{{#Wiki_filter:}} | {{#Wiki_filter:Catawba Nuclear Station UFSAR Appendix 2B. Figures Appendix 2B. Figures | ||
Catawba Nuclear Station UFSAR Figure 2-1 (Page 1 of 1) | |||
Figure 2-1. Regional Location HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED A copy of this figure is located in the licensing file. Regional location information is provided in Figures 1-1 and 2-2. Topographical information is provided in Figures 2-67 to 2-77. | |||
(24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-2 (Page 1 of 1) | |||
Figure 2-2. Site Location HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-3 (Page 1 of 1) | |||
Figure 2-3. Site Area HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED Security-Related Information Withhold under10 CFR 2.39 (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-4 (Page 1 of 1) | |||
Figure 2-4. Release Points HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-5 (Page 1 of 1) | |||
Figure 2-5. Significant Population Groupings, Ten Miles | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-6 (Page 1 of 1) | |||
Figure 2-6. Significant Population Groupings, Fifty Miles | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-7 (Page 1 of 1) | |||
Figure 2-7. Vicinity Topography HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-8 (Page 1 of 1) | |||
Figure 2-8. Five Mile (Eight Kilometer) Area HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-9 (Page 1 of 1) | |||
Figure 2-9. Population Centers | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-10 (Page 1 of 1) | |||
Figure 2-10. Cumulative Population, Year of Plant Start-Up | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-11 (Page 1 of 1) | |||
Figure 2-11. Cumulative Population, End of Plant Life HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-12 (Page 1 of 1) | |||
Figure 2-12. Locations and Routes HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-13 (Page 1 of 1) | |||
Figure 2-13. Tornado Frequency 1916 - 1955 | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-14 (Page 1 of 1) | |||
Figure 2-14. Visible Plume Length Frequency (June - November) | |||
HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-15 (Page 1 of 1) | |||
Figure 2-15. Visible Plume Length Frequency (December - May) | |||
HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-16 (Page 1 of 2) | |||
Figure 2-16. Vicinity Topography - Profile | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-16 (Page 2 of 2) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-17 (Page 1 of 1) | |||
Figure 2-17. Relative Elevations of Meteorological Instruments (22 OCT 2001) | |||
Catawba Nuclear Station UFSAR Figure 2-18 (Page 1 of 1) | |||
Figure 2-18. Cumulative Frequency Distribution of Hourly Dilution Factors at the Exclusion Area Boundary (Northeast Sector) for Short Term Accident (X/Q)s HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-19 (Page 1 of 1) | |||
Figure 2-19. Cumulative Frequency Distribution of Hourly Dilution Factors at the Low Population Zone Boundary (Northeast Sector) for Short Term Accident (X/Q)s (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-20 (Page 1 of 1) | |||
Figure 2-20. Site Earthwork HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED Security-Related Information Withhold under10 CFR 2.39 (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-21 (Page 1 of 1) | |||
Figure 2-21. Plan-Profile of Catawba River | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-22 (Page 1 of 1) | |||
Figure 2-22. Surface Water Users HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Security-Related Information Withhold under10 CFR 2.39 Security-Related Information Withhold under10 CFR 2.39 Catawba Nuclear Station UFSAR Figure 2-25 (Page 1 of 1) | |||
Figure 2-25. Catch Basin Inlet Details HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-26 (Page 1 of 1) | |||
Figure 2-26. Administration and Security Fence Base Details HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-27 (Page 1 of 1) | |||
Figure 2-27. Local Intense Precipitation PMP Flood Routing Using Puls Graphical Method HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (18 APR 2009) | |||
Catawba Nuclear Station UFSAR Figure 2-28 (Page 1 of 1) | |||
Figure 2-28. PMP Flood Routing; Type I Inlets - 100% Efficient; Type II Inlets - 100% Efficient HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (18 ARP 2009) | |||
Catawba Nuclear Station UFSAR Figure 2-29 (Page 1 of 1) | |||
Figure 2-29. PMP Flood Routing; Type I Inlets - 100% Efficient; Type II Inlets - 50% Efficient HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (18 APR 2009) | |||
Catawba Nuclear Station UFSAR Figure 2-30 (Page 1 of 1) | |||
Figure 2-30. PMP Flood Routing; Type I Inlets - 100% Efficient; Type II Inlets - 0% Efficient HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (18 APR 2009) | |||
Catawba Nuclear Station UFSAR Figure 2-31 (Page 1 of 1) | |||
Figure 2-31. PMP Flood Routing; Switchyard HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (18 APR 2009) | |||
Catawba Nuclear Station UFSAR Figure 2-32 (Page 1 of 1) | |||
Figure 2-32. PMP Flood Routing; Cooling Tower Yard HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (18 APR 2009) | |||
Catawba Nuclear Station UFSAR Figure 2-33 (Page 1 of 1) | |||
Figure 2-33. Deleted Per 2009 Update (18 APR 2009) | |||
Catawba Nuclear Station UFSAR Figure 2-34 (Page 1 of 1) | |||
Figure 2-34. Probable Maximum Precipitation HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-35 (Page 1 of 1) | |||
Figure 2-35. Basin Subareas and Thiessen Polygons and Isohyetal Map for Probable Maximum Precipitation HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-36 (Page 1 of 1) | |||
Figure 2-36. Lag Time HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-37 (Page 1 of 1) | |||
Figure 2-37. Basin Subarea Unit Hydrographs HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-38 (Page 1 of 1) | |||
Figure 2-38. Reservoir Inflows, Outflows, and Elevations for Wylie Reservoir HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-39 (Page 1 of 1) | |||
Figure 2-39. PMF Hydrograph, Lake Wylie HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-40 (Page 1 of 1) | |||
Figure 2-40. Fetch Map HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-41 (Page 1 of 1) | |||
Figure 2-41. Wylie Reservoir Inflows, Outflows and Elevations HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-42 (Page 1 of 1) | |||
Figure 2-42. SNSW PMF Hydrographs HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Security-Related Information Withhold under10 CFR 2.39 Catawba Nuclear Station UFSAR Figure 2-44 (Page 1 of 3) | |||
Figure 2-44. LPSW Intake Structure HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-44 (Page 2 of 3) | |||
(24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-44 (Page 3 of 3) | |||
Security-Related Information Withhold under10 CFR 2.39 (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-45 (Page 1 of 1) | |||
Figure 2-45. NSW and SNSW Discharge Structures HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-46 (Page 1 of 1) | |||
Figure 2-46. SNSW Intake Structure HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-47 (Page 1 of 1) | |||
Figure 2-47. Location of Wells Surveyed HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-48 (Page 1 of 1) | |||
Figure 2-48. Groundwater Users HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-49 (Page 1 of 1) | |||
Figure 2-49. River Bank Wells HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-50 (Page 1 of 1) | |||
Figure 2-50. Reconstruction Groundwater Contour Map HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED SSecurity-Related Information Withhold under10 CFR 2.39 (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-51 (Page 1 of 1) | |||
Figure 2-51. Site Cross-Section HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-52 (Page 1 of 1) | |||
Figure 2-52. Monthly Groundwater Hydrograph (October, 1973 to September, 1977) | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-53 (Page 1 of 1) | |||
Figure 2-53. Groundwater Level, Daily Rainfall and Lake Level | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-54 (Page 1 of 1) | |||
Figure 2-54. Schematic Equipment Arrangement for Rock Permeability Testing | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-55 (Page 1 of 1) | |||
Figure 2-55. Schematic Equipment Arrangement for Soil Permeability Testing | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-56 (Page 1 of 1) | |||
Figure 2-56. Pumping Test No. 1 - A85-TW Location, Plan | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-57 (Page 1 of 1) | |||
Figure 2-57. Pumping Test No. 2 - A48TW Location, Plan | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-58 (Page 1 of 1) | |||
Figure 2-58. Core of Depression - Pumping Test 1 | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-59 (Page 1 of 1) | |||
Figure 2-59. Core of Depression - Pumping Test 2 | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-60 (Page 1 of 1) | |||
Figure 2-60. Auxiliary and Reactor Building Groundwater Drainage System SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-61 (Page 1 of 1) | |||
Figure 2-61. Auxiliary and Reactor Building Groundwater Drainage System HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-62 (Page 1 of 1) | |||
