MONTHYEARLIC-22-0001, Well Water Results with River Stage2022-01-13013 January 2022 Well Water Results with River Stage ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML16057A0742016-02-26026 February 2016 Response to Regulatory Information Summary (RIS) 2015-16, Planned Licensing Action Submittals for All Power Reactor Licensees. ML15355A0872015-12-22022 December 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request- Flood Causing Mechanism Reevaluation ML13351A4762013-12-16016 December 2013 Recommendation for NRC to Close Confirmatory Action Letter EA-13-020 Supporting the Restart of Fort Calhoun Station and Recommendation to Issue Post-Restart Confirmatory Action Letter ML13109A3022012-12-20020 December 2012 G20120458/EDATS: OEDO-2012-0390 - Attachment 6 ML13109A3032012-12-20020 December 2012 G20120458/EDATS: OEDO-2012-0390 - Attachment 7 ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML12012A2512011-06-0808 June 2011 Email from Edward Mccutchen to Louis Carson, Brownville, Ne Flood Forecast LIC-11-0041, Transmittal of Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2011-04-0505 April 2011 Transmittal of Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) LIC-07-0073, Closure of NRC TAC Issues2008-07-11011 July 2008 Closure of NRC TAC Issues LIC-08-0037, Calculation FC05694, Calculation of Minimum Reactor Coolant Time Using Shutdown Cooling System, Attachment 2, Pages 91 Through End2008-03-31031 March 2008 Calculation FC05694, Calculation of Minimum Reactor Coolant Time Using Shutdown Cooling System, Attachment 2, Pages 91 Through End ML0810703262008-03-31031 March 2008 Calculation FC05694, Calculation of Minimum Reactor Coolant Time Using Shutdown Cooling System, Attachment 2, Pages 51 Through 90 ML0810703252008-03-31031 March 2008 Calculation FC05694, Calculation of Minimum Reactor Coolant Time Using Shutdown Cooling System. LIC-08-0037, Calculation FC05694, Calculation of Minimum Reactor Coolant Time Using Shutdown Cooling System, Attachment 2, Pages 51 Through 902008-03-31031 March 2008 Calculation FC05694, Calculation of Minimum Reactor Coolant Time Using Shutdown Cooling System, Attachment 2, Pages 51 Through 90 LIC-08-0037, Calculation FC05694, Calculation of Minimum Reactor Coolant Time Using Shutdown Cooling System.2008-03-31031 March 2008 Calculation FC05694, Calculation of Minimum Reactor Coolant Time Using Shutdown Cooling System. ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists LIC-06-0116, Spreadsheet File of Instructions, Time Temp Ph Input, Material Input, Materials Conversions, Results Tables2006-10-10010 October 2006 Spreadsheet File of Instructions, Time Temp Ph Input, Material Input, Materials Conversions, Results Tables ML0628604322006-10-10010 October 2006 Spreadsheet File of Instructions, Materials Conversions, Results Table, Releases by Material, & Precipitate by Material, Reports ML0514304242005-06-0303 June 2005 Summary of Meeting with Omaha Public Power District, Fort Calhoun - Summary of Conference Call 2005 Steam Generator Inspection LIC-05-0040, Relaxation Request for First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors2005-04-0707 April 2005 Relaxation Request for First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors ML18346A2461978-08-0808 August 1978 Furnishing Information Re Combustion Engineering Owners' Group Proposed Plan to Resolve the Asymmetric LOCA Loads Issue 2022-01-13
[Table view] Category:Letter
MONTHYEARML24019A1672024-01-31031 January 2024 Issuance of Amendment to Renewed Facility License to Add License Condition to Include License Termination Plan Requirements IR 05000285/20230062023-12-21021 December 2023 NRC Inspection Report 05000285/2023006 LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information IR 05000285/20230052023-11-0202 November 2023 NRC Inspection Room 05000285/2023005 ML23276A0042023-09-28028 September 2023 U.S. EPA Response Letter to NRC Letter on Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites MOU - Fort Calhoun Station, Unit 1 (License No. DPR-40, Docket No. 50-285) IR 05000285/20230042023-09-13013 September 2023 NRC Inspection Report 05000285/2023-004 LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 ML23234A2412023-08-18018 August 2023 Email - Letter to M Porath Re Ft Calhoun Unit 1 LTP EA Section 7 Informal Consultation Request ML23234A2392023-08-18018 August 2023 Letter to B Harisis Re Ft Calhoun Unit 1 LTP EA State of Nebraska Comment Request.Pdf IR 05000285/20230032023-07-10010 July 2023 NRC Inspection Report 05000285/2023003 ML23082A2202023-06-26026 June 2023 Consultation on the Decommissioning of the Fort Calhoun Station Unit 1 Pressurized Water Reactor in Fort Calhoun, Nebraska ML23151A0032023-06-0505 June 2023 Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 IR 05000285/20230022023-06-0505 June 2023 NRC Inspection Report 05000285/2023002 