ML17075A273: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 19: Line 19:


==SUBJECT:==
==SUBJECT:==
Perry Nuclear Power Plant Docket Number 50-440, License Number: NPF-58 Physical Security Plan Revision 14 -440-280-5382 In accordance with 10 CFR 50.4(b)(4), one copy of the Perry Nuclear Power Plant (PNPP) Physical Security Plan (PSP) Revision 14 is enclosed, along with 10 CFR 50.54(p) Plan Change Acceptability Determination. A separate copy of this PSP revision is being provided to NRC Region Ill Office. The revision to the PSP was effective on February 1, 2017. . To justify implementation of the security plan change without prior NRC approval, a 10 CFR 50.54(p) Plan Change Acceptability Determination was performed. It was determined that the changes do not delete or contradict any regulatory requirement; do not decrease the overall level of security system performance as described in paragraphs (b) through (h) of 1 O CFR 73.55 to protect against the design basis threat of radiological sabotage, as stated iri 10 CFR 73.1; arid the changes are consistent with 10 CFR 73.55 and do not decrease the overall level of security system performance needed to protect against the design basis threat of radiological sabotage, as stated in 10 CFR 73.1. The specific changes to the PSP and its appendices are identified by revision bars and
 
* follow the template guidance from the Nuclear Energy Institute (NEI) template 03-12, "Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan [and Independent Spent Fuel Storage Installation Security Program], Revision 7, dated October 2011.
Perry Nuclear Power Plant Docket Number 50-440, License Number: NPF-58 Physical Security Plan Revision 14 -440-280-5382 In accordance with 10 CFR 50.4(b)(4),
* The enclosures to this letter contain "Safeguards Information" as described in 1 O CFR 73.21 and must be protected accordingly. This page may be decontrolled upon removal of enclosures. SAFEGUARDS INFORMATION May be decontrolled upon removal the enclosures   
one copy of the Perry Nuclear Power Plant (PNPP) Physical Security Plan (PSP) Revision 14 is enclosed, along with 10 CFR 50.54(p)
-*-------------------------------------SAFEGUARDS INFORMATION* May be decontrolled upon removal the enclosures Perry Nuclear Power Plant L-17-056 Page 2 of 2 The specific details of the changes to the PSP have been included in the enclosure to this . letter.
Plan Change Acceptability Determination.
* There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Vincent Forbus, Manager -Site Protection, at (440) 280-5938. Sincerely, David B. Hamilton  
A separate copy of this PSP revision is being provided to NRC Region Ill Office. The revision to the PSP was effective on February 1, 2017. . To justify implementation of the security plan change without prior NRC approval, a 10 CFR 50.54(p)
Plan Change Acceptability Determination was performed.
It was determined that the changes do not delete or contradict any regulatory requirement; do not decrease the overall level of security system performance as described in paragraphs (b) through (h) of 1 O CFR 73.55 to protect against the design basis threat of radiological  
: sabotage, as stated iri 10 CFR 73.1; arid the changes are consistent with 10 CFR 73.55 and do not decrease the overall level of security system performance needed to protect against the design basis threat of radiological  
: sabotage, as stated in 10 CFR 73.1. The specific changes to the PSP and its appendices are identified by revision bars and
* follow the template guidance from the Nuclear Energy Institute (NEI) template 03-12, "Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan [and Independent Spent Fuel Storage Installation Security Program],
Revision 7, dated October 2011.
* The enclosures to this letter contain "Safeguards Information" as described in 1 O CFR 73.21 and must be protected accordingly.
This page may be decontrolled upon removal of enclosures.
SAFEGUARDS INFORMATION May be decontrolled upon removal the enclosures   
-*-------------------------------------
SAFEGUARDS INFORMATION*
May be decontrolled upon removal the enclosures Perry Nuclear Power Plant L-17-056 Page 2 of 2 The specific details of the changes to the PSP have been included in the enclosure to this . letter.
* There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Vincent Forbus, Manager -Site Protection, at (440) 280-5938.
Sincerely, David B. Hamilton  


==Enclosure:==
==Enclosure:==
A. 10 CFR 50.54(p) Plan Change Acceptability Determination B. PNPP Physical Security Plan, Revision 14 cc: NRC Region Ill Regional Administrator (with one copy of both enclosures) NRC Resident Inspector (w/o enclosures) NRC Project Manager (w/o enclosures) The enclosures to this letter contain "Safeguards Information" as described in 10 CFR 73.21 and must be protected accordingly. This page may be decontrolled upon removal enclosures. SAFEGUARDS INFORMATION May be decontrolled upon removal the enclosures   
 
