==Inspection Report==
==Inspection Report==
Docket Number: 05000397
Docket Number:
 
05000397 License Number:
License Number: NPF-21
NPF-21 Report Number:
 
05000397/2024001 Enterprise Identifier:
Report Number: 05000397/2024001
I-2024-001-0002 Licensee:
 
Energy Northwest Facility:
Enterprise Identifier: I-2024-001-0002
Columbia Generating Station Location:
 
Richland, WA Inspection Dates:
Licensee: Energy Northwest
January 1, 2024, to March 31, 2024 Inspectors:
 
J. Brodlowicz, Resident Inspector R. Bywater, Senior Project Engineer D. Dodson, Senior Reactor Inspector S. Hedger, Senior Emergency Preparedness Inspector C. Highley, Senior Resident Inspector C. Kline, Senior Resident Inspector J. Melfi, Project Engineer C. Rosales-Cooper, Senior Emergency Preparedness Specialist Approved By:
Facility: Columbia Generating Station
Patricia J. Vossmar, Chief Reactor Projects Branch A Division of Operating Reactor Safety
 
Location: Richland, WA
 
Inspection Dates: January 1, 2024, to March 31, 2024
 
Inspectors: J. Brodlowicz, Resident Inspector R. Bywater, Senior Project Engineer D. Dodson, Senior Reactor Inspector S. Hedger, Senior Emergency Preparedness Inspector C. Highley, Senior Resident Inspector C. Kline, Senior Resident Inspector J. Melfi, Project Engineer C. Rosales-Cooper, Senior Emergency Preparedness Specialist
 
Approved By: Patricia J. Vossmar, Chief Reactor Projects Branch A Division of Operating Reactor Safety
 
Enclosure


=SUMMARY=
=SUMMARY=
Line 82: Line 72:
===Partial Walkdown Sample (IP Section 03.01) (4 Samples)===
===Partial Walkdown Sample (IP Section 03.01) (4 Samples)===
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
: (1) standby liquid control train A on January 4, 2024
(1)standby liquid control train A on January 4, 2024 (2)service water loop A on January 22, 2024 (3)stator cooling water system on February 15, 2024 (4)emergency diesel generator division 1 on March 19, 2024
: (2) service water loop A on January 22, 2024
: (3) stator cooling water system on February 15, 2024
: (4) emergency diesel generator division 1 on March 19, 2024


===Complete Walkdown Sample (IP Section 03.02) (1 Sample)===
===Complete Walkdown Sample (IP Section 03.02) (1 Sample)===
: (1) low-pressure core spray system on March 20, 2024
(1)low-pressure core spray system on March 20, 2024


==71111.05 - Fire Protection==
==71111.05 - Fire Protection==
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (7 Samples)===
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (7 Samples)===
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
: (1) cable spreading room, fire area RC-2, on January 4, 2024
(1)cable spreading room, fire area RC-2, on January 4, 2024 (2)reactor building 522-foot elevation, fire area R-1-E522, on January 10, 2024 (3)emergency diesel generator room 1 and 2, fire area DG-2, DG-3, DG-4, DG-5, DG-8, and DG-9, on January 11, 2024 (4)reactor building 471-foot elevation, fire area R-1-E471, on January 16, 2024 (5)service water standby pump houses, fire area SW1 and SW2, on February 13, 2024 (6)makeup water pump house on February 15, 2024 (7)radioactive waste demin alley unused rooms level 487-foot elevation, fire area RC-1-E487, on March 5, 2024
: (2) reactor building 522-foot elevation, fire area R-1-E522, on January 10, 2024
: (3) emergency diesel generator room 1 and 2, fire area DG-2, DG-3, DG-4, DG-5, DG-8, and DG-9, on January 11, 2024
: (4) reactor building 471-foot elevation, fire area R-1-E471, on January 16, 2024
: (5) service water standby pump houses, fire area SW1 and SW2, on February 13, 2024
: (6) makeup water pump house on February 15, 2024
: (7) radioactive waste demin alley unused rooms level 487-foot elevation, fire area RC-1-E487, on March 5, 2024


===Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)===
===Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)===
: (1) evaluated on-site fire brigade response and de-brief to an announced fire drill at reactor feed pump 1 on January 25, 2024
(1)evaluated on-site fire brigade response and de-brief to an announced fire drill at reactor feed pump 1 on January 25, 2024


==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
Line 114: Line 95:
===Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)===
===Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)===
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
: (1) elevated risk due to low-pressure core spray surveillance on January 2, 2024
(1)elevated risk due to low-pressure core spray surveillance on January 2, 2024 (2)elevated risk to work on emergency control room chilled water on January 23, 2024 (3)risk-informed completion times and risk mitigation actions due to diesel generator 2 and service water B pump inoperable on January 24, 2024 (4)elevated Yellow risk due to stator cooling water heat exchanger cleaning on February 15, 2024 (5)elevated Yellow risk due to failure of the reactor core isolation cooling quarterly surveillance on March 29, 2024
: (2) elevated risk to work on emergency control room chilled water on January 23, 2024
: (3) risk-informed completion times and risk mitigation actions due to diesel generator 2 and service water B pump inoperable on January 24, 2024
: (4) elevated Yellow risk due to stator cooling water heat exchanger cleaning on February 15, 2024
: (5) elevated Yellow risk due to failure of the reactor core isolation cooling quarterly surveillance on March 29, 2024