Figure 2-62. Plot of Water Level at Structure Versus Rebound Time HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-63 (Page 1 of 1) | |||
Figure 2-63. Auxiliary and Reactor Building Groundwater Drainage System HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-64 (Page 1 of 1) | |||
Figure 2-64. Auxiliary and Reactor Building Groundwater Drainage System HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-65 (Page 1 of 2) | |||
Figure 2-65. Powerhouse Foundation SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 (27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-65 (Page 2 of 2) | |||
SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 (27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-66 (Page 1 of 1) | |||
Figure 2-66. Location of Compacted Backfill (Powerhouse Area) | |||
(22 OCT 2001) | |||
Catawba Nuclear Station UFSAR Figure 2-67 (Page 1 of 1) | |||
Figure 2-67. Regional Physiographic Map | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-68 (Page 1 of 1) | |||
Figure 2-68. Regional Geologic Map | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-69 (Page 1 of 1) | |||
Figure 2-69. Regional Tectonic Map | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-70 (Page 1 of 1) | |||
Figure 2-70. Regional Geologic Cross-Section | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-71 (Page 1 of 3) | |||
Figure 2-71. Regional Aeromagnetic Map | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-71 (Page 2 of 3) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-71 (Page 3 of 3) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-72 (Page 1 of 1) | |||
Figure 2-72. Regional Bouguer Gravity Anomaly Map | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-73 (Page 1 of 1) | |||
Figure 2-73. Subregional Geologic Index | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-74 (Page 1 of 1) | |||
Figure 2-74. Regional Linear Features Map | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-75 (Page 1 of 1) | |||
Figure 2-75. Subregional Geologic Map | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-76 (Page 1 of 1) | |||
Figure 2-76. Subregional Drainage Map with Linear Stream Segments | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-77 (Page 1 of 1) | |||
Figure 2-77. Regional In Situ Stresses | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-78 (Page 1 of 1) | |||
Figure 2-78. Boring Location Plan | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-79 (Page 1 of 1) | |||
Figure 2-79. Boring Location Plan | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-80 (Page 1 of 1) | |||
Figure 2-80. Subsurface Profiles | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-81 (Page 1 of 1) | |||
Figure 2-81. Subsurface Profiles | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-82 (Page 1 of 1) | |||
Figure 2-82. Subsurface Profiles | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-83 (Page 1 of 1) | |||
Figure 2-83. Subsurface Profiles | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-84 (Page 1 of 1) | |||
Figure 2-84. Subsurface Profiles | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-85 (Page 1 of 1) | |||
Figure 2-85. Subsurface Profiles | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-86 (Page 1 of 1) | |||
Figure 2-86. Subsurface Profiles | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-87 (Page 1 of 1) | |||
Figure 2-87. Subsurface Profiles | |||
[HISTORICAL INFORMAITON NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-88 (Page 1 of 1) | |||
Figure 2-88. Subsurface Profiles | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-89 (Page 1 of 1) | |||
Figure 2-89. Subsurface Profiles | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-90 (Page 1 of 1) | |||
Figure 2-90. Subsurface Profiles | |||
[HISTORICAL INFORMATION NOT REQUIRD TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-91 (Page 1 of 1) | |||
Figure 2-91. Subsurface Profiles | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-92 (Page 1 of 1) | |||
Figure 2-92. Subsurface Profiles | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-93 (Page 1 of 1) | |||
Figure 2-93. Subsurface Profiles | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-94 (Page 1 of 1) | |||
Figure 2-94. Seismic Refraction Traverses | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-95 (Page 1 of 1) | |||
Figure 2-95. Seismic Refraction Traverses | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-96 (Page 1 of 1) | |||
Figure 2-96. Seismic Refraction Traverses | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-97 (Page 1 of 1) | |||
Figure 2-97. Seismic Refraction Traverses | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-98 (Page 1 of 1) | |||
Figure 2-98. Uphole Seismic Data, Boring A-61 | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-99 (Page 1 of 1) | |||
Figure 2-99. Uphole Seismic Data, Boring A-63 | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-100 (Page 1 of 1) | |||
Figure 2-100. Contours on Top of Continous Rock | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-101 (Page 1 of 5) | |||
Figure 2-101. Equal Area Projections of Poles to Planes - Powerhouse Excavation | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-101 (Page 2 of 5) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-101 (Page 3 of 5) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-101 (Page 4 of 5) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-101 (Page 5 of 5) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-102 (Page 1 of 5) | |||
Figure 2-102. Equal Area Projections of Poles to Planes - SNSW Pond Dam Excavations | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-102 (Page 2 of 5) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-102 (Page 3 of 5) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-102 (Page 4 of 5) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-102 (Page 5 of 5) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-103 (Page 1 of 1) | |||
Figure 2-103. Geologic Map of Powerhouse Excavation - Reactor and Auxiliary Building Area | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
A copy of this figure is located in the licensing file. | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-104 (Page 1 of 1) | |||
Figure 2-104. Geologic Map of Powerhouse Excavation - Turbine and Service Building Area | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
A copy of this figure is located in the licensing file. | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-105 (Page 1 of 1) | |||
Figure 2-105. Geologic Map of SNSW Pond Dam Excavation | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
A copy of this figure is located in the licensing file. | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-106 (Page 1 of 1) | |||
Figure 2-106. Regional Epicenter Map | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-107 (Page 1 of 1) | |||
Figure 2-107. Epicenters of Earthquakes Located Within 50-Mile Radius of the Site | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-108 (Page 1 of 1) | |||
Figure 2-108. Epicenters of Earthquakes Probably Felt at the Catawba Site | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-109 (Page 1 of 1) | |||
Figure 2-109. Acceleration - Intensity Relationships | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-110 (Page 1 of 4) | |||
Figure 2-110. Design Response Spectra, .08g HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-110 (Page 2 of 4) | |||
(24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-110 (Page 3 of 4) | |||
(24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-110 (Page 4 of 4) | |||
(24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-111 (Page 1 of 1) | |||
Figure 2-111. Design Response Spectra, .08g HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-112 (Page 1 of 1) | |||
Figure 2-112. Design Response Spectra, .15g HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-113 (Page 1 of 2) | |||
Figure 2-113. Design Response Spectra, 25 feet of Overburden, .08g at Rock HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-113 (Page 2 of 2) | |||
(24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-114 (Page 1 of 1) | |||
Figure 2-114. Actual Foundation Conditions at Structures Designed Using Response Spectrum Computed for 25 FT. of Overburden (Fill) | |||
HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-115 (Page 1 of 1) | |||
Figure 2-115. Soil Columns for Unit 2 Fuel Oil Storage Tanks and Unit 2 Above Ground Storage Tank (22 OCT 2001) | |||
Catawba Nuclear Station UFSAR Figure 2-116 (Page 1 of 1) | |||
Figure 2-116. Comparison of Computed Response Spectra and Design Response Spectrum HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-117 (Page 1 of 1) | |||
Figure 2-117. Location Plan for Seismic Refraction Lines on Rock In Powehouse Excavation HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-118 (Page 1 of 1) | |||
Figure 2-118. Results of Seismic Refraction Lines - NSW Intake Structure and NSW Pump Structure | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-119 (Page 1 of 4) | |||
