18-0011 Attachment Page 1 ATTACHMENT REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING OMAHA PUBLIC POWER DISTRICT'S DECOMMISSIONING FUNDING PLAN UPDATE FOR FORT CALHOUN STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-54 Regulatory Requirement Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 72.30(c), at the time of license renewal and at intervals not to exceed 3 years, the decommissioning funding plan (DFP) required to be submitted by 10 CFR 72.30(b) must be resubmitted with adjustments as necessary to account for changes in costs and the extent of contamination.
The DFP must update the information submitted with the original or prior approved plan. In addition, the DFP must also specifically consider the effect of the following events on decommissioning costs, as required by 10 CFR 72.30(c)(1)-(4):
(1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.
Background By letter dated March 31 , 2015, Omaha Public Power District (OPPD) submitted for U.S. Nuclear Regulatory Commission (NRC) staff review and approval, a decommissioning funding plan update (DFP Update) for the independent spent fuel storage installation (ISFSI) at Fort Calhoun Station (Agencywide Documents Access and Management System Accession No. ML 15090A763).
The NRC staff reviewed OPPD's DFP update for the ISFSI and believes OPPD's submittal was not sufficient to meet the intent of the requirement in 72.30(c).
The DFP update does not provide sufficient information to allow the NRC to determine that the events listed in 10 CFR 72.30(c)(1)-(4) have been specifically considered.
RAI1 For the ISFSI, provide a revised DFP that includes information on the occurrence, and the effect on decommissioning costs, of each of the events listed in 10 CFR 72.30(c)(1)-(4):
(1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.
LIC-18-0011 Attachment Page 2 OPPD Response:
As noted 10 CFR 72.30(c) defines specific events that must be considered in the subsequent updates. The submittal of DFP Update of the ISFSI March 31, 2015, should have contained the following:
- 1. No spills of radioactive material producing additional residual radioactivity in onsite subsurface material have occurred.
- 2. Facility modifications that affected the ISFSI, including those that were implemented within the licensed area, were assessed and had no impact. 3. There were no changes in authorized possession limits. 4. No active decommissioning occurred during the period encompassed by the referenced submittal (ML 15090A763), thus, there have not been any actual remediation costs that exceed the previous cost estimate.