| REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE By letter dated September 29, 1987, and affidavit dated September 22, 1987, you submitted your application for certification of the Advanced Boiling Water Reactor (ABWR) Design. As part of that application, in Chapter 4 of the SSAR, you submitted original information on the ABWR fuel design and requested that it be withheld from public disclosure pursuant to 10 CFR 2.790. | | REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE By {{letter dated|date=September 29, 1987|text=letter dated September 29, 1987}}, and affidavit dated September 22, 1987, you submitted your application for certification of the Advanced Boiling Water Reactor (ABWR) Design. As part of that application, in Chapter 4 of the SSAR, you submitted original information on the ABWR fuel design and requested that it be withheld from public disclosure pursuant to 10 CFR 2.790. |
| We have reviewed ycur application and the material based on the requirements i and criteria of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains trade l secrets or proprietary commercial information. Therefore, the information i rarked as proprietary in Chapter 4 of the SSAR will be withheld from public | | We have reviewed ycur application and the material based on the requirements i and criteria of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains trade l secrets or proprietary commercial information. Therefore, the information i rarked as proprietary in Chapter 4 of the SSAR will be withheld from public |
| ; disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic 4 | | ; disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic 4 |
Line 50: |
Line 50: |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE By letter dated September 29, 1987, and affidavit dated September 22, 1987, you submitted your application for certification of the Advanced Boiling Water Reactor (ABWR) Design. As part of that application, in Chapter 4 of the SSAR, you submitted original information on the ABWR fuel design and requested ihat it be withheld from public disclosure pursuant to 10 CFR 2.790. | | REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE By {{letter dated|date=September 29, 1987|text=letter dated September 29, 1987}}, and affidavit dated September 22, 1987, you submitted your application for certification of the Advanced Boiling Water Reactor (ABWR) Design. As part of that application, in Chapter 4 of the SSAR, you submitted original information on the ABWR fuel design and requested ihat it be withheld from public disclosure pursuant to 10 CFR 2.790. |
| We have reviewed your application and the material based on the requirements and criteria of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains trade secrets or proprietary consnercial information. Therefore, the information marked as proprietary in Chapter 4 of the SSAR will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. | | We have reviewed your application and the material based on the requirements and criteria of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains trade secrets or proprietary consnercial information. Therefore, the information marked as proprietary in Chapter 4 of the SSAR will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. |
| Withholding from public inspection,shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. | | Withholding from public inspection,shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20073T0701994-07-0101 July 1994 Reports Changes & Errors in ECCS Evaluation Models ML20090J9651992-03-11011 March 1992 Forwards Piping Design Insps,Tests,Analysis & Acceptance Criteria (Itaac).Piping Design ITAAC Will Be Included as Part of Generic ITAAC ML20090J9701992-03-11011 March 1992 Forwards Proprietary Responses to Issues Re Sections 9.3,9.5 & 11.2 of Advanced BWR Ssar.Responses Reflect Correctons & Additions to Earlier Proprietary Submittals.Responses Withheld ML20090J9791992-03-11011 March 1992 Forwards Responses to Resolution of Issues Related to Advanced BWR Draft SER Chapters 1,2,3,5,6,9,10,12,13,14 & 15 (SECY-91-355) ML20090J9941992-03-11011 March 1992 Forwards