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information IR 05000285/20230012023-02-24024 February 2023 NRC Inspection Report 05000285/2023001 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML23020A0462023-01-19019 January 2023 Threatened and Endangered Species List: Nebraska Ecological Services Field Office IR 05000285/20220062023-01-0505 January 2023 NRC Inspection Report 05000285/2022-006 ML22357A0662022-12-30030 December 2022 Technical RAI Submittal Letter on License Amendment Request for Approval of License Termination Plan IR 05000285/20220052022-10-26026 October 2022 NRC Inspection Report 05000285/2022-005 ML22276A1052022-09-30030 September 2022 Conclusion of Consultation Under Section 106 NHPA for Ft. Calhoun Station LTP ML22258A2732022-09-29029 September 2022 Letter to John Swigart, Shpo; Re., Conclusion of Consultation Under Section 106 Hnpa Fort Calhoun Station Unit 1 ML22265A0262022-09-26026 September 2022 U.S. Nuclear Regulatory Commission'S Analysis of Omaha Public Power District'S Decommissioning Status Report (License No. DPR-40, Docket No. 50-285) IR 05000285/20220042022-09-14014 September 2022 NRC Inspection Report 05000285/2022004 ML22138A1252022-08-0303 August 2022 Letter to Mr. Timothy Rhodd, Chairperson, Iowa Tribe of Kansas and Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1262022-08-0303 August 2022 Letter to Roger Trudell, Chairman, Santee Sioux Nation, Nebraska, Re., Ft Calhoun LTP Section 106 ML22101A1092022-08-0303 August 2022 Letter to Mr. Durell Cooper, Chairman, Apache Tribe of Oklahoma; Re., Ft Calhoun LTP Section 106 ML22138A1242022-08-0303 August 2022 Letter to Mr. Reggie Wassana, Governor, Cheyenne and Arapaho Tribes, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1292022-08-0303 August 2022 Letter to Tiauna Carnes, Chairperson, Sac and Fox Nation of Missouri in Kansas, Re., Ft Calhoun LTP Section 106 ML22138A1212022-08-0303 August 2022 Letter to Mr. Edgar Kent, Chairman, Iowa Tribe of Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1282022-08-0303 August 2022 Letter to Victoria Kitcheyan, Chairwoman, Winnebago Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1232022-08-0303 August 2022 Letter to Mr. Leander Merrick, Chairperson, Omaha Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1222022-08-0303 August 2022 Letter to Mr. John Shotton, Chairman, Otoe-Missouria Tribe of Indians, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1272022-08-0303 August 2022 Letter to Vern Jefferson, Chairman, Sac and Fox Tribe of the Mississippi in Iowa, Re., Ft Calhoun LTP Section 106 ML22214A0922022-08-0303 August 2022 Letter to Stacy Laravie, Thpo, Ponca Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1302022-08-0303 August 2022 Letter to Justin Wood, Principal Chief, Sac and Fox Nation, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22159A2152022-06-28028 June 2022 Letter Forwarding FRN on Public Meeting and Request for Comment on License Termination Plan LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information IR 05000285/20220032022-06-15015 June 2022 NRC Inspection Report 05000285/2022003 ML22119A2472022-05-0303 May 2022 Review of Amendment Request to Add a LC to Include LTP Requirements, RAI for Environmental Review IR 05000285/20220022022-04-28028 April 2022 NRC Inspection Report 050-00285/2022-002 LIC-22-0005, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2022-04-20020 April 2022 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report 2024-01-31
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARML23276A0042023-09-28028 September 2023 U.S. EPA Response Letter to NRC Letter on Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites MOU - Fort Calhoun Station, Unit 1 (License No. DPR-40, Docket No. 50-285) LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information ML22034A5592022-01-13013 January 2022 Response to Fort Calhoun Station, Unit No. 1 - Acceptance Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Supplemental Information (EPID L-2021-LIT-OOOO) Ml21350A02 ML20202A6542020-07-16016 July 2020 Response for Fort Calhoun Station Fort Calhoun Station, Unit No. 1, Revised Post-Shutdown Decommissioning Activities Report LIC-19-0021, Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme2019-11-20020 November 2019 Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme LIC-18-0018, Independent Spent Fuel Storage Installation - Emergency Plan Update2018-04-18018 April 2018 Independent Spent Fuel Storage Installation - Emergency Plan Update ML18088B3782018-03-29029 March 2018 Response to Request for Additional Information Regarding Omaha Public Power District'S Decommissioning Funding Plan Update for Fort Calhoun Station Independent Spent Fuel Storage Installation ML17348A6232017-12-14014 December 2017 Response for Fort Calhoun Station Specific Questions and Concerns Regarding Omaha