Figure 2-119. Seismic Refraction Profiles - NSW Pipe Lines | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-119 (Page 2 of 4) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-119 (Page 3 of 4) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-119 (Page 4 of 4) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-120 (Page 1 of 3) | |||
Figure 2-120. Results of Seismic Refraction Lines in Powerhouse Excavation | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-120 (Page 2 of 3) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-120 (Page 3 of 3) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-121 (Page 1 of 1) | |||
Figure 2-121. Summary of Grain Size Distribution of Residual Soils from Adamellite | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-122 (Page 1 of 1) | |||
Figure 2-122. Summary of Optimum Moisture and Maximum Dry Density of Residual Soils from Plant Area | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-123 (Page 1 of 3) | |||
Figure 2-123. Typical Consolidation Test Results of Compacted Residual Soils from Plant Area | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-123 (Page 2 of 3) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-123 (Page 3 of 3) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-124 (Page 1 of 3) | |||
Figure 2-124. Summary of Consolidation Characteristics of Partially Weathered Rock Materials | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-124 (Page 2 of 3) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-124 (Page 3 of 3) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-125 (Page 1 of 3) | |||
Figure 2-125. Summary of Mohr Diagrams of Compacted Residual Soils from Plant Area | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-125 (Page 2 of 3) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-125 (Page 3 of 3) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-126 (Page 1 of 3) | |||
Figure 2-126. Summary of Mohr Diagrams for Partially Weathered Rock Materials | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-126 (Page 2 of 3) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-126 (Page 3 of 3) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-127 (Page 1 of 3) | |||
Figure 2-127. Summary of Stress-Strain Data on Rock Core | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-127 (Page 2 of 3) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-127 (Page 3 of 3) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-128 (Page 1 of 1) | |||
Figure 2-128. Summary of Rock Test Data From Plant Area Substructure Excavation | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-129 (Page 1 of 1) | |||
Figure 2-129. Dynamic Moduli of Foundation Materials - Plant Area | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-130 (Page 1 of 1) | |||
Figure 2-130. Contours of Plant Excavation Bottom at Start of Blasting | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-131 (Page 1 of 1) | |||
Figure 2-131. Soil Column Analysis - NSW Pipeline HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-132 (Page 1 of 3) | |||
Figure 2-132. Sections Through Powerhouse HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-132 (Page 2 of 3) | |||
(24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-132 (Page 3 of 3) | |||
(24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-133 (Page 1 of 1) | |||
Figure 2-133. Cross Sections Through NSW and SNSW Pump Structure and Diesel Fuel Oil Storage Tanks HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-134 (Page 1 of 1) | |||
Figure 2-134. Selected Subsurface Profiles Through NSW Pipe Lines HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-135 (Page 1 of 1) | |||
Figure 2-135. Earth Pressure Distribution on Subsurface Walls HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-136 (Page 1 of 1) | |||
Figure 2-136. Number of Moisture Tests Versus Moisture Content for Compacted Group I Backfill HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-137 (Page 1 of 1) | |||
Figure 2-137. Number of Compaction Tests Versus Percent Compaction for Group I Backfill HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-138 (Page 1 of 1) | |||
Figure 2-138. Number of Compaction Tests Versus Relative Density for Granular Backfill HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-139 (Page 1 of 4) | |||
Figure 2-139. Nuclear Service Water System Yard Layout - Longitudinal Profiles HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-139 (Page 2 of 4) | |||
(24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-139 (Page 3 of 4) | |||
(24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-139 (Page 4 of 4) | |||
(24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-140 (Page 1 of 1) | |||
Figure 2-140. Typical Section, Standby Nuclear Service Water Pond Dam HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-141 (Page 1 of 1) | |||
Figure 2-141. Standby Nuclear Service Water Pond Dam, Details HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-142 (Page 1 of 1) | |||
Figure 2-142. Plan, Standby Nuclear Service Water Pond Dam HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-143 (Page 1 of 2) | |||
Figure 2-143. Profile of Standby Nuclear Service Water Pond Outlet Works HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-143 (Page 2 of 2) | |||
(24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-144 (Page 1 of 1) | |||
Figure 2-144. Boring Location Plan, Standby Nuclear Service Water Pond Dam | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-145 (Page 1 of 2) | |||
Figure 2-145. Section Along Axis of Plan Standby Nuclear Service Water Pond Dam HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-145 (Page 2 of 2) | |||
(24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-146 (Page 1 of 1) | |||
Figure 2-146. Section A-87 Through A-96, South of Standby Nuclear Service Water Pond Dam HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-147 (Page 1 of 1) | |||
Figure 2-147. Section A-103 S1 Through A-103 S2, Standby Nuclear Service Water Pond Dam HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-148 (Page 1 of 1) | |||
Figure 2-148. Standby Nuclear Service Water Pond Dam, Section A-116 Through A-119 HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-149 (Page 1 of 1) | |||
Figure 2-149. Standby Nuclear Service Water Pond Dam, Section A-117 Through A-118 HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-150 (Page 1 of 1) | |||
Figure 2-150. Summary of Grain Size Distribution, Residual Soils at Standby Nuclear Service Water Pond Dam - Foundation Saprolites | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-151 (Page 1 of 3) | |||
Figure 2-151. Summary of Mohr Diagrams for Foundation Soils, Standby Nuclear Service Water Pond Dam | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-151 (Page 2 of 3) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-151 (Page 3 of 3) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-152 (Page 1 of 4) | |||
Figure 2-152. Cyclic Triaxial Strength Results | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-152 (Page 2 of 4) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-152 (Page 3 of 4) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-152 (Page 4 of 4) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-153 (Page 1 of 1) | |||
Figure 2-153. Cyclic Strength of Soils | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-154 (Page 1 of 2) | |||
Figure 2-154. Summary of Consolidation Characteristics for Residual Soils, Standby Nuclear Service Water Pond Dam | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-154 (Page 2 of 2) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-155 (Page 1 of 1) | |||
Figure 2-155. Cross Hole Seismic Data, Boring A-103 | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-156 (Page 1 of 1) | |||
Figure 2-156. Cross Hole Seismic Data, Boring A-105 | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-157 (Page 1 of 1) | |||
Figure 2-157. Dynamic Tests on Foundation Soils | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-158 (Page 1 of 4) | |||
Figure 2-158. Summary of Mohr Diagrams of Partially Weathered Rock | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-158 (Page 2 of 4) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-158 (Page 3 of 4) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-158 (Page 4 of 4) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-159 (Page 1 of 1) | |||
Figure 2-159. Standby Nuclear Service Water Pond Dam Foundation Plan HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-160 (Page 1 of 1) | |||
Figure 2-160. Standby Nuclear Service Water Pond Dam Foundation Bedrock-South Abutment HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-161 (Page 1 of 1) | |||
Figure 2-161. Standby Nuclear Service Water Pond Dam Fill Sources and Quantities Placed Versus Date | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-162 (Page 1 of 1) | |||
Figure 2-162. Summary Grain Size Distribution, Residual Sands - General Borrow Areas Investigated for PSAR | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-163 (Page 1 of 1) | |||
Figure 2-163. Summary Grain Size Distribution Residual Soils- Silty Sands, SNSW Pond Dam Embankment Borrow Area Utilized | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-164 (Page 1 of 1) | |||