Draft Rev 0 to Advanced BWR Srvdl Wetwell Piping Stress Analysis Design Rept & Draft Rev 0 to Design Rept, Main Steam Line a & Safety Relief Valve Discharge Piping Stress Analysis, Per 911209-10 Ge/Nrc Meeting ML20090G5801992-03-0909 March 1992 Summerizes Staff Position Re NRC Conference Call on Dser Comments to Advanced BWR Ssar ISI Requirements ML20090F6171992-03-0505 March 1992 Forwards Rev B to 23A6100AQ,Section 17.3 Re Responses to Request for Resolution of Issues Related to Reliability Assurance Program (Rap).Subj Responses Will Be Included as Amend to Advanced BWR Ssar in Future ML20094G9691992-03-0202 March 1992 Forwards Radwaste Bldg Seismic Analysis. Informs That GE Intends to Amend Ssar W/Subj Analysis in Future Amend ML20094G7141992-02-25025 February 1992 Forwards Proprietary Revised App 18E, Advanced BWR Man-Machine Interface Sys Design & Implementation Process, of Advanced BWR Ssar.App Withheld ML20094G7401992-02-25025 February 1992 Forwards Proprietary Summary of 920127 Telcon W/Nrc & Brookhaven Lab to Clarify Aspects of Human Factors Review of Advanced Bwr,Specifically Review of Design Implementation Process.Summary Withheld ML20090A0441992-02-25025 February 1992 Forwards Proprietary Rev R-0 to Advanced BWR Project Common Engineering Work Plan. Plan Withheld ML20092N1451992-02-25025 February 1992 Requests Addition of Listed Individual to Advanced BWR Document Distribution List ML20092L0801992-02-25025 February 1992 Forwards App 19P to Chapter 19 of Evaluation of Potential Mods to Advanced BWR Design ML20090B1881992-02-24024 February 1992 Forwards Draft Rev 0 to Advanced BWR Ssar Main Steam, Feedwater & Srvdl Piping Sys Design Criteria & Analysis Methods & Draft Rev 0 to Advanced BWR Feedwater Loop a Piping & Equipment Loads, Per Ge/Nrc 911209-10 Meeting ML20092M2931992-02-20020 February 1992 Forwards Discussion of Differences Between Us Advanced BWR & K-6/7 Project.Advanced BWR Design Under Review for for Differences to K 6/7 & Addl Differences Will Be Included in Future Ssar Amend ML20094G7201992-02-17017 February 1992 Forwards Proprietary Revised App 18E, Advanced BWR Man-Machine Interface Sys Design & Implementation Process, of Advanced BWR Ssar.App Withheld ML20092F4241992-02-14014 February 1992 Forwards Proprietary Portion of GE Response to Agenda Items Discussed During 911120-21 Meeting W/Nrc Reactor Sys Branch. Response Withheld ML20092F4601992-02-14014 February 1992 Forwards Nonproprietary Portion of GE Response to Agenda Items Discussed During 911120-21 Meeting W/Nrc Reactor Sys Branch Re Standby Liquid Control Sys Instrumentation & Controls ML20092F4971992-02-13013 February 1992 Forwards Proprietary App 18F, Emergency Operation Info & Controls to Chapter 18, Human Factors Engineering of Advanced BWR Std SAR Covering Control Room Inventory.App 18F Withheld ML20092F5251992-02-11011 February 1992 Responds to Performance & Quality Evaluation Branch Open Items on Advanced BWR Std SAR Chapter 14 ML20092F5181992-02-10010 February 1992 Forwards Responses to 920110-16 Requests for Addl Info on Advanced BWR Design for Severe Accidents ML20092C0251992-02-0303 February 1992 Forwards Proprietary Responses to Addl Info Noted in 911004 Draft SER for Chapter 7.Responses Are Cross Ref W/Summary Item Number Corresponding to Review Meeting in San Jose on 910807 & 08.Responses Withheld ML20092C1671992-02-0303 February 1992 Forwards Nonproprietary Responses to Addl Items of Concern Noted in Draft SER for Chapter 7.Advises That GE Will Amend Advanced BWR Ssar W/Responses in Future Amend ML20092C1831992-02-0303 February 1992 Forwards Response to Leak Before Break Issue Addressed in 911209-10 Ge/Nrc Meeting.Advises That GE Intend to Amend Ssar W/Response in Future Amend ML20100P9651992-01-31031 January 1992 Forwards Proprietary NEDC-30032 Joint Study Final Rept - Joint Study W/Regard to 'Study (II) Related to Advanced Bwr' - Thermal Margin During Rapid Coastdown,820401-830331. Rept Withheld ML20091K8911992-01-22022 January 1992 Forwards Response to Open Issue 3 of SECY-91-153 Re Main Steam Line Seismic Classification Including,Static Design Procedure to Be Utilized in Evaluation of Seismic Capability