ML13162A583: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 1
| page count = 1
}}
}}
=Text=
{{#Wiki_filter:***.FFIIALU
-SECURITY RELATED lNFfRMATO.NU*
Hardened Plant Vent:* FitzPatrick is a GE Mark 1 BWR. The current (licensed) configuration is a hard pipe from the primary containment to the suction of the standby gas treatment system, which is located outside the reactor building in an adjacent building at ground level.* In response to GL 89-16 (Mark I hardened vent), FitzPatrick conducted an evaluation, through completion of the Individual Plant Examination, of the as licensed design and concluded the vent was acceptable." This evaluation was reviewed and inspected by the NRC. The Safety Evaluation Report dated September 28, 1992, concluded that Fitzpatrick's torus vent met the hardened vent design criteria intent with the improved operator training and procedures associated with containment venting.* Resident staff recently documented the (hard pipe) configuration during TI 2515/183 inspection activities in IR 0500033/2011008.
* A recent 2.206 petition submitted by Beyond Nuclear has challenged the adequacy of this design and requested enforcement actions be taken by the NRC.Outside of Scope 1i A I I It"%ff II t./t-it-b-l"IP1 I 1;.%I- "Pdi -*-&EeURfft--REtAT`ED INF0RMM IIUN 1f$L-Cmilr af st-ý,t ./w) Da-Y}}

Revision as of 23:44, 16 July 2018

Hardened Plant Vent
ML13162A583
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 05/16/2013
From:
NRC/OIS/IRSD/RFSB
To:
References
FOIA/PA-2013-0010
Download: ML13162A583 (1)


Text

      • .FFIIALU

-SECURITY RELATED lNFfRMATO.NU*

Hardened Plant Vent:* FitzPatrick is a GE Mark 1 BWR. The current (licensed) configuration is a hard pipe from the primary containment to the suction of the standby gas treatment system, which is located outside the reactor building in an adjacent building at ground level.* In response to GL 89-16 (Mark I hardened vent), FitzPatrick conducted an evaluation, through completion of the Individual Plant Examination, of the as licensed design and concluded the vent was acceptable." This evaluation was reviewed and inspected by the NRC. The Safety Evaluation Report dated September 28, 1992, concluded that Fitzpatrick's torus vent met the hardened vent design criteria intent with the improved operator training and procedures associated with containment venting.* Resident staff recently documented the (hard pipe) configuration during TI 2515/183 inspection activities in IR 0500033/2011008.

  • A recent 2.206 petition submitted by Beyond Nuclear has challenged the adequacy of this design and requested enforcement actions be taken by the NRC.Outside of Scope 1i A I I It"%ff II t./t-it-b-l"IP1 I 1;.%I- "Pdi -*-&EeURfft--REtAT`ED INF0RMM IIUN 1f$L-Cmilr af st-ý,t ./w) Da-Y