Figure 2-164. Earth Embankment Material, Grain Size Distribution, Standby Nuclear Service Water Pond Dam | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-165 (Page 1 of 1) | |||
Figure 2-165. Optimum Moisture, Maximum Dry Density for Soil During PSAR Investigation and Borrow Area Studies, Standby Nuclear Service Water Pond Dam | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-166 (Page 1 of 1) | |||
Figure 2-166. Dry Density versus Optimum Moisture Content, From Proctor Tests on Soils Placed on SNSW Pond Dam | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-167 (Page 1 of 4) | |||
Figure 2-167. Summary of Mohr Diagrams of Structural Fill Obtained During PSAR Investigations | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-167 (Page 2 of 4) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-167 (Page 3 of 4) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-167 (Page 4 of 4) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-168 (Page 1 of 4) | |||
Figure 2-168. Summary of Mohr Diagrams of Structural Fill from Borrow Areas Used for Standby Nuclear Service Water Pond Dam Embankment | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-168 (Page 2 of 4) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-168 (Page 3 of 4) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-168 (Page 4 of 4) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-169 (Page 1 of 2) | |||
Figure 2-169. Summary of Mohr Diagrams for Structural Fill Sampled from Standby Nuclear Service Water Pond Embankment | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-169 (Page 2 of 2) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-170 (Page 1 of 4) | |||
Figure 2-170. Distribution of Field Density Tests with Percent Compaction on Standby Nuclear Service Water Pond Dam Embankment | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-170 (Page 2 of 4) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-170 (Page 3 of 4) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-170 (Page 4 of 4) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-171 (Page 1 of 3) | |||
Figure 2-171. Typical Consolidation Tests of Compacted Soils Obtained During PSAR Investigation and from Borrow Areas Used for Standby Nuclear Service Water Pond Dam Embankment | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-171 (Page 2 of 3) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-171 (Page 3 of 3) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-172 (Page 1 of 1) | |||
Figure 2-172. Slope Protection, Filter layer, Grain Size Distribution | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-173 (Page 1 of 1) | |||
Figure 2-173. Number of Moisture Tests Versus Moisture Content for Standby Nuclear Service Water Pond Dam | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-174 (Page 1 of 1) | |||
Figure 2-174. Number of Moisture Tests Versus Moisture Content for Standby Nuclear Service Water Pond Dam | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-175 (Page 1 of 1) | |||
Figure 2-175. Number of Compaction Tests Versus Percent Compaction for Standby Nuclear Service Water Pond Dam | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-176 (Page 1 of 1) | |||
Figure 2-176. Blanket Drain Course. Filter, Density Test Distribution | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-177 (Page 1 of 2) | |||
Figure 2-177. Blanket Drain Top Layer Fine Filter Density Test Distribution | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-177 (Page 2 of 2) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-178 (Page 1 of 1) | |||
Figure 2-178. Blanket Drain, Coarse Fitler, Grain Size Distribution | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-179 (Page 1 of 1) | |||
Figure 2-179. Blanket Drain, Fine Filter-Top Layer, Grain Size Distribution | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-180 (Page 1 of 1) | |||
Figure 2-180. Blanket Drain, Fine Filter-Bottom Layer, Grain Size Distribution | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-181 (Page 1 of 1) | |||
Figure 2-181. Cross-Section for Stability Analysis (22 OCT 2001) | |||
Catawba Nuclear Station UFSAR Figure 2-182 (Page 1 of 1) | |||
Figure 2-182. Dynamic Modulus for Embankment and Foundation Materials HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-183 (Page 1 of 1) | |||
Figure 2-183. Dynamic Modulus and Combining Pressure for Foundation Soils - Saprolites HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-184 (Page 1 of 1) | |||
Figure 2-184. Failure Surfaces of Lowest Safety Factor - Static Analysis HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-185 (Page 1 of 1) | |||
Figure 2-185. Finite Element Representation HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-186 (Page 1 of 1) | |||
Figure 2-186. Static Finite Element Analysis, Vertical Effective Normal Stress in Embankment HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-187 (Page 1 of 1) | |||
Figure 2-187. Static Finite Element Analysis, Horizontal Shear Stress in Embankment HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-188 (Page 1 of 1) | |||
Figure 2-188. Static Finite Element Analysis, Principal Stress Ratios in Embankment HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-189 (Page 1 of 1) | |||
Figure 2-189. Cyclic Triaxial Tests - Typical Strain and Pore Pressure Data (Remolded Samples) | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-190 (Page 1 of 1) | |||
Figure 2-190. Variation of Damping for Embankment and Foundation Materials | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-191 (Page 1 of 1) | |||
Figure 2-191. Variation of Modulus for Embankment and Foundation Materials | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-192 (Page 1 of 1) | |||
Figure 2-192. Dynamic Tests on Embankment Materials | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-193 (Page 1 of 1) | |||
Figure 2-193. Time History of Synthetic EQ-1 | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-194 (Page 1 of 1) | |||
Figure 2-194. Time History of Synthetic EQ-2 | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-195 (Page 1 of 1) | |||
Figure 2-195. Time History of Synthetic EQ-3 | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-196 (Page 1 of 1) | |||
Figure 2-196. Time History of Synthetic EQ-4 | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-197 (Page 1 of 1) | |||
Figure 2-197. Failure Potential Under Cyclic Loading | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-198 (Page 1 of 1) | |||
Figure 2-198. Seismic Coefficient SNSW Pond Dam HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-199 (Page 1 of 1) | |||
Figure 2-199. Standby Nuclear Service Water Pond Dam Instrumentation Details HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-200 (Page 1 of 1) | |||
Figure 2-200. Local Safety Factors Against 5% Strain HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-201 (Page 1 of 5) | |||
Figure 2-201. SNSW Pond Dam Piezometric Readings | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-201 (Page 2 of 5) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-201 (Page 3 of 5) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-201 (Page 4 of 5) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-201 (Page 5 of 5) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-202 (Page 1 of 12) | |||
Figure 2-202. SNSW Pond Dam Settlement Versus Time | |||
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED] | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-202 (Page 2 of 12) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-202 (Page 3 of 12) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-202 (Page 4 of 12) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-202 (Page 5 of 12) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-202 (Page 6 of 12) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-202 (Page 7 of 12) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-202 (Page 8 of 12) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-202 (Page 9 of 12) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-202 (Page 10 of 12) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-202 (Page 11 of 12) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-202 (Page 12 of 12) | |||
(27 MAR 2003) | |||
Catawba Nuclear Station UFSAR Figure 2-203 (Page 1 of 1) | |||
Figure 2-203. SNSW Pond Dam Crest Elevation HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004) | |||
Catawba Nuclear Station UFSAR Figure 2-204 (Page 1 of 1) | |||
Figure 2-204. Design Response Spectrum for Direct Generation (22 OCT 2001)}} |
Latest revision as of 17:21, 18 January 2022
ML21229A015 | |
Person / Time | |
---|---|
Site: | Catawba |
Issue date: | 10/24/2004 |
From: | Duke Energy Carolinas |
To: | Division of Operating Reactor Licensing |
Stone Z | |
Shared Package | |
ML21228A237 | List: |
References | |
Download: ML21229A015 (282) | |
Text
Catawba Nuclear Station UFSAR Appendix 2B. Figures Appendix 2B. Figures
Catawba Nuclear Station UFSAR Figure 2-1 (Page 1 of 1)
Figure 2-1. Regional Location HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED A copy of this figure is located in the licensing file. Regional location information is provided in Figures 1-1 and 2-2. Topographical information is provided in Figures 2-67 to 2-77.