of Condenser Anchorage & Turbine Bldg ML20094E4571992-01-17017 January 1992 Forwards Tier 1 Design Certification Matl,Pilot Itacc Examples for GE Advanced BWR Design & Advanced BWR Design Certification Generic ITAAC for Seismic Category 1 Structures,Position Paper ML20087D2641992-01-10010 January 1992 Forwards Response to Agenda Items 1,5,9 & 16 Discussed at Ge/Nrc Reactor Sys Branch 911120-21 Meetings.Items Include, Stability Performance in Normal Operating Region,Loss of Ac Power & Loss of Feedwater Heating Transient ML20087D4771992-01-10010 January 1992 Forwards Responses to Agenda Item 12 Discussed During 911120-21 Meeting W/Reactor Sys Branch of Nrc.Responses Withheld ML20087D0011992-01-0606 January 1992 Forwards Proprietary Tables to App 18F to Chapter 18 Re Human Factors Engineering.Ge Will Amend Ssar to Include Subj Info in Future Amend.Encl Withheld ML20087B7161992-01-0606 January 1992 Forwards Response to Issues Raised at Ge/Nrc 911209-10 Meetings Re Inservice Insp Relief Requests for Reactor Pressure Vessel Bottom Head Weld & Reactor Pressure Vessel Bottom head-to-shell Weld ML20086U5451992-01-0606 January 1992 Forwards Response to NRC Request for Addl Info Re Incorporation of Operating Experience in Advanced BWR ML20086U1941991-12-20020 December 1991 Confirms That Licensee Advanced BWR Application Should Be Processed as Application for Part 52 Final Design Approval & Subsequent Design Certification Per 10CFR52.45 ML20086N9601991-12-19019 December 1991 Forwards Proprietary & Nonproprietary Versions of Rev B to Update of App 9A, Reactor Bldg Fire Hazard Analysis ML20086P2161991-12-19019 December 1991 Forwards Proprietary Responses to Resolution of Issues Re Advanced BWR Draft SER ML20086P2251991-12-19019 December 1991 Forwards Nonproprietary Responses to Resolution of Issues Re Advanced BWR Draft SER ML20091H4061991-12-13013 December 1991 Forwards Selected Sections of Chapter 9, Auxiliary Sys & Chapter 18, Human Factors Engineering of Ssar for Advanced Bwr,Amend 19,including Update of Control Bldg Fire Protection Drawings.Encl Withheld ML20086N2161991-12-13013 December 1991 Forwards Amend 19 to Advanced BWR Ssar ML20094D2041991-12-12012 December 1991 Forwards Proposed Advanced BWR Tech Specs,Per Vendor to Nrc.Specs Will Be Documented Via Amend to Chapter 16 of Advanced BWR Ssar,Once Specs Finalized ML20086H5741991-12-0202 December 1991 Describes Plan for Submitting Advanced BWR Tech Specs to Nrc,Per 911108 Meeting.First Submittal of Noninstrumentation & Control Sys Will Be Submitted by 911213.Third Submittal Re 65 Unchanged LCOs Will Be Submitted by 920131 ML20086H6101991-11-27027 November 1991 Forwards Responses to Open Issues in GE Advanced BWR Ssar Chapter 8 Re Offsite Power Sys & Protective Sys for Reactor Internal Pumps,Per 910916-18 Meeting W/Nrc.Proprietary Versions of Response Withheld ML20086H6161991-11-27027 November 1991 Forwards Proprietary Responses to Open Issues 8.3.3.6 & 8.3.5 for Advanced BWR Ssar,Chapter 8,per Commitment at 910916-18 Meeting in San Jose.Encl Withheld ML20086E4831991-11-25025 November 1991 Forwards Tables Re Significant New Open Issues Included in Final,Draft Ser,Significant Open Items Included in All Draft Sers,Ge Future Submittals & Proposed Issues for Discussion at Dec Mgt Meeting,Per NRC ML20086C7201991-11-12012 November 1991 Forwards Proprietary Draft Writeup for Fire Protection PRA, as Requested in Draft SER on Advanced BWR Pra,Per SECY-91-309,dtd 911001.Encl Withheld ML20086A8121991-11-12012 November 1991 Forwards Draft Writeup for Fire Protection Probabilistic Risk Assessment Requested in Draft SER on Advanced BWR Probabilistic Risk Assessment.Ge Will Amend Ssar to Include Info When Finalized ML20079P1731991-11-0707 November 1991 Forwards Response to Discussion Item 7 from 910906 Conference Call Re Rod Block Algorithm & Setpoint ML20079M2561991-11-0101 November 1991 Forwards Proprietary GE Responses to Staff Position Re GE BWR Power Upgrade Program,Dtd 910930.Responses in Ref to Licensing Topical Rept NEDC-31897P-1, Generic Evaluations of GE BWR Power Uprate,June 1991. Responses Withheld ML20079L7461991-11-0101 November 1991 Forwards Summary of Major Advanced BWR Design Differences, Assessment of How TS Differ from Improved Ts,Including Summary of New,Different or Inapplicable & Example of How TS Would Be Written Where TS Differ from Improved TS ML20085K2631991-10-25025 October 1991 Forwards Addl Documents,In Response to NRC Re Resolution of Issues Related to Chapter 18 of Ssar for Advanced BWR Design.Documents Withheld ML20058L6811991-10-25025 October 1991 Forwards Rept Providing Update of in-reactor Surveillance Programs & Overall GE BWR Fuel Experience Through Dec 1990 1994-07-01