==71111.15 - Operability Determinations and Functionality Assessments==
==71111.15 - Operability Determinations and Functionality Assessments==
===Operability Determination or Functionality Assessment (IP Section 03.01) (2 Samples)===
===Operability Determination or Functionality Assessment (IP Section 03.01) (2 Samples)===
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
: (1) emergency diesel generator 2 following AHU-21 coil failure on January 24, 2024
(1)emergency diesel generator 2 following AHU-21 coil failure on January 24, 2024 (2)emergency diesel generator 2 bearing sump low level, condition report (CR) 00456622, on March 25, 2024
: (2) emergency diesel generator 2 bearing sump low level, condition report (CR) 00456622, on March 25, 2024


==71111.24 - Testing and Maintenance of Equipment Important to Risk==
==71111.24 - Testing and Maintenance of Equipment Important to Risk==
Line 131: Line 107:
===Post-Maintenance Testing (PMT) (IP Section 03.01) (4 Samples)===
===Post-Maintenance Testing (PMT) (IP Section 03.01) (4 Samples)===
: (1) OSP-SLC/IST-Q701 standby liquid control pumps operability test following relief valve replacement on January 3, 2024
: (1) OSP-SLC/IST-Q701 standby liquid control pumps operability test following relief valve replacement on January 3, 2024
: (2) OSP-CCH/IST-M702 control room heating, ventilation, and air conditioning operability test following work on January 25, 2024
: (2) OSP-CCH/IST-M702 control room heating, ventilation, and air conditioning operability test following work on January 25, 2024 (3)reactor core isolation cooling valve 90 flush of the seat on March 14, 2024 (4)emergency diesel generator 2 air handling unit DMA-AH-21 following replacement of damaged cooling coil on March 30, 2024
: (3) reactor core isolation cooling valve 90 flush of the seat on March 14, 2024
: (4) emergency diesel generator 2 air handling unit DMA-AH-21 following replacement of damaged cooling coil on March 30, 2024


===Surveillance Testing (IP Section 03.01) (4 Samples)===
===Surveillance Testing (IP Section 03.01) (4 Samples)===
Line 149: Line 123:
==71114.01 - Exercise Evaluation==
==71114.01 - Exercise Evaluation==
Inspection Review (IP Section 02.01-02.11) (1 Partial)
Inspection Review (IP Section 02.01-02.11) (1 Partial)
 
(1)
(1) (Partial)
(Partial)
The inspectors evaluated the biennial emergency plan exercise conducted on March 26, 2024. However, at the end of the first quarter 2024, the licensee had not completed its critique process for the exercise. As such, the inspectors had not completed the full evaluation of the exercise and the critique process. The inspectors plan to complete the inspection in the second quarter, and the results of the inspection will be documented in NRC Inspection Report 05000397/2024002.
The inspectors evaluated the biennial emergency plan exercise conducted on March 26, 2024. However, at the end of the first quarter 2024, the licensee had not completed its critique process for the exercise. As such, the inspectors had not completed the full evaluation of the exercise and the critique process. The inspectors plan to complete the inspection in the second quarter, and the results of the inspection will be documented in NRC Inspection Report 05000397/2024002.


Line 158: Line 132:


==OTHER ACTIVITIES - BASELINE==
==OTHER ACTIVITIES - BASELINE==
===71151 - Performance Indicator Verification
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
 
The inspectors verified licensee performance indicators submittals listed below:
 
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===
{{IP sample|IP=IP 71151|count=1}}
{{IP sample|IP=IP 71151|count=1}}
: (1) January 1, 2023, through December 31, 2023
: (1) January 1, 2023, through December 31, 2023 IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (1 Sample)
 
IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (1 Sample)
: (1) January 1, 2023, through December 31, 2023
: (1) January 1, 2023, through December 31, 2023


Line 173: Line 142:


===EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12) (1 Sample)===
===EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12) (1 Sample)===
: (1) January 1, 2023, through December 31, 2023
: (1) January 1, 2023, through December 31, 2023 EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample)
 
EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample)
: (1) January 1, 2023, through December 31, 2023 EP03: Alert And Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)
: (1) January 1, 2023, through December 31, 2023 EP03: Alert And Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)
: (1) January 1, 2023, through December 31, 2023
: (1) January 1, 2023, through December 31, 2023
Line 184: Line 151:


