{{#Wiki_filter:Georgia Power Compey 40 invemess Center Parkway Post Ofree Box 1295 Birmingham, Alabama 35201 Telophone 2e5 877-7279 J. T. Beckham, Jr.                                                                    Georgia Power Vice President Nuclear Hatch Projm:t                                                                      !!>e aumern ciectrc m um Docket Nos.        50-321                                                            HL-4537 50-366 March 23, 1994 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 1
{{#Wiki_filter:}}
I Edwin I. Hatch Nuclear Plant Annual Environmental Surveillance Report i
Gentlemen:                                                                                                        1 In accordance with the Plant Hatch Units 1 and ? Emironmental Technical SpecificWons,                              j (Appendix B to the Operating Licenses) Section 5.6.1, Georgia Power Company is submitting the                      I enclosed Environmental Surveillance Report for 1993.
l If you have any questions in this regard, please contact this office at any time.
Sincerely, h
J. T. Beckham, Jr.
LPD. sis ENV 94-067
 
==Enclosure:==
Annual Emironmental Surveillance Report cc:    Gro_rgia_Eower Company Mr. H. L. Sunmer, General Manager - Nuclear Plant Mr. C. M. Hobson, Manager - Environmental Affairs NORMS U. S. Nuclear Regulatory Commission. Washincton. D. Cm Mr. K. N. Jabbour, Licensing Project Manager - Hatch U. S. Nuclear Regulatory Commission. Recion 11 Mr. S. D. Ebacter, Regional Administrator Mr. L. D. Wert, Senior Resident Inspector - Hatch 3000C_
9403300193 931231 PDR      ADOCK 05000321
                                                                                                        /
d    95 j #
R                        PDR                                                                          (  l a
 
ENCLOSURE EDWIN I IIATCll NUCLEAR PLANT- UNITS 1 AND 2 NRC DOCKETS 50-321,50-366 OPERATING LICENSES DPR-57, NPF-5 ANNUAL ENVIRONMENTAL SURVEILLANCE REPORT 1993 Specification In accordance with the Edwin I. Hatch Nuclear Pir.nt (Plant Hatch) Technical Specifications, Appendix B, Section 5.6.1, this report is submitted summarizing the environmental activities for Units I and 2 of the Edwin I. Hatch Nuclear Plant for the period January 1,1993 through December 31,1993.
Reportina Requirg_ments A. Summaries, Analyses, and Interpretations of the Environmental Monitoring Activities Results for the Report Period No nonradiological environmental monitoring activities were perfonned at Plant Hatch during the reporting period beyond those performed in accordance with NPDES Permit No. GA 0004120 Monitoring activities performed in accordance with NPDES Permit No. GA 0004120 are referenced in Section H.
B. Comparison With Preoperational Studies, With Operational Controls, and With Previous Monitoring Reports Comparisons with preoperational studics, operational controls, and previous monitoring reports were not necessary because no nonradiological monitoring programs were conducted during the monitoring period beyond those perfonned in accordance with NPDES Pennit No. GA 0004120.
C. An Assessment of Observed Impacts of Plant Operation on the Environment No significant environmental impacts were associated with plant operation during the reporting period.
IIL-4537 ENV-94-067 i
 
F EDWIN 1. IIATCII NUCLEAR PLANT- UNITS 1 AND 2 ANNUAL ENVIRONMENTAL SURVEILLANCE REPORT 1993 D. Environmental Technical Specifications (ETS) Noncompliances and Corrective Actions Taken No instances ofIsrS noncompliance occurred during the reporting period.
E. Changes to Federal and State Permits or Certificates U. S. Anny Corps of Engineers Permit No. 199101536 was reissued in 1993.
This permit authorizes the construction of a temporary weir in the Altamaha River to assure adequate cooling water during severe drought periods.
Attachment 1 provides an informational copy of the permit.
F. Changes in Station Design or Operation that Could Involve an Environmental Impact or Change in the Findings of the Final Environmental Statement In 1993, no changes were made in station design or operation which presented significant environmental impact or resulted in a change in the findings of the Final Environmental Statement.
G. Changes in the ETS No amendments to the ETS were issued during the reporting period.
II. Copies of All Reports Regarding Station Discharges Made in Accordance With NPDES Permit No. GA 0004120 Copies of the Plant liatch 1993 quarterly NPDES Operations Monitoring Reports and the 1993 Flow Monitoring and Characterization Study are included as Attachments 2 and 3 respectively.
Ill-4547 ENV-94-067 2
 
~-
ATTACIIMENT 1 EDWIN 1. IIATCll NUCLEAR PLANT - UNITS 1 AND 2 CORPS OF ENGINEERS PERMIT NO.199101536 T
IIL-4537 ENV-94-067 Edwin 1. llatch Nuclear Plants - Units 1 and 2 NRC DocLets 50421,50-3M Operating Ucenses DPR-57, NPF-5 Annual Environmental Surveillance Report
 
l t.
DEPARTMENT OF THE ARMY PERMIT Permittee:    Georgia Power Company Permit Number:  199101536 ISSUING OFFICE:                                    ,
Savannah District Corps of Engineers Post office Box 889 Savannah, GA 31402-0889 NOTE: The term "you" and its derivatives, as used in this permit, means the permittee or any future transferee. The term "this office" refers to the appropriate district or division office of the Corps of Engineers having jurisdiction over the permitted activity or the appropriate official of that office acting under the authority of the commanding officer.
You are authorized to perform work in accordance with the terms and conditions specified below.
PROJECT DESCRIPTION: The permitted activity is the construction of a temporary water retaining structure (weir) containing approximately 475 cubic yards of bagged river sand. The temporary structure will.be 550' long, 3' wide at the top, and 8' to 23 ' wide at the base. The height of the structure will vary from l' to 4 ' depending on river bottom contours. The crest elevation will be 62.3' above mean sea level, adequate to provide intake water to Plant Hatch. The temporary structure will have 2 fish ladders each 30' wide with the crest at 62.0' mean sea level. There will be a boat pass near the center of the structure 15' wide and approximately 4' deep. The temporary structure will be marked upstream with 6 lighted buoys at 100' center to center spacing 1,000' upstream and 3 lighted buoys at 200' center to center spacing 500' upstream. Six lighted buoys at 100' center to center spacing will also be placed 500'          :
downstream of the structure. The weir would be placed only in the event of an extreme low flow situation in the Altamaha River, after supplemental flows from upstream reservoirs were near exhaustion.
PROJECT LOCATION: The site is located in the Altamaha River, approximate River Mile 116.3, near the E. I. Hatch Steam Electric Generating Station, Plant Hatch, approximately 4,200 feet downstream of U. S. Highway 1, in Appling and Toombs, Counties Georgia.
                                                                              ]
ll l
 
,, : ..'                                                                        l PERMIT CONDITIONS:
General Conditions:
: 1.      The time limit for completing the work authorized ends on February 1, 1998.        If you find that you need more time to complete the authorized activity, submit your request for a time extension to this office for consideration at least one month before the above date is reached.
j
: 2. You must maintain the activity authorized by this permit in    !
good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area.
: 3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and state coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places.
: 4.      If you sell the property associated with this permit, you must obtain the signature of the new owner in the space provided and forward a copy of the permit to this office to validate the transfer of this authorization.
: 5. If a conditioned water quality certification has been issued for your project, you must comply with conditions specified      in the certification as special conditions to this permit. For your convenience, a copy of the certification is attached if it contains such conditions.
: 6. You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit.
Special Conditions:
: 1. The weir will only be constructed in the event of an extreme low flow situation after supplemental flow from upstream reservoirs are near exhaustion.
: 2. That the permittee will notify this office as early in advance of construction as possible, at least 10 days in advance.
Once the notification is received, the District Engineer will
 
c notify the appropriate Federal and State agencies, and issue the necessary Notice to Mariners.
: 3. That the permittee will place all lights and signals to mark the weir as may be prescribed by the U. S. Coast Guard. These lights and signals shall be installed and maintained by and at the expense of the permittee.
: 4. That all materials used in construction of the weir vill be removed to a high ground site.
: 5. That any change to the river due to construction equipment be restored after construction.
: 6. That someone with a background in riparian and riverine habitat studies be present during construction of the weir to insure that impacts to riparian and riverine habitats are minimized. That the weir be under surveillance and daily reports on weir conditions be made by the permittee.
: 7. That the permittee shall begin removal of the weir on or before 1 January and complete removal of the weir by 1 February.
If deviation from this schedule is anticipated by the permitte due to extreme low or high water elevations,.the permittee shall notify the District Engineer of the situation at the earliest possible date and request approval of a new schedule of removal.
B. That sounding or bottom probing    be conducted to ensure that That results of all sounding all materials have been removed.
and/or probing shall be reported.
: 9. That the permittee shall notify this office once removal of the weir is completed.
FURTHER INFORMATION:
: 1. Congressional Authorities: You have been authorized to undertake the activity described above pursuant to:
(x) Section 10 of the River and Harbor Act of 1899 (33 U.S.C.
403).
(x) Section 404 of the Clean Water Act (33 U.S.C. 1344).
( ) Section 103 of the Marine Protectio'n, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413).                          7
: 2. Limits of this authorization.
: a. This permit does not obviate the need to obtain other Federal, state, or local authorizations required by law.
l l
l
 