(24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-2 (Page 1 of 1)
Figure 2-2. Site Location HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-3 (Page 1 of 1)
Figure 2-3. Site Area HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED Security-Related Information Withhold under10 CFR 2.39 (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-4 (Page 1 of 1)
Figure 2-4. Release Points HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-5 (Page 1 of 1)
Figure 2-5. Significant Population Groupings, Ten Miles
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-6 (Page 1 of 1)
Figure 2-6. Significant Population Groupings, Fifty Miles
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-7 (Page 1 of 1)
Figure 2-7. Vicinity Topography HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-8 (Page 1 of 1)
Figure 2-8. Five Mile (Eight Kilometer) Area HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-9 (Page 1 of 1)
Figure 2-9. Population Centers
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-10 (Page 1 of 1)
Figure 2-10. Cumulative Population, Year of Plant Start-Up
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-11 (Page 1 of 1)
Figure 2-11. Cumulative Population, End of Plant Life HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-12 (Page 1 of 1)
Figure 2-12. Locations and Routes HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-13 (Page 1 of 1)
Figure 2-13. Tornado Frequency 1916 - 1955
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-14 (Page 1 of 1)
Figure 2-14. Visible Plume Length Frequency (June - November)
HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-15 (Page 1 of 1)
Figure 2-15. Visible Plume Length Frequency (December - May)
HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-16 (Page 1 of 2)
Figure 2-16. Vicinity Topography - Profile
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-16 (Page 2 of 2)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-17 (Page 1 of 1)
Figure 2-17. Relative Elevations of Meteorological Instruments (22 OCT 2001)
Catawba Nuclear Station UFSAR Figure 2-18 (Page 1 of 1)
Figure 2-18. Cumulative Frequency Distribution of Hourly Dilution Factors at the Exclusion Area Boundary (Northeast Sector) for Short Term Accident (X/Q)s HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-19 (Page 1 of 1)
Figure 2-19. Cumulative Frequency Distribution of Hourly Dilution Factors at the Low Population Zone Boundary (Northeast Sector) for Short Term Accident (X/Q)s (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-20 (Page 1 of 1)
Figure 2-20. Site Earthwork HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED Security-Related Information Withhold under10 CFR 2.39 (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-21 (Page 1 of 1)
Figure 2-21. Plan-Profile of Catawba River
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-22 (Page 1 of 1)
Figure 2-22. Surface Water Users HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Security-Related Information Withhold under10 CFR 2.39 Security-Related Information Withhold under10 CFR 2.39 Catawba Nuclear Station UFSAR Figure 2-25 (Page 1 of 1)
Figure 2-25. Catch Basin Inlet Details HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-26 (Page 1 of 1)
Figure 2-26. Administration and Security Fence Base Details HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-27 (Page 1 of 1)
Figure 2-27. Local Intense Precipitation PMP Flood Routing Using Puls Graphical Method HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (18 APR 2009)
Catawba Nuclear Station UFSAR Figure 2-28 (Page 1 of 1)
Figure 2-28. PMP Flood Routing; Type I Inlets - 100% Efficient; Type II Inlets - 100% Efficient HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (18 ARP 2009)
Catawba Nuclear Station UFSAR Figure 2-29 (Page 1 of 1)
Figure 2-29. PMP Flood Routing; Type I Inlets - 100% Efficient; Type II Inlets - 50% Efficient HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (18 APR 2009)
Catawba Nuclear Station UFSAR Figure 2-30 (Page 1 of 1)
Figure 2-30. PMP Flood Routing; Type I Inlets - 100% Efficient; Type II Inlets - 0% Efficient HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (18 APR 2009)
Catawba Nuclear Station UFSAR Figure 2-31 (Page 1 of 1)
Figure 2-31. PMP Flood Routing; Switchyard HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (18 APR 2009)
Catawba Nuclear Station UFSAR Figure 2-32 (Page 1 of 1)
Figure 2-32. PMP Flood Routing; Cooling Tower Yard HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (18 APR 2009)
Catawba Nuclear Station UFSAR Figure 2-33 (Page 1 of 1)
Figure 2-33. Deleted Per 2009 Update (18 APR 2009)
Catawba Nuclear Station UFSAR Figure 2-34 (Page 1 of 1)
Figure 2-34. Probable Maximum Precipitation HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-35 (Page 1 of 1)
Figure 2-35. Basin Subareas and Thiessen Polygons and Isohyetal Map for Probable Maximum Precipitation HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-36 (Page 1 of 1)
Figure 2-36. Lag Time HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-37 (Page 1 of 1)
Figure 2-37. Basin Subarea Unit Hydrographs HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-38 (Page 1 of 1)
Figure 2-38. Reservoir Inflows, Outflows, and Elevations for Wylie Reservoir HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-39 (Page 1 of 1)
Figure 2-39. PMF Hydrograph, Lake Wylie HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-40 (Page 1 of 1)
Figure 2-40. Fetch Map HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-41 (Page 1 of 1)
Figure 2-41. Wylie Reservoir Inflows, Outflows and Elevations HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-42 (Page 1 of 1)
Figure 2-42. SNSW PMF Hydrographs HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Security-Related Information Withhold under10 CFR 2.39 Catawba Nuclear Station UFSAR Figure 2-44 (Page 1 of 3)
Figure 2-44. LPSW Intake Structure HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-44 (Page 2 of 3)
(24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-44 (Page 3 of 3)
Security-Related Information Withhold under10 CFR 2.39 (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-45 (Page 1 of 1)
Figure 2-45. NSW and SNSW Discharge Structures HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-46 (Page 1 of 1)
Figure 2-46. SNSW Intake Structure HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-47 (Page 1 of 1)
Figure 2-47. Location of Wells Surveyed HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-48 (Page 1 of 1)
Figure 2-48. Groundwater Users HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-49 (Page 1 of 1)
Figure 2-49. River Bank Wells HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-50 (Page 1 of 1)
Figure 2-50. Reconstruction Groundwater Contour Map HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED SSecurity-Related Information Withhold under10 CFR 2.39 (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-51 (Page 1 of 1)
Figure 2-51. Site Cross-Section HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-52 (Page 1 of 1)
Figure 2-52. Monthly Groundwater Hydrograph (October, 1973 to September, 1977)
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-53 (Page 1 of 1)
Figure 2-53. Groundwater Level, Daily Rainfall and Lake Level
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-54 (Page 1 of 1)
