| {{#Wiki_filter:FENOC5501 North State Route 2FirstEnergy Nuclear Operating Company Oak Harbor, Ohio 43449Raymond A. Lieb 419-321-7676Vice President, Nuclear Fax: 419-321-7582May 30, 2014L-1 4-184United States Nuclear Regulatory CommissionDocument Control DeskWashington, D.C. 20555-0001 | | {{#Wiki_filter:FENOC5501 North State Route 2FirstEnergy Nuclear Operating Company Oak Harbor, Ohio 43449Raymond A. Lieb 419-321-7676 Vice President, Nuclear Fax: 419-321-7582 May 30, 2014L-1 4-184United States Nuclear Regulatory Commission Document Control DeskWashington, D.C. 20555-0001 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Davis-Besse Nuclear Power Station, Unit 1Docket Number 50-346, License Number NPF-3Response to Regulatory Issue Summary 2014-05, "Preparation and Schedulingof Operator Licensing Examinations"The Davis-Besse Nuclear Power Station (DBNPS) is providing information inresponse to NRC Regulatory Issue Summary (RIS) 2014-05, "Preparation andScheduling of Operator Licensing Examinations," as requested. The attachedNRC Form 536, "Operator Licensing Examination Data," provides informationthrough calendar year 2019 for Initial Operator License Examinations andthrough calendar year 2017 for Generic Fundamentals Examinations.There are no regulatory commitments included in this letter. If there are anyquestions or if additional information is required, please contact Mr. Daniel T.Hartnett, Superintendent -Nuclear Operations Training at (419) 249-2396.Sincer ly,Raymond A. Liebvaw | | Davis-Besse Nuclear Power Station, Unit 1Docket Number 50-346, License Number NPF-3Response to Regulatory Issue Summary 2014-05, "Preparation and Scheduling of Operator Licensing Examinations" The Davis-Besse Nuclear Power Station (DBNPS) is providing information inresponse to NRC Regulatory Issue Summary (RIS) 2014-05, "Preparation andScheduling of Operator Licensing Examinations," |
| | as requested. |
| | The attachedNRC Form 536, "Operator Licensing Examination Data," provides information through calendar year 2019 for Initial Operator License Examinations andthrough calendar year 2017 for Generic Fundamentals Examinations. |
| | There are no regulatory commitments included in this letter. If there are anyquestions or if additional information is required, please contact Mr. Daniel T.Hartnett, Superintendent |
| | -Nuclear Operations Training at (419) 249-2396. |
| | Sincer ly,Raymond A. Liebvaw |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| NRC Form 536 -Operator Licensing Examination Datacc: Regional Administrator, NRC Region IIIDB-1 NRC/NRR Project ManagerDB-1 NC Senior Resident InspectorChief, Operations Branch, NRC Region IIIUtility Radiological Safety Board EnclosureL-14-184Form NRC -536Operator Licensing Examination Data(one page follows) | | |
| NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/3012014(09-2011) Estimated burden per response to comply with this voluntary information collaction request: 1hour. This information collection is used to plan budgets and resources for operatorexaminations. Send comments regarding burden estimate to the Information Services BranchOPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internce-EXAMINATION DATA mail to Intocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information andRegulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington,DC 20503. If a means used to impose an information collection does not display a currentlyvalid OMB control number, the NRC may not conduct or sponsor, and a person is not required torespond to, the information collection.FACILITY NRC REGIONDavis-Besse Nuclear Power Station IIIA. PROPOSED EXAMINATION PREPARATION SCHEDULEPROPOSED NUMBER CY 16 CY 17 CY 18 CY 19ESTIMATED NUMBER OFLICENSEE-PREPARED 1 1 0 1EXAMINATIONSESTIMATED NUMBER OFNRC-PREPARED 0 0 0 0EXAMINATIONSB. INITIAL OPERATOR LICENSE EXAMINATIONSPROPOSED NUMBER CY 16 CY 17 CY 18 CY 19NUMBER OF REACTOR 7 6 0 7OPERATORSNUMBER OF SENIOR REACTOROPERATORS -INSTANT 6 0 5NUMBER OF SENIOR REACTOR 2 2 0 2OPERATORS -UPGRADENUMBER OF SENIOR REACTOROPERATORS -LIMITED 0 0 0 0PROPOSED DATESPRIMARY DATE 06/13/2016 12/04/2017 06/17/2019ALTERNATE DATE 07/18/2016 01/08/2018 07/15/2019C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULECY 16 CY 17PROPOSED _NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBERESTIMATEDNUMBER OF 12CANDIDATESNRC FORM 536 (09-2011)}} | | NRC Form 536 -Operator Licensing Examination Datacc: Regional Administrator, NRC Region IIIDB-1 NRC/NRR Project ManagerDB-1 NC Senior Resident Inspector Chief, Operations Branch, NRC Region IIIUtility Radiological Safety Board Enclosure L-14-184Form NRC -536Operator Licensing Examination Data(one page follows) |
| | NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: |