*.o    -
i
: b. This permit does not grant any property rights or exclusive privileges.
: c. This permit does not authorite any injury to the property or rights of others.
: d. This permit does not authorize interference with any existing or proposed Federal projects.
: 3. Limits of Federal Liability. In issuing this permit, the 7ederal Government does not assume any liability for the              !
following:
: a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes,
: b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest.
: c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit.
: d. Design or construction deficiencies associated with the permitted work.
: e. Damage claims associated with any future modification, suspension, or revocation of this permit.
: 4. Reliance on Applicant's Data. The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided.
: 5. Re-evaluation of Permit Decision. This office may re-evaluate its decision on this permit at any time the circumstances warrant. Circumstances that could require re-evaluation include, but are not limited to, the following:
: a. You fail to comply with the terms and conditions of this permit.
: b. The information provided by you in support of your permit application proves to have been false, incomplete, or inaccurate (see 4 above).
: c. Significant new information surfaces which this office did not consider in reaching the original public in.terest decision.
Such a re-evaluation may result in a determination that it is      I appropriate to use the suspension, modification, and revocation procedures contained.in 33 CFR 325.7 or enforcement procedures 1
 
4
                                                                        'Ehe such as those contained in 33 CFR 326.4 and 326.5.
referenced enforcement procedures provide'for the issuance of an administrative order requiring you to comply with the terms and conditions of your permit and for the initiation of legal action where appropriate. You will.be required to pay for any corrective measures ordered by this office, and if you fail to comply with such directive, this office may in certain situations (such as those specified in 33 CFR 209 170) accomplish the corrective measures by contract or otherwise and bill you for the cost.
: 6.      Extensions. General Condition 1 establishes a time. limit for the completion of the activity authorized by.this permit. Unless there are circumstances requiring either a prompt completion of.
the authorized activity or a reevaluation of the public interest decision, the Corps will normally give favorable consideration to.
a request for an extension of this time limit.
                  ,v.    , - - ,- -          y    ,            -,
 
_        _      . _ .. _  _                  _ _ _ . _        _ . ~            _ _ . _ . _ _          _. _        _
. . , .t ...-
Your signature below, as permittee, indicates that you. accept and agree to comply with the terms and conditions of this permit.
S~ .5/~ f3 '
hsY(PERMITTEE)                                                                  (DATE)
This permit becomes effective when the Federal, official',
designated to act for the Secretary of the Army, has signed below.
                                            ~                          T        *
                                                                            #                                      (DATE)
                      /                /
Issued for and in behalf of:
Donald R. Holzwarth Colonel, U. S. Army District Engineer When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner (s) of the property.                To validate the transfer of this permit and the associated liabilities with compliance with its terms and-conditions, have the transferee sign and date below.
(DATE)
(TRANSFEREE) i I
l
                                                                                                                                      .l l
l h
                                              - . . , , .    -        ,  ,      , . . , . . -            y -
y  .
7  , p-
 
l l
1 l
iibis hotice of.huthorization must.be ~ / (... .%                                    .                  I conspicuously: displayed at the site 1of mork.',A                                            -          ,
United States Army Corps of Engineers 19 93-1 l
A permit to construet a tervorary weir in the Altamha niver                                                        i at Plant flatch in Applina and Toonos Counties has been issued to c~m4a s-v cyny                              on ar rei t 10 m Address of Permittee _ccoran Per en,nanv t
Permit Number 4                                            l 199101536                                        For    str/Cf Comp 0nder r                                                                      Donald R. Holzwarth Colonel. U.S. Army District Engineer ENG FORM 4336, Jul 81 f u CPn monos soita or sut to uay og usto teret: cecw.o) i 1
I
 
i
,                                            ATTACilMENT 2 EDWIN 1. HATCil NUCLEAR PLANT - UNITS l' AND 2 1993 NPDES OPERATION MONITORING REPORTS p
HL-4537 ENV-94-067
  . Edwin L Hatch Nuclear Plants - Units I and 2 NRC Dockets 50-321,50-366 Operating Licenws DPR-57, NPF-5 Annual Environmental Surveillance Report -
                                                                                    'l i
 
Paga 1 of 14 NPDES: OPERATION MONITORING REPORT Georgia Power Company                                          From:    01-01-93 Plant E.I. Hatch                                                To:    03-31-93 P.O. Box 4545 Atlanta, Georgia  30302                          Permit Number:      GA0004120 Discharge Location:      O1G - Low Volume Waste    (Neutralization Tank)
Type of Sample: Grab Frequency of Analysis:    2/Mo 4
Code:                              (530)                    (550)
Parameter:                    Suspended Solids          Oil & Grease mg/l                      29/1 Limits:                          Avg. 30                Avg. 15 Max. 100                Max. 20 Date:
01-08-93                            0.5                        0.0 01-18-93                          14.7                        0.0 02-01-93                            6.0                        0.1 02-16-93                          11.9                        1.0 03-11-93                          24.2                        0.0 03-16-93                            8.0                        0.0 Number of Samples:                    6                          6 Average Value:                    10.9                        0.2 Maximum Value:                    24.2                        1.0 Minimum Value:                      0.5                        0.1 Limits Exceeded:                      0                          0
 
Paga 2 of 14 NPDES: OPERATION MONITORING REPORT Georgia Power Company                                              From:      01-01-93 Plant E.I. Hatch                                                      To:    03-31-93 P.O. Box 4545 Atlanta, Georgia  30302                              Permit Number:        GA0004120 Discharge Location:        O1H - Lov Volume Waste (Pressure Filters Backwash)
Type of Sample:  Grab Frequency of Analysis:      1/Qtr Code.4                                    (530)                  (550)
Parameter:                        Suspended Solids          Oil & Grease mg/l                  mg/l Limits:                                Avg.        30          Avg. 15 Max.      100          Max. 20 Date:
03-23-93 (A)                                  3                    <5 03-23-93 (B)                                  4                    <5 03-23 (C)                                3                    <5 03-23-93 (D)                                  5                    <5 Number of Samples:                          4                      4 Average Value:                              4                      <5 Maximum Value:                              5                      <5 Minimum Value:                              3                      <5 Limits Exceeded:                            0                      0 1
I
 
                                                                          .Paga 3 of 14 NPDES: OPERATION MONITORING REPORT Georgia Power Company                                      ,
From:    01-01-93 Plant E.I. Hatch                                                      To:    03-31-93 P.O. Box 4545 Atlanta, Georgia  30302                              Permit Number:      GA0004120 Discharge Location:      01A - Cooling Tower Blowdown Unit One Location: Blowdown    Blowdown      Blowdown        Tower Basin        Tower Basin Type:      Mitpl Grab  Mltpl Crab Mitpl Grab          Grab                Grab Frequency:1/Wk/ Unit  1/Wk/ Unit    1/Wk/ Unit        1/Qtr              1/Qtr Parameter:    Fac      Fac max.      Total Time        Zinc              Chromium 4                                of TRC rel        max.                max.
                                        & TRC avg.
(mg/1)      (mg/1)      (min) (mg/1)    (mg/1)              (mg/1)
Limits:      0.2        0.5          120    N/A      1.0                0.2 Codes:    50064      50064        81400 50060      1092                1034 Date:
01-06-93      0          0            0    0        --                  --
01-08-93      -          -            -    -
                                                          .06                    0 01-13-93      0          0            0    0        --                  --
01-20-93      0          0            0    0        --                  --
01-27-93      0          0            0    0        --                  --
02-03-93      0          0            0    0        --                  --
02-10-93      0          0            0    0        --                  --
02-18-93      0          0            0    0        --                  --
02-24-93      0          0            0    0        --                  --
03-03-93      0          0            0    0        --                  --
03-10-93      0          0            0    0        --                  --
* 03-17-93      -          -            -      -        --                  --
* 03-24-93      -          -            -      -        --                  --
J Humber of Samples:      10          10          10      10          1                  1 Avg Value:        0          0          0        0      .06                    0 Max Value:        0          0          0        0      .06                    0 Min Value:        0          0          0        0      .06                    0 Limits Exceeded:        0          0          0        0          0                  0
* Note: Unit 1 in outage. Unable to obtain sample.
 
Pag 3 4 of 14 NPDES: OPERATION MONITORING REPORT Georgia Power Company                                                            From:    01-01-93 Plant E.I. Hatch                                                                    To:    03-31-93 P.O. Box 4545 Atlanta, Georgia        30302                                      Permit Number:      GA0004120 Discharge Location:            02A - Cooling Tower Blowdown Unit Two Location: Blowdown          Blowdown        Blowdown        ' Tower Basin        Tower Basin Type:      Mltpl Grab        Mltpl Grab Mltpl Grab                  Grab                Grab Frequency:1/Wk/ Unit        1/WX/ Unit      1/Wk/ Unit            1/Qtr              1/Qtr Parameter:
Fac            Fac max.        Total Time            Zinc              Chromium of TRC rel            max.                max.
                                                      & TRC avg.
(mg/1)            (mg/1)          (min)(mg/1)        (mg/1)                (mg/1)
Limits:      0.2              0.5            120    N/A            1.0                0.2 Codes:    50064            50064            81400 50060            1092                1034 Date:
01-05-93      0                  0              0      0          --                  --
01-08-93      -                  -
0      0          .87                  0.0 01-13-93      0                  0              0      0          --                .--
01-20-93      0                  0              0      0          --                  --
01-27-93      0                  0              0      0          --                  --
02-03-93      0                  0              0      0          --                  --
02-10-93      0                  0              0    ,0            --                  --
02-18-93      0                  0              0      0          --                  --
02-24-93      0                  0              0      0          --                  --
03-03-93      0                  0              0      0          --                  --
* 03-10-93      --              --              --    --              --                  --
* 03-17-93      --              --              --    --              --                  --
* 03-24-93      --              --              --    --              --                  --
Number of Samples:      9                  9            9        9            1                  1 Avg Value:        0                  0            0        0            0                  0 Max Value:        0                  0            0        0            0                  0 Min Value:        0                  0            0        0            0                  0 Limits Exceeded:        0                  0            0        0            0                  0
* Unit Two in outage. Unable to obtain sample.
1
 