Figure 2-54. Schematic Equipment Arrangement for Rock Permeability Testing
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-55 (Page 1 of 1)
Figure 2-55. Schematic Equipment Arrangement for Soil Permeability Testing
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-56 (Page 1 of 1)
Figure 2-56. Pumping Test No. 1 - A85-TW Location, Plan
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-57 (Page 1 of 1)
Figure 2-57. Pumping Test No. 2 - A48TW Location, Plan
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-58 (Page 1 of 1)
Figure 2-58. Core of Depression - Pumping Test 1
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-59 (Page 1 of 1)
Figure 2-59. Core of Depression - Pumping Test 2
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-60 (Page 1 of 1)
Figure 2-60. Auxiliary and Reactor Building Groundwater Drainage System SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-61 (Page 1 of 1)
Figure 2-61. Auxiliary and Reactor Building Groundwater Drainage System HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-62 (Page 1 of 1)
Figure 2-62. Plot of Water Level at Structure Versus Rebound Time HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-63 (Page 1 of 1)
Figure 2-63. Auxiliary and Reactor Building Groundwater Drainage System HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-64 (Page 1 of 1)
Figure 2-64. Auxiliary and Reactor Building Groundwater Drainage System HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-65 (Page 1 of 2)
Figure 2-65. Powerhouse Foundation SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 (27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-65 (Page 2 of 2)
SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 (27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-66 (Page 1 of 1)
Figure 2-66. Location of Compacted Backfill (Powerhouse Area)
(22 OCT 2001)
Catawba Nuclear Station UFSAR Figure 2-67 (Page 1 of 1)
Figure 2-67. Regional Physiographic Map
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-68 (Page 1 of 1)
Figure 2-68. Regional Geologic Map
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-69 (Page 1 of 1)
Figure 2-69. Regional Tectonic Map
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-70 (Page 1 of 1)
Figure 2-70. Regional Geologic Cross-Section
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-71 (Page 1 of 3)
Figure 2-71. Regional Aeromagnetic Map
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-71 (Page 2 of 3)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-71 (Page 3 of 3)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-72 (Page 1 of 1)
Figure 2-72. Regional Bouguer Gravity Anomaly Map
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-73 (Page 1 of 1)
Figure 2-73. Subregional Geologic Index
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-74 (Page 1 of 1)
Figure 2-74. Regional Linear Features Map
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-75 (Page 1 of 1)
Figure 2-75. Subregional Geologic Map
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-76 (Page 1 of 1)
Figure 2-76. Subregional Drainage Map with Linear Stream Segments
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-77 (Page 1 of 1)
Figure 2-77. Regional In Situ Stresses
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-78 (Page 1 of 1)
Figure 2-78. Boring Location Plan
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-79 (Page 1 of 1)
Figure 2-79. Boring Location Plan
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-80 (Page 1 of 1)
Figure 2-80. Subsurface Profiles
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-81 (Page 1 of 1)
Figure 2-81. Subsurface Profiles
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-82 (Page 1 of 1)
Figure 2-82. Subsurface Profiles
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-83 (Page 1 of 1)
Figure 2-83. Subsurface Profiles
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-84 (Page 1 of 1)
Figure 2-84. Subsurface Profiles
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-85 (Page 1 of 1)
Figure 2-85. Subsurface Profiles
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-86 (Page 1 of 1)
Figure 2-86. Subsurface Profiles
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-87 (Page 1 of 1)
Figure 2-87. Subsurface Profiles
[HISTORICAL INFORMAITON NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-88 (Page 1 of 1)
Figure 2-88. Subsurface Profiles
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-89 (Page 1 of 1)
Figure 2-89. Subsurface Profiles
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-90 (Page 1 of 1)
Figure 2-90. Subsurface Profiles
[HISTORICAL INFORMATION NOT REQUIRD TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-91 (Page 1 of 1)
Figure 2-91. Subsurface Profiles
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-92 (Page 1 of 1)
Figure 2-92. Subsurface Profiles
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-93 (Page 1 of 1)
Figure 2-93. Subsurface Profiles
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-94 (Page 1 of 1)
Figure 2-94. Seismic Refraction Traverses
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-95 (Page 1 of 1)
Figure 2-95. Seismic Refraction Traverses
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-96 (Page 1 of 1)
Figure 2-96. Seismic Refraction Traverses
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-97 (Page 1 of 1)
Figure 2-97. Seismic Refraction Traverses
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-98 (Page 1 of 1)
Figure 2-98. Uphole Seismic Data, Boring A-61
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-99 (Page 1 of 1)
Figure 2-99. Uphole Seismic Data, Boring A-63
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-100 (Page 1 of 1)
Figure 2-100. Contours on Top of Continous Rock
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-101 (Page 1 of 5)
Figure 2-101. Equal Area Projections of Poles to Planes - Powerhouse Excavation
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-101 (Page 2 of 5)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-101 (Page 3 of 5)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-101 (Page 4 of 5)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-101 (Page 5 of 5)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-102 (Page 1 of 5)
Figure 2-102. Equal Area Projections of Poles to Planes - SNSW Pond Dam Excavations
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-102 (Page 2 of 5)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-102 (Page 3 of 5)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-102 (Page 4 of 5)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-102 (Page 5 of 5)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-103 (Page 1 of 1)
Figure 2-103. Geologic Map of Powerhouse Excavation - Reactor and Auxiliary Building Area
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
A copy of this figure is located in the licensing file.
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-104 (Page 1 of 1)
Figure 2-104. Geologic Map of Powerhouse Excavation - Turbine and Service Building Area
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
A copy of this figure is located in the licensing file.
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-105 (Page 1 of 1)
Figure 2-105. Geologic Map of SNSW Pond Dam Excavation
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
A copy of this figure is located in the licensing file.