[Table view] Category:NRC TO VENDOR/MANUFACTURER
MONTHYEARML20059L2881990-09-19019 September 1990 Forwards Request for Addl Info Re Application for Certification of Advanced BWR Design ML20059A3931990-08-15015 August 1990 Forwards Request for Addl Info Re GE Application for Certification of Advanced BWR Design.Responses to Encl 1 Requested by 900831 & Responses to Encls 2 & 3 by 900928 ML20055J2661990-07-27027 July 1990 Forwards Request for Addl Info Re GE Application for Certification of Advanced BWR Design ML20246E1681989-08-17017 August 1989 Forwards Draft SER Re Final Design Approval & Design Certification of Advanced Bwr,For Use ML20245F0271989-08-0707 August 1989 Provides Clarification & Further Guidance Re Containment Design to Assure That Containment Conditional Failure Probability Less than 1 in 10 When Weighted Over Credible Core Damage Sequences.Goal of 0.1 Possible ML20246C0101989-06-30030 June 1989 Forwards Ltr from Director,Ofc of Nrr,Ack Receipt of Petition Filed by Ecology Ctr of Southern CA & Stating That Petition Is Being Treated Under 10CFR2.206 ML20245B6941989-06-16016 June 1989 Forwards Director'S Decision,Ltr of Transmittal & Fr Notice in Response to Ocre Petition Filed Under 10CFR2.206. Petitioner Expressed Concerns Re 890309 Power Oscillation Event at LaSalle Unit 2 & Requested Commission Action ML20245C3691989-06-16016 June 1989 Advises of Intended Visit to Audit Process of Verification & Validation for Advanced BWR Software Development ML20247F3491989-05-16016 May 1989 Requests Addl Info Re Application for Certification of Advanced BWR Design.Questions Cover Qa,Instrumentation & Controls,Electromagnetic Compatibility Qualification & Design & Performance Info.Response Requested by 890711 ML20195G9371988-11-22022 November 1988 Provides Recently Developed Info Re Scope of Future Std Design Applications & of Staff Review of Advanced BWR ML20155K5151988-10-26026 October 1988 Forwards Request for Addl Info Re GE Application for Certification of Advanced BWR Design.Info Includes Suppression Pool Water,Condensate Storage Tank,Discharge Line Fill Pump & Standby Liquid Control Sys ML20154Q1741988-09-26026 September 1988 Forwards Request for Addl Info Re Application for Certification of Advanced BWR Design.Responses Requested by 881130 ML20154J9201988-09-20020 September 1988 Forwards Request for Addl Info Re GE Application for Certification of Advanced BWR Design for Response by 881121 in Order to Maintain Review Schedule ML20154D8091988-09-12012 September 1988 Forwards Request for Addl Info Re GE Application for Certification of Advanced BWR Design for Response by 881115 ML20153A8471988-07-0707 July 1988 Forwards Request for Addl Info Re GE Application for Certification of Advanced BWR Design.Responses Requested by 880915 ML20195F1951988-06-0303 June 1988 Responds to Re Fee for Design Approvals & Certifications.Commission in Process of Examining Fees for All Types of Reviews.Ge Concerns Will Be Included in Commission Review Process ML20150F7751988-03-29029 March 1988 Advises That Info on Advanced BWR Fuel Design in Chapter 4 of Supplemental SAR Will Be Withheld from Public Disclosure (Ref 10CFR2.790),per 870929 Request ML20153B1541988-03-15015 March 1988 Informs of Relocation of NRR to Stated Address in Rockville, MD ML20147C4121988-02-29029 February 1988 Submits List of Concerns to Be Addressed During 880223-25 Preliminary Design QA Audit ML20149L8971988-02-22022 February 1988 Forwards Request for Addl Info Re GE Application for Certification of Advanced BWR Design by 880430.Request Addresses Areas of SRP Chapters 4,5,6 & 15,reviewed by Mechanical,Matls & Chemical Engineering Branches 1990-09-19