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Observation: Semiannual Trend Review of Issues Associated with Emergency 71152S Diesel Generator Subsystems The inspectors reviewed the licensees corrective action program for potential adverse trends in emergency diesel generator subsystem performance that might be indicative of a more significant safety issue. The inspectors observed a negative trend in performance of emergency diesel generator subsystems, including one fuel oil and six ventilation system problems in a 3-month period:
Observation: Semiannual Trend Review of Issues Associated with Emergency Diesel Generator Subsystems 71152S The inspectors reviewed the licensees corrective action program for potential adverse trends in emergency diesel generator subsystem performance that might be indicative of a more significant safety issue. The inspectors observed a negative trend in performance of emergency diesel generator subsystems, including one fuel oil and six ventilation system problems in a 3-month period:
* CR-452870: On November 22, 2023, during a monthly surveillance of DG-2, a fuel oil pipe crack failure and fuel oil leak required the engine to be shut down.
* CR-452870: On November 22, 2023, during a monthly surveillance of DG-2, a fuel oil pipe crack failure and fuel oil leak required the engine to be shut down.
* CR-453346: On December 7, 2023, DG-3, mixed air damper 32/2, was found partially open due to a failed motor, which provided a flow path for additional outside air into the DG-3 room. The licensee determined DG-3 was operable in the as-found condition.
* CR-453346: On December 7, 2023, DG-3, mixed air damper 32/2, was found partially open due to a failed motor, which provided a flow path for additional outside air into the DG-3 room. The licensee determined DG-3 was operable in the as-found condition.
Line 205: Line 172:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type Designation Description or Title Revision or
Inspection
Procedure Date
Procedure
71111.01 Procedures SOP-Cold Weather Operations 044
Type
Designation
Description or Title
Revision or
Date
71111.01
Procedures
SOP-
COLDWEATHER-
COLDWEATHER-
OPS
OPS
71111.04 Corrective Action Action Requests 453426, 453635, 454088, 454160, 454270, 454441,
Cold Weather Operations
Documents 456282, 456283, 456286, 456317, 456381
044
Drawings M-520 Reactor Building HPSC and LPCS Flow Diagram 105
Corrective Action
M512-2 Flow Diagram - Diesel Oil & Miscellaneous Systems Diesel 041
Documents
Action Requests
453426, 453635, 454088, 454160, 454270, 454441,
456282, 456283, 456286, 456317, 456381
M-520
Reactor Building HPSC and LPCS Flow Diagram
105
M512-2
Flow Diagram - Diesel Oil & Miscellaneous Systems Diesel
Generator Building
Generator Building
M512-3 Flow Diagram Diesel Oil & Miscellaneous Systems Diesel 042
041
Drawings
M512-3
Flow Diagram Diesel Oil & Miscellaneous Systems Diesel
Generator Building
Generator Building
Procedures 1.3.76 Integrated Risk Management 068
2
1.3.83 Protected Equipment Program 039
1.3.76
18.1.40 Chemical Cleaning of Generator Stator Cooling Water 000
Integrated Risk Management
OSP-SW-M101 Standby Service Water Loop A Valve Position Verification054
068
SOP-DG1-LU Emergency Diesel Generator (DIV 1) Valve and Power 009
1.3.83
Protected Equipment Program
039
18.1.40
Chemical Cleaning of Generator Stator Cooling Water
000
OSP-SW-M101
Standby Service Water Loop A Valve Position Verification
054
SOP-DG1-LU
Emergency Diesel Generator (DIV 1) Valve and Power
Supply Lineup
Supply Lineup
SOP-DG1-STBY Emergency Diesel Generator (DIV 1) Standby Lineup 024
009
SOP-LPCS-STBY Placing LPCS in Standby Status 002
SOP-DG1-STBY
SOP-SLC-LU SLC System Valve and Breaker Lineup 000
Emergency Diesel Generator (DIV 1) Standby Lineup
Work Orders 02204557, WR-29176217
24
71111.05 Corrective Action 454332
SOP-LPCS-STBY
Placing LPCS in Standby Status
2
Procedures
SOP-SLC-LU
SLC System Valve and Breaker Lineup
000
71111.04
Work Orders
204557, WR-29176217
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
Drawings A-581 Makeup Water Pump House Elevations, Details and 004
454332
Makeup Water Pump House Elevations, Details and
Schedules
Schedules
Makeup Water Pump House Building Sections 003
004
Makeup Water Pump House Miscellaneous Details 002
Makeup Water Pump House Building Sections
Fire Plans PFP-DG-Diesel Generator Building 006
003
Drawings
Makeup Water Pump House Miscellaneous Details
2
PFP-DG-
BUILDING
BUILDING
PFP-RB-471 Reactor 471 008
Diesel Generator Building
PFP-RB-522 Reactor 522 008
006
Inspection Type Designation Description or Title Revision or
PFP-RB-471
Procedure Date
Reactor 471
PFP-RW-484-487 Radwaste 484-487 007
008
71111.11Q Miscellaneous LR002602 Columbia Simulator Scenario Respond to Loss of E-SM-1 000
71111.05
Procedures ABN-ELEC-SM-1, SM-7, SM-75, SM-72, SL-71, SL-73, and SL-11 024
Fire Plans
SM1/SM7 Distribution System Failures
PFP-RB-522
ABN-POWER Unplanned Reactor Power Change 020
Reactor 522
ABN-RPS Loss of RPS 017
008
71111.13 Calculations DMA-CC-21 RICT DMA-CC-21 RICT 01/18/2024
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
PFP-RW-484-487
Radwaste 484-487
007
Miscellaneous
LR002602
Columbia Simulator Scenario Respond to Loss of E-SM-1
000
ABN-ELEC-
SM1/SM7
SM-1, SM-7, SM-75, SM-72, SL-71, SL-73, and SL-11
Distribution System Failures
24
ABN-POWER
Unplanned Reactor Power Change
20
71111.11Q
Procedures
ABN-RPS
Loss of RPS
017
Calculations
DMA-CC-21 RICT
RMTS Report R1
RMTS Report R1
Corrective Action Action Requests 454601
DMA-CC-21 RICT
