ML12180A603: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:June 28, 2012 | {{#Wiki_filter:June 28, 2012 | ||
John T. Conway, Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company 77 Beale Street, B32 | John T. Conway, Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company 77 Beale Street, B32 | ||
San Francisco, CA 94105 SUBJECT: DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000275/2013301; 05000323/2013301 Dear Mr. Conway: In a telephone conversation on January 25, 2012 between Messrs. Ron Fortier, Senior Instructor and Steve Garchow, Chief Examiner, arrangements were made for the administration | San Francisco, CA 94105 | ||
of licensing examinations at Diablo Canyon Power Plant during the week(s) of November 26 and December 3, 2012. As agreed during the telephone conversation, the staff of the U.S. Nuclear Regulatory Commission (NRC) will prepare the written examination and will coordinate the development of | SUBJECT: DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000275/2013301; 05000323/2013301 | ||
the operating test based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. Your staff will be given the opportunity to review the examinations during the week of July 20, 2012. To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by September 7, 2012. The operating tests and supporting reference materials | Dear Mr. Conway: | ||
In a telephone conversation on January 25, 2012 between Messrs. Ron Fortier, Senior Instructor and Steve Garchow, Chief Examiner, arrangements were made for the administration | |||
of licensing examinations at Diablo Canyon Power Plant during the week(s) of November 26 and December 3, 2012. | |||
As agreed during the telephone conversation, the staff of the U.S. Nuclear Regulatory Commission (NRC) will prepare the written examination and will coordinate the development of | |||
the operating test based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. Your staff will be given the opportunity to review the examinations during the week of July 20, 2012. | |||
To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by September 7, 2012. The operating tests and supporting reference materials | |||
identified in Attachment 3 to ES-201 will be due by October 5, 2012. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.] We request that any personal, proprietary, sensitive unclassified, or safeguards | identified in Attachment 3 to ES-201 will be due by October 5, 2012. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.] We request that any personal, proprietary, sensitive unclassified, or safeguards | ||
information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for on-site validation of the examinations is required during the week of November 5, 2012. | information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for on-site validation of the examinations is required during the week of November 5, 2012. | ||
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511 | UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511 | ||
Mr. Conway - 2 - In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, | Mr. Conway - 2 - | ||
your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in | In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, | ||
effect while the written examinations and operating tests are being administered. To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement | your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. | ||
may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 50 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to | Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in | ||
effect while the written examinations and operating tests are being administered. | |||
To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement | |||
may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. | |||
This letter contains information collections that are subject to the Paperwork Reduction Act of | |||
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 50 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to | |||
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an | the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an | ||
information collection, unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access | information collection, unless it displays a currently valid OMB control number. | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access | |||
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. | and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. | ||
Mr. Conway - 3 - Thank you for your cooperation in this matter. Mr. Fortier has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Garchow at 817-200-1426, or myself at 817-200- | Mr. Conway - 3 - | ||
Thank you for your cooperation in this matter. Mr. Fortier has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Garchow at 817-200-1426, or myself at 817-200- | |||
1159. Sincerely, | |||
/RA/ Mark S. Haire, Chief Operations Branch Division of Reactor Safety | |||
Dockets: 50-275; 50-323 Licenses: DPR-80; DPR-82 | |||
Electronic Distribution for Diablo Canyon | |||
ML12180A603 | |||
ADAMS: No # Yes # SUNSI Review Complete Reviewer Initials: SMG | |||
# Publicly Available | |||
# Non-Sensitive | |||
Non-publicly Available Sensitive RIV: DRS/OPS | |||
RIV: DRS/BC OPS SGarchow MHaire /RA/ /RA/ 06/27/2012 06/28/2012 | |||
}} | }} |
Revision as of 05:41, 28 July 2018
ML12180A603 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 06/28/2012 |
From: | Haire M S Operations Branch IV |
To: | Conway J T Pacific Gas & Electric Co |
vlm/Garchow S M | |
References | |
50-275/13-301, 50-323/13-301 | |
Download: ML12180A603 (4) | |
See also: IR 05000275/2013301
Text
June 28, 2012
John T. Conway, Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company 77 Beale Street, B32
San Francisco, CA 94105
SUBJECT: DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000275/2013301; 05000323/2013301
Dear Mr. Conway:
In a telephone conversation on January 25, 2012 between Messrs. Ron Fortier, Senior Instructor and Steve Garchow, Chief Examiner, arrangements were made for the administration
of licensing examinations at Diablo Canyon Power Plant during the week(s) of November 26 and December 3, 2012.
As agreed during the telephone conversation, the staff of the U.S. Nuclear Regulatory Commission (NRC) will prepare the written examination and will coordinate the development of
the operating test based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. Your staff will be given the opportunity to review the examinations during the week of July 20, 2012.
To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by September 7, 2012. The operating tests and supporting reference materials
identified in Attachment 3 to ES-201 will be due by October 5, 2012. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.] We request that any personal, proprietary, sensitive unclassified, or safeguards
information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for on-site validation of the examinations is required during the week of November 5, 2012.
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
Mr. Conway - 2 -
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement
may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
Mr. Conway - 3 -
Thank you for your cooperation in this matter. Mr. Fortier has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Garchow at 817-200-1426, or myself at 817-200-
1159. Sincerely,
/RA/ Mark S. Haire, Chief Operations Branch Division of Reactor Safety
Dockets: 50-275; 50-323 Licenses: DPR-80; DPR-82
Electronic Distribution for Diablo Canyon
ADAMS: No # Yes # SUNSI Review Complete Reviewer Initials: SMG
- Publicly Available
- Non-Sensitive
Non-publicly Available Sensitive RIV: DRS/OPS
RIV: DRS/BC OPS SGarchow MHaire /RA/ /RA/ 06/27/2012 06/28/2012