\'. ) . SAFEGUARDS INFORMATION May be decontrolled upon removal the enclosures Enclosure A L-17-056 10 CFR 50.54(p) Plan Change Acceptability Determination
A. 10 CFR 50.54(p)
Plan Change Acceptability Determination B. PNPP Physical Security Plan, Revision 14 cc: NRC Region Ill Regional Administrator (with one copy of both enclosures)
NRC Resident Inspector (w/o enclosures)
NRC Project Manager (w/o enclosures)
The enclosures to this letter contain "Safeguards Information" as described in 10 CFR 73.21 and must be protected accordingly.
This page may be decontrolled upon removal enclosures.
SAFEGUARDS INFORMATION May be decontrolled upon removal the enclosures   
\'. ) . SAFEGUARDS INFORMATION May be decontrolled upon removal the enclosures Enclosure A L-17-056 10 CFR 50.54(p)
Plan Change Acceptability Determination
* 23 pages to follow SAFEGUARDS INFORMATION May be decontrolled upon removal the* enclosures}}
* 23 pages to follow SAFEGUARDS INFORMATION May be decontrolled upon removal the* enclosures}}

Revision as of 21:13, 29 June 2018

Perry, Submittal of Revision 14 to Physical Security Plan
ML17075A273
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/09/2017
From: Hamilton D B
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-17-056
Download: ML17075A273 (3)


Text

FE NOCŽ FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P.O. Box 97 10 Center Road Perry, Ohio 44081 David B. Hamilton Vice President March 9, 2017 L-17-056 SAFEGUARDS INFORMATION May be decontrolled upon removal the enclosures 10 CFR 50.54(p )(2) ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Perry Nuclear Power Plant Docket Number 50-440, License Number: NPF-58 Physical Security Plan Revision 14 -440-280-5382 In accordance with 10 CFR 50.4(b)(4),

one copy of the Perry Nuclear Power Plant (PNPP) Physical Security Plan (PSP) Revision 14 is enclosed, along with 10 CFR 50.54(p)

Plan Change Acceptability Determination.

A separate copy of this PSP revision is being provided to NRC Region Ill Office. The revision to the PSP was effective on February 1, 2017. . To justify implementation of the security plan change without prior NRC approval, a 10 CFR 50.54(p)

Plan Change Acceptability Determination was performed.

It was determined that the changes do not delete or contradict any regulatory requirement; do not decrease the overall level of security system performance as described in paragraphs (b) through (h) of 1 O CFR 73.55 to protect against the design basis threat of radiological

sabotage, as stated iri 10 CFR 73.1; arid the changes are consistent with 10 CFR 73.55 and do not decrease the overall level of security system performance needed to protect against the design basis threat of radiological
sabotage, as stated in 10 CFR 73.1. The specific changes to the PSP and its appendices are identified by revision bars and
  • follow the template guidance from the Nuclear Energy Institute (NEI) template 03-12, "Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan [and Independent Spent Fuel Storage Installation Security Program],

Revision 7, dated October 2011.

  • The enclosures to this letter contain "Safeguards Information" as described in 1 O CFR 73.21 and must be protected accordingly.

This page may be decontrolled upon removal of enclosures.

SAFEGUARDS INFORMATION May be decontrolled upon removal the enclosures

-*-------------------------------------

SAFEGUARDS INFORMATION*

May be decontrolled upon removal the enclosures Perry Nuclear Power Plant L-17-056 Page 2 of 2 The specific details of the changes to the PSP have been included in the enclosure to this . letter.

  • There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Vincent Forbus, Manager -Site Protection, at (440) 280-5938.

Sincerely, David B. Hamilton

Enclosure:

A. 10 CFR 50.54(p)

Plan Change Acceptability Determination B. PNPP Physical Security Plan, Revision 14 cc: NRC Region Ill Regional Administrator (with one copy of both enclosures)

NRC Resident Inspector (w/o enclosures)

NRC Project Manager (w/o enclosures)

The enclosures to this letter contain "Safeguards Information" as described in 10 CFR 73.21 and must be protected accordingly.

This page may be decontrolled upon removal enclosures.

SAFEGUARDS INFORMATION May be decontrolled upon removal the enclosures

\'. ) . SAFEGUARDS INFORMATION May be decontrolled upon removal the enclosures Enclosure A L-17-056 10 CFR 50.54(p)

Plan Change Acceptability Determination

  • 23 pages to follow SAFEGUARDS INFORMATION May be decontrolled upon removal the* enclosures