01/18/2024
Corrective Action
Documents
Documents
Procedures 1.3.76 Integrated Risk Management 067
Action Requests
1.3.83 Protected Equipment Program 038
454601
Work Orders 02192869, 02207944, 02211744, 02212666,
1.3.76
71111.15 Procedures OSP-ELEC-M702 Diesel Generator 2-Monthly Operability Test 071
Integrated Risk Management
Work Orders 02217212
067
71111.24 Miscellaneous AR CR 443704 CCH-CR-1B Low Oil Level - Adverse Condition Monitoring 04/26/2023
Procedures
1.3.83
Protected Equipment Program
038
71111.13
Work Orders
2192869, 02207944, 02211744, 02212666,
Procedures
OSP-ELEC-M702
Diesel Generator 2-Monthly Operability Test
071
71111.15
Work Orders
217212
Miscellaneous
AR CR 443704
CCH-CR-1B Low Oil Level - Adverse Condition Monitoring
Plan
Plan
Procedures ISP-LPCS/RHR-ECCS-LPCI(A) and LPCS Pump Discharge Flow (Min. 007
04/26/2023
X301 Flow)-CC
ISP-LPCS/RHR-
ISP-RCIC-Q903 RCIC Isolation on RCIC Steam Supply Flow High Div 2- 019
X301
ECCS-LPCI(A) and LPCS Pump Discharge Flow (Min.
Flow)-CC
007
ISP-RCIC-Q903
RCIC Isolation on RCIC Steam Supply Flow High Div 2-
CFT/CC
CFT/CC
OSP-SLC-M101 Standby Liquid Control Valve Alignment 003
019
OSP-SLC/IST-Standby Liquid Control Pumps Operability Test 031
OSP-SLC-M101
Standby Liquid Control Valve Alignment
003
Procedures
OSP-SLC/IST-
Q701
Q701
Work Orders 02114148, 02178048, 02197798, 02205848, 02207944,
Standby Liquid Control Pumps Operability Test
031
71111.24
Work Orders
2114148, 02178048, 02197798, 02205848, 02207944,
207952, 02211565, 022117441
207952, 02211565, 022117441
71114.01 Corrective Action Action Requests 428926, 432074, 432408, 432500, 434040, 435460,
Corrective Action
Documents 436639, 436644, 436878, 438355, 441301, 441611,
Documents
Action Requests
28926, 432074, 432408, 432500, 434040, 435460,
436639, 436644, 436878, 438355, 441301, 441611,
443431, 446279, 449562, 451402, 451883, 451890,
443431, 446279, 449562, 451402, 451883, 451890,
2196, 452279, 452306, 453359, 453917, 455316
2196, 452279, 452306, 453359, 453917, 455316
Corrective Action Action Requests 456734
71114.01
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
Inspection Type Designation Description or Title Revision or
Action Requests
Procedure Date
456734
Miscellaneous Columbia Generating Station ERO Team "D" Exercise 10/26/2021
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Columbia Generating Station ERO Team "D" Exercise
Report, After Action Report/Improvement Plan
Report, After Action Report/Improvement Plan
Columbia Generating Station ERO EDMG Demonstration 11/30/2021
10/26/2021
Columbia Generating Station ERO EDMG Demonstration
Exercise Report, After Action Report/Improvement Plan
Exercise Report, After Action Report/Improvement Plan
Columbia Generating Station ERO Team "A" ERO Drill, 02/22/2022
11/30/2021
Columbia Generating Station ERO Team "A" ERO Drill,
After Action Report/Improvement Plan
After Action Report/Improvement Plan
Columbia Generating Station ERO Team "B" ERO Drill, 04/26/2022
2/22/2022
Columbia Generating Station ERO Team "B" ERO Drill,
After Action Report/Improvement Plan
After Action Report/Improvement Plan
Columbia Generating Station ERO Team "C" ERO Drill, 06/21/2022
04/26/2022
Columbia Generating Station ERO Team "C" ERO Drill,
After Action Report/Improvement Plan
After Action Report/Improvement Plan
Columbia Generating Station ERO Team "A" ERO Dress 09/13/2022
06/21/2022
Columbia Generating Station ERO Team "A" ERO Dress
Rehearsal, After Action Report/Improvement Plan
Rehearsal, After Action Report/Improvement Plan
Columbia Generating Station ERO Team "A" ERO Exercise, 10/25/2022
09/13/2022
Columbia Generating Station ERO Team "A" ERO Exercise,
After Action Report/Improvement Plan
After Action Report/Improvement Plan
Columbia Generating Station ERO Team "B" ERO Dress 02/06/2024
10/25/2022
Columbia Generating Station ERO Team "B" ERO Dress
Rehearsal, After Action Report/Improvement Plan
Rehearsal, After Action Report/Improvement Plan
EPI-21 Drill and Exercise Development and Implementation 19
2/06/2024
Procedures 1.3.1 Operating Policies, Programs, and Practices 141
Miscellaneous
13.1.1 Classifying the Emergency 49 (Minor
EPI-21
Drill and Exercise Development and Implementation
1.3.1
Operating Policies, Programs, and Practices
141
13.1.1
Classifying the Emergency
(Minor
2)
2)
13.1.1A Classifying the Emergency - Technical Bases 34
13.1.1A
13.10.1 Control Room Operation and Shift Manager Duties 35
Classifying the Emergency - Technical Bases
13.10.9 Operations Support Center Manager and Staff Duties 50
13.10.1
13.11.1 EOF Manager Duties 44 (Minor
Control Room Operation and Shift Manager Duties
13.10.9
Operations Support Center Manager and Staff Duties
13.11.1
EOF Manager Duties
(Minor
005)
005)
13.11.10 Security Manager Duties 22
13.11.10
(Minor 002)
Security Manager Duties
13.11.2 Assistant EOF Manager Duties 10
(Minor 002)
(Minor 001)
13.11.2
13.11.7 Radiological Emergency Manager Duties 37
Assistant EOF Manager Duties
(Minor 004)
(Minor 001)
13.12.19 JIC Management 25
13.11.7
13.14.8 Drill and Exercise Program 18
Radiological Emergency Manager Duties
13.2.1 Emergency Exposure Levels/Protective Action Guides 22
(Minor 004)
Inspection Type Designation Description or Title Revision or
13.12.19
Procedure Date
JIC Management
(Minor 002)
13.14.8
13.2.2 Determining Protective Action Recommendations 20
Drill and Exercise Program
(Minor 002)
Procedures
13.4.1 Emergency Notifications 44
13.2.1
(Minor 002)
Emergency Exposure Levels/Protective Action Guides
13.5.1 Local, Protected Area or Site Evacuation 31
 