| | 09/3012014 (09-2011) |
| | Estimated burden per response to comply with this voluntary information collaction request: |
| | 1hour. This information collection is used to plan budgets and resources for operatorexaminations. |
| | Send comments regarding burden estimate to the Information Services BranchOPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internce-EXAMINATION DATA mail to Intocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information andRegulatory |
| | : Affairs, NEOB-10202, (3150-0131), |
| | Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required torespond to, the information collection. |
| | FACILITY NRC REGIONDavis-Besse Nuclear Power Station IIIA. PROPOSED EXAMINATION PREPARATION SCHEDULEPROPOSED NUMBER CY 16 CY 17 CY 18 CY 19ESTIMATED NUMBER OFLICENSEE-PREPARED 1 1 0 1EXAMINATIONS ESTIMATED NUMBER OFNRC-PREPARED 0 0 0 0EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 16 CY 17 CY 18 CY 19NUMBER OF REACTOR 7 6 0 7OPERATORS NUMBER OF SENIOR REACTOROPERATORS |
| | -INSTANT 6 0 5NUMBER OF SENIOR REACTOR 2 2 0 2OPERATORS |
| | -UPGRADENUMBER OF SENIOR REACTOROPERATORS |
| | -LIMITED 0 0 0 0PROPOSED DATESPRIMARY DATE 06/13/2016 12/04/2017 06/17/2019 ALTERNATE DATE 07/18/2016 01/08/2018 07/15/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULECY 16 CY 17PROPOSED |
| | _NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBERESTIMATED NUMBER OF 12CANDIDATES NRC FORM 536 (09-2011)}} |
|
---|
Category:Letter
MONTHYEARIR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 L-24-025, Submittal of the Updated Final Safety Analysis Report, Revision 352024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 the Associated Independent Spent Fuel Storage Installations IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) 2024-09-06
[Table view] |
Text
FENOC5501 North State Route 2FirstEnergy Nuclear Operating Company Oak Harbor, Ohio 43449Raymond A. Lieb 419-321-7676 Vice President, Nuclear Fax: 419-321-7582 May 30, 2014L-1 4-184United States Nuclear Regulatory Commission Document Control DeskWashington, D.C. 20555-0001
Subject:
Davis-Besse Nuclear Power Station, Unit 1Docket Number 50-346, License Number NPF-3Response to Regulatory Issue Summary 2014-05, "Preparation and Scheduling of Operator Licensing Examinations" The Davis-Besse Nuclear Power Station (DBNPS) is providing information inresponse to NRC Regulatory Issue Summary (RIS) 2014-05, "Preparation andScheduling of Operator Licensing Examinations,"
as requested.
The attachedNRC Form 536, "Operator Licensing Examination Data," provides information through calendar year 2019 for Initial Operator License Examinations andthrough calendar year 2017 for Generic Fundamentals Examinations.
There are no regulatory commitments included in this letter. If there are anyquestions or if additional information is required, please contact Mr. Daniel T.Hartnett, Superintendent
-Nuclear Operations Training at (419) 249-2396.
Sincer ly,Raymond A. Liebvaw
Enclosure:
NRC Form 536 -Operator Licensing Examination Datacc: Regional Administrator, NRC Region IIIDB-1 NRC/NRR Project ManagerDB-1 NC Senior Resident Inspector Chief, Operations Branch, NRC Region IIIUtility Radiological Safety Board Enclosure L-14-184Form NRC -536Operator Licensing Examination Data(one page follows)
NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES:
09/3012014 (09-2011)
Estimated burden per response to comply with this voluntary information collaction request:
1hour. This information collection is used to plan budgets and resources for operatorexaminations.
Send comments regarding burden estimate to the Information Services BranchOPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internce-EXAMINATION DATA mail to Intocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information andRegulatory
- Affairs, NEOB-10202, (3150-0131),
Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required torespond to, the information collection.
FACILITY NRC REGIONDavis-Besse Nuclear Power Station IIIA. PROPOSED EXAMINATION PREPARATION SCHEDULEPROPOSED NUMBER CY 16 CY 17 CY 18 CY 19ESTIMATED NUMBER OFLICENSEE-PREPARED 1 1 0 1EXAMINATIONS ESTIMATED NUMBER OFNRC-PREPARED 0 0 0 0EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 16 CY 17 CY 18 CY 19NUMBER OF REACTOR 7 6 0 7OPERATORS NUMBER OF SENIOR REACTOROPERATORS
-INSTANT 6 0 5NUMBER OF SENIOR REACTOR 2 2 0 2OPERATORS
-UPGRADENUMBER OF SENIOR REACTOROPERATORS
-LIMITED 0 0 0 0PROPOSED DATESPRIMARY DATE 06/13/2016 12/04/2017 06/17/2019 ALTERNATE DATE 07/18/2016 01/08/2018 07/15/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULECY 16 CY 17PROPOSED
_NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBERESTIMATED NUMBER OF 12CANDIDATES NRC FORM 536 (09-2011)