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-106 (Page 1 of 1)
Figure 2-106. Regional Epicenter Map
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-107 (Page 1 of 1)
Figure 2-107. Epicenters of Earthquakes Located Within 50-Mile Radius of the Site
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-108 (Page 1 of 1)
Figure 2-108. Epicenters of Earthquakes Probably Felt at the Catawba Site
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-109 (Page 1 of 1)
Figure 2-109. Acceleration - Intensity Relationships
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-110 (Page 1 of 4)
Figure 2-110. Design Response Spectra, .08g HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-110 (Page 2 of 4)
(24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-110 (Page 3 of 4)
(24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-110 (Page 4 of 4)
(24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-111 (Page 1 of 1)
Figure 2-111. Design Response Spectra, .08g HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-112 (Page 1 of 1)
Figure 2-112. Design Response Spectra, .15g HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-113 (Page 1 of 2)
Figure 2-113. Design Response Spectra, 25 feet of Overburden, .08g at Rock HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-113 (Page 2 of 2)
(24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-114 (Page 1 of 1)
Figure 2-114. Actual Foundation Conditions at Structures Designed Using Response Spectrum Computed for 25 FT. of Overburden (Fill)
HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-115 (Page 1 of 1)
Figure 2-115. Soil Columns for Unit 2 Fuel Oil Storage Tanks and Unit 2 Above Ground Storage Tank (22 OCT 2001)
Catawba Nuclear Station UFSAR Figure 2-116 (Page 1 of 1)
Figure 2-116. Comparison of Computed Response Spectra and Design Response Spectrum HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-117 (Page 1 of 1)
Figure 2-117. Location Plan for Seismic Refraction Lines on Rock In Powehouse Excavation HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-118 (Page 1 of 1)
Figure 2-118. Results of Seismic Refraction Lines - NSW Intake Structure and NSW Pump Structure
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-119 (Page 1 of 4)
Figure 2-119. Seismic Refraction Profiles - NSW Pipe Lines
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-119 (Page 2 of 4)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-119 (Page 3 of 4)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-119 (Page 4 of 4)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-120 (Page 1 of 3)
Figure 2-120. Results of Seismic Refraction Lines in Powerhouse Excavation
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-120 (Page 2 of 3)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-120 (Page 3 of 3)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-121 (Page 1 of 1)
Figure 2-121. Summary of Grain Size Distribution of Residual Soils from Adamellite
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-122 (Page 1 of 1)
Figure 2-122. Summary of Optimum Moisture and Maximum Dry Density of Residual Soils from Plant Area
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-123 (Page 1 of 3)
Figure 2-123. Typical Consolidation Test Results of Compacted Residual Soils from Plant Area
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-123 (Page 2 of 3)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-123 (Page 3 of 3)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-124 (Page 1 of 3)
Figure 2-124. Summary of Consolidation Characteristics of Partially Weathered Rock Materials
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-124 (Page 2 of 3)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-124 (Page 3 of 3)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-125 (Page 1 of 3)
Figure 2-125. Summary of Mohr Diagrams of Compacted Residual Soils from Plant Area
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-125 (Page 2 of 3)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-125 (Page 3 of 3)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-126 (Page 1 of 3)
Figure 2-126. Summary of Mohr Diagrams for Partially Weathered Rock Materials
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-126 (Page 2 of 3)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-126 (Page 3 of 3)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-127 (Page 1 of 3)
Figure 2-127. Summary of Stress-Strain Data on Rock Core
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-127 (Page 2 of 3)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-127 (Page 3 of 3)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-128 (Page 1 of 1)
Figure 2-128. Summary of Rock Test Data From Plant Area Substructure Excavation
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-129 (Page 1 of 1)
Figure 2-129. Dynamic Moduli of Foundation Materials - Plant Area
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-130 (Page 1 of 1)
Figure 2-130. Contours of Plant Excavation Bottom at Start of Blasting
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-131 (Page 1 of 1)
Figure 2-131. Soil Column Analysis - NSW Pipeline HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-132 (Page 1 of 3)
Figure 2-132. Sections Through Powerhouse HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-132 (Page 2 of 3)
(24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-132 (Page 3 of 3)
(24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-133 (Page 1 of 1)
Figure 2-133. Cross Sections Through NSW and SNSW Pump Structure and Diesel Fuel Oil Storage Tanks HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-134 (Page 1 of 1)
Figure 2-134. Selected Subsurface Profiles Through NSW Pipe Lines HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-135 (Page 1 of 1)
Figure 2-135. Earth Pressure Distribution on Subsurface Walls HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-136 (Page 1 of 1)
Figure 2-136. Number of Moisture Tests Versus Moisture Content for Compacted Group I Backfill HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-137 (Page 1 of 1)
Figure 2-137. Number of Compaction Tests Versus Percent Compaction for Group I Backfill HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-138 (Page 1 of 1)
Figure 2-138. Number of Compaction Tests Versus Relative Density for Granular Backfill HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-139 (Page 1 of 4)
Figure 2-139. Nuclear Service Water System Yard Layout - Longitudinal Profiles HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-139 (Page 2 of 4)
(24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-139 (Page 3 of 4)
(24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-139 (Page 4 of 4)
(24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-140 (Page 1 of 1)
Figure 2-140. Typical Section, Standby Nuclear Service Water Pond Dam HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-141 (Page 1 of 1)
Figure 2-141. Standby Nuclear Service Water Pond Dam, Details HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-142 (Page 1 of 1)
Figure 2-142. Plan, Standby Nuclear Service Water Pond Dam HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-143 (Page 1 of 2)
Figure 2-143. Profile of Standby Nuclear Service Water Pond Outlet Works HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-143 (Page 2 of 2)
(24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-144 (Page 1 of 1)
Figure 2-144. Boring Location Plan, Standby Nuclear Service Water Pond Dam
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-145 (Page 1 of 2)
Figure 2-145. Section Along Axis of Plan Standby Nuclear Service Water Pond Dam HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-145 (Page 2 of 2)
(24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-146 (Page 1 of 1)
Figure 2-146. Section A-87 Through A-96, South of Standby Nuclear Service Water Pond Dam HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-147 (Page 1 of 1)
Figure 2-147. Section A-103 S1 Through A-103 S2, Standby Nuclear Service Water Pond Dam HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-148 (Page 1 of 1)
Figure 2-148. Standby Nuclear Service Water Pond Dam, Section A-116 Through A-119 HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-149 (Page 1 of 1)
Figure 2-149. Standby Nuclear Service Water Pond Dam, Section A-117 Through A-118 HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-150 (Page 1 of 1)
Figure 2-150. Summary of Grain Size Distribution, Residual Soils at Standby Nuclear Service Water Pond Dam - Foundation Saprolites
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-151 (Page 1 of 3)
Figure 2-151. Summary of Mohr Diagrams for Foundation Soils, Standby Nuclear Service Water Pond Dam
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-151 (Page 2 of 3)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-151 (Page 3 of 3)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-152 (Page 1 of 4)
Figure 2-152. Cyclic Triaxial Strength Results
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-152 (Page 2 of 4)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-152 (Page 3 of 4)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-152 (Page 4 of 4)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-153 (Page 1 of 1)
Figure 2-153. Cyclic Strength of Soils
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-154 (Page 1 of 2)
Figure 2-154. Summary of Consolidation Characteristics for Residual Soils, Standby Nuclear Service Water Pond Dam
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-154 (Page 2 of 2)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-155 (Page 1 of 1)
Figure 2-155. Cross Hole Seismic Data, Boring A-103
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-156 (Page 1 of 1)