p Paga 5 of 14 NPDES: OPERATION MONITORING REPORT Georgia Power Company                                                          From:  01-01-93 Plant E.I. Hatch                                                                To:  03-31-93 P.O. Box 4545 Atlanta, Georgia              30302                                Permit Number:    GA0004120 Discharge Location:                01B - Unit One Cooling Water Overflow Location: Blowdown                Blowdown    Blowdown          Tower Disch. Tower Disch.
Type:                Mltpl Grab Mltpl Grab Mltpl Grab              Grab            Grab Frequency:1/Wk/ Unit              1/Wk/ Unit  1/Wk/ Unit          1/Qtr            1/Qtr Parameter:              Fac      Fac max. Total Time          Zine          Chromium a                                          of TRC rel          max.              max.
                                                  & TRC avg.
(mg/1)      (mg/1)      (min)(mg/1)        (mg/1)            (mg/1)
Limits:                0.2          0.5        120      N/A        1.0              0.2 Codes:                50064      50064        81400 50060        1092              1034 Date:
03-19-93                --          --          --      --
                                                                        <.1              <.1
                                                                                                  -l l
I Number of                                                                                          i Samples:                  0            0            0        0          1                1      l Avg Value:                  -            -            -        -
                                                                          <.1            <.1        l Max Value:                  -            -            -        -
                                                                          <.1            <.1      !
Min Value:                  -            --          -        -
                                                                          <.1            <.1      o Limits Exceeded:                  0            0              0        0        0                0      l l
1 1
i l
l 1
 
3 Pcg3 6 of 14 NPDES: OPERATION MONITORING REPORT Georgia Power Company                                            From:  01-01-93 Plant E.I. Hatch                                                    Tot  03-31-93 P.O. Box 4545 Atlanta, Georgia      30302                            Permit Number:    GA0004120
  ** Discharge Location:        01I - Unit One Cooling, Tower Basin Drains Location: Blowdown        Blowdown      Blowdown    Tower Disch. Tower Disch.
Type:      Mitp1 Grab    Mltpl Grab Mltpl Grab        Grab            Grab Frequency:1/Wk/ Unit      1/Wk/ Unit    1/Wk/ Unit    1/Qtr            1/Qtr Parameter:    Fac        Fac max.      Total Time    Zinc          Chromium of TRC rel    max.              max.
                                            & TRC avg.
(mg/1)        (mg/1)      (min) (mg/1)  (mg/1)            (mg/1)
Limits:      0.2            0.5          120    N/A    1.0              0.2 Codes:      50064        50064        81400 50060  1092              1034 Date:
03-23-93    -              -            -      -
                                                            .5                0 Discharge occured during period of no chlorination.
Number of Samples:    0              0            0    0      1                1 Avg Value:    0              0            0    0      .5                0 Max Value:    0              0            0    0      .5                0 Min Value:    0              0            0    0      .5                0 Limits
    . Exceeded:  0              0            0    0      0                0          i j
l i
i
 
Pega 7 of 14 NPDES: OPERATION MONITORING REPORT Georgia Power Company                                          From:      01-01-93 Plant E.I. Hatch                                                  To:  03-31-93 P.O. Box 4545 Atlanta, Georgia  30302                            Permit Number:    GA0004120 Discharge Location:      01J - Unit One Cooling Tower Basin Overflows to Storm Drains Location: Blowdown    Blowdown      Blowdown    Tower Disch.      Tower Disch..
Type:      Mltpl Grab  Mltpl Grab Mitpl Grab        Grab              Grab Frequency:1/WK/ Unit  1/WX/ Unit    1/Wk/ Unit      1/Qtr            1/Qtr Parameter:  Fac      Fac max.      Total Time      Zinc            Chromium of TRC rel      max.              max.
4
                                        & TRC avg.
(mg/1)      (mg/1)      (min) (mg/1)  (mg/1)            (mg/1)
Limits:    0.2          0.5          120    N/A    1.0                0.2 Codes:    50064      50064        81400 50060    1092              1034 Date:
03-23-93    -            -              -      -
                                                          .1                0 Discharge occured during period of no chlorination.
1 Number of Samples:    0            0            0      0        1                1 Avg Value:    0            0            0      0      .1                0 Max Value:    0            0            0      0      .1                0 Min Value:    0            0            0      0      .1                0 Limits Exceeded:    0            0            0      0  . 0                0 l
I
 
Pcga 8 of 14 1
NPDES: OPERATION MONITORING REPORT Georgia Power Company                                                      From:  01-01-93 Plant E.I. Hatch                                                            To:  03-31-93  l l
P.O. Box 4545 Atlanta, Georgia            30302                              Permit Number:    GA0004120 Discharge Location:              02B - Unit Two Cooling Water Overflow To Storm Drains Location: Blowdown              Blowdown      Blowdown      Tower Disch. Tower Disch.
Type:              Mltpl Grab    Mitpl Grab Mitpl Grab          Grab            Grab Frequency:1/Wk/ Unit            1/Wk/ Unit    1/Wk/ Unit      1/Qtr          - 1/Qtr Para 6eter:          Fac        Fac max.      Total Time      Zinc          Chromium of TRC rel      max.            max.
                                                                                                          & TRC avg.
(mg/1)        (mg/l)        (min) (mg/1)  (ag/1)          (mg/1)
Limits:            0.2          0.5            120    N/A    1.0              0.2 Codes:            50064        50064          81400 50060    1092            1034 Date:
01-16-93            --            --            --    --    0.6              0
* 03-31-93                          <.1          <.1                0  <.1    0.2              0
* Temperature reading = 68 0                          F ( 20 0 C), Flow rate of 400 gpm
* Bypass Authorization due to Unit One Dual Division Plant Service Water Outage.
Discharges occured during periods of no chlorination.
Number of Samples:  1              1              1    1      2                2 Avg Value: <.1                          <.1              0    <.1      0.4              0 Max Value:                <.1          <1                0  <.1      0.6              0 Min Value:                <.1    .      <.1                0  <.1      0.2              0 Limits Exceeded:          0              0              0    0      0                0
 
l PGg3 9 of 14 NPDES: OPERATION MONITORING REPORT Georgia Power Company                                          From:01-01-93 Plant E.I. Match                                      -        To:  03-31-93 P.O. Box 4545 Atlanta, Georgia  30302                            Permit Number:  GA0004120 Discharge Location:      02C - Unit Two Cooling Water Overflow Location: Blowdown    Blowdown    Blowdown      Tower Disch. Tower Disch.
Type:      Mltpl Grab  Mltpl Grab Mitpl Grab        Grab            Grab Frequency:1/Wk/ Unit  1/Wk/ Unit  1/Wk/ Unit    1/Qtr          1/Qtr Parameter:  Fac      Fac max. Total Time    Zinc          Chromium 4                              of TRC rel      max.            max.
                                      & TRC avg.
(mg/1)      (mg/1)      (min)(mg/1)    (mg/1)          (mg/1)
Limits:    0.2          0.5        120    N/A    1.0              0.2 Codes:    50064        50064      81400 50060    1092            1034 Date:
01-16-93    --          --          --    --
0.6              0 Discharge occured during a period of no chlorination.
Number of Samples:        0            0            0    0    1                1 Avg Value:        0            0            0    0  0.6                0 Max Value:        0            0            0    0  0.6                0 Min Value:        0            0            0    0  0.6                0 Limits Exceeded:        0            0            0    0      0                0 l
l i
l l
l 1
 
Paga 10 of 14 i
NPDES: OPERATION MONITORING REPORT Georgia Power Company                                                              From:  01-01-93 Plant E.I. Hatch                                                                    To:  03-31-93 P.O. Box 4545 Atlanta, Georgia        30302                                        Permit Number:    GA0004120 Discharge Location:                01E - Low Volume Waste (Liquid Radwaste System Unit One)
Type of Sample: Grab Frequency of Analysis:              2/Mo Code:                (530)                (550)
Parameter:          TSS                O&G              Nitrite (Chill Water) Releases mg/l                mg/l              to discharge point OSN 01 Limits:          Avg. 30            Avg. 15    Initial        Amount    Dilution      Final Max.100            Max. 20      Conc.        Drained    Flow rate    Conc.
(ppm)      (gallons)      (gpm)      (ppb)
Date:
01-04            7                0.5          --            --          --          --
01-18-93            14                  0.0          --            --          --          --
02-01-93            .1                0.3          --            --          --          --
02-15-93              1                0.0          --            --          --          --
03-01-93              2                2.9          --            --          --          --
03-15-93              4                2.4          --            --          --          --
03-30-93              -                  -
300            6792      14000        141 Number of Samples    :    6                    6              1            1        1          1 Average Value:      5                  1.0        300          6792      14000          141 Maximum Value:    14                  2.9        300        . 6792      14000          141 Minimum Value:    .1                  0.0        300          6792      14000          141 Limits Exceeded: 0                          0        NA            NA        NA          NA
 
