ML021900069: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000JU L 0 3 200210 CFR 55.40U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:In the Matter of Tennessee Valley Authority) )Docket No. 50-390WATTS BAR NUCLEAR PLANT (WBN) -NRC REGULATORY ISSUE SUMMARY (RIS) 2002-09 -PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS RIS 2002-09 was released by NRC on June 6, 2002, and requested information regarding WBN's projected operator licensing examination schedules and the estimated number of applicants. The information requested by NRC was defined on Form 536. The enclosure to this letter addresses NRC's request and provides an estimate of the examination requirements for WBN.  Should you require additional information regarding this matter, please contact me at (423) 365-1824.  Sincerely,Manager, Site Licensing and Industry AffairsEnclosure cc: See page 2Pnted on recycled paper/'4o)c,2:  
{{#Wiki_filter:Tennessee  
U.S. Nuclear Regulatory Commission Page 2 JUL 0 3 2002 cc (Enclosure): NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr. L. Mark Padovan, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303  
Valley Authority, Post Office Box 2000, Spring City, Tennessee  
Enclosure Operator Licensing Examination Data (Data as defined on NRC Form 536) FACILITY NRC REGION WATTS BAR NUCLEAR PLANT II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY03 CY04 CY05 CY06 ESTIMATED NUMBER OF LICENSEE PREPARED 0 0 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC PREPARED 0 1 1 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY03 CY04 CY05 CY06 NUMBER OF REACTOR 0 4 4 0 OPERATORS NUMBER OF SENIOR REACTOR 0 2 2 0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0 2 2 0 OPERATORS -UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS -LIMITED PROPOSED DATES 05/03 -05/07 10/09 -10/13 PRIMARY DATE ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULEPROPOSED NUMBER CY03 CY04 FIRST SECOND THIRD FIRST SECOND THIRD ESTIMATED NUMBER OF 0 4 0 0 0 4 CANDIDATES  
37381-2000
 
JU L 0 3 2002 10 CFR 55.40 U.S. Nuclear Regulatory  
Commission  
ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of Tennessee  
Valley Authority) )Docket No. 50-390 WATTS BAR NUCLEAR PLANT (WBN) -NRC REGULATORY  
ISSUE SUMMARY (RIS) 2002-09 -PREPARATION  
AND SCHEDULING  
OF OPERATOR LICENSING  
EXAMINATIONS  
RIS 2002-09 was released by NRC on June 6, 2002, and requested  
information  
regarding  
WBN's projected  
operator licensing  
examination  
schedules  
and the estimated  
number of applicants.  
The information  
requested  
by NRC was defined on Form 536. The enclosure  
to this letter addresses  
NRC's request and provides an estimate of the examination  
requirements  
for WBN.  Should you require additional  
information  
regarding  
this matter, please contact me at (423) 365-1824.   
Sincerely, Manager, Site Licensing  
and Industry Affairs Enclosure
cc: See page 2 Pnted on recycled paper/'4o)c,2:  
U.S. Nuclear Regulatory  
Commission  
Page 2 JUL 0 3 2002 cc (Enclosure):  
NRC Resident Inspector  
Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee  
37381 Mr. L. Mark Padovan, Senior Project Manager U.S. Nuclear Regulatory  
Commission  
MS 08G9 One White Flint North 11555 Rockville  
Pike Rockville, Maryland 20852-2739  
U.S. Nuclear Regulatory  
Commission  
Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303  
Enclosure  
Operator Licensing  
Examination  
Data (Data as defined on NRC Form 536) FACILITY NRC REGION WATTS BAR NUCLEAR PLANT II A. PROPOSED EXAMINATION  
PREPARATION  
SCHEDULE PROPOSED NUMBER CY03 CY04 CY05 CY06 ESTIMATED  
NUMBER OF LICENSEE PREPARED 0 0 0 0 EXAMINATIONS  
ESTIMATED  
NUMBER OF NRC PREPARED 0 1 1 0 EXAMINATIONS  
B. INITIAL OPERATOR LICENSE EXAMINATIONS  
PROPOSED NUMBER CY03 CY04 CY05 CY06 NUMBER OF REACTOR 0 4 4 0 OPERATORS  
NUMBER OF SENIOR REACTOR 0 2 2 0 OPERATORS  
-INSTANT NUMBER OF SENIOR REACTOR 0 2 2 0 OPERATORS  
-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS  
-LIMITED PROPOSED DATES 05/03 -05/07 10/09 -10/13 PRIMARY DATE ALTERNATE  
DATE C. PROPOSED GENERIC FUNDAMENTALS  
EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY03 CY04 FIRST SECOND THIRD FIRST SECOND THIRD ESTIMATED  
NUMBER OF 0 4 0 0 0 4 CANDIDATES
}}
}}