Public Power District'S Post-Shutdown Decommissioning Activities Report (PSDAR) LIC-17-0068, Reply to Final Request for Additional Information (RAI) for Fort Calhoun Exemption from 10 CFR 140.11 (a)(4), Off-site Primary and Secondary Liability Insurance (MF9664)2017-10-0404 October 2017 Reply to Final Request for Additional Information (RAI) for Fort Calhoun Exemption from 10 CFR 140.11 (a)(4), Off-site Primary and Secondary Liability Insurance (MF9664) LIC-17-0065, Submittal of Response to Request for Additional Information Re Fort Calhoun Request to Revise Their Technical Specifications to Align to Those Requirements for Decommissioning2017-09-26026 September 2017 Submittal of Response to Request for Additional Information Re Fort Calhoun Request to Revise Their Technical Specifications to Align to Those Requirements for Decommissioning ML17268A2212017-09-25025 September 2017 Response to Request for Additional Information (RAI) Regarding License Amendment Request 16-04 Revising Current Licensing Basis to Use Aci Ultimate Strength Requirements ML17264A7502017-09-21021 September 2017 Response to Request for Additional Information (RAI) License Amendment Request Regarding Removal of Dry Cask Loading Limits Fort Calhoun Station, Unit 1 Docket No.: 50-285 (MF9831) LIC-17-0054, Submission of Corrected Pages for Response to Request for Additional Information, Fort Calhoun Station, Unit No. 1 - Request for Additional Information Certified Fuel Handler Training Program2017-06-0606 June 2017 Submission of Corrected Pages for Response to Request for Additional Information, Fort Calhoun Station, Unit No. 1 - Request for Additional Information Certified Fuel Handler Training Program LIC-17-0047, Final Request for Additional Information Concerning License Amendment Request 16-07: Revise the Emergency Plan to the Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2017-05-15015 May 2017 Final Request for Additional Information Concerning License Amendment Request 16-07: Revise the Emergency Plan to the Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme LIC-17-0048, Response to Request for Additional Information Regarding the Fort Calhoun Station Request to Revise Technical Specifications to Align Staffing Requirements for Permanently Defueled Condition2017-04-27027 April 2017 Response to Request for Additional Information Regarding the Fort Calhoun Station Request to Revise Technical Specifications to Align Staffing Requirements for Permanently Defueled Condition LIC-17-0045, Response to Request for Additional Information Defueled Emergency Plan Exemption Request2017-04-20020 April 2017 Response to Request for Additional Information Defueled Emergency Plan Exemption Request LIC-17-0037, Response to Request for Additional Information, Fort Calhoun Station, Unit No.1 - Final Request for Additional Information Concerning Exemption from the Requirements of 10 CFR 50.47 and Appendix E2017-04-14014 April 2017 Response to Request for Additional Information, Fort Calhoun Station, Unit No.1 - Final Request for Additional Information Concerning Exemption from the Requirements of 10 CFR 50.47 and Appendix E LIC-17-0036, Supplemental Response to Request for Additional Information - Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment2017-04-0505 April 2017 Supplemental Response to Request for Additional Information - Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment ML17089A5442017-03-30030 March 2017 Response to Request for Additional Information Certified Fuel Handler Training Program LIC-17-0020, Response to Request for Additional Information, Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment2017-03-0303 March 2017 Response to Request for Additional Information, Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment LIC-17-0024, Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 4 of 4)2017-02-10010 February 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 4 of 4) ML17041A4432017-02-10010 February 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 1 of 4) ML17041A4442017-02-10010 February 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 2 of 4) LIC-16-0107, Final Response to the Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident and Corresponding Commitments2016-11-18018 November 2016 Final Response to the Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident and Corresponding Commitments LIC-16-0090, Response to Request for Additional Information Regarding Certified Fuel Handler Training Program2016-10-0707 October 2016 Response to Request for Additional Information Regarding Certified Fuel Handler Training Program LIC-16-0078, Revision to Response to Request for Information Regarding Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - Flood Hazard Reevaluation Report2016-09-14014 September 2016 Revision to Response to Request for Information