ML21256A141: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ES-301                                      Transient and Event Checklist                                  Form ES-301-5 TEAM 1 Facility: Point Beach                                  Date of Exam: 26 July 2021              Operating Test No.: 2021 A            E                                                      Scenarios P            V 1                      2                    3                  4          T        M P            E O        I L            N            CREW                  CREW                  CREW              CREW T        N I            T          POSITION              POSITION            POSITION          POSITION I
{{#Wiki_filter:}}
C                                                                                                      A S      A      B    S      A      B    S      A    B      S      A      B            M A            T                                                                                          L R      T      O      R      T      O      R      T    O      R      T      O            U N            Y O      C      P    O      C      P    O      C    P      O      C      P            M(*)
T            P E                                                                                              R      I  U RO            RX                                                                                3            1      1    1    0 NOR        1                    2                                                            2      1    1    1 SRO-I I/C        2, 3, 5, 6 3, 4, 5, 7 1, 4, 5          11      4    4    2 SRO-U                    4                    6                                                6 MAJ                                                                                            3      2    2    1 TS        2, 3                  1, 3                                                          4      0    2    2 RO            RX                1                                                                            1      1    1    0 NOR                                                                                            0      1    1    1 SRO-I                          2, 6                          3                                        3, 7 I/C                                                                                            5      4    4    2 SRO-U        MAJ              4                            6                                        6    3      2    2    1 TS                                                                                            0      0    2    2 RO            RX                        2              2                                                    2      1    1    0 NOR                      1                                                                    1      1    1    1 SRO-I                                  3, 5          4, 5, I/C                                                                                            5      4    4    2 7
SRO-U                                  4              6 MAJ                                                                                            2      2    2    1 TS                                                                                                    0    2    2 RO            RX                                                                                                    1    1    0 NOR                                                                                                  1    1    1 SRO-I I/C                                                                                                  4    4    2 SRO-U        MAJ                                                                                                  2    2    1 TS                                                                                                    0    2    2 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
 
ES-301                                      Transient and Event Checklist                                  Form ES-301-5 TEAMS 2 & 3 Facility: Point Beach                                  Date of Exam: 26 July 2021              Operating Test No.: 2021 A            E                                                      Scenarios P            V 1                      2                    3                  4          T        M P            E O        I L            N            CREW                  CREW                  CREW                CREW T        N I            T          POSITION              POSITION            POSITION            POSITION I
C                                                                                                      A S      A      B    S      A      B    S      A    B        S    A      B            M A            T                                                                                          L R      T      O      R      T      O      R      T    O        R    T      O            U N            Y O      C      P    O      C      P    O      C    P      O      C      P            M(*)
T            P E                                                                                              R      I  U RO            RX                                      2                                                    1      1    1    0 NOR        1                                                                                  1      1    1    1 SRO-I I/C        2, 3, 5, 6 4, 5, 7
3, 7 9      4    4    2 SRO-U                    4                            6                                              6 MAJ                                                                                          3      2    2    1 TS        2, 3                                                                              2      0    2    2 RX                1                                                        3                  2      1    1    0 RO NOR                              2                                                            1      1    1    1 SRO-I I/C              2, 6          3, 4,                                    1, 4,              10 5, 7                                      5, 7                      4    4    2 SRO-U        MAJ              4              6                                        6                  3      2    2    1 TS                              1, 3                                      2, 4              4      0    2    2 RO            RX                        2                                                      3          2      1    1    0 NOR                      1                                                                  1      1    1    1 SRO-I                                  3, 5                  3                                1, 4, I/C                                                                                          6      4    4    2 5
SRO-U                                  4                    6                                6 MAJ                                                                                          3      2    2    1 TS                                                                                            0      0    2    2 RO            RX                                                                                                    1    1    0 NOR                                                                                                  1    1    1 SRO-I I/C                                                                                                  4    4    2 SRO-U        MAJ                                                                                                  2    2    1 TS                                                                                                    0    2    2 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.}}

Revision as of 23:05, 16 January 2022

2021 Point Beach Initial License Exam Forms ES-301-5
ML21256A141
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/12/2021
From: Chuck Zoia
NRC/RGN-III/DRS/OLB
To:
Zoia C
Shared Package
ML20139A040 List:
References
Download: ML21256A141 (2)


Text