(Minor 001)
Inspection
13.8.1 Emergency Dose Projection System Operations 41
Procedure
26525 OSC Health Physics Lead Checklist 8
Type
SWP-CAP-6 Condition Report Review 30
Designation
71114.08 Miscellaneous Energy Northwest, Columbia Generating Station, ERO 01/18/2024
Description or Title
Revision or
Date
(Minor 002)
13.2.2
Determining Protective Action Recommendations
(Minor 002)
13.4.1
Emergency Notifications
(Minor 002)
13.5.1
Local, Protected Area or Site Evacuation
(Minor 001)
13.8.1
Emergency Dose Projection System Operations
26525
OSC Health Physics Lead Checklist
SWP-CAP-6
Condition Report Review
Energy Northwest, Columbia Generating Station, ERO
Team "B" Exercise, March 26, 2024
Team "B" Exercise, March 26, 2024
Energy Northwest, Columbia Generating Station, Plume 08/17/2022
01/18/2024
Energy Northwest, Columbia Generating Station, Plume
Phase Exercise, October 25, 2022
Phase Exercise, October 25, 2022
Energy Northwest, Columbia Generating Station, Plume 01/21/2020
08/17/2022
Miscellaneous
Energy Northwest, Columbia Generating Station, Plume
Phase Exercise, March 24, 2020
Phase Exercise, March 24, 2020
Procedures 13.1.1A Classifying The Emergency - Technical Bases 34
01/21/2020
(Minor 02)
13.1.1A
13.2.2 Determining Protective Action Recommendations 20
Classifying The Emergency - Technical Bases
(Minor 02)
(Minor 02)
13.4.1 Emergency Notifications 44
13.2.2
(Minor 01)
Determining Protective Action Recommendations
13.8.1 Emergency Dose Projection System Operation 40
(Minor 02)
71151 Corrective Action Action Requests 440338, 444047, 451768, 452196
13.4.1
Emergency Notifications
(Minor 01)
71114.08
Procedures
13.8.1
Emergency Dose Projection System Operation
Corrective Action
Documents
Documents
Miscellaneous Columbia Generating Station, Alert and Notification System 11/14/2016
Action Requests
(ANS) Design Report, Revision 2
440338, 444047, 451768, 452196
Drill, Exercise, and Actual Events Opportunity Evaluation - 01/30/2023
Columbia Generating Station, Alert and Notification System  
(ANS) Design Report, Revision 2
11/14/2016
Drill, Exercise, and Actual Events Opportunity Evaluation -
PQD Code LR002579, Event #2023-01
PQD Code LR002579, Event #2023-01
Drill, Exercise, and Actual Events Opportunity Evaluation - 04/04/2023
01/30/2023
Drill, Exercise, and Actual Events Opportunity Evaluation -
PQD Code LR002537, Event #2023-11
PQD Code LR002537, Event #2023-11
Drill, Exercise, and Actual Events Opportunity Evaluation - 09/06/2023
04/04/2023
Drill, Exercise, and Actual Events Opportunity Evaluation -
PQD Code LR002597, Event #2023-24
PQD Code LR002597, Event #2023-24
Drill, Exercise, and Actual Events Opportunity Evaluation - 11/20/2023
09/06/2023
Inspection Type Designation Description or Title Revision or
71151
Procedure Date
Miscellaneous
Drill, Exercise, and Actual Events Opportunity Evaluation -
11/20/2023
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
PQD Code L#E000050, Event #2023-27
PQD Code L#E000050, Event #2023-27
Procedures 13.1.1A Classifying the Emergency - Technical Bases 34
13.1.1A
(Minor 002)
Classifying the Emergency - Technical Bases
EPI-18 Emergency Preparedness Performance Indicators 27
(Minor 002)
TSI-6.2.22 EP Annual Emergency Response Siren System Activation 4
EPI-18
Test (Minor 002)
Emergency Preparedness Performance Indicators
TSI-6.2.32 EP Siren Polling Test 3
TSI-6.2.22
(Minor 002)
EP Annual Emergency Response Siren System Activation
71152S Corrective Action Action Requests 452870, 453346, 454585, 454897, 455030, 455075, 455140
Test
(Minor 002)
Procedures
TSI-6.2.32
EP Siren Polling Test
(Minor 002)
71152S
Corrective Action
Documents
Documents
 
