Category:PRELIMINARY NOTIFICATION OF EVENT OR OCCURRENCE (PNO
MONTHYEARPNO-I-99-048, on 991022,operators Initiated Plant Shutdown from 100% Reactor Power,Due to Continued RCS Leakage Through B Pressurizer Code Safety Valve to Primary Relief Tank. Operators Are Reducing Reactor Power at 12% Per H1999-10-22022 October 1999 PNO-I-99-048:on 991022,operators Initiated Plant Shutdown from 100% Reactor Power,Due to Continued RCS Leakage Through B Pressurizer Code Safety Valve to Primary Relief Tank. Operators Are Reducing Reactor Power at 12% Per H PNO-I-99-046, on 991008,NMP,Unit 1 Declared Unusual Event,Due to Carbon Dioxide Discharge in Records Storage Room of Administration Bldg,Which Was Migrating Beyond Confines of Storage Room.Nrc Resident Inspector Staff Responded1999-10-0808 October 1999 PNO-I-99-046:on 991008,NMP,Unit 1 Declared Unusual Event,Due to Carbon Dioxide Discharge in Records Storage Room of Administration Bldg,Which Was Migrating Beyond Confines of Storage Room.Nrc Resident Inspector Staff Responded PNO-I-99-042A, on 990927,DC Fabricators Notified Region I That Package Had Been Located on Premises of Tn Technologies.Region I Public Affairs Ofc Is Available to Respond to Public.States of Nj & Tx Have Been Notified1999-09-27027 September 1999 PNO-I-99-042A:on 990927,DC Fabricators Notified Region I That Package Had Been Located on Premises of Tn Technologies.Region I Public Affairs Ofc Is Available to Respond to Public.States of Nj & Tx Have Been Notified PNO-I-99-045, on 990923,operators at Limerick Generating Station Declared Unusual Event Due to Presence of Toxic Gases within Site Boundary.No Toxic Gases Were Detected within Main Cr.No Personnel Were Injured or Made Ill1999-09-24024 September 1999 PNO-I-99-045:on 990923,operators at Limerick Generating Station Declared Unusual Event Due to Presence of Toxic Gases within Site Boundary.No Toxic Gases Were Detected within Main Cr.No Personnel Were Injured or Made Ill PNO-I-99-043, on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power1999-09-16016 September 1999 PNO-I-99-043:on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power PNO-I-99-041A, on 990908,Metorex,Inc Notified Region I That Package Containing Two Heps Probes Housing Sealed Sources Shipped by Fedex Failed to Arrive at Destination.On 990913, Package Located in Good Condition & Delivered to Customer1999-09-13013 September 1999 PNO-I-99-041A:on 990908,Metorex,Inc Notified Region I That Package Containing Two Heps Probes Housing Sealed Sources Shipped by Fedex Failed to Arrive at Destination.On 990913, Package Located in Good Condition & Delivered to Customer PNO-I-99-042, on 990909,DC Fabricators,Inc Notified Region I Package Shipped Containing Generally Licensed Device Failed to Arrive at Destination.Licensee & Tn Technologies Working UPS Since August to Locate Package.Nj & Tx Notified1999-09-0909 September 1999 PNO-I-99-042:on 990909,DC Fabricators,Inc Notified Region I Package Shipped Containing Generally Licensed Device Failed to Arrive at Destination.Licensee & Tn Technologies Working UPS Since August to Locate Package.Nj & Tx Notified PNO-I-99-041, on 990908,Region I Was Notified by Licensee That Shipped Package Containing Generally Licensed Devices Had Failed to Arrive at Destination.Licensee Is Working with Fedex to Locate Package.States of Nj & Oh Notified1999-09-0808 September 1999 PNO-I-99-041:on 990908,Region I Was Notified by Licensee That Shipped Package Containing Generally Licensed Devices Had Failed to Arrive at Destination.Licensee Is Working with Fedex to Locate Package.States of Nj & Oh Notified PNO-I-99-039, on 990831,Haddam Neck Plant CR Was Notified by Transportation Contractor,Hittman Transportation Svcs,That Driver of Truck,Left Plant Earlier in Day Noticed Water Leakage from from sea-land Container He Was Transporting1999-09-0101 September 1999 PNO-I-99-039:on 990831,Haddam Neck Plant CR Was Notified by Transportation Contractor,Hittman Transportation Svcs,That Driver of Truck,Left Plant Earlier in Day Noticed Water Leakage from from sea-land Container He Was Transporting PNO-I-99-037, on 990505,for Docket 4009043,determined That Four of Slugs Were Missing.Licensee Performed Visual Search of Facility & Radiation Survey But Was Unable to Locate Missing Slugs.Region I Will Perform Reactive Insp1999-08-0505 August 1999 PNO-I-99-037:on 990505,for Docket 4009043,determined That Four of Slugs