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20059L2881990-09-19019 September 1990 Forwards Request for Addl Info Re Application for Certification of Advanced BWR Design ML20059A3931990-08-15015 August 1990 Forwards Request for Addl Info Re GE Application for Certification of Advanced BWR Design.Responses to Encl 1 Requested by 900831 & Responses to Encls 2 & 3 by 900928 ML20055J2661990-07-27027 July 1990 Forwards Request for Addl Info Re GE Application for Certification of Advanced BWR Design ML20246E1681989-08-17017 August 1989 Forwards Draft SER Re Final Design Approval & Design Certification of Advanced Bwr,For Use ML20245F0271989-08-0707 August 1989 Provides Clarification & Further Guidance Re Containment Design to Assure That Containment Conditional Failure Probability Less than 1 in 10 When Weighted Over Credible Core Damage Sequences.Goal of 0.1 Possible ML20246C0101989-06-30030 June 1989 Forwards Ltr from Director,Ofc of Nrr,Ack Receipt of Petition Filed by Ecology Ctr of Southern CA & Stating That Petition Is Being Treated Under 10CFR2.206 ML20245B6941989-06-16016 June 1989 Forwards Director'S Decision,Ltr of Transmittal & Fr Notice in Response to Ocre Petition Filed Under 10CFR2.206. Petitioner Expressed Concerns Re 890309 Power Oscillation Event at LaSalle Unit 2 & Requested Commission Action ML20245C3691989-06-16016 June 1989 Advises of Intended Visit to Audit Process of Verification & Validation for Advanced BWR Software Development ML20247F3491989-05-16016 May 1989 Requests Addl Info Re Application for Certification of Advanced BWR Design.Questions Cover Qa,Instrumentation & Controls,Electromagnetic Compatibility Qualification & Design & Performance Info.Response Requested by 890711 ML20195G9371988-11-22022 November 1988 Provides Recently Developed Info Re Scope of Future Std Design Applications & of Staff Review of Advanced BWR ML20155K5151988-10-26026 October 1988 Forwards Request for Addl Info Re GE Application for Certification of Advanced BWR Design.Info Includes Suppression Pool Water,Condensate Storage Tank,Discharge Line Fill Pump & Standby Liquid Control Sys ML20154Q1741988-09-26026 September 1988 Forwards Request for Addl Info Re Application for Certification of Advanced BWR Design.Responses Requested by 881130 ML20154J9201988-09-20020 September 1988 Forwards Request for Addl Info Re GE Application for Certification of Advanced BWR Design for Response by 881121 in Order to Maintain Review Schedule ML20154D8091988-09-12012 September 1988 Forwards Request for Addl Info Re GE Application for Certification of Advanced BWR Design for Response by 881115 ML20151N0391988-07-28028 July 1988 Forwards Documents Re NRC Review of GE Application for Certification of Advanced BWR Design,Per 880201 Meeting Agreement.W/O Encl ML20153A8471988-07-0707 July 1988 Forwards Request for Addl Info Re GE Application for Certification of Advanced BWR Design.Responses Requested by 880915 ML20195F1951988-06-0303 June 1988 Responds to Re Fee for Design Approvals & Certifications.Commission in Process of Examining Fees for All Types of Reviews.Ge Concerns Will Be Included in Commission Review Process ML20150F7751988-03-29029 March 1988 Advises That Info on Advanced BWR Fuel Design in Chapter 4 of Supplemental SAR Will Be Withheld from Public Disclosure (Ref 10CFR2.790),per 870929 Request ML20153B1541988-03-15015 March 1988 Informs of Relocation of NRR to Stated Address in Rockville, MD ML20147C4121988-02-29029 February 1988 Submits List of Concerns to Be Addressed During 880223-25 Preliminary Design QA Audit ML20149L8971988-02-22022 February 1988 Forwards Request for Addl Info Re GE Application for Certification of Advanced BWR Design by 880430.Request Addresses Areas of SRP Chapters 4,5,6 & 15,reviewed by Mechanical,Matls & Chemical Engineering Branches IR 05000605/20080201985-10-29029 October 1985 Forwards Safety Insp Rept Conducted on 850605-0820 Under General License Issued to Miami Paper Co.No Items of Noncompliance Identified IR 05000605/20070301985-10-21021 October 1985 Forwards Safety Insp Conducted on 850605-0730 Issued to Standard Oil Co General License.No Items of Noncompliance Were Found IR 05000605/20080141985-10-18018 October 1985 Forwards Safety Insp Rept Conducted on 850605-0814 Under General License Issued to Dunn Paper.Items of Noncompliance Noted IR 05000605/20080161985-10-18018 October 1985 Forwards Safety Insp Rept Conducted on 850605-0816 Under General License Issued to Alumax Mill Products.No Items of Noncompliance Identified IR 05000605/20080121985-10-18018 October 1985 Discusses Insp Conducted on 850605-0812 & Forwards Safety Insp Rept.No Violations Observed 1990-09-19