Action Requests
13
2870, 453346, 454585, 454897, 455030, 455075, 455140
}}
}}

Revision as of 18:33, 24 November 2024

Integrated Inspection Report 05000397/2024001
ML24115A189
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/24/2024
From: Patricia Vossmar
NRC/RGN-IV/DORS/PBA
To: Schuetz R
Energy Northwest
References
IR 2023001
Download: ML24115A189 (14)


Text

April 24, 2024

SUBJECT:

COLUMBIA GENERATING STATION - INTEGRATED INSPECTION REPORT 05000397/2024001

Dear Robert Schuetz:

On March 31, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Columbia Generating Station. On April 18, 2024, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Patricia J. Vossmar, Chief Reactor Projects Branch A Division of Operating Reactor Safety Docket No. 05000397 License No. NPF-21

Enclosure:

As stated

Inspection Report

Docket Number:

05000397 License Number:

NPF-21 Report Number:

05000397/2024001 Enterprise Identifier:

I-2024-001-0002 Licensee:

Energy Northwest Facility:

Columbia Generating Station Location:

Richland, WA Inspection Dates:

January 1, 2024, to March 31, 2024 Inspectors:

J. Brodlowicz, Resident Inspector R. Bywater, Senior Project Engineer D. Dodson, Senior Reactor Inspector S. Hedger, Senior Emergency Preparedness Inspector C. Highley, Senior Resident Inspector C. Kline, Senior Resident Inspector J. Melfi, Project Engineer C. Rosales-Cooper, Senior Emergency Preparedness Specialist Approved By:

Patricia J. Vossmar, Chief Reactor Projects Branch A Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Columbia Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

The unit began the inspection period near rated thermal power. On March 10, 2024, the unit was down powered to 29 percent for planned maintenance. The unit was returned to rated thermal power on March 12, 2024. On March 14, 2024, the unit was down powered to 79 percent for planned maintenance. The unit was returned to rated thermal power on March 14,

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) Inspected adequacy of severe weather protections in the service and circulating water structures, diesel generator building, and outside building areas prior to the artic freeze conditions on January 11, 2024.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1)standby liquid control train A on January 4, 2024 (2)service water loop A on January 22, 2024 (3)stator cooling water system on February 15, 2024 (4)emergency diesel generator division 1 on March 19, 2024

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1)low-pressure core spray system on March 20, 2024

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (7 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1)cable spreading room, fire area RC-2, on January 4, 2024 (2)reactor building 522-foot elevation, fire area R-1-E522, on January 10, 2024 (3)emergency diesel generator room 1 and 2, fire area DG-2, DG-3, DG-4, DG-5, DG-8, and DG-9, on January 11, 2024 (4)reactor building 471-foot elevation, fire area R-1-E471, on January 16, 2024 (5)service water standby pump houses, fire area SW1 and SW2, on February 13, 2024 (6)makeup water pump house on February 15, 2024 (7)radioactive waste demin alley unused rooms level 487-foot elevation, fire area RC-1-E487, on March 5, 2024

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1)evaluated on-site fire brigade response and de-brief to an announced fire drill at reactor feed pump 1 on January 25, 2024

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during a reactor down power to 62 percent, rod sequence exchange, and loss of a reactor recirculation pump leading to single loop operations on March 10, 2024.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated the loss of the electrical switchgear medium voltage bus on January 24, 2024.

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1)elevated risk due to low-pressure core spray surveillance on January 2, 2024 (2)elevated risk to work on emergency control room chilled water on January 23, 2024 (3)risk-informed completion times and risk mitigation actions due to diesel generator 2 and service water B pump inoperable on January 24, 2024 (4)elevated Yellow risk due to stator cooling water heat exchanger cleaning on February 15, 2024 (5)elevated Yellow risk due to failure of the reactor core isolation cooling quarterly surveillance on March 29, 2024

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (2 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1)emergency diesel generator 2 following AHU-21 coil failure on January 24, 2024 (2)emergency diesel generator 2 bearing sump low level, condition report (CR) 00456622, on March 25, 2024

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (4 Samples)

(1) OSP-SLC/IST-Q701 standby liquid control pumps operability test following relief valve replacement on January 3, 2024
(2) OSP-CCH/IST-M702 control room heating, ventilation, and air conditioning operability test following work on January 25, 2024 (3)reactor core isolation cooling valve 90 flush of the seat on March 14, 2024 (4)emergency diesel generator 2 air handling unit DMA-AH-21 following replacement of damaged cooling coil on March 30, 2024

Surveillance Testing (IP Section 03.01) (4 Samples)

(1) ISP-RCIC-Q903 RCIC isolation on RCIC steam supply flow high division 2 on January 9, 2024
(2) OSP-ELEC-B202 emergency diesel generator 2 monthly operability test on January 18, 2024
(3) OSP-RCIC/IST-Q701 RCIC operability test on March 11, 2024
(4) OSP-LPCS/IST-Q702 low-pressure core spray system operability test on March 29, 2024

Inservice Testing (IST) (IP Section 03.01) (1 Sample)

(1) ISP-LPCS/RHR-X301 emergency core cooling system low-pressure coolant injection (LPCI) A and low-pressure core spray pump discharge flow on January 2, 2024

Reactor Coolant System Leakage Detection Testing (IP Section 03.01) (1 Sample)

(1) OSP-INST-H101 shift and daily instrument checks (Mode 1, 2, 3) section 9.3 on March 5, 2024

71114.01 - Exercise Evaluation

Inspection Review (IP Section 02.01-02.11) (1 Partial)

(1)

(Partial)

The inspectors evaluated the biennial emergency plan exercise conducted on March 26, 2024. However, at the end of the first quarter 2024, the licensee had not completed its critique process for the exercise. As such, the inspectors had not completed the full evaluation of the exercise and the critique process. The inspectors plan to complete the inspection in the second quarter, and the results of the inspection will be documented in NRC Inspection Report 05000397/2024002.

71114.08 - Exercise Evaluation - Scenario Review

Inspection Review (IP Section 02.01 - 02.04) (1 Sample)

(1) The inspectors reviewed the licensee's preliminary exercise scenario that was submitted to the NRC on January 18, 2024 (Agencywide Documents Access and Management System [ADAMS] Accession No. ML24018A078), for the exercise scheduled on March 26, 2024. The inspectors discussed the preliminary scenario comments with Jennifer Kuklinski, Manager, Emergency Preparedness, and other members of the emergency preparedness staff on February 20, 2024. The inspectors' review does not constitute NRC approval of the scenario.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===

(1) January 1, 2023, through December 31, 2023 IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (1 Sample)
(1) January 1, 2023, through December 31, 2023

IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (1 Sample)

(1) January 1, 2023, through December 31, 2023

EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12) (1 Sample)

(1) January 1, 2023, through December 31, 2023 EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample)
(1) January 1, 2023, through December 31, 2023 EP03: Alert And Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)
(1) January 1, 2023, through December 31, 2023

71152S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02)

(1) The inspectors reviewed the licensees corrective action program for potential adverse trends in emergency diesel generator subsystems performance that might be indicative of a more significant safety issue. The inspectors observed a negative trend in performance. This observation is further detailed in the results section of this report.