Were Missing.Licensee Performed Visual Search of Facility & Radiation Survey But Was Unable to Locate Missing Slugs.Region I Will Perform Reactive Insp PNO-I-99-036, on 990718,update to Beaver Valley,Unit 2 Forced Outage Made.Licensee Replaced Suspected Voltage Regulator Control Relays & Satisfactorily Retested EDG 2-2.Resident Inspectors Continue to Monitor Licensee Corrective Action1999-07-26026 July 1999 PNO-I-99-036:on 990718,update to Beaver Valley,Unit 2 Forced Outage Made.Licensee Replaced Suspected Voltage Regulator Control Relays & Satisfactorily Retested EDG 2-2.Resident Inspectors Continue to Monitor Licensee Corrective Action PNO-I-99-035, on 990724,Calvert Cliffs,Unit 1 Automatically Shutdown from 100% Power.All Control Rods Fully Inserted & All Safety Equipment Operated as Designed During & Following Shutdown.Licensee Plans to Replace a Phase Bushing1999-07-26026 July 1999 PNO-I-99-035:on 990724,Calvert Cliffs,Unit 1 Automatically Shutdown from 100% Power.All Control Rods Fully Inserted & All Safety Equipment Operated as Designed During & Following Shutdown.Licensee Plans to Replace a Phase Bushing PNO-I-99-033, on 990716,apparent Electrical Fault Occurred During EDG Full Load Test,Which Opened Supply Breaker Between Emergency & Normal 4 Kilovolt Busses.Station Personnel Intend to Resolve & Correct Electrical Fault1999-07-19019 July 1999 PNO-I-99-033:on 990716,apparent Electrical Fault Occurred During EDG Full Load Test,Which Opened Supply Breaker Between Emergency & Normal 4 Kilovolt Busses.Station Personnel Intend to Resolve & Correct Electrical Fault PNO-I-99-032, on 990713,licensee Contacted NRC Headquarters Operations Officer to Rept Loss of Package Containing 2 Mci of Liquid I-125.Licensee Contacting Federal Express to Determine If Package Was Actually Delivered1999-07-14014 July 1999 PNO-I-99-032:on 990713,licensee Contacted NRC Headquarters Operations Officer to Rept Loss of Package Containing 2 Mci of Liquid I-125.Licensee Contacting Federal Express to Determine If Package Was Actually Delivered PNO-I-99-030, on 990630,licensee Notified NRC Region I That Shipping Container Loaded with Internally Contaminated Vacuum Cleaning Device,Used at Maine Yankee for Asbestos Removal,Was Damaged.No Radioactive Matl Was Released1999-06-30030 June 1999 PNO-I-99-030:on 990630,licensee Notified NRC Region I That Shipping Container Loaded with Internally Contaminated Vacuum Cleaning Device,Used at Maine Yankee for Asbestos Removal,Was Damaged.No Radioactive Matl Was Released PNO-I-99-028, on 990608,Susquehanna Unit 2 Automatically Shut Down from 100% Power,Due to Failure in a Main Transformer. Region I Public Affairs Prepared to Respond to Media Inquires.Resident Inspectors on-site & Responded1999-06-0909 June 1999 PNO-I-99-028:on 990608,Susquehanna Unit 2 Automatically Shut Down from 100% Power,Due to Failure in a Main Transformer. Region I Public Affairs Prepared to Respond to Media Inquires.Resident Inspectors on-site & Responded PNO-I-99-026A, on 990518,main Transformer Was Damaged During Testing of Replacement Bushing While Unit Was in Refueling Outage.Current Refueling Outage Was Originally Scheduled to Be Completed on 990607,with Return to Full Power Operation1999-06-0101 June 1999 PNO-I-99-026A:on 990518,main Transformer Was Damaged During Testing of Replacement Bushing While Unit Was in Refueling Outage.Current Refueling Outage Was Originally Scheduled to Be Completed on 990607,with Return to Full Power Operation PNO-I-99-026, on 990518,fire Occurred at Pilgrim Station in Main Electrical Transformer.Licensee Requested off-site Firefighting Assistance.Resident Inspector Responded to Site Upon Notification of Event.Licensee Issued Press Release1999-05-19019 May 1999 PNO-I-99-026:on 990518,fire Occurred at Pilgrim Station in Main Electrical Transformer.Licensee Requested off-site Firefighting Assistance.Resident Inspector Responded to Site Upon Notification of Event.Licensee Issued Press Release PNO-I-99-024, on 990516,Saratoga Sheriff Dept Received Call That Suspicious Persons Were Seen Outside Facility Operated by Wright-Malta Corp in Saratoga County,Ny.Sheriff Dept Responded & Found That Facility Had Been Broken Into1999-05-18018 May 1999 PNO-I-99-024:on 990516,Saratoga Sheriff Dept Received Call That Suspicious Persons Were Seen Outside Facility Operated by Wright-Malta Corp in Saratoga County,Ny.Sheriff Dept Responded & Found That