Figure 2-156. Cross Hole Seismic Data, Boring A-105
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-157 (Page 1 of 1)
Figure 2-157. Dynamic Tests on Foundation Soils
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-158 (Page 1 of 4)
Figure 2-158. Summary of Mohr Diagrams of Partially Weathered Rock
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-158 (Page 2 of 4)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-158 (Page 3 of 4)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-158 (Page 4 of 4)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-159 (Page 1 of 1)
Figure 2-159. Standby Nuclear Service Water Pond Dam Foundation Plan HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-160 (Page 1 of 1)
Figure 2-160. Standby Nuclear Service Water Pond Dam Foundation Bedrock-South Abutment HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-161 (Page 1 of 1)
Figure 2-161. Standby Nuclear Service Water Pond Dam Fill Sources and Quantities Placed Versus Date
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-162 (Page 1 of 1)
Figure 2-162. Summary Grain Size Distribution, Residual Sands - General Borrow Areas Investigated for PSAR
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-163 (Page 1 of 1)
Figure 2-163. Summary Grain Size Distribution Residual Soils- Silty Sands, SNSW Pond Dam Embankment Borrow Area Utilized
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-164 (Page 1 of 1)
Figure 2-164. Earth Embankment Material, Grain Size Distribution, Standby Nuclear Service Water Pond Dam
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-165 (Page 1 of 1)
Figure 2-165. Optimum Moisture, Maximum Dry Density for Soil During PSAR Investigation and Borrow Area Studies, Standby Nuclear Service Water Pond Dam
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-166 (Page 1 of 1)
Figure 2-166. Dry Density versus Optimum Moisture Content, From Proctor Tests on Soils Placed on SNSW Pond Dam
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-167 (Page 1 of 4)
Figure 2-167. Summary of Mohr Diagrams of Structural Fill Obtained During PSAR Investigations
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-167 (Page 2 of 4)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-167 (Page 3 of 4)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-167 (Page 4 of 4)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-168 (Page 1 of 4)
Figure 2-168. Summary of Mohr Diagrams of Structural Fill from Borrow Areas Used for Standby Nuclear Service Water Pond Dam Embankment
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-168 (Page 2 of 4)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-168 (Page 3 of 4)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-168 (Page 4 of 4)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-169 (Page 1 of 2)
Figure 2-169. Summary of Mohr Diagrams for Structural Fill Sampled from Standby Nuclear Service Water Pond Embankment
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-169 (Page 2 of 2)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-170 (Page 1 of 4)
Figure 2-170. Distribution of Field Density Tests with Percent Compaction on Standby Nuclear Service Water Pond Dam Embankment
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-170 (Page 2 of 4)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-170 (Page 3 of 4)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-170 (Page 4 of 4)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-171 (Page 1 of 3)
Figure 2-171. Typical Consolidation Tests of Compacted Soils Obtained During PSAR Investigation and from Borrow Areas Used for Standby Nuclear Service Water Pond Dam Embankment
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-171 (Page 2 of 3)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-171 (Page 3 of 3)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-172 (Page 1 of 1)
Figure 2-172. Slope Protection, Filter layer, Grain Size Distribution
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-173 (Page 1 of 1)
Figure 2-173. Number of Moisture Tests Versus Moisture Content for Standby Nuclear Service Water Pond Dam
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-174 (Page 1 of 1)
Figure 2-174. Number of Moisture Tests Versus Moisture Content for Standby Nuclear Service Water Pond Dam
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-175 (Page 1 of 1)
Figure 2-175. Number of Compaction Tests Versus Percent Compaction for Standby Nuclear Service Water Pond Dam
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-176 (Page 1 of 1)
Figure 2-176. Blanket Drain Course. Filter, Density Test Distribution
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-177 (Page 1 of 2)
Figure 2-177. Blanket Drain Top Layer Fine Filter Density Test Distribution
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-177 (Page 2 of 2)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-178 (Page 1 of 1)
Figure 2-178. Blanket Drain, Coarse Fitler, Grain Size Distribution
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-179 (Page 1 of 1)
Figure 2-179. Blanket Drain, Fine Filter-Top Layer, Grain Size Distribution
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-180 (Page 1 of 1)
Figure 2-180. Blanket Drain, Fine Filter-Bottom Layer, Grain Size Distribution
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-181 (Page 1 of 1)
Figure 2-181. Cross-Section for Stability Analysis (22 OCT 2001)
Catawba Nuclear Station UFSAR Figure 2-182 (Page 1 of 1)
Figure 2-182. Dynamic Modulus for Embankment and Foundation Materials HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-183 (Page 1 of 1)
Figure 2-183. Dynamic Modulus and Combining Pressure for Foundation Soils - Saprolites HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-184 (Page 1 of 1)
Figure 2-184. Failure Surfaces of Lowest Safety Factor - Static Analysis HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-185 (Page 1 of 1)
Figure 2-185. Finite Element Representation HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-186 (Page 1 of 1)
Figure 2-186. Static Finite Element Analysis, Vertical Effective Normal Stress in Embankment HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-187 (Page 1 of 1)
Figure 2-187. Static Finite Element Analysis, Horizontal Shear Stress in Embankment HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-188 (Page 1 of 1)
Figure 2-188. Static Finite Element Analysis, Principal Stress Ratios in Embankment HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-189 (Page 1 of 1)
Figure 2-189. Cyclic Triaxial Tests - Typical Strain and Pore Pressure Data (Remolded Samples)
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-190 (Page 1 of 1)
Figure 2-190. Variation of Damping for Embankment and Foundation Materials
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-191 (Page 1 of 1)
Figure 2-191. Variation of Modulus for Embankment and Foundation Materials
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-192 (Page 1 of 1)
Figure 2-192. Dynamic Tests on Embankment Materials
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-193 (Page 1 of 1)
Figure 2-193. Time History of Synthetic EQ-1
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-194 (Page 1 of 1)
Figure 2-194. Time History of Synthetic EQ-2
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-195 (Page 1 of 1)
Figure 2-195. Time History of Synthetic EQ-3
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-196 (Page 1 of 1)
Figure 2-196. Time History of Synthetic EQ-4
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-197 (Page 1 of 1)
Figure 2-197. Failure Potential Under Cyclic Loading
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-198 (Page 1 of 1)
Figure 2-198. Seismic Coefficient SNSW Pond Dam HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-199 (Page 1 of 1)
Figure 2-199. Standby Nuclear Service Water Pond Dam Instrumentation Details HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-200 (Page 1 of 1)
Figure 2-200. Local Safety Factors Against 5% Strain HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-201 (Page 1 of 5)
Figure 2-201. SNSW Pond Dam Piezometric Readings
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-201 (Page 2 of 5)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-201 (Page 3 of 5)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-201 (Page 4 of 5)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-201 (Page 5 of 5)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-202 (Page 1 of 12)
Figure 2-202. SNSW Pond Dam Settlement Versus Time
[HISTORICAL INFORMATION NOT REQUIRED TO BE REVISED]
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-202 (Page 2 of 12)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-202 (Page 3 of 12)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-202 (Page 4 of 12)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-202 (Page 5 of 12)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-202 (Page 6 of 12)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-202 (Page 7 of 12)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-202 (Page 8 of 12)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-202 (Page 9 of 12)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-202 (Page 10 of 12)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-202 (Page 11 of 12)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-202 (Page 12 of 12)
(27 MAR 2003)
Catawba Nuclear Station UFSAR Figure 2-203 (Page 1 of 1)
Figure 2-203. SNSW Pond Dam Crest Elevation HISTORICAL INFORMATION IN ITALICS BELOW NOT REQUIRED TO BE REVISED (24 OCT 2004)
Catawba Nuclear Station UFSAR Figure 2-204 (Page 1 of 1)
Figure 2-204. Design Response Spectrum for Direct Generation (22 OCT 2001)