Regarding Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - Flood Hazard Reevaluation Report ML16165A0282016-06-0909 June 2016 Response to NRC Request for Additional Information Revise Current Licensing Basis to Use American Concrete Institute Ultimate Strength Requirements LIC-16-0044, Calculation FC08499 Evaluation of FCS Concrete Compressive Strength Test Data2016-06-0101 June 2016 Calculation FC08499 Evaluation of FCS Concrete Compressive Strength Test Data LIC-16-0025, Ft. Calhoun, Unit 1 - Response to Request for Additional Information Adoption of TSTF-501, Revision 12016-04-0808 April 2016 Ft. Calhoun, Unit 1 - Response to Request for Additional Information Adoption of TSTF-501, Revision 1 LIC-16-0022, Response to NRC Request for Additional Information Revise Current Licensing Basis to Allow Use of Equipment Classification Methodology from ANSI/ANS-58.14-20112016-04-0808 April 2016 Response to NRC Request for Additional Information Revise Current Licensing Basis to Allow Use of Equipment Classification Methodology from ANSI/ANS-58.14-2011 ML16057A0742016-02-26026 February 2016 Response to Regulatory Information Summary (RIS) 2015-16, Planned Licensing Action Submittals for All Power Reactor Licensees. LIC-16-0001, Response to NRC Request for Additional Information Technical Specification Administrative Changes2016-01-27027 January 2016 Response to NRC Request for Additional Information Technical Specification Administrative Changes LIC-15-0147, Response to NRC Request for Additional Information Fifth Lnservice Testing Interval Relief Requests P-1 and P-22016-01-11011 January 2016 Response to NRC Request for Additional Information Fifth Lnservice Testing Interval Relief Requests P-1 and P-2 LIC-15-0139, ISFSI - Supplemental OPPD Response to NRC Request for Additional Information License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 62015-12-0808 December 2015 ISFSI - Supplemental OPPD Response to NRC Request for Additional Information License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 ML15350A0192015-11-30030 November 2015 Enclosure 6, Response to Remaining Questions from NRC Request for Additional Information (RAI) Regarding Reactor Vessel Internal Component Aging Management Program. (Non-Proprietary) ML15350A0182015-11-30030 November 2015 Transmittal of Response to Remaining Questions from NRC Request for Additional Information (RAI) Regarding Reactor Vessel Internal Component Aging Management Program LIC-15-0129, Addendum to Response to Request for Information Regarding Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - Flood Hazard Reevaluation Report2015-11-0404 November 2015 Addendum to Response to Request for Information Regarding Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - Flood Hazard Reevaluation Report LIC-15-0121, ISFSI - Supplemental OPPD Response to NRC Request for Additional Information License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 62015-11-0202 November 2015 ISFSI - Supplemental OPPD Response to NRC Request for Additional Information License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 LIC-15-0113, Response to Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation2015-09-28028 September 2015 Response to Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation LIC-15-0115, ISFSI - Response to NRC Request for Clean Copy of Emergency Action Level Technical Basis Document2015-09-18018 September 2015 ISFSI - Response to NRC Request for Clean Copy of Emergency Action Level Technical Basis Document LIC-15-0102, Response to NRC Request for Additional Information Re License Amendment Request to Adopt Emergency Action Level Scheme Per NEI 99-01, Rev. 62015-09-11011 September 2015 Response to NRC Request for Additional Information Re License Amendment Request to Adopt Emergency Action Level Scheme Per NEI 99-01, Rev. 6 2023-09-28
[Table view] |
Text
LI C-16-0006 February 26, 2016 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Fort Calhoun Station (FCS), Unit 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285
Subject:
Response to Regulatory Information Summary (RIS) 2015-16, "Planned Licensing Action Submittals for All Power Reactor Licensees
Reference:
Regulatory Information Summary (RIS) 2015-16, Revision 1, "Planned Licensing Action Submittals for All Power Reactor Licensees," dated January 15, 2016 The Omaha Public Power District submits this letter in response to the U.S. Nuclear Regulatory Commission (NRC) request for information contained in RIS 2015-16 regarding planned licensing actions over the next 3 calendar years, and power uprate applications over the next 5 calendar years. contains a list of planned licensing actions over the next 3 calendar years (i.e. 2016 through 2019). At this time, a power uprate application for Fort Calhoun Station, Unit No. 1 is not forecast to occur in the next 5 calendar years.