Facility Had Been Broken Into PNO-I-99-023, on 990411,NMP Performed Insps That Identified Indications of Crack Growth Around Portion of One of Vertical Welds.Repair Mod for Shroud Vertical Welds Is Expected to Take Approx Five Days to Complete1999-05-12012 May 1999 PNO-I-99-023:on 990411,NMP Performed Insps That Identified Indications of Crack Growth Around Portion of One of Vertical Welds.Repair Mod for Shroud Vertical Welds Is Expected to Take Approx Five Days to Complete PNO-I-99-022, on 990509,Millstone Unit 2 Established Reactor Criticality.Nrc Staff Providing Augmented Insp Coverage of Restart Activities,Including round-the-clock Observations of Licensee Activities During Key Operational Evolutions1999-05-11011 May 1999 PNO-I-99-022:on 990509,Millstone Unit 2 Established Reactor Criticality.Nrc Staff Providing Augmented Insp Coverage of Restart Activities,Including round-the-clock Observations of Licensee Activities During Key Operational Evolutions PNO-I-99-019, on 990420,Limerick Unit 1 Automatically Shutdown from 100% Power on Low Rwl Due to Loss of Mfw. Normal Feedwater Sys Has Been Restored,Which Allowed for Securing of RCIC & HPCI Systems.Licensee Issued Pr1999-04-21021 April 1999 PNO-I-99-019:on 990420,Limerick Unit 1 Automatically Shutdown from 100% Power on Low Rwl Due to Loss of Mfw. Normal Feedwater Sys Has Been Restored,Which Allowed for Securing of RCIC & HPCI Systems.Licensee Issued Pr PNO-I-99-016, on 990406,operators Initiated Plant Cooldown from Normal Operating Pressure & Temp in Mode 3,hot Standby. Cooldown Was Necessary to Minimize Further Degradation of Bonnet Pressure Seal for Valve 2-SI-652 & to Repair Valve1999-04-0707 April 1999 PNO-I-99-016:on 990406,operators Initiated Plant Cooldown from Normal Operating Pressure & Temp in Mode 3,hot Standby. Cooldown Was Necessary to Minimize Further Degradation of Bonnet Pressure Seal for Valve 2-SI-652 & to Repair Valve PNO-I-99-013, on 990311,RSO for Gai Consultants,Inc Contacted NRC Safety Hotline to Rept Theft of Troxler Electronics Lab,Inc.Gauge Contains 8 Mci Sealed Source of Cs-137 & 40 Mci Sealed Source of Am-241.Licensee Contacted Local Police1999-03-11011 March 1999 PNO-I-99-013:on 990311,RSO for Gai Consultants,Inc Contacted NRC Safety Hotline to Rept Theft of Troxler Electronics Lab,Inc.Gauge Contains 8 Mci Sealed Source of Cs-137 & 40 Mci Sealed Source of Am-241.Licensee Contacted Local Police PNO-I-99-012, on 990302,Intl Paper,Inc Discovered & Informed NRC That Source Housing Containing 80 Mci of Am-241 Could Not Be Located.Commonwealth of PA Has Been Notified of Event.Region I Will Continue to Follow Incident1999-03-0404 March 1999 PNO-I-99-012:on 990302,Intl Paper,Inc Discovered & Informed NRC That Source Housing Containing 80 Mci of Am-241 Could Not Be Located.Commonwealth of PA Has Been Notified of Event.Region I Will Continue to Follow Incident PNO-I-99-011, on 990208,operators Experienced lock-up of Unit 2 Plant Monitoring Sys Computers While Performing Testing for Y2K Mod of Rod Worth Minimizer Sys.Region I Public Affairs Prepared to Respond to Media Inquiries1999-03-0303 March 1999 PNO-I-99-011:on 990208,operators Experienced lock-up of Unit 2 Plant Monitoring Sys Computers While Performing Testing for Y2K Mod of Rod Worth Minimizer Sys.Region I Public Affairs Prepared to Respond to Media Inquiries PNO-I-99-007, on 990129,state of AL Was Notified That Ronan Model SA-15 Gauge Containing 100 Mci Cs-137 Source Was Inadvertently Transferred to Acutus Gladwin Mold Co.Region I Will Have Inspector at Company on 9902031999-02-0303 February 1999 PNO-I-99-007:on 990129,state of AL Was Notified That Ronan Model SA-15 Gauge Containing 100 Mci Cs-137 Source Was Inadvertently Transferred to Acutus Gladwin Mold Co.Region I Will Have Inspector at Company on 990203 PNO-I-99-006, on 990128,operators Inadvertently Reduced Spent Fuel Pool Water Level by Two Inches When Purification of Spent Fuel Pool Water Initiated.Operators Held Shift Briefing to Discuss Realigning Purification Sys1999-01-29029 January 1999 PNO-I-99-006:on 990128,operators Inadvertently Reduced Spent Fuel Pool Water Level by Two Inches When Purification of Spent Fuel Pool Water Initiated.Operators Held Shift Briefing to Discuss Realigning Purification Sys PNO-I-99-004, on 990115,carbon Dioxide Was Inadvertently Discharged Into Unit 3 Cable Spreading Room,Containing Electrical Wiring.Ambulance Reported to