[Table view] |
Text
oa March 29, 1988 ,
Docket No. STN 50-605
. DISTRIBUTION:
Ricardo Artigas, Manager ipoetet File / LRubenstein Licensing & Consulting Services NRC PCR JPartlow GE Nuclear Energy, Mail Code 682 PDSNP Reading DScaletti General Electric Company EHylton 175 Curtner Avenue EJordan San Jose, California 95125 EShomaker, OGC-Rockville
Dear Mr. Artigas:
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE By letter dated September 29, 1987, and affidavit dated September 22, 1987, you submitted your application for certification of the Advanced Boiling Water Reactor (ABWR) Design. As part of that application, in Chapter 4 of the SSAR, you submitted original information on the ABWR fuel design and requested that it be withheld from public disclosure pursuant to 10 CFR 2.790.
We have reviewed ycur application and the material based on the requirements i and criteria of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains trade l secrets or proprietary commercial information. Therefore, the information i rarked as proprietary in Chapter 4 of the SSAR will be withheld from public
- disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic 4
Energy Act of 1954, as amended.
4
- Withholding from public inspection shall not affect the right, if any, of 4
persons properly and directly concerned to inspcct the documents. If the need arises, we may send copies of this information to our consultants working in 4
this area. We will, of course, ensure that the consultants have signed the 4
appropriate agreements for handling proprietary information.
I If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, ycu should promptly notify the NRC. You should also understand that the NRC may have cause to review this determination in the future, such as, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely, '
original signed by Dino C. Scaletti, Project Manager ,
Standardization and Non-Power Reactor Project Directorate .
Division of Reactor Projects - III, IV, Y and Special Projects /
, Office of Nuclear Reactor Regul tio PDS 'P Dp ' ' % 0 .e vie
! ERyllon DSca etti:cw E omaker KLRubenstein 03/21/88 03/f)/88 03/M/88 03/q/88 8804050408 880329 l PDR ADOCK 050 5 i
o
+# g UNITFD STATES g NUCLEAR REGULATORY COMMISSION
[ W ASHING TON, D. C, 20555
% ,,,,, March 29, 1988 Docket No. STN 50-605 Ricardo Artigas, Manager Licensing & Consulting Services GE Nuclear Energy, Mail Code 682 .
General Electric Company 175 Curtner Avenue San Jose, California 95125
Dear Mr. Artigas:
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE By letter dated September 29, 1987, and affidavit dated September 22, 1987, you submitted your application for certification of the Advanced Boiling Water Reactor (ABWR) Design. As part of that application, in Chapter 4 of the SSAR, you submitted original information on the ABWR fuel design and requested ihat it be withheld from public disclosure pursuant to 10 CFR 2.790.
We have reviewed your application and the material based on the requirements and criteria of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains trade secrets or proprietary consnercial information. Therefore, the information marked as proprietary in Chapter 4 of the SSAR will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection,shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You should also ,
understand that the NRC may have cause to review this determination in the future, such as, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely, ;
%% C. Sc4M Dino C. Scaletti, Project Manager l
l Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation i