05000397/FIN-2015003-03: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 12: Line 12:
| identified by = NRC
| identified by = NRC
| Inspection procedure = IP 71111.04
| Inspection procedure = IP 71111.04
| Inspector = C Stott, D Bradley, J Groom, J O, 'Donnelll Carson, M Phalen, N Greene, R Smith
| Inspector = C Stott, D Bradley, J Groom, J O'Donnell, L Carson, M Phalen, N Greene, R Smith
| CCA = P.2
| CCA = P.2
| INPO aspect = PI.2
| INPO aspect = PI.2

Latest revision as of 00:22, 22 February 2018

03
Site: Columbia Energy Northwest icon.png
Report IR 05000397/2015003 Section 1R04
Date counted Sep 30, 2015 (2015Q3)
Type: NCV: Green
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71111.04
Inspectors (proximate) C Stott
D Bradley
J Groom
J O'Donnell
L Carson
M Phalen
N Greene
R Smith
Violation of: Technical Specification - Procedures

10 CFR 50 Appendix B Criterion III, Design Control

Technical Specification
CCA P.2, Evaluation
INPO aspect PI.2
'