Site as Precautionary Measure.Licensee Assembled Event Review1999-01-20020 January 1999 PNO-I-99-004:on 990115,carbon Dioxide Was Inadvertently Discharged Into Unit 3 Cable Spreading Room,Containing Electrical Wiring.Ambulance Reported to Site as Precautionary Measure.Licensee Assembled Event Review PNO-I-99-003, on 990114,NY Power Authority Declared Unusual Event at Plant Due to Fire at Onsite Hydrogen Storage Facility.No Attempt Made to Isolate Hydrogen Supply to Fire for Personnel Safety Reasons.Region I Responded to Event1999-01-15015 January 1999 PNO-I-99-003:on 990114,NY Power Authority Declared Unusual Event at Plant Due to Fire at Onsite Hydrogen Storage Facility.No Attempt Made to Isolate Hydrogen Supply to Fire for Personnel Safety Reasons.Region I Responded to Event PNO-I-99-002, on 990113,Defense Logistics Agency (DLA) Representative Notified Region I That Package Received with Removable Contamination in Excess of Applicable Limits at Anniston Army Depot Facilities in AL on 9901041999-01-13013 January 1999 PNO-I-99-002:on 990113,Defense Logistics Agency (DLA) Representative Notified Region I That Package Received with Removable Contamination in Excess of Applicable Limits at Anniston Army Depot Facilities in AL on 990104 PNO-I-99-001, on 981231,Millstone Unit 2 Began Reloading Fuel Into Reactor After Extended Shutdown.Millstone Unit 3 Went Critical on 981230,after Forced Outage Due to Inadvertent MSIV Closure During Surveillance Testing at Power1999-01-0404 January 1999 PNO-I-99-001:on 981231,Millstone Unit 2 Began Reloading Fuel Into Reactor After Extended Shutdown.Millstone Unit 3 Went Critical on 981230,after Forced Outage Due to Inadvertent MSIV Closure During Surveillance Testing at Power PNO-I-98-063, on 981217,licensee Medical Physicists Contacted NRC Operations Ctr to Rept Failure of Nucletron Selectron Ldr Remote Afterloader to Reimplant Cs-137 Sources in Patient Undergoing Brachytherapy.State of CT Informed1998-12-18018 December 1998 PNO-I-98-063:on 981217,licensee Medical Physicists Contacted NRC Operations Ctr to Rept Failure of Nucletron Selectron Ldr Remote Afterloader to Reimplant Cs-137 Sources in Patient Undergoing Brachytherapy.State of CT Informed PNO-I-98-062, on 981211,Millstone Unit 3 Tripped from 100% Reactor Power During MSIV Partial Stroke Testing.Solenoid Valve Integral to MSIV Failed to Reopen When Licensed Operator Released Test Switch1998-12-15015 December 1998 PNO-I-98-062:on 981211,Millstone Unit 3 Tripped from 100% Reactor Power During MSIV Partial Stroke Testing.Solenoid Valve Integral to MSIV Failed to Reopen When Licensed Operator Released Test Switch PNO-I-98-061, on 981210,notified NRC Region I Staff That Radioactive Matl Had Been Detected at Incinerator Facility, CT Resources Recovery Authority,In Hartford,Ct,In Dumpster. Dumpster Currently on Premises of Hauler,Mccauley Trucking1998-12-10010 December 1998 PNO-I-98-061:on 981210,notified NRC Region I Staff That Radioactive Matl Had Been Detected at Incinerator Facility, CT Resources Recovery Authority,In Hartford,Ct,In Dumpster. Dumpster Currently on Premises of Hauler,Mccauley Trucking PNO-I-98-057, on 981130,util Commenced Shutdown of Salem Unit 2 to Repair 21 RCP Seal.Resident Inspectors Observed Portions of Plant Shutdown & Plan to Observe Continuing Maint Activities on RCP Seal1998-12-0101 December 1998 PNO-I-98-057:on 981130,util Commenced Shutdown of Salem Unit 2 to Repair 21 RCP Seal.Resident Inspectors Observed Portions of Plant Shutdown & Plan to Observe Continuing Maint Activities on RCP Seal PNO-I-98-058, on 981130,informed Region I That There Was Potential Loss of nuclear-powered Cardiac Pacemeker, Containing 250 Mg of plutonium-238,which Equates to Approx 4.27 Ci.Region I Will Continue to Follow Up on Incident1998-12-0101 December 1998 PNO-I-98-058:on 981130,informed Region I That There Was Potential Loss of nuclear-powered Cardiac Pacemeker, Containing 250 Mg of plutonium-238,which Equates to Approx 4.27 Ci.Region I Will Continue to Follow Up on Incident PNO-I-98-059, on 981201,representative of PA Dept of Environ Protection Contacted NRC Region I Staff About Loss of Control Over Licensed Matl at Women Inst for Fertility, Plymouth,Pa.Region I Will Continue to Monitor Actions1998-12-0101 December 1998 PNO-I-98-059:on 981201,representative of PA Dept of Environ Protection Contacted NRC Region I Staff About Loss of Control Over Licensed