This letter contains no regulatory commitments.
If you should have any questions regarding this submittal or require additional information, please contact Mr. Bradley H. Blome at 402-533-7270.
Respectfully, Shane M. Marik Site Vice President and CNO SMM/BHB/mle
Enclosure:
Fort Calhoun Station, Unit No. 1, Licensing Actions Planned Over the Next 3 Calendar Years c: M. L. Dapas, NRC Regional Administrator, Region IV C. F. Lyon, NRC Senior Project Manager S. M. Schneider, NRC Senior Resident Inspector 444 SOUTH 16TH STREET MALL* OMAHA. NE 68102-2247
LI C-16-0006 Enclosure Page 1 Fort Calhoun Station, Unit No. 1, Licensing Actions Planned Over the Next 3 Calendar Years
LIC-16-0006 Table of Estimated Licensing Actions Enclosure Fort Calhoun Station, Unit No. 1 Page 2 NRC Docket No. 50-285 Licensing TSTF Licensing Proposed Outage Outage Can the Comments Proprietary Action # Action Submittal Related? Related Date NRC Staff Information Type Description/Title Date (Y/N) (MM/DD/YYYY) make the (Y/N) information public?
(YIN)
License N/A NFPA 805 March y 10/01/2016 to y - N Amendment Modification 2016 11/07/2016 Request Changes U~AR}
LAR 545 lnservice Testing 1st N N/A y N Quarter I
--- -- 2017 -- ------- - *-- --- -
LAR N/A Deletion of Spent 3rd N N/A y In support of spri ng I N Fuel Cask Quarter I 2019 fuel loadin~
Loading 2016 campaign. Final Technical Rule on Criticalit:
Specification Control of Fuel 11w thin (TS) (TS Dry Storage Gas s 2.8.3(6)) or Transportatior Packages in a S1 ent Fuel Pool (71 FR 66648) permits ti e deletion of this Technical
~- --
Specification. --+------ - - - -
LAR N/A Small Break 4th N N/A y Reference OPP[ y Loss-of-Coolant Quarter I Letter LIC-14-001 2 Accident (LOCA) 2016 dated April 25, 21 14
'.JML14118A208}..
LAR N/A Realistic Large 1st N N/A y Reference OPPD y Break LOCA Quarter I Letter LI C-14-006 2 Analysis 2017 dated April 25, 20 14
__ ______ U~!- 141J.~A208).
LIC-16-0006 Table of Estimated Licensing Actions Enclosure Fort Calhoun Station, Unit No. 1 Page 3 NRC Docket No. 50-285 TSTF Licensing Proposed Outage Outage Can the Comments Proprietary Licensing Action # Action Submittal Related? Related Date NRC Staff Information Type Description/Title Date (Y/N) (MM/DDNYYY) make the (Y/N) information public?
~- - --
(Y/N)
LAR N/A Deletion of 1st y 03/2018 to y N Shutdown Quarter I 04/2018 Cooling 2017 Autoclosure 1 - - -- - -
Interlock y
- - *- - * ~ - . -- -
Relief N/A Proposed March N N Request Alternative to 2016 Utilize Code Case N-513-4, "Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1" -
Relief N/A Relief Requests 3rd N y In support of ISi 5th N Request for lnservice Quarter I Interval Program Inspection (ISi) 2016 Update.
5th Interval Program Relief N/A Relief Request 3rd N y Required for ISi 4th N Request for End of ISi 4th Quarter I Interval Close Out Interval 2018 Completion.