Revision as of 15:09, 31 August 2018

NRC Regulatory Issue Summary (RIS) 2002-09 - Preparation and Scheduling of Operator Licensing Examinations for Watts Bar Nuclear Plant
ML021900069
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 07/03/2002
From: Pace P L
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-02-009
Download: ML021900069 (3)


See also: RIS 2002-09

Text

Tennessee

Valley Authority, Post Office Box 2000, Spring City, Tennessee

37381-2000

JU L 0 3 2002 10 CFR 55.40 U.S. Nuclear Regulatory

Commission

ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of Tennessee

Valley Authority) )Docket No. 50-390 WATTS BAR NUCLEAR PLANT (WBN) -NRC REGULATORY

ISSUE SUMMARY (RIS) 2002-09 -PREPARATION

AND SCHEDULING

OF OPERATOR LICENSING

EXAMINATIONS

RIS 2002-09 was released by NRC on June 6, 2002, and requested

information

regarding

WBN's projected

operator licensing

examination

schedules

and the estimated

number of applicants.

The information

requested

by NRC was defined on Form 536. The enclosure

to this letter addresses

NRC's request and provides an estimate of the examination

requirements

for WBN. Should you require additional

information

regarding

this matter, please contact me at (423) 365-1824.

Sincerely, Manager, Site Licensing

and Industry Affairs Enclosure

cc: See page 2 Pnted on recycled paper/'4o)c,2:

U.S. Nuclear Regulatory

Commission

Page 2 JUL 0 3 2002 cc (Enclosure):

NRC Resident Inspector

Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee

37381 Mr. L. Mark Padovan, Senior Project Manager U.S. Nuclear Regulatory

Commission

MS 08G9 One White Flint North 11555 Rockville

Pike Rockville, Maryland 20852-2739

U.S. Nuclear Regulatory

Commission

Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303

Enclosure

Operator Licensing

Examination

Data (Data as defined on NRC Form 536) FACILITY NRC REGION WATTS BAR NUCLEAR PLANT II A. PROPOSED EXAMINATION

PREPARATION

SCHEDULE PROPOSED NUMBER CY03 CY04 CY05 CY06 ESTIMATED

NUMBER OF LICENSEE PREPARED 0 0 0 0 EXAMINATIONS

ESTIMATED

NUMBER OF NRC PREPARED 0 1 1 0 EXAMINATIONS

B. INITIAL OPERATOR LICENSE EXAMINATIONS

PROPOSED NUMBER CY03 CY04 CY05 CY06 NUMBER OF REACTOR 0 4 4 0 OPERATORS

NUMBER OF SENIOR REACTOR 0 2 2 0 OPERATORS

-INSTANT NUMBER OF SENIOR REACTOR 0 2 2 0 OPERATORS

-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS

-LIMITED PROPOSED DATES 05/03 -05/07 10/09 -10/13 PRIMARY DATE ALTERNATE

DATE C. PROPOSED GENERIC FUNDAMENTALS

EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY03 CY04 FIRST SECOND THIRD FIRST SECOND THIRD ESTIMATED

NUMBER OF 0 4 0 0 0 4 CANDIDATES