Matl at Women Inst for Fertility, Plymouth,Pa.Region I Will Continue to Monitor Actions PNO-I-98-053, on 981115,plant Experienced Turbine Trip While Operating at 95% Power Due to High Level Condition on One of Two Moisture Separators.Reactor Automatically Shut Down.Util Evaluating Incorrect Sys Drawing.States of Nj & DE Notifie1998-11-16016 November 1998 PNO-I-98-053:on 981115,plant Experienced Turbine Trip While Operating at 95% Power Due to High Level Condition on One of Two Moisture Separators.Reactor Automatically Shut Down.Util Evaluating Incorrect Sys Drawing.States of Nj & DE Notifie PNO-I-98-052, on 981116,Brown Univ Graduate Student Has Been Charged by Providence Police with Using Iodine 125-tainted Food to Poison Two Other Univ Students.Ri Agreement State & Has Jurisdiction Over Use of Byproduct Matl within Borders1998-11-16016 November 1998 PNO-I-98-052:on 981116,Brown Univ Graduate Student Has Been Charged by Providence Police with Using Iodine 125-tainted Food to Poison Two Other Univ Students.Ri Agreement State & Has Jurisdiction Over Use of Byproduct Matl within Borders PNO-I-98-051, on 981112,licensee Shutdown Seabrook Station, After Visual Insp Indicated Damage to Main Generator a Phase Output bus.One-week Outage Planned to Troubleshoot & Repair Bus Ductwork.Licensee Did Not Issue Press Release1998-11-13013 November 1998 PNO-I-98-051:on 981112,licensee Shutdown Seabrook Station, After Visual Insp Indicated Damage to Main Generator a Phase Output bus.One-week Outage Planned to Troubleshoot & Repair Bus Ductwork.Licensee Did Not Issue Press Release PNO-I-98-050, on 981030,Region IV Ofc Was Notified That Contaminated Package Had Been Received at Hummelstown,Pa Facility.Facility Concluded That Contaminant Was I-131.Insp at Facility Will Continue1998-10-30030 October 1998 PNO-I-98-050:on 981030,Region IV Ofc Was Notified That Contaminated Package Had Been Received at Hummelstown,Pa Facility.Facility Concluded That Contaminant Was I-131.Insp at Facility Will Continue PNO-I-98-048, on 981016,Vermont Yankee Commenced Normal Plant Shutdown,Due to Increasing Steam Leakage from Instrumentation Line on Main Steam High Pressure Drain Sys in Steam Tunnel.Outage Expected to Last Several Days1998-10-16016 October 1998 PNO-I-98-048:on 981016,Vermont Yankee Commenced Normal Plant Shutdown,Due to Increasing Steam Leakage from Instrumentation Line on Main Steam High Pressure Drain Sys in Steam Tunnel.Outage Expected to Last Several Days PNO-I-98-045, on 981002,representative from State of CT Dept of Environ Protection Contacted NRC Staff Re Radioactive Matl Found in Scrap Yard.Nrc Staff Contacted Representative of Scrap Dealer for Further Info1998-10-0202 October 1998 PNO-I-98-045:on 981002,representative from State of CT Dept of Environ Protection Contacted NRC Staff Re Radioactive Matl Found in Scrap Yard.Nrc Staff Contacted Representative of Scrap Dealer for Further Info PNO-I-98-040, 980821,licensee RSO Contacted NRC Operations Ctr to Report Theft of Troxler Electronics Lab,Inc Model 4640 Density Gauge,Serial Number 1112.Licensee Considering Issuance of Press Release.Commonwealth of PA Notified1998-08-24024 August 1998 PNO-I-98-040:980821,licensee RSO Contacted NRC Operations Ctr to Report Theft of Troxler Electronics Lab,Inc Model 4640 Density Gauge,Serial Number 1112.Licensee Considering Issuance of Press Release.Commonwealth of PA Notified PNO-I-98-039, 980812,Millstone Unit 3 Was Shutdown to Repair Small Leak on Afws Discharge Noted.Current Leakage Does Not Exceed Regulatory Requirements & Shutdown Not Required by Tech Specs.Licensee Issued Press Release on 9808111998-08-12012 August 1998 PNO-I-98-039:980812,Millstone Unit 3 Was Shutdown to Repair Small Leak on Afws Discharge Noted.Current Leakage Does Not Exceed Regulatory Requirements & Shutdown Not Required by Tech Specs.Licensee Issued Press Release on 980811 PNO-I-98-037, on 980807,thorium Bearing Waste at Hazardous Waste Site Occurred.Pa Dept of Environ Protection Stated, They Have Been in Contact W/Hazardous Waste Facility Concerning Matl for About Three Wks.Pa Has Been Notified1998-08-0707 August 1998 PNO-I-98-037:on 980807,thorium Bearing Waste at Hazardous Waste Site Occurred.Pa Dept of Environ Protection Stated, They Have Been in Contact W/Hazardous Waste Facility Concerning Matl for About Three Wks.Pa Has Been Notified PNO-I-98-035, on 980803:automatic Reactor Scram Occurred Due