Catawba Nuclear Station UFSAR Appendix 8B. Figures Appendix 8B. Figures
Catawba Nuclear Station UFSAR Figure 8-1 (Page 1 of 1)
(09 OCT 2019)
Figure 8-1. Onsite Power System
Catawba Nuclear Station UFSAR Figure 8-2 (Page 1 of 1)
(22 OCT 2001)
Figure 8-2. Duke Transmission System
Catawba Nuclear Station UFSAR Figure 8-3 (Page 1 of 1)
(21 OCT 2010)
Figure 8-3. Deleted Per 2010 Update
SeSeSecurity-Related Information Withhold under 10 CFR 2.390
Catawba Nuclear Station UFSAR Figure 8-5 (Page 1 of 1)
(22 OCT 2001)
Figure 8-5. Newport Transmission Line Plan This figure is currently unavailable in an electronic format. It can be located in a hardcopy version of the FSAR.
Catawba Nuclear Station UFSAR Figure 8-6 (Page 1 of 1)
(22 OCT 2001)
Figure 8-6. Allison Creek Transmission Line Plan
Catawba Nuclear Station UFSAR Figure 8-7 (Page 1 of 1)
(22 OCT 2001)
Figure 8-7. Roddey Transmission Line Plan
Catawba Nuclear Station UFSAR Figure 8-8 (Page 1 of 1)
(22 OCT 2001)
Figure 8-8. Clay Hill Transmission Line Plan
Catawba Nuclear Station UFSAR Figure 8-9 (Page 1 of 1)
(22 OCT 2001)
Figure 8-9. Moser Transmission Line Plan
Catawba Nuclear Station UFSAR Figure 8-10 (Page 1 of 1)
(22 OCT 2001)
Figure 8-10. 230KV Switchyard General Arrangement
Catawba Nuclear Station UFSAR Figure 8-11 (Page 1 of 1)
(22 OCT 2001)
Figure 8-11. 230KV Switchyard 125VDC Auxiliary Power System
Catawba Nuclear Station UFSAR Figure 8-12 (Page 1 of 1)
(22 OCT 2001)
Figure 8-12. 230KV Switchyard and Station Interconnections
Catawba Nuclear Station UFSAR Figure 8-13 (Page 1 of 1)
(17 APR 2012)
Figure 8-13. Offsite Power System Protective Relaying Zones
Catawba Nuclear Station UFSAR Figure 8-14 (Page 1 of 1)
(22 OCT 2001)
Figure 8-14. Stability Analysis Diagram Revised Per CNCE-10888
Catawba Nuclear Station UFSAR Figure 8 Figure 8-18(Page 1 of 1)
(22 OCT 2001)
Figure 8-15. Deleted Per 2000 Revision Figure 8-16. Deleted Per 2000 Revision Figure 8-17. Deleted Per 2000 Revision Figure 8-18. Deleted Per 2000 Revision
Catawba Nuclear Station UFSAR Figure 8-19 (Page 1 of 2)
(09 OCT 2019)
Figure 8-19. Non-Class 1E AC Power Systems
Catawba Nuclear Station UFSAR Figure 8-19 (Page 2 of 2)
(09 OCT 2019)
Catawba Nuclear Station UFSAR Figure 8-20 (Page 1 of 1)
(22 OCT 2001)
Figure 8-20. 13.8KV Normal Auxiliary Power System and 600 VAC Cooling Tower Auxiliary Power System
Catawba Nuclear Station UFSAR Figure 8-21 (Page 1 of 1)
(24 OCT 2004)
Figure 8-21. Essential and Blackout Auxiliary Power Systems
Catawba Nuclear Station UFSAR Figure 8-22 (Page 1 of 2)
(17 OCT 2013)
Figure 8-22. 125 VDC and 240/120 VAC Auxiliary Control Power Systems
Catawba Nuclear Station UFSAR Figure 8-22 (Page 2 of 2)
(17 OCT 2013)
Catawba Nuclear Station UFSAR Figure 8-23 (Page 1 of 1)
(22 OCT 2001)
Figure 8-23. 250 VDC Auxiliary Power System
Catawba Nuclear Station UFSAR Figure 8-24 (Page 1 of 1)
(24 OCT 2004)
Figure 8-24. 125 VDC and 120 VAC Vital Instrumentation and Control Power System
Catawba Nuclear Station UFSAR Figure 8-25 (Page 1 of 1)
(24 APR 2006)
Figure 8-25. 125 VDC Vital Instrumentation and Control Battery Duty Cycle
Catawba Nuclear Station UFSAR Figure 8-26 (Page 1 of 1)
(17 APR 2012)
Figure 8-26. 125 VDC Diesel Essential Auxiliary Power System
Catawba Nuclear Station UFSAR Figure 8-27 (Page 1 of 1)
(24 APR 2006)
Figure 8-27. 125 VDC Diesel Auxiliary Power Battery Duty Cycle
Catawba Nuclear Station UFSAR Figure 8-28 (Page 1 of 1)
(22 OCT 2001)
Figure 8-28. Peacock Transmission Line Plan