Examination Coveraqe --
LI C-16-0006 February 26, 2016 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Fort Calhoun Station (FCS), Unit 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285
Subject:
Response to Regulatory Information Summary (RIS) 2015-16, "Planned Licensing Action Submittals for All Power Reactor Licensees
Reference:
Regulatory Information Summary (RIS) 2015-16, Revision 1, "Planned Licensing Action Submittals for All Power Reactor Licensees," dated January 15, 2016 The Omaha Public Power District submits this letter in response to the U.S. Nuclear Regulatory Commission (NRC) request for information contained in RIS 2015-16 regarding planned licensing actions over the next 3 calendar years, and power uprate applications over the next 5 calendar years. contains a list of planned licensing actions over the next 3 calendar years (i.e. 2016 through 2019). At this time, a power uprate application for Fort Calhoun Station, Unit No. 1 is not forecast to occur in the next 5 calendar years.
This letter contains no regulatory commitments.
If you should have any questions regarding this submittal or require additional information, please contact Mr. Bradley H. Blome at 402-533-7270.
Respectfully, Shane M. Marik Site Vice President and CNO SMM/BHB/mle
Enclosure:
Fort Calhoun Station, Unit No. 1, Licensing Actions Planned Over the Next 3 Calendar Years c: M. L. Dapas, NRC Regional Administrator, Region IV C. F. Lyon, NRC Senior Project Manager S. M. Schneider, NRC Senior Resident Inspector 444 SOUTH 16TH STREET MALL* OMAHA. NE 68102-2247
LI C-16-0006 Enclosure Page 1 Fort Calhoun Station, Unit No. 1, Licensing Actions Planned Over the Next 3 Calendar Years
LIC-16-0006 Table of Estimated Licensing Actions Enclosure Fort Calhoun Station, Unit No. 1 Page 2 NRC Docket No. 50-285 Licensing TSTF Licensing Proposed Outage Outage Can the Comments Proprietary Action # Action Submittal Related? Related Date NRC Staff Information Type Description/Title Date (Y/N) (MM/DD/YYYY) make the (Y/N) information public?
(YIN)
License N/A NFPA 805 March y 10/01/2016 to y - N Amendment Modification 2016 11/07/2016 Request Changes U~AR}
LAR 545 lnservice Testing 1st N N/A y N Quarter I
--- -- 2017 -- ------- - *-- --- -
LAR N/A Deletion of Spent 3rd N N/A y In support of spri ng I N Fuel Cask Quarter I 2019 fuel loadin~
Loading 2016 campaign. Final Technical Rule on Criticalit:
Specification Control of Fuel 11w thin (TS) (TS Dry Storage Gas s 2.8.3(6)) or Transportatior Packages in a S1 ent Fuel Pool (71 FR 66648) permits ti e deletion of this Technical
~- --
Specification. --+------ - - - -
LAR N/A Small Break 4th N N/A y Reference OPP[ y Loss-of-Coolant Quarter I Letter LIC-14-001 2 Accident (LOCA) 2016 dated April 25, 21 14
'.JML14118A208}..
LAR N/A Realistic Large 1st N N/A y Reference OPPD y Break LOCA Quarter I Letter LI C-14-006 2 Analysis 2017 dated April 25, 20 14
__ ______ U~!- 141J.~A208).
LIC-16-0006 Table of Estimated Licensing Actions Enclosure Fort Calhoun Station, Unit No. 1 Page 3 NRC Docket No. 50-285 TSTF Licensing Proposed Outage Outage Can the Comments Proprietary Licensing Action # Action Submittal Related? Related Date NRC Staff Information Type Description/Title Date (Y/N) (MM/DDNYYY) make the (Y/N) information public?
~- - --
(Y/N)
LAR N/A Deletion of 1st y 03/2018 to y N Shutdown Quarter I 04/2018 Cooling 2017 Autoclosure 1 - - -- - -
Interlock y
- - *- - * ~ - . -- -
Relief N/A Proposed March N N Request Alternative to 2016 Utilize Code Case N-513-4, "Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1" -
Relief N/A Relief Requests 3rd N y In support of ISi 5th N Request for lnservice Quarter I Interval Program Inspection (ISi) 2016 Update.
5th Interval Program Relief N/A Relief Request 3rd N y Required for ISi 4th N Request for End of ISi 4th Quarter I Interval Close Out Interval 2018 Completion.