to Low Reactor Vessel Water Level.Licensee Elected to Enter Cold Shutdown to Complete Several Maint Items.Licensee Issued Press Release1998-08-0404 August 1998 PNO-I-98-035:on 980803:automatic Reactor Scram Occurred Due to Low Reactor Vessel Water Level.Licensee Elected to Enter Cold Shutdown to Complete Several Maint Items.Licensee Issued Press Release PNO-I-98-036, on 980804,Troxler Portable Moisture Density Gauge Was Damaged.Rso Indicated That Source Appears to Be Shielded But Source Rod Does Appear to Be Bent.Rso Will Be Performing Leak Test of Gauge Prior to Return to Mfg1998-08-0404 August 1998 PNO-I-98-036:on 980804,Troxler Portable Moisture Density Gauge Was Damaged.Rso Indicated That Source Appears to Be Shielded But Source Rod Does Appear to Be Bent.Rso Will Be Performing Leak Test of Gauge Prior to Return to Mfg PNO-I-98-033, on 980728,licensee Identified Leak of Approximately 1,000 Gallons of Demineralized Water & Chemical Agents Used for Decontamination of Plant Sys.Region I Radiation Specialist Will Be Onsite to Review Licensee1998-07-28028 July 1998 PNO-I-98-033:on 980728,licensee Identified Leak of Approximately 1,000 Gallons of Demineralized Water & Chemical Agents Used for Decontamination of Plant Sys.Region I Radiation Specialist Will Be Onsite to Review Licensee 1999-09-09
[Table view]Some use of "" in your query was not closed by a matching "". Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-I-99-048, on 991022,operators Initiated Plant Shutdown from 100% Reactor Power,Due to Continued RCS Leakage Through B Pressurizer Code Safety Valve to Primary Relief Tank. Operators Are Reducing Reactor Power at 12% Per H1999-10-22022 October 1999 PNO-I-99-048:on 991022,operators Initiated Plant Shutdown from 100% Reactor Power,Due to Continued RCS Leakage Through B Pressurizer Code Safety Valve to Primary Relief Tank. Operators Are Reducing Reactor Power at 12% Per H ML20217N1491999-10-21021 October 1999 Notice of Violation from Insp on 990720-29.Violation Noted: as of July 1999,licensee Did Not Take Adequate Measures to Assure That Condition Adverse to Quality Involving Macro Biological Fouling of Service Water System Corrected IR 05000277/19990071999-10-19019 October 1999 Insp Rept 50-277/99-07 & 50-278/99-07 on 990810-0922.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000277/19993021999-10-13013 October 1999 NRC Operator Licensing Exam Repts 50-277/99-302OL & 50-278/99-302OL (Including Completed & Graded Tests) for Tests Administered on 990913-16.All Applicants Passed All Portions of Exams IR 05000354/19983021999-10-13013 October 1999 Suppl NRC Operator Licensing Exam Rept 50-354/98-302 on 991025-29 (NRC Onsite Review),Mgt Meeting on 990322, in-office Reviews on 990429-30 & 0617-18 & Telephone Call on Appeal Results on 990720 PNO-I-99-046, on 991008,NMP,Unit 1 Declared Unusual Event,Due to Carbon Dioxide Discharge in Records Storage Room of Administration Bldg,Which Was Migrating Beyond Confines of Storage Room.Nrc Resident Inspector Staff Responded1999-10-0808 October 1999 PNO-I-99-046:on 991008,NMP,Unit 1 Declared Unusual Event,Due to Carbon Dioxide Discharge in Records Storage Room of Administration Bldg,Which Was Migrating Beyond Confines of Storage Room.Nrc Resident Inspector Staff Responded IR 05000293/19990051999-10-0808 October 1999 Insp Rept 50-293/99-05 on 990726-0905.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000334/19990061999-10-0707 October 1999 Insp Repts 50-334/99-06 & 50-412/99-06 on 990809-13 & 990823-27.Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Implementation IR 05000271/19990111999-10-0707 October 1999 Insp Rept 50-271/99-11 on 990809-27.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000354/19990051999-10-0101 October 1999 Insp Rept 50-354/99-05 on 990711-0829.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Mitigating Sys,Barrier Integrity & Performance Indicator Verification IR 05000334/19990051999-09-30030 September 1999 Insp Repts 50-334/99-05 & 50-412/99-05 on 990725-0904.Two Violations Noted & Being Treated as Nvcs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support PNO-I-99-042A, on 990927,DC Fabricators Notified Region I That Package Had Been Located on Premises of Tn Technologies.Region I Public Affairs Ofc Is Available to Respond to Public.States of Nj & Tx Have Been Notified1999-09-27027 September 1999 PNO-I-99-042A:on 990927,DC Fabricators Notified Region I That Package Had Been Located on Premises of Tn Technologies.Region I Public Affairs Ofc Is Available to Respond to Public.States of Nj & Tx Have Been Notified IR 05000289/19990071999-09-27027 September 1999 Insp Rept 50-289/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000443/19990101999-09-24024 September 1999 Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Major Areas Inspected:Corrective Action Program PNO-I-99-045, on 990923,operators at Limerick Generating Station Declared Unusual Event Due to Presence of Toxic Gases within Site Boundary.No Toxic Gases Were Detected within Main Cr.No Personnel Were Injured or Made Ill1999-09-24024 September 1999 PNO-I-99-045:on 990923,operators at Limerick Generating Station Declared Unusual Event Due to Presence of Toxic Gases within Site Boundary.No Toxic Gases Were Detected within Main Cr.No Personnel Were Injured or Made Ill IR 05000333/19990071999-09-22022 September 1999 Insp Rept 50-333/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Plant Activities IR 05000244/19990071999-09-20020 September 1999 Insp Rept 50-244/99-07 on 990719-23 & 0802-06.NCVs Noted. Major Areas Inspected:Maint & Engineering IR 05000352/19990051999-09-16016 September 1999 Insp Repts 50-352/99-05 & 50-353/99-05 on 990713-0816.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-I-99-043, on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power1999-09-16016 September 1999 PNO-I-99-043:on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power ML20212E0231999-09-15015 September 1999 Notice of Violations from Insp on 990812.Violations Noted:On 990505 Licensee Determined That Licensed Matl Was Missing & Did Not Rept by Telephone within 30 Days After Occurrence IR 05000245/19990081999-09-14014 September 1999 Insp Repts 50-245/99-08,50-336/99-08 & 50-423/99-08 on 990615-0809.Four Violations Noted & Being Treated as Ncvs. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000220/19990061999-09-14014 September 1999 Insp Repts 50-220/99-06 & 50-410/99-06 on 990620-0731.NCVs Noted.Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support IR 05000271/19990061999-09-13013 September 1999 Insp Rept 50-271/99-06 on 990621-0801.Noncited Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-I-99-041A, on 990908,Metorex,Inc Notified Region I That Package Containing Two Heps Probes Housing Sealed Sources Shipped by Fedex Failed to Arrive at Destination.On 990913, Package Located in Good Condition & Delivered to Customer1999-09-13013 September 1999 PNO-I-99-041A:on 990908,Metorex,Inc Notified Region I That Package Containing Two Heps Probes Housing Sealed Sources Shipped by Fedex Failed to Arrive at Destination.On 990913, Package Located in Good Condition & Delivered to Customer ML20216F2591999-09-10010 September 1999 Monitoring Rept 99-02 on 990823-27.No Violations Noted. Major Areas Inspected:Observe Site Operations & Current Project Status at West Valley Demonstration Project PNO-I-99-042, on 990909,DC Fabricators,Inc Notified Region I Package Shipped Containing Generally Licensed Device Failed to Arrive at Destination.Licensee & Tn Technologies Working UPS Since August to Locate Package.Nj & Tx Notified1999-09-0909 September 1999 PNO-I-99-042:on 990909,DC Fabricators,Inc Notified Region I Package Shipped Containing Generally Licensed Device Failed to Arrive at Destination.Licensee & Tn Technologies Working UPS Since August to Locate Package.Nj & Tx Notified IR 05000352/19993031999-09-0808 September 1999 Exam Repts 50-352/99-303OL & 50-353/99-303OL on 990812.Exam Results: One Reactor Operator Applicant Was Administered Retake Section B of Test & Passed IR 05000317/19990061999-09-0808 September 1999 Insp Repts 50-317/99-06 & 50-318/99-06 on 990627-0814. Noncited Violations Noted.Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support PNO-I-99-041, on 990908,Region I Was Notified by Licensee That Shipped Package Containing Generally Licensed Devices Had Failed to Arrive at Destination.Licensee Is Working with Fedex to Locate Package.States of Nj & Oh Notified1999-09-0808 September 1999 PNO-I-99-041:on 990908,Region I Was Notified by Licensee That Shipped Package Containing Generally Licensed Devices Had Failed to Arrive at Destination.Licensee Is Working with Fedex to Locate Package.States of Nj & Oh Notified ML20211Q5791999-09-0707 September 1999 Insp Rept 50-412/99-07 on 990720-29.