INSPECTION RESULTS

Observation: Semiannual Trend Review of Issues Associated with Emergency Diesel Generator Subsystems 71152S The inspectors reviewed the licensees corrective action program for potential adverse trends in emergency diesel generator subsystem performance that might be indicative of a more significant safety issue. The inspectors observed a negative trend in performance of emergency diesel generator subsystems, including one fuel oil and six ventilation system problems in a 3-month period:

  • CR-452870: On November 22, 2023, during a monthly surveillance of DG-2, a fuel oil pipe crack failure and fuel oil leak required the engine to be shut down.
  • CR-453346: On December 7, 2023, DG-3, mixed air damper 32/2, was found partially open due to a failed motor, which provided a flow path for additional outside air into the DG-3 room. The licensee determined DG-3 was operable in the as-found condition.
  • CR-454585: On January 18, 2024, during a monthly surveillance of DG-2, a significant leak of service water occurred due to ruptured piping on cooling coil DMA-CC-21. The licensee determined that the cooling coil had been exposed to cold outside air because the outside air/recirculation dampers DMA-AD-21/2 were operating backwards.
  • CR-454897: On January 29, 2024, during an extent of condition investigation for CR-454585, the licensee found DG-3 face/bypass dampers DMA-AD-31/1 did not spring-return properly on a third attempt after two successful functional checks. One of the DMA-AD-31/1 damper motors had failed. The licensee determined DG-3 was operable prior to the failure.
  • CR-455030: On February 1, 2024, the NRC identified that two door hinges on DG-2 air handling unit DMA-AH-21 had cotter pins that were not fully engaged in the hinges.

The licensee determined the air handling unit was functional in the as-found condition.

  • CR-455075: On February 3, 2024, during an extent of condition investigation for CR-454585, the licensee found DG-1 air handling unit DMA-AH-11 outside/recirculation dampers would not close completely. Also, the licensee found the DG-1 air handling unit DMA-AH-12 outside/recirculation dampers and face/bypass dampers would not close completely. The condition resulted in approximately six times the evaluated bypass flow evaluated by the room temperature design calculation. The licensee determined DG-1 was operable in the as-found condition.
  • CR-455140: On February 6, 2024, the licensee identified a large temperature difference between the DG-1 and DG-2 rooms. The licensee found that DG-1 temperature controller DMA-TIC-11/2 had a setpoint drift of 24 degrees Fahrenheit and was not controlling temperature properly. The licensee determined DG-1 was operable in the as-found condition.

The inspectors concluded the above examples illustrated a negative trend in performance of emergency diesel generator subsystems. The station has initiated a system vulnerability evaluation for the diesel HVAC system (CR 455790).

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 18, 2024, the inspectors presented the emergency preparedness performance indicator verification results to Robert Schuetz, Chief Executive Officer, and other members of the licensee staff.
  • On April 18, 2024, the inspectors presented the integrated inspection results to Robert Schuetz, Chief Executive Officer, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Procedures

SOP-

COLDWEATHER-

OPS

Cold Weather Operations

044

Corrective Action

Documents

Action Requests

453426, 453635, 454088, 454160, 454270, 454441,

456282, 456283, 456286, 456317, 456381

M-520

Reactor Building HPSC and LPCS Flow Diagram

105

M512-2

Flow Diagram - Diesel Oil & Miscellaneous Systems Diesel

Generator Building

041

Drawings

M512-3

Flow Diagram Diesel Oil & Miscellaneous Systems Diesel

Generator Building

2

1.3.76

Integrated Risk Management

068

1.3.83

Protected Equipment Program

039

18.1.40

Chemical Cleaning of Generator Stator Cooling Water

000

OSP-SW-M101

Standby Service Water Loop A Valve Position Verification

054

SOP-DG1-LU

Emergency Diesel Generator (DIV 1) Valve and Power

Supply Lineup

009

SOP-DG1-STBY

Emergency Diesel Generator (DIV 1) Standby Lineup

24

SOP-LPCS-STBY

Placing LPCS in Standby Status

2

Procedures

SOP-SLC-LU

SLC System Valve and Breaker Lineup

000

71111.04

Work Orders

204557, WR-29176217

Corrective Action

Documents

Resulting from

Inspection

454332

Makeup Water Pump House Elevations, Details and

Schedules

004

Makeup Water Pump House Building Sections

003

Drawings

Makeup Water Pump House Miscellaneous Details

2

PFP-DG-

BUILDING

Diesel Generator Building

006

PFP-RB-471

Reactor 471

008

71111.05

Fire Plans

PFP-RB-522

Reactor 522

008

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

PFP-RW-484-487

Radwaste 484-487

007

Miscellaneous

LR002602

Columbia Simulator Scenario Respond to Loss of E-SM-1

000

ABN-ELEC-

SM1/SM7

SM-1, SM-7, SM-75, SM-72, SL-71, SL-73, and SL-11

Distribution System Failures

24

ABN-POWER

Unplanned Reactor Power Change

20

71111.11Q

Procedures

ABN-RPS

Loss of RPS

017

Calculations

DMA-CC-21 RICT

RMTS Report R1

DMA-CC-21 RICT

01/18/2024

Corrective Action

Documents

Action Requests

454601

1.3.76

Integrated Risk Management

067

Procedures

1.3.83

Protected Equipment Program

038

71111.13

Work Orders

2192869, 02207944, 02211744, 02212666,

Procedures

OSP-ELEC-M702

Diesel Generator 2-Monthly Operability Test

071

71111.15

Work Orders

217212

Miscellaneous

AR CR 443704

CCH-CR-1B Low Oil Level - Adverse Condition Monitoring

Plan

04/26/2023

ISP-LPCS/RHR-

X301

ECCS-LPCI(A) and LPCS Pump Discharge Flow (Min.

Flow)-CC

007

ISP-RCIC-Q903

RCIC Isolation on RCIC Steam Supply Flow High Div 2-

CFT/CC

019

OSP-SLC-M101

Standby Liquid Control Valve Alignment

003

Procedures

OSP-SLC/IST-

Q701

Standby Liquid Control Pumps Operability Test

031

71111.24

Work Orders

2114148, 02178048, 02197798, 02205848, 02207944,

207952, 02211565, 022117441

Corrective Action

Documents

Action Requests

28926, 432074, 432408, 432500, 434040, 435460,

436639, 436644, 436878, 438355, 441301, 441611,

443431, 446279, 449562, 451402, 451883, 451890,

2196, 452279, 452306, 453359, 453917, 455316

71114.01

Corrective Action

Documents

Resulting from

Inspection

Action Requests

456734

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Columbia Generating Station ERO Team "D" Exercise

Report, After Action Report/Improvement Plan

10/26/2021

Columbia Generating Station ERO EDMG Demonstration

Exercise Report, After Action Report/Improvement Plan

11/30/2021

Columbia Generating Station ERO Team "A" ERO Drill,

After Action Report/Improvement Plan

2/22/2022

Columbia Generating Station ERO Team "B" ERO Drill,

After Action Report/Improvement Plan

04/26/2022

Columbia Generating Station ERO Team "C" ERO Drill,

After Action Report/Improvement Plan

06/21/2022

Columbia Generating Station ERO Team "A" ERO Dress

Rehearsal, After Action Report/Improvement Plan

09/13/2022

Columbia Generating Station ERO Team "A" ERO Exercise,

After Action Report/Improvement Plan

10/25/2022

Columbia Generating Station ERO Team "B" ERO Dress

Rehearsal, After Action Report/Improvement Plan

2/06/2024

Miscellaneous

EPI-21

Drill and Exercise Development and Implementation

1.3.1

Operating Policies, Programs, and Practices

141

13.1.1

Classifying the Emergency

(Minor

2)

13.1.1A

Classifying the Emergency - Technical Bases

13.10.1

Control Room Operation and Shift Manager Duties

13.10.9

Operations Support Center Manager and Staff Duties

13.11.1

EOF Manager Duties

(Minor

005)

13.11.10

Security Manager Duties

(Minor 002)

13.11.2

Assistant EOF Manager Duties

(Minor 001)

13.11.7

Radiological Emergency Manager Duties

(Minor 004)

13.12.19

JIC Management

13.14.8

Drill and Exercise Program

Procedures

13.2.1

Emergency Exposure Levels/Protective Action Guides

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

(Minor 002)

13.2.2

Determining Protective Action Recommendations

(Minor 002)

13.4.1

Emergency Notifications

(Minor 002)

13.5.1

Local, Protected Area or Site Evacuation

(Minor 001)

13.8.1

Emergency Dose Projection System Operations

26525

OSC Health Physics Lead Checklist

SWP-CAP-6

Condition Report Review

Energy Northwest, Columbia Generating Station, ERO

Team "B" Exercise, March 26, 2024

01/18/2024

Energy Northwest, Columbia Generating Station, Plume

Phase Exercise, October 25, 2022

08/17/2022

Miscellaneous

Energy Northwest, Columbia Generating Station, Plume

Phase Exercise, March 24, 2020

01/21/2020

13.1.1A

Classifying The Emergency - Technical Bases

(Minor 02)

13.2.2

Determining Protective Action Recommendations

(Minor 02)

13.4.1

Emergency Notifications

(Minor 01)

71114.08

Procedures

13.8.1

Emergency Dose Projection System Operation

Corrective Action

Documents

Action Requests

440338, 444047, 451768, 452196

Columbia Generating Station, Alert and Notification System

(ANS) Design Report, Revision 2

11/14/2016

Drill, Exercise, and Actual Events Opportunity Evaluation -

PQD Code LR002579, Event #2023-01

01/30/2023

Drill, Exercise, and Actual Events Opportunity Evaluation -

PQD Code LR002537, Event #2023-11

04/04/2023

Drill, Exercise, and Actual Events Opportunity Evaluation -

PQD Code LR002597, Event #2023-24

09/06/2023

71151

Miscellaneous

Drill, Exercise, and Actual Events Opportunity Evaluation -

11/20/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

PQD Code L#E000050, Event #2023-27

13.1.1A

Classifying the Emergency - Technical Bases

(Minor 002)

EPI-18

Emergency Preparedness Performance Indicators

TSI-6.2.22

EP Annual Emergency Response Siren System Activation

Test

(Minor 002)

Procedures

TSI-6.2.32

EP Siren Polling Test

(Minor 002)

71152S

Corrective Action

Documents

Action Requests

2870, 453346, 454585, 454897, 455030, 455075, 455140