Response to Regulatory Information Summary (RIS) 2015-16, Planned Licensing Action Submittals for All Power Reactor Licensees.
ML16057A074
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/26/2016
From: Marik S
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LI C-16-0006, RIS-2015-08
Download: ML16057A074 (4)


Text

LI C-16-0006 February 26, 2016 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Fort Calhoun Station (FCS), Unit 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285

Subject:

Response to Regulatory Information Summary (RIS) 2015-16, "Planned Licensing Action Submittals for All Power Reactor Licensees

Reference:

Regulatory Information Summary (RIS) 2015-16, Revision 1, "Planned Licensing Action Submittals for All Power Reactor Licensees," dated January 15, 2016 The Omaha Public Power District submits this letter in response to the U.S. Nuclear Regulatory Commission (NRC) request for information contained in RIS 2015-16 regarding planned licensing actions over the next 3 calendar years, and power uprate applications over the next 5 calendar years. contains a list of planned licensing actions over the next 3 calendar years (i.e. 2016 through 2019). At this time, a power uprate application for Fort Calhoun Station, Unit No. 1 is not forecast to occur in the next 5 calendar years.

This letter contains no regulatory commitments.

If you should have any questions regarding this submittal or require additional information, please contact Mr. Bradley H. Blome at 402-533-7270.

Respectfully, Shane M. Marik Site Vice President and CNO SMM/BHB/mle

Enclosure:

Fort Calhoun Station, Unit No. 1, Licensing Actions Planned Over the Next 3 Calendar Years c: M. L. Dapas, NRC Regional Administrator, Region IV C. F. Lyon, NRC Senior Project Manager S. M. Schneider, NRC Senior Resident Inspector 444 SOUTH 16TH STREET MALL* OMAHA. NE 68102-2247

LI C-16-0006 Enclosure Page 1 Fort Calhoun Station, Unit No. 1, Licensing Actions Planned Over the Next 3 Calendar Years

LIC-16-0006 Table of Estimated Licensing Actions Enclosure Fort Calhoun Station, Unit No. 1 Page 2 NRC Docket No. 50-285 Licensing TSTF Licensing Proposed Outage Outage Can the Comments Proprietary Action # Action Submittal Related? Related Date NRC Staff Information Type Description/Title Date (Y/N) (MM/DD/YYYY) make the (Y/N) information public?

(YIN)

License N/A NFPA 805 March y 10/01/2016 to y - N Amendment Modification 2016 11/07/2016 Request Changes U~AR}

LAR 545 lnservice Testing 1st N N/A y N Quarter I

--- -- 2017 -- ------- - *-- --- -

LAR N/A Deletion of Spent 3rd N N/A y In support of spri ng I N Fuel Cask Quarter I 2019 fuel loadin~

Loading 2016 campaign. Final Technical Rule on Criticalit:

Specification Control of Fuel 11w thin (TS) (TS Dry Storage Gas s 2.8.3(6)) or Transportatior Packages in a S1 ent Fuel Pool (71 FR 66648) permits ti e deletion of this Technical

~- --

Specification. --+------ - - - -

LAR N/A Small Break 4th N N/A y Reference OPP[ y Loss-of-Coolant Quarter I Letter LIC-14-001 2 Accident (LOCA) 2016 dated April 25, 21 14

'.JML14118A208}..

LAR N/A Realistic Large 1st N N/A y Reference OPPD y Break LOCA Quarter I Letter LI C-14-006 2 Analysis 2017 dated April 25, 20 14

__ ______ U~!- 141J.~A208).

LIC-16-0006 Table of Estimated Licensing Actions Enclosure Fort Calhoun Station, Unit No. 1 Page 3 NRC Docket No. 50-285 TSTF Licensing Proposed Outage Outage Can the Comments Proprietary Licensing Action # Action Submittal Related? Related Date NRC Staff Information Type Description/Title Date (Y/N) (MM/DDNYYY) make the (Y/N) information public?

~- - --

(Y/N)

LAR N/A Deletion of 1st y 03/2018 to y N Shutdown Quarter I 04/2018 Cooling 2017 Autoclosure 1 - - -- - -

Interlock y

- - *- - * ~ - . -- -

Relief N/A Proposed March N N Request Alternative to 2016 Utilize Code Case N-513-4, "Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1" -

Relief N/A Relief Requests 3rd N y In support of ISi 5th N Request for lnservice Quarter I Interval Program Inspection (ISi) 2016 Update.

5th Interval Program Relief N/A Relief Request 3rd N y Required for ISi 4th N Request for End of ISi 4th Quarter I Interval Close Out Interval 2018 Completion.

Examination Coveraqe --

LI C-16-0006 February 26, 2016 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Fort Calhoun Station (FCS), Unit 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285

Subject:

Response to Regulatory Information Summary (RIS) 2015-16, "Planned Licensing Action Submittals for All Power Reactor Licensees

Reference:

Regulatory Information Summary (RIS) 2015-16, Revision 1, "Planned Licensing Action Submittals for All Power Reactor Licensees," dated January 15, 2016 The Omaha Public Power District submits this letter in response to the U.S. Nuclear Regulatory Commission (NRC) request for information contained in RIS 2015-16 regarding planned licensing actions over the next 3 calendar years, and power uprate applications over the next 5 calendar years. contains a list of planned licensing actions over the next 3 calendar years (i.e. 2016 through 2019). At this time, a power uprate application for Fort Calhoun Station, Unit No. 1 is not forecast to occur in the next 5 calendar years.

This letter contains no regulatory commitments.

If you should have any questions regarding this submittal or require additional information, please contact Mr. Bradley H. Blome at 402-533-7270.

Respectfully, Shane M. Marik Site Vice President and CNO SMM/BHB/mle

Enclosure:

Fort Calhoun Station, Unit No. 1, Licensing Actions Planned Over the Next 3 Calendar Years c: M. L. Dapas, NRC Regional Administrator, Region IV C. F. Lyon, NRC Senior Project Manager S. M. Schneider, NRC Senior Resident Inspector 444 SOUTH 16TH STREET MALL* OMAHA. NE 68102-2247

LI C-16-0006 Enclosure Page 1 Fort Calhoun Station, Unit No. 1, Licensing Actions Planned Over the Next 3 Calendar Years

LIC-16-0006 Table of Estimated Licensing Actions Enclosure Fort Calhoun Station, Unit No. 1 Page 2 NRC Docket No. 50-285 Licensing TSTF Licensing Proposed Outage Outage Can the Comments Proprietary Action # Action Submittal Related? Related Date NRC Staff Information Type Description/Title Date (Y/N) (MM/DD/YYYY) make the (Y/N) information public?

(YIN)

License N/A NFPA 805 March y 10/01/2016 to y - N Amendment Modification 2016 11/07/2016 Request Changes U~AR}

LAR 545 lnservice Testing 1st N N/A y N Quarter I

--- -- 2017 -- ------- - *-- --- -

LAR N/A Deletion of Spent 3rd N N/A y In support of spri ng I N Fuel Cask Quarter I 2019 fuel loadin~

Loading 2016 campaign. Final Technical Rule on Criticalit:

Specification Control of Fuel 11w thin (TS) (TS Dry Storage Gas s 2.8.3(6)) or Transportatior Packages in a S1 ent Fuel Pool (71 FR 66648) permits ti e deletion of this Technical

~- --

Specification. --+------ - - - -

LAR N/A Small Break 4th N N/A y Reference OPP[ y Loss-of-Coolant Quarter I Letter LIC-14-001 2 Accident (LOCA) 2016 dated April 25, 21 14

'.JML14118A208}..

LAR N/A Realistic Large 1st N N/A y Reference OPPD y Break LOCA Quarter I Letter LI C-14-006 2 Analysis 2017 dated April 25, 20 14

__ ______ U~!- 141J.~A208).

LIC-16-0006 Table of Estimated Licensing Actions Enclosure Fort Calhoun Station, Unit No. 1 Page 3 NRC Docket No. 50-285 TSTF Licensing Proposed Outage Outage Can the Comments Proprietary Licensing Action # Action Submittal Related? Related Date NRC Staff Information Type Description/Title Date (Y/N) (MM/DDNYYY) make the (Y/N) information public?

~- - --

(Y/N)

LAR N/A Deletion of 1st y 03/2018 to y N Shutdown Quarter I 04/2018 Cooling 2017 Autoclosure 1 - - -- - -

Interlock y

- - *- - * ~ - . -- -

Relief N/A Proposed March N N Request Alternative to 2016 Utilize Code Case N-513-4, "Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1" -

Relief N/A Relief Requests 3rd N y In support of ISi 5th N Request for lnservice Quarter I Interval Program Inspection (ISi) 2016 Update.

5th Interval Program Relief N/A Relief Request 3rd N y Required for ISi 4th N Request for End of ISi 4th Quarter I Interval Close Out Interval 2018 Completion.