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering PNO-I-99-039, on 990831,Haddam Neck Plant CR Was Notified by Transportation Contractor,Hittman Transportation Svcs,That Driver of Truck,Left Plant Earlier in Day Noticed Water Leakage from from sea-land Container He Was Transporting1999-09-0101 September 1999 PNO-I-99-039:on 990831,Haddam Neck Plant CR Was Notified by Transportation Contractor,Hittman Transportation Svcs,That Driver of Truck,Left Plant Earlier in Day Noticed Water Leakage from from sea-land Container He Was Transporting IR 05000293/19990041999-08-27027 August 1999 Insp Rept 50-293/99-04 on 990610-0725.Non-cited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000423/19990071999-08-27027 August 1999 Insp Rept 50-423/99-07 on 990614-0715.Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Review of C/A Program Using IP 40500, Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000443/19990051999-08-25025 August 1999 Insp Rept 50-443/99-05 on 990621-0801.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000334/19990041999-08-24024 August 1999 Insp Repts 50-334/99-04 & 50-412/99-04 on 990613-0724. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000213/19990021999-08-20020 August 1999 Insp Rept 50-213/99-02 on 990420-0719.No Violations Noted. Major Areas Inspected:Decommissioning Operations & Sf Safety Maint & Surveillance,Plant Support & Rediological Controls IR 05000289/19990041999-08-19019 August 1999 Insp Rept 50-289/99-04 on 990606-0717.Noncited Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000271/19990121999-08-19019 August 1999 Insp Rept 50-271/99-12 on 990628-0811.Violation Noted.Major Areas Inspected:Maint Rule Periodic Evaluation Required by 10CFR50.65(a)(3) IR 05000333/19990061999-08-12012 August 1999 Insp Rept 50-333/99-06 on 990601-0717.No Violations Noted. Major Areas Inspected:Exam of Activities Conducted Under License Re Safety & Compliance with Commission Rules & Regulations IR 05000354/19990041999-08-11011 August 1999 Insp Rept 50-354/99-04 on 990530-0711.No Violations Noted. Major Areas inspected:cornerstone-mitigating Sys,Pi Verification IR 05000352/19990041999-08-10010 August 1999 Insp Repts 50-352/99-04 & 50-353/99-04 on 990525-0712.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Engineering & Maint PNO-I-99-037, on 990505,for Docket 4009043,determined That Four of Slugs Were Missing.Licensee Performed Visual Search of Facility & Radiation Survey But Was Unable to Locate Missing Slugs.Region I Will Perform Reactive Insp1999-08-0505 August 1999 PNO-I-99-037:on 990505,for Docket 4009043,determined That Four of Slugs Were Missing.Licensee Performed Visual Search of Facility & Radiation Survey But Was Unable to Locate Missing Slugs.Region I Will Perform Reactive Insp IR 05000277/19993011999-08-0404 August 1999 NRC Operator Licensing Exam Repts 50-277/99-301 & 50-278/99-301 Administered on 990702-14 (Administration) & 990715-22 (Grading).Six of Six Limited SROs Passed All Portions of Exams IR 05000352/19993021999-08-0404 August 1999 NRC Operator Licensing Exam Repts 50-352/99-302 & 50-353/99-302 Adminsitered on 990702-14 (Administration) & 990715-22 (Grading).Six of Six Limited SROs Passed All Portions of Exams IR 05000029/19990021999-08-0404 August 1999 Insp Rept 50-029/99-02 on 990411-0714.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Safe Operation of Sf Pool,Radiological Controls,Organization & Mgt Controls & Auditing & C/As for Decommissioning Activities ML20210N5781999-08-0303 August 1999 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:On 980116,licensee Contractor Discriminated Against Contractor Electrician Due to Employee Involvement in Protected Activity ML20210P3251999-08-0303 August 1999 Notice of Violation from Insp on 980129-0527.Violation Noted:On 990116,Willimas Power Corp (Wpc),Contractor for Naesco,Discriminated Against Wpc Electrician Due to Employee Involvement in Protected Activity ML20210P3431999-08-0303 August 1999 Notice of Violation from Insp on 990129-0527.Violation Noted:On 980116,G Pageau Engaged in Deliberate Misconduct That Caused Naesco to Be in Violation of 10CFR50.7 ML20211B0331999-07-29029 July 1999 Safety Insp on 990729 of License SNM-1892.Insp Findings:No Violations Identified ML20211B0761999-07-28028 July 1999 Safety Insp on 990728 of License SNM-205.Insp Findings: No Violations Noted 1999-09-09
[Table view]Some use of "" in your query was not closed by a matching "". |