Pcg3 13 of 14 NPDES: OPERATION MONITORING REPORT Georgia Power Company From:  01-01-93 Plant E.I. Hatch                                                            To:  03-31-93 P.O. Box 4545 Atlanta, Georgia    30302                                  Permit Number:      GA0004120 Discharge Location:      02E - Low Volume Waste (Liquid Radwaste System Unit Two)
Type of Sample:  Grab Frequency of Analysis:    2/Mo Cod e'i          (530)        (550)
Parameter:        TSS        O&G              Nitrite (Chill Water) Releases mg/l        mg/l              to discharge point OSN 02 Limits:        Avg. 30    Avg. 15      Initial      Amount      Dilution      Final Max.100    Max. 20      Conc.      Drained      Flow rate    Conc.
(ppm)        (gallons)      (gpm)      (ppb)
Date:
01-04-93            2        1.3          --
01-18-93            1        0.3          --
02-01-93            3        1.3          --
02-15-93            1        1.9          --            --
03-01-93            2        2.4          --
03-15-93          .7          0.9          --
Number of Samples  :  6            6            0            0          0            0 Average Value:  1.6          1,4            0            0          0            0 Maximum Value:    3          2.4            0            0          0            0 Minimum'Value:  .7          0.3            0            0          0            0 Limits Exceeded: 0              0          NA            NA          NA              NA 1
i
 
Pcg3 12 of 14        l NPDES: OPERATION MONITORING REPORT Georgia Power Company                                      From:    01-01-93 Plant E.I. Hatch                                              To:    03-31-93 P.O. Box 4545 Atlanta, Georgia  30302 -                        Permit Number:  GA0004120 Discharge Location:      01 - Combined Plant Waste Streams Unit One Frequency of Analysis:    1/Wk Type of samples:          In Situ      Grab      Grab          Grab Parameter:              Temperature    T.R.C. F.A.C.        pH LimiEs:                  Deg. F        N/A        N/A        Min. 6.0 Max. 9.0 Code:                      (11)        (50060)  (50064)        (400)
Date:
01-04-93                    62        <.1        <.1            6.8 01-11-93                    68        <.1        <.1            6.6 01-18-93                    73 ,      <.1        <.1            7.3 01-25-93                    71        <.1        <.1            7.4 02-01-93                    77        <.1        <.1            7.4 02-08-93                    71        <.1        <.1            7.7 02-15-93                    64        <.1        <.1            7.0 02-22-93                    60        <1        <.1            7.1 03-01-93                    59        <.1        <.1            7.1 03-08-93                    75        <.1        <.1            7.5 03-15-93                    60        <.1        <.1            7.2 03-22-93                    59        <.1        <.1            7.3 03-29-93                    66        <.1        <.1            6.9 Number of Samples:          13          13        13            13 Average Value:              67        <.1        <.1            7.2 Maximum Value:              77        <.1        <.1            7.7 Minimum Value:              59          0          0            6.6 Limits Exceeded:              0          0          0              0
 
t P293 13 of 14 NPDES: OPERATION MONITORING REPORT Georgia Power Company                                      From:      01-01-93 Plant E.I. Hatch                                              To:      03-31-93 P.O. Box 4545 Atlanta, Georgia  30302                          Permit Number:      GA0004120 Discharge Location:      02 - Combined Plant Waste Streams Unit Two Frequency of Analysis: 1/Wk Type of Samples:          In Situ      Grab        Grab        Grab Parameter:            Temperature      T.R.C.      F.A.C.        pH Limits:                  Deg. F        N/A        N/A        Min. 6.0 Max. 9.0 code:                      (11)        (50060)    (50064)      (400)
Date:
01-04-93                      73        <.1        <.1          7.4 01-11-93                      73        <.1        <.1          7.1 01-18-93                      73        <.1        <.1          7.4 01-25-93                      66        <.1        <.1          7.1 02-01-93                      68        <.1        <.1          7.5 02-08-93                      68        <.1        <.1          7.6 02-15-93                      71        <.1        <.1          7.8 02-22-93                      66        <.1        <.1          7.1 03-01-93                      64        <.1        <.1          7.8 03-08-93                      62        <.1        <.1          7.4 03-15-93                      66        <.1        <1            7.2 03-22-93                      57        <.1        <.1          6.8 03-29-93                      66        <.1        <.1          6.9 Number of Samples:            13          13        13          13 Average Value:                67        <.1        <.1          7. 3-Maximum Value:                73        <.1        <.1          7.8 Minimum Value:                57        <.1        <.1          6.8 Limits Exceeded:                0        0          0            0
 
P0ga 14 of 14 NPDES: OPERATION MONITORING REPORT Georgia Power Company                                            From:  01-01-93 Plant E.I. Hatch                                                  To:  03-31-93 P.O. Box 4545 Atlanta, Georgia 30302                                Permit Number:  GA0004120 I  certify    under  the  penalty  of  law  that this document and all attachments    were prepared under my direction or supervision in accordance with  a system designed to assure that qualified personnel properly gather and  evaluate    the  information  submitted. Based  on my inquiry of the person  or  persons    who manage    the  system,  or  those persons directly responsible    for    gathering the information, the information submitted.is, to  the  best of my knowledge and belief, true, accurate, and complete.        I am  aware  that  there  are  significant  penalties    for  submitting false information,    including the possibility of fine and imprisonment for known violations.
h 1 S L - 80714-0v H. L. Sumner, Jr.
General Manager Nuclear Plant
 
r q
Paga 1 of 15    i NPDES: OPERATION MONITORING REPORT Georgia Power Company                                          From:    04-01-93 Plant E.I. Hatch                                                  To:    06-30-93 P.O. Box 4545 Atlanta, Georgia  30302                            Permit Number:      GA0004120 Discharge Location:      O1G - Low    Volume Waste (Neutralization Tank)-
Type of Sample:  Grab Frequency of Analysis:    2/Mo Code:                                (530)                    (556)
Parameter:                      Suspended Solids          Oil & Grease mg/l                      mg/l Limits:                            Avg. 30              Avg. 15 Max. 100              Max. 20 Date:
04-05-93                      .      2.9                      1.0 04-26-93                            13.5                        0.0 05-06-93                            15.2                        0.5 05-19-93                            19.0                        0.0 06-07-93                              0.3                      0.0 06-23-93                              2.4                      0.5 Number of Samples:                      6                        .6 Average Value:                        8.9                      0.3 Maximum Value:                      19.0                        1.0 Minimum Value:                        0.3                      0.0 Limits Exceeded:                      -0                          0 l
i
                                                                                      .]
 
Pago 2 of 15        ]
NPDES: OPERATION MONITORING REPORT Georgia Power Company                                                From:      04-01-93 Plant E.I. Hatch                                                        To:    06-30-93 P.O. Box 4545 Atlanta, Georgia    30302                                Permit Number:        GA0004120 Discharge I,ocation:      01H - Low Volume Waste (Pressure Filters Backwash)
Type of Sample: Grab Frequency of Analysis:    1/Qtr Cod e":                              (530)                        (556)
Parameter:                      Suspended Solids                011 & Grease mg/l                        mg/l Limits:                            Avg.      30                  Avg.      15 Max. 100                  Max.      20 Date:
05-17-93 (A)                              2                            <5 05-17-93 (B)                              2                            <5 05-17-93 (C)                              4                            <5 05-17-93 (D)                              5                            <5 Number of Samples:                      4                              4 Average Value:                        3.3                          <5 Maximum Value:                          5                            <5 Minimum Value:                          2                            <5 Limits Exceeded:                        0                              0 l
l
~; _    - -          -            -                  . . . .                , .            ,
 
Page 3lof 15 NPDES: OPERATION MONITORING REPORT Georgia Power Company                                        From:    04-01-93 Plant E.I. Hatch                                                To:    06-30-93 P.O. Box 4545 Atlanta, Georgia  30302                            Permit Number:  GA0004120 Discharge Location:      01A - Cooling Tower Blowdown Unit One Location: Blowdown    Blowdown      Blowdown    Tower Basin    Tower Basin Type:      Mltpl Grab  Mltpl Grab Mitpl Grab        Grab            Grab Frequency:1/Wk/ Unit  1/Wk/ Unit    1/Wk/ Unit    1/Qtr          1/Qtr Parameter:    Fac      Fac max.      Total Time    Zinc          Chromium
          #                              of TRC rel    max.            max.
                                          & TRC avg.
(mg/1)      (mg/1)      (min) (mg/1)  (mg/1)          (mg/1)
Limits:      0.2        0.5          120    N/A    1.0            0.2 Codes:    50064        50064        81400 50060    1092            1034 Date:                                                                --
* 04-07-93      -          -
* 04-14-93      -          -            -
* 04-21-93      -          -              -
* 04-28-93'    -          -
* 05-04-93      -          -
05-12-93      0          0            0    0      --              --
05-19-93      0          0            0    0      --
05-25-93      -          -            -    -
0.4              0 05-26-93      0          0            0    0      --
06-02-93      0          0            0    0      --              --
06-09-93      0          0            0    0      --
06-16-93      0          0            0    0      --              --
06-23-93      0          0            0    0      --
Number of                                                                        ;
Samples:      7          7            7    7        1              1 Avg Value:      0          0            0    0    0.4                0 Max Value:      0          0            0    0    0.4                0 Min Value:      0          0            0    0    0.4                0 Limits Exceeded:      0          0            0    0        0              0
* Note: Unit 1 in outage. Unable to obtain sample.
 
Page 4 of 15 NPDES: OPERATION MONITORING REPORT Georgia Power Company                                          From:    04-01-93  I To:    06-30-93  I Plant-E.I. Hatch P.O. Box 4545 Atlanta, Georgia  30302                            Permit Number:  GA0004120  ;
Discharge Location:      02A - Cooling Tower Blowdown Unit Two Location: Blowdown    Blowdown      Blowdown      Tower Basin    Tower Basin Type:      Mltpl Grab Mltpl Grab Mltpl Grab          Grab            Grab Frequency:1/Wk/ Unit  1/Wk/ Unit    1/Wk/ Unit      1/Qtr          1/Qtr Parameter:    Fac      Fac max.      Total Time      Zinc          Chromium 4                              of TRC rel      max.            max.
                                      & TRC avg.
(mg/1)      (mg/1)      (min) (mg/1)  (mg/1)          (mg/1)
Limits:      0.2        0.5          120    ti/A    1.0              0.2 Codes:    50064      50064        81400 50060    1092            1034 Date:
04-07-93      0          0            0      0    .04                0.0 04-14-93      0          0            0      0      --
04-22-93      0          0            0      0      --                --
04-28-93      0          0            0      0      --
05-04-93      0          0            0      0      --
05-12-93      0          0            0      0      --
05-19-93      0          0            0      0      --
05-26-93      0          0            0      0      --
06-02-93      0          0            0      0      --
06-09-93      0          0            0      0      --
06-16-93      0          0            0      0      --
06-23-93      0          0            0      0      --
Number of samples:    12          12          12      12        1                  1 Avg Value:      0          0          0        0    .04                  0 Max Value:      0          0          0        0    .04                  0 Min Value:      0          0          0        0    .04                  0 Limits Exceeded:      0          0          0        0      0                  0 w
 
q Page 5 of 15 NPDES: OPERATION MONITORING REPORT Georgia Power Company                                              From:  04-01-93 Plant E.I. Hatch                                                      To:  06-30-93 P.O. Box 4545 Atlanta, Georgia 30302                                  Permit Number:    GA0004120 Discharge Location:      01B - Unit One Cooling Water Overflow Location: Blowdown    Blowdown    Blowdown          Tower Disch. Tower Disch.
Type:      Mltpl Grab  Mltpl Grab  Mltpl-Grab          Grab            Grab Frequency:1/Wk/ Unit  1/Wk/ Unit  1/Wk/ Unit          1/Qtr            1/Qtr Parameter:    Fac      Fac max. Total Time          Zine          Chromium of TRC rel          max.              max.
                                    & TRC avg.
(mg/1)      (mg/1)      (min) (mg/1)        (mg/1)            (29/1)
Limits:      0.2        0.5        120        N/A      1.0              0.2 Codes:    50064        50064      81400 50060        1092              1034 Date:
04-20-93      --          --            --        --
0.8              0.0 Number of Samples:        0          0            0        0        1                1 Avg Value:        -          -            -        -
0.8            0.0 Max Value:        -          -            -        -
0.8            0.0 Min Value:        -          -            -        -
0.8            0.0 Limits Exceeded:        0          0            0~        0        0                0
 
Page 6 of 15 NPDES: OPERATION MONITORING REPORT Georgia Power Company                                          From:    04-01-93 Plant E.I. Hatch                                                  To:    06-30-93 P.O. Box 4545 Atlanta, Georgia    30302                            Permit Number:    GA0004120 Discharge Location:        O1I - Unit One Cooling Tower Basin Drains Location: Blowdown        Blowdown    Blowdown    Tower Disch. Tower Disch.
Type:      Mitpl Grab    Mltpl Grab Mltpl Grab      Grab            Grab Frequency:1/Wk/ Unit      1/Wk/ Unit  1/Wk/ Unit    1/Qtr            1/Qtr Parameter:    Fac        Fac max. Total Time    Zinc          Chromium of TRC rel    max,              max.
                                        & TRC avg.
(mg/l)        (mg/1)      (min) (mg/1)  (mg/1)            (mg/1)
Limits:      0.2          0.5          120    N/A    1.0              0.2 Codes:    50064          50064        81400 50060  1092              1034 Date:
There were no discharges from this sample point during this time period.
I i
Number of Samples:    O            O            O      O        O              O          1 Avg Value:    -            -            -      -        -              -
Max Value:    -            -            -      -        -              -
Min Value:    -            -            -      -        -              -
Limits                                                                                !
Exceeded:    -            -            -      -      -                -
I i
 
Pago 7 of 15 NPDES: OPERATION MONITORING REPORT Georgia Power Company                                          From:  04-01-93 Plant E.I. Hatch                                                  To:  06-30-93 P.O. Box 4545 Atlanta, Georgia  30302                            Permit Number:    GA0004120 Discharge Location:      01J - Unit One Cooling Tower Basin Overflows to Storm Drains Location: Blowdown    Blowdown      Blowdown    Tower Disch. Tower Disch.
Type      Mltpl Grab  Mitpl Grab Mltpl Grab        Grab            Grab Frequency:1/Wk/ Unit  1/Wk/ Unit    1/Wk/ Unit    1/Qtr            1/Qtr Parameter:  Fac      Fac max.      Total Time    Zinc          Chromium of TRC rel    max.              max.
2                                & TRC avg.
(mg/1)      (mg/l)        (min) (mg/1)  (mg/1)            (mg/1)    i Limits:    0.2          0.5          120    N/A    1.0              0.2      l Codes:    50064      50064          81400 50060  1092              1034 Date:
06-30-93    -            -                -    -    **              **
**  Sample results are to be submitted on next quarter's report due.to lateness of sample and turn around time from the lab.
Discharge occurred C    'ig period of no chlorination.                          '
Number of Samples:    0            0              0    0      1                1 Avg Value:    -            -            -      -      **              **
Max Value:    -            -            -      -      **              **
Min Value:    -            -            -      -      **              **
Limits Exceeded:    -            -            -      -      **              **
 
Pago 8 of.15 NPDES: OPERATION MONITORING REPORT Georgia Power Company                                          From:  04-01-93 To:  06-30-93 Plant E.I. Match P.O. Box 4545 Atlanta, Georgia  30302                            Permit Number:    GA0004120 Discharge Location:      02B - Unit Two Cooling Water Overflow To Storm                      '
Drains Location: Blowdown    Blowdown    Blowdown      Tower Disch. Tower Disch.
Type:      Mitp1 Grab Mltpl Grab Mltpl Grab        Grab            Grab Frequency:1/Wk/ Unit    1/Wk/ Unit  1/Wk/ Unit      1/Qtr            1/Qtr Parameter:    Fac      Fac max. Total Time      Zinc            Chromium of TRC rel      max.            max.
                                      & TRC avg.
(mg/1)      (mg/1)      (min) (mg/1)  (mg/1)          (mg/1).
Limits:      0.2        0.5          120    N/A    1.0              0.2 Codes:    50064        50064        81400 50060    1092            1034 Date:
04-10-93      --          --          --    --      0                0 Discharge    occurred during period of no chlorination.
Number of samples:    0          0            0      0      1                1 Avg Value:      -          -            -      -
0                0 Max Value:      -          -            -      -
0                0 Min Value:      -          -            -      -      0                0                    '
Limits Exceeded:    -          -            -      -
0                0 l
l
 
Pegn.9 of 15 NPDES: OPERATION MONITORING REPORT Georgia Power Company                                            From:04-01-93 Plant E.I. Hatch                                                To:  06-30-93 P.O. Box 4545 Atlanta, Georgia    30302                            Permit Number:  GA0004120 Discharge Location:      02C - Unit Two Cooling Water Overflow
. Location: Blowdown    Blowdown    Blowdown      Tower Disch. Tower Disch.
Type:      Mitpl Grab  Mitp1 Grab  Mitp1 Grab      Grab            Grab Frequency:1/Wk/ Unit    1/WX/ Unit  1/Wk/ Unit    1/Qtr          1/Qtr Parameter:    Fac      Fac max. Total Time    Zinc          Chromium
* of TRC rel      max.            max.
                                      & TRC avg.
(mg/l)      (mg/l)      (min) (mg/1)  (ag/1)          (mg/1)
Limits:      0.2          0.5        120    N/A    1.0              0.2 Codes:      50064      50064        81400 50060    1092            1034 Date:
04-20-93      --          --          --    --      0.5              0 Discharge occurred during a period of no chlorination.
Number of Samples:        0            0            0    0    1                1 Avg Value:        -            -            -    -
0.5                0 Max Value:        -            -            -    -
0.5                0 Min Value:        -            -            -    -
0.5                0 Limits 0                0 Exceeded:        -            -            -    -
 
Pago 10 of 15 NPDES: OPERATION MONITORING REPORT Georgia Power Company                                                    From:  04-01-93 Plant E.I. Hatch                                                            To:  06-30-93 P.O. Box 4545 Atlanta, Georgia    30302                                  Permit Number:      GA0004120 Discharge Location:      01E - Low Volume Waste (Liquid Radwaste System Unit One)
Type of Sample:    Grab Frequency of Analysis:    2/Mo a
code:              (530)        (556)
Parameter:        TSS        O&G            Nitrite (Chill Water) Releases mg/l        mg/l              to discharge point OSN 01 Limits:          Avg. 30    Avg. 15    Initial        Amount      Dilution      Final Max.100    Max. 20      Conc.        Drained    Flow rate    Conc.
(Ppm)      (gallons)      (gpm)        (ppb)
Date:
04-05-93          15          1.4        --            --
04-19-93            2        2.8        --
04-26-93            -          -
120            6829        12000          720 05-03-93            7        2.5        --
05-17-93            3        7.1 05-29-93            -          -          80          6110        16000          357 06-07-93            6        6.3        --
06-21-93          12          3.9        --            --
Number of Samples    :  6            6        2            2          2              2      ;
Average Value:    8            4        100          6470        14000          539    i Maximum Value:    15          6.3        120          6829        16000          720 357    1 Minimum Value:    3          1.4          80        6110        12000 Limits Exceeded: O              O        NA            NA          NA            NA
 
q P2g3-11 of 15 NPDES: OPERATION MONITORING REPORT Georgia Power Company                                                  From:  04-01-93 Plant E.I. Hatch                                                          To:  06-30-93 P.O. Box 4545 Atlanta, Georgia    30302                                  Permit Number:    GA0004120 Discharge Location:      02E - Low Volume Waste (Liquid Radwaste System Unit Two)
Type of Sample: Grab Frequency of Analysis:    2/Mo Codea              (530)          (556)
Parameter:        TSS        O&G              Nitrite (Chill Water) Releases ag/l        ag/l              to discharge point OSN 02 Limits:        Avg. 30    Avg. 15      Initial      Amount      Dilution    Final Max.100    Max. 20      Conc.      Drained      Flow rate  Conc.
(ppm)        (gallons)      (gpm)    (ppb)
Date:
04-05-93            5        0.0          --            --          --        --
04-07-93            -        --
320          5015      15000      1488 04-08-93            -        --
360          5182      10000      1984 04-10-93            -        --
480          4897      11000      2705 04-11-93            -        --
80          6591        8500        564 04-19-93            2        2.9          --            --          --        --
05-03-93            1        3.8          --            --          --        --
05-17-93            2        0.0          --            --          --        --
06-07-93            2        1.0          --            --          --        --
06-21-93            2        1.0          --            --          --        --
Number of Samples    :  6              6        4            4          4            4 Average Value:  2.3          1.5        310        5414        11125        1685      <
Maximum Value:    5          3.8        480        6591        15000        2705 Minimum Value:    1          0.0          80        5015          8500        564 Limits Exceeded: 0              0        NA            NA          NA            NA
 
Pag 3 12 of 15 NPDES: OPERATION MGAITORING REPORT Georgia Power Company                                        From:    04-01-93 To:    06-30-93 Plant E.I. Hatch P.O. Box 4545 Atlanta, Georgia  30302                            Permit Number:    GA0004120 Sewage Treatment Plant Sludge Disposal (lbs/ day / month)
April                          May                            June Date        1bs                  Date      lbs Date      .l bs No sludge removed              05/06      131                  06/01      312 during the month                05/10      138                  06/02      196 of April                      05/11      196                  06/03      436 05/12      128                  06/05 1347 05/14      128                  06/06      442 05/15      140                  06/07      242 05/18      148                  06/08      246 05/20      534                  06/09    '237 05/22      367                  06/10      163 05/25      248                  06/11      86 05/26      144                  06/12      220 05/27      473                  06/13      209 05/28      230                  06/15- 378
                                                              '06/16      201 This  sludge was  removed  for    disposal for incineration and burial as dry active waste.                                                                  .
l l
l 1
1
 
Pego 13 of 15 NPDES: OPERATION MONITORING REPORT                            4 Georgia Power Company                                        From:      04-01-93 Plant E.I. Hatch                                                To:      06-30-93 P.O. Box 4545 Atlanta, Georgia  30302                          Permit' Number:' GA0004120 Discharge Location:      01 - Combined Plant Waste Streams 'Onit One Frequency of Analysis:    1/Wk Type of Samples:          In Situ      Grab        Grab          Grab Parameter:            Temperature      T.R.C.      F.A.C.            pH Limits:                  Deg. F        N/A        N/A        Min. 6.0 Max. 9.0 Code:                      (11)        (50060)    (50064)        (400)
Date:
04-05-93                    66        <.1        <.1              6.8 04-12-93                    62        <.1        <.1              6.7 04-19-93                    66        <.1        <.1              7.0 04-26-93                    71        <.1        <.1              7.4 05-03-93                    73        <.1        <.1              7.5 05-10-93                    75        <1          <.1              7.2 05-17-93                    82        <.1        <.1              7.4 05-24-93                    82        <.1        <.1              8.1 05-31-93                    87        <.1        <.1              8.2 06-07-93                    88        <.1        <.1              7.3 06-14-93                    84        <.1        <.1              8.0 06-21-93                    86          0          0                8.1 06-28-93                    86        <.1        <.1              7.6 l
i l
I Number of Samples:          13          13          13                13 Average Value:              78        <.1        <.1              7.5 Maximum Value:              88        <.1        <.1              8.2 Minimum Value:              62          0          0                6.7 Limits Exceeded:              0          0          0                0
 
                                                                              .q Paga 14 of 15 NPDES: OPERATION MONITORING REPORT Georgia Power Company                                      From:    04-01-93 To:    06-30-93 Plant E.I. Hatch
.P.O. Box 4545 Atlanta, Georgia 30302                          Permit Number:    GA0004120 Discharge Location:    02 - Combined Plant Waste Streams Unit Two            ;
Frequency of Analysis:  1/Wk Type of samples:        In Situ      Grab        Grab        Grab Parameter:            Temperature    T.R.C.      F.A.C.      pH            ,
Limits:                  Deg. F        N/A        N/A      Min. 6.0 Hax. 9.0 Code:                      (11)      (50060)    (50064)      (400)
Date:
04-05-93                    66        <.1        <.1          6.8 04-12-93                    64        <.1        <.1          6.8 04-19-93                    69        <.1        <.1          7.5 04-26-93                    68        <.1        <.1          7.4 05-03-93                    75        <.1        <.1          7.7 05-10-93                    77        <.1        <.1          7.4 05-17-93                    82        <.1        <.1          7.6 05-24-93                    78        <.1        <.1          8.2-05-31-93                    82        <.1        <.1          7.6 06-07-93                    91        <.1        <.1          7.6 06-14-93                    86        <.1        <.1          8.1 06-21-93                    86          0          0            8.0 06-28-93                    87        <.1        <.1          7.6 Number of Samples:          13          13        13          13              l Average Value:              78        <.1        <.1          7.6              l Haximum Value:              91        <.1        <.1          8.2              !
Minimum Value:              64          0        0          6.8 Limits Exceeded:              0          0        0            0
                                                                              .i
 
a-  ,
                                                                              'Psg3 15 of--15 x q NPDES: OPERATION MONITORING REPORT:
        -Georgia Power. company                                              From:- 04-01-93 Plant E.I. Hatch                                                      To: ' 06-30-93 P.O. Box 4545
        . Atlanta, Georgia        30302                          Permit Number:  GA0004120-I    certify    under  the  penalty  of  law that this document and all attachments      were prepared under my direction;or' supervision in accordance with, a system designed to assure that qualified. personnel properly gather,-
and    evaluate    the  information  submitted. Based  on my inquiry of the person      or  persons    who  manage  the  system,  or  those persons directly responsible .for        gathering the information, the information' submitted is, to  the    best of my knowledge and belief, true, accurate,:and. complete.- I am  aware    that  there    are  significant  penalties  for  submitting false, information,    including the possibility of fine'and imprisonment for known violations.
                    ~
01/MC
      'H. L.
ltwi&
Sumner, Jr.
General Manager Nuclear Plant I
i
                                                                                                  )
 
QUARTERLY OPERATIONAL MONITORING REPORT From:      07-01-93 Georgia Power Company                                                  09-30-93 To:
Plant E.I. Hatch P.O. Box 4545                                                        GA0004120 Atlantn, Georgia  30302                          Permit Number:
Discharge Location:    01G - Low Volume Waste    (Neutralization Tank)
Type of Sample:                    Grab                    Grab Frequency of Analysis:            2/ Month                2/ Month PCS Code:                          (530)                  (556)
Parameter:              Suspended Solids mg/l (TSS)  Oil & Grease ug/l (O&G)
Limits:                          Avg.      30            Avg.      15 Max. 100            Max. 20 TSS                        O&G Daini                              MG/L                      MG/L 07-Os-93                          12.5                      4.0 07-20-93                            5.0                      0.0 08-02-93                            3.4                      2.5 08-22-93                          22.0                        0.0 09-06-93                            1.6                      0.6 09-24-93                            8.0                      0.0 Month of Juiv No. of Samples:                        2                          2 Average Value:                      8.8                        2.0 Max Value:                          12.5                        4.0 Min. Value:                          5.0                        0.0 Limits Exceeded:                      0                          0 Konth of Aucust                                                  2 No. of Samples:                        2 Average Value:                    13.7                        1.3 Max, Value:                        22.0                        2.5 Min. Value                            3.4                        0.0 Limits Exceeded:                      0                          0 Month of September No. of Samples:                      2                          2 Average Value:                      4.8                        0.3 Max. Value:                          8.0                        0.6 Min. Value:                          1.6                        0.0 Limits Exceeded:                      0                          0 Page 1 of 15
 
1
                                                          ' QUARTERLY OPERATIONAL MONITORING _ REPORT l Georgia-Power Company'                                                                                From:        07-01                  . Plant E.I. Hatch                                                                                        To:-      09-30-93.
P.O.. Box 4545 Atlanta, Georgia                    30302                                                  Permit. Number:        GA0004120 Discharge Location:                                  01H - Low Volume Waste (Pressure Filters Backwash)
Type of Sample:                                                      Grab                              Grab
.                  Frequency of Analysis:                                            1/ Quarter                      1/ Quarter.
PCS Code:                                                            (530)                            (556)
Parameter:                                              -Suspended Solids mg/l (TSS)            Oil & Grease.mg/l (O&G)
_ Limits:                                                          Avg.                  30          Avg.        15 Max.              100            Max. 20 TSS                                O&G Date:                                                                liga                              MG/L 08-19-93 (A)                                                            <1                            <5 08-17-93 (B)                                                            <1                            <5 08-17-93 (C)                                                            <1                            <5 08-17-93 (D)                                                            <1                            <5 3
Month of July:
No. of Samples:                                                              0                              0 Average Value:                                                          ---
Max. Value:                                                              ---
Min. Value:                                                              ---
Limits Exceeded:                                                          ---                            ---
Month of Auciust:
No. of Samples:                                                              4                              2 Average Value:                                                            <1                              <5 Max. Value:                                                              <1                              < 5.
Min. Value                                                                <1                              <5-Limits Exceeded:                                                              0                              0 Month of Sootember:
No. of Samples:                                                              0                              0 Average Value:                                                            ---
                  -Max. Value:                                                                ---
Min. Value:                                                                ---
Limits Exceeded:                                                          ---                            ---
4 Page 2 of 15 4
      # - . . , , ;.      .~
                              .,                      . , , . . , . . . .  ,          ....m.      , . _ .                              f . ., _ .
 
QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company                                                From:  07-01-93 To:  09-30-93 Plant E.I. Hatch P.O. Box 4545 Atlanta, Georgia      30302                            Permit Number:    GA0004120 Dischargo Location:        01A - Unit one Cooling Tower Blowdown Location:      Blowdown      Blowdown      Blowdown    Tower Basin      Tower Basin Type:            Mltpl        Mltpl          Mltpl        Grab              Grab Grab          Grab            Grab Frequency:      1/ Week      1/ Week        1/ Week      1/ Quarter      1/ Quarter Parameter:      Fac          Fac max. Total Time TRC        Zinc          Chromium rel & avg.      max.              max.
(mg/1)        (mg/l)      (min)(mg/1)    (mg/1)            (mg/1) 0.2        0.5          120    N/A      1.0              0.2 Limits:
PCS Code:        50064        50064      81400 50060        1092              1034 DatM                                                                            --
07-02-93            0            0          0      0        --
07-06-93            0            0          0      0      .04              0.0 07-14-93            0            0          0      0        --
07-21-93            0            0          0      0        --
07-28-93            0            0          0      0        --                --
08-04-93            0            0          0      0        --
08-11-93            0            0          0      0        --                --
08-18-93            0            0          0      0        --
08-25-93            0            0          0      0        --
09-01-93            0            0          0      0        --
09-08-93            0            0          0      0        --
09-15-93            0            0          0      0        --
09-22-93            0            0          0      0        --
09-29-93            0            0          0      0        --
Mpnth of July:
5            5          5      5            1                1 No. of Samples:
Avg. Value:        0            0          0      0        .04              0.0 Max. Value:        0            0          0      0        .04              0.0 Min. Value:        0            0          0      0        .04              0.0 0          0      0            0                0 Limits Exceeded:    0 Month of Aucust:
No. of Samples:    4            4          4      4            0                0 Avg. Value:        0            0          0      0        ---
Max. Value:        0            0          0      0        ---
Min. Value:        0            0          0      0        ---
Limits Exceeded:    0            0          0      0        ---
Month of September:
No. of Samples:    5            5          5      5            0                0 Avg. Value:        0            0          0      0        ---
Max. Value:        0            0          0      0        ---
Min. Value:        0            0          0      0        ---
Limits Exceeded: O              O          O      O        ---
Page 3 of 15
 
QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company                                              From:  07-01-93 Plant E.I. Hatch                                                      To:  09-30-93 P.O. Box 4545 Atlanta, Georgia      30302                            Permit Number:    GA0004120 Discharge Location:        02A - Unit Two Cooling Tower Blowdown Location:      Blowdown      Blowdown      Blowdown    Tower Basin      Tower Basin Type:            Mltpl        Mitpl          Mltpl        Grab              Grab Grab          Grab          Grab Frequency:      1/ Week      1/ Week      1/ Week      1/ Quarter      1/ Quarter Parameter:      Fac          Fac max. Total Time TRC      Zinc          Chromium rel & avg.      max.              max.
(mg/1)        (mg/1)      (min)(ag/1)    (mg/1)            (mg/1)
Limits:            0.2        0.5        120    N/A      1.0              0.2 PCS Code:        50064        50064      81400 50060      1092              1034 pptet 07-02-93            0            0          0      0        ---
0            0          0      0        0.4              .02 0.7-06-93                                                                    ---
07-14-93            0            0          0      0        ---
07-21-93            0            0          0      0        ---              ---
07-28-93            0            0          0      0        ---
08-04-93            0            0          0      0        ---              ---
08-11-93            0            0          0      0        ---
08-18-93            0            0          0      0        ---              ---
08-75-93            0            0          0      0        ---              ---
09-01-93            0            0          0      0        --                  --
09-08-93            0            0          0      0        --
09-15-93            0            0          0      0        --                  --
09-22-93            0            0          0      0        --
09-29-93            0            0          0      0        --
Month of Julv:
No. of Samples:    5            5          5      5            1                  1 Avg. Value:        0            0          0      0        0.4                .02 Max. Value:        0            0          0      0        0.4                .02 Min. Value:        0            0          0      0        0.4                .02 Limits Exceeded:    0            0          0      0            0                  0 Month of August:
No. of Samples:    4            4          4      4            0                  0 Avg. Value:        0            0          0      0        ---
Max. Value:        0            0          0      0        ---
Min. Value:        0            0          0      0        ---
Limits Exceeded:    0            0          0      0        ---
Month of September:
No. of Samples:    5            5          5      5            0                  0 Avg. Value:        0            0          0      0        ---
Max. Value:          0          0          0      0        ---
Min. Value:          0          0          0      0        ---
Limits Exceeded: 0              0          0      0        ---
1 l
l Page 4 of 15 1
 
1 QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company                                          From:  07-01-93 Plant E.I. Match                                                To:  09-30-93 P.O. Box 4545 Atlanta, Georgia    30302                          Permit Number:  GA0004120 Discharge Location:      01B - Unit One Cooling Water overflow Location:      Blowdown    Blowdown    Blowdown    Tower Basin    Tower Basin Type:          Mitp1        M1tpl        Mitpl          Grab            Grab Grab        Grab        Grab Frequency:    1/ Week      1/ Week      1/ Week      1/ Quarter    1/ Quarter Parameter:      Fac        Fac max. Total Time TRC      Zinc        Chromium rel & avg.      max.            max.
(mg/1)      (mg/1)    (min)(mg/1)    (mg/1)          (mg/1)
Limits:          0.2        0.5        120    N/A      1.0            0.2 PCS Code:      50064      50064      81400 50060      1092            1034 E.?LtII.
Cooling water did not overflow during this reporting period.
Mpnth of July:
No. of Samples:
Avg. Value:
Max. Value:
Min. Value:
, Limits Exceeded:                                                                  (
Month of Aucust:
No. of Samples:
Avg. Value:
Max. Value:
Min. Value:
Limits Exceeded:
Mpnth of Sectember:
No. of Samples:
Avg. Value:
Max. Value:
Min. Value:
Limits Exceeded:
Page 5 of 15
 
QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company                                                From:      07-01-93 To:      09-30-93 Plant E.I. Hatch P.O. Box 4545 Atlanta, Georgia    30302                            Permit Number:        GA0004120 Discharge Location:        01I - Unit One Cooling Tower Basin Drains Location:      Blowdown    Blowdown      Blowdown    Toder Basin          Tower Basin Type:            Mltpl        Mltpl          Mltpl        Grab                  Grab Grab        Grab          Grab Frequency:      1/ Week      1/ Week        1/ Week      1/ Quarter          1/ Quarter Parameter:      Fac        Fac max. Total Time TRC        Zinc                Chromium rel & avg.      max.                  max.
(mg/1)      (mg/l)      (min) (mg/1)    (mg/1)                (mg/1)
Limits:            0.2        0.5          120    N/A      1.0                    0.2 PCS Code:        50064      50064      81400 50060        1092                  1034 Dptet Basins were not drained during this reporting period.
Month of Julv:
No. of Samples:
Avg. Value:
Max. Value:
Min. Value:
Limits Exceeded:
Month of Auaust:
No. of Samples:
Avg. Value:
Max. Value:
Min. Value:
Limits Exceeded:
Month of September:
No. of Samples:
Avg. Value:
Max. Value-Min. Value:
Limits Exceeded:
l 1
Page 6 of 15
___ __ _- _ ______- _ - __- - __ - __ _ _ __ O
 
QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company                                              From:  07-01-93 Plant E.I. Match                                                    To:  09-30-93 P.O. Box 4545 Atlanta, Georgia    30302                              Permit Number:    GA0004120 Discharge Location:      01J - Unit One Cooling Tower Basin Overflows to Storm Drains        .
Location:      Blowdown    Blowdown        Blowdown    Tower Basin      Tower Basin Type:          Mltpl          Mltpl        Mltpl          Grab            Grab Grab          Grab          Grab Frequency:    1/ Week      1/ Week        1/ Week      1/ Quarter      1/ Quarter Parameter:      Fac        Fac max. Total Time TRC          Zinc          Chromium rel & avg.        max.            max.
(mg/1)      (mg/1)        (min) (mg/1)      (mg/1)          (mg/1)
Limits:          0.2          0.5        120    N/A        1.0              0.2 PCS Code:      50064      50064        81400 50060        1092            1034 Date:
Basins did not overflow during this reporting period.
Month of July:
No. of Samples:
Avg. Value:
Max. Value:
* Min. Value:
Limits Exceeded:
Month of Auaust:
No. of samples:
Avg. Value:
Max. Value:
Min. Value:
Limits Exceeded:
Month of Sentember:
No. of Samples:
Avg. Value:
Max, Value:
Min. Value:
Limits Exceeded:
Page 7 of 15
 
QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company                                                          From:  07-01-93 Plant E.I. Hatch                                                                To:  09-30-93 P.O. Box 4545 Atlanta, Georgia        30302                                      Permit Number:  GA0004120 Discharge Location:            02B - Unit Two Cooling Water Overflow To Storm Drains Location:      Blowdown        Blowdown            Blowdown        Tower Basin    Tower Basin Type:            Mltpl          Mltpl                Mltp1          Grab            Grab Grab            Grab                  Grab Frequency:      1/ Week        1/ Week            1/ Week          1/ Quarter    1/ Quarter Parameter:        Fac            Fac max. Total Time TRC                Zinc        Chromium rel & avg.            max.            max.
(mg/1)          (mg/l)          (min) (mg/1)          (mg/1)          (mg/1)
Limits:            0.2          0.5            120        N/A        1.0            0.2 PCS tode:        50064          50064          81400 50060            1092            1034 Date:
07-01-93              -              -              -          -
0.39            0.0 08-26-93              -              -            -          -
0.50            0.0 Mpnth of Julv:
No. of Samples:        0              0              0          0          1              1 Avg. Value:        ---            ---            ---        ---
0.39          0.0 Max. Value:        ---            ---            ---        ---
0.39          0.0 Min. Value:        ---          ---            ---        ---          0.39          0.0 Limits Exceeded:---                ---            ---        ---
0              0 Month of August:
No. of Samples:        0              0              0          0          1              1 Avg. Value:        ---            ---            -'-        ---
0.50          0.0 Max. Value:        ---            ---            ---        ---
0.50          0.0 Min. Value:        ---            ---            ---        ---          0.50          0.0 Limits Exceeded:---                ---            ---        ---
0              0 Month qf Sentember:
No. of Samples:        0              0            0          0          0              0 Avg. Value:        ---            ---            ---
Max. Value:        ---            ---            ---
Min. Value:        ---            ---
Limits Exceeded:---                ---
Discharges occurred during periods of no chlorination.
Page 8 of 15
 
QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company                                                        From:  07-01-93 To:  09-30-93 Plant E.I. Match                                                                                -
P.O. Box 4545 Atlanta, Georgia          30302                                  Permit Number:    GA0004120 Discharge Location:            02C - Unit Two Cooling Water Overflow Location:        Blowdown        Blowdown          Blowdown      Tower Basin      Tower Basin Type:            Mltp1            Mitpl              Mltpl          Grab              Grab Grab            Grab              Grab Frequency:      1/ Week          1/ Week          1/ Week        1/ Quarter      1/ Quarter Parameter:        Fac            Fac max. Total Time TRC              Zinc          Chromium rel & avg.          max.              max.
(mg/1)          (mg/1)        (min) (mg/1)        (mg/1)            (mg/1) 0.2            0.5          120      N/A        1.0              0. 2 -
Limits:
PCS Code:        50064          50064        81400 50060            1092            1034 Dn%cF 07-21-93            --            --            --        --        0.27            0.0 Month of Julv:
0            0          0          1              1 No. of Samples:        0 Avg. Value:        ---            ---          ---        ---        0.27            0.0 Max. Value:        ---            ---          ---        ---        0.27            0.0
                                                  ---        ---        0.27            0.0 Min. Value:        ---            ---
                                                  ---        ---            0              0 Limits Exceeded:---                ---
Month of August:
No. of Samples:        0              0            0          0          0              0 Avg. Value:        ---            ---          ---
Max. Value:        ---            ---          ---
Min. Value:        ---            ---
Limits Exceeded:---                ---          ---
Month of September:
No. of Samples:        0              0          0          0          0              0 Avg. Value:        ---            ---
Max. Value:          ---            ---
Min. Value:        ---            ---
Limits Exceeded:---                ---
Discharge occurred during period of no chlorination.
l Page 9 of 15 i
l 1
l
 
QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company                                                    From:  07-01-93 Plant E.I. Hatch                                                            To:  09-30-93 P.O. Box 4545 Atlanta, Georgia    30302                                  Permit Number:      GA0004120 Discharge Location:        01E - Lov Volume Waste (Liquid Radwaste System Unit One)
Type of sample:    Grab Frequency of Analysis:      2/ Month PCS Code:        (530)        (556)
Parameter:        TSS        O&G            Nitrite (Chill Water) Releases mg/l        ag/l              to discharge point OSN 01 Limits:          Avg. 30    Avg. 15    Initial      Amount      Dilution      Final Max.100    Max. 20      Conc.        Drained    Flow    rate  Conc.
    #                                    (ppm)      (gallons)      (gpm)      (ppb)
Date:
07-06-93            8          2.4        --
07-19-93            .2          0.5        --
08-02-93            2          2.9        --
08-16-93            28          2.5        --
09-06-93            11          0.3        --
09-20-93            7          1.3 Month of July:
No. of Samples      2          2            0            0            0          0 Average Value:      4.1        1.5 Max. Value          8.0        2.4        ---
Min. Value          0.2        0.5        ---
Limits Exceeded:    0          0          ---          ---          ---          ---
Epnth of Auaust:
No. of Samples      2          2              0          0            0            0 Average Value:      15          2.7        ---
Max. Value          28          2.9        ---
Min. Value          2          2.5 Limits Exceeded:                                                      ---
0          0          ---
Month of September:
No. of Samples      2          2              0            0            0            0 Average Value:      9          0.8 Max. Value          11          1.3        ---
Min. Value          7          0.3 Limits Exceeded:    0          0          ---
Page 10 of 15                                        j
 
Fro 3:  07-01-93 G0orgin Powar Company                                                          To:  09-30-93 Plcnt E.I. Hatch P.O.-Box 4545                                                Permit Number:      GA0004120 I
Atlanta, Georgia    30302 Discharge Location:        02E - Low Volume Waste (Liquid Radwaste System Unit Two)
I Type of Sample:    Grab Frequency of Analysis:      2/ Month PCS Code:        (530)        (556)
Parameter:        TSS        O&G            Nitrite (Chill Water) Releases ag/l        mg/l              to discharge point OSN 02 Avg. 15      Initial        -Amount    Dilution      Final Limits:        Avg. 30 Max.100      Max. 20      Conc.          Drained Flow rate        Conc.
(ppm)          (gallons)    (gpm)        (ppb)
Date:
07-05-93          1.2          2.4                                                  --
07-20-93            1          0.5        --
08-02-93            1          0.0        --
08-16-93          0.8          0.0        --
09-06-93          4.2          0.0                                                  --
09-20-93          0.5          1.0 Month of Julv:                                                              0            0 2          2            0              0 No. of Samples                              ---            ---          ---            ---
Average Value:    1.1          2.3                                                    ---
Max. Value        1.2          4.0                                                    ---
Min. Value        1.0          0.5                                                    ---
Limits Exceeded:    0          0          ---
Month of Aunust:                              0              0            0            0 No. of Samples      2          2                                                      ---
Average Value:    0.9          1.3                                                    ---
Max. Value          1.0        2.5                                                    ---
Min. Value        0.8          0.0                                                    ---
Limits Exceeded: 0              0          ---
Month of September:                                                        O              O No. of Samples      2            2            0  .
O Average Value:      1          0.5                                                    ---
Max. Value        1.6          1.0                                                    ---
Min. Value        0.5          0.0                                                    ---
Limits Exceeded:      0          0          ---
Page 11 of 15
 
  ..                                            .    . . . . , -    .        ~.      . ..      .-      .          .          .,    .          . . . -
1 1
_ QUARTERLY OPERATIONAL MONITORING REPORT
                                              - Georgia Power Company-                                                                          From:        07-01-93 To : ' 09-30-93 Plant 1E.I. Hatch
<                                              P.O.      Box 4545                                                                  .
                                              -Atlanta, Georgia' 30302                                                            Permit' Number:- GA0004120 Sewage Treatment. Plant sludge Disposal (1bs/ day / month) is-July                                                        August                                September Date          1bs                          Date        Ibs Date                    Ibs No sludge removed                                          No sludge removed                            09/21    _288 during'the' month                                          during the month                            09/22      216 of July                                                        of-August E
                                                                                                                                                                        'A
                                                .This sludge was removed for disposal                                    as dry active vaste.
1 Page 12 of 15 l
2
  -- - - - - - - - - - _ - _ _ _ _ _ _ _ _ _                      .m_  _ _--      .    .Es. ,  e- - .    ,y .y  e_,      .            3 4 ,-.                --
 
QUARTERLY OPERATIONAL MONITORING REPORT i
Georgia Power Company                                        From:    07-01-93 Plant E.I. Hatch                                              To:    09-30-93 .
                                                                              )
P.O. Box 4545 Atlanta, Georgia    30302                          Permit Number:  GA0004120 Discharge Location:      01 - Combined Plant Waste Streams Unit One-          ;
l Frequency of Analysis:    1/ Week Type of Samples:          In Situ        Grab    Grab          Grab Parameter:              Temperature        T.R.C. F.A.C.        pH Limits:                    Degree F        N/A      N/A        Min. 6.0 Max. 9.0 PCS Code:                    (11)        (50060)  (50064)        (400)
DJlLt&1.
07-05-93                      91          <.1      <.1            7.5 07-li-93                      89          <.1      <.1            8.2 07-19-93                      89          <.1      <.1            8.4 07-26-93                      89          <.1      <.1            8.3 08-02-93                      89          <.1      <.1            6.7 08-09-93                      89          <.1      <.1            7.4 08-16-93                      87          <.1      <.1            7.G 08-23-93                      95          <.1      <.1            7.6 08-30-93                      89          <.1      <.1            8.2 09-06-93                      89          <.1      <.1            7.2 09-13-93                      69 -        <.1      <.1            8.4 09-20-93                      85          <.1      <.1            8.2 09-27-93                      89          <.1      <.1            8.4 Month of Julv:
No. of Samples                  4          4        4              4 Average Value:                90          <.1      <.1            8.2 Max. Value                    91          <.1      <.1            8.4 Min. Value                    89          <.1      <.1            7.5 Limits Exceeded:                0          0        0              0 Month of Aucust:
No. of Samples                  5          5        5              5 Average Value:                90          <.1      <.1            7.5 Max. Value                    95          <.1      <.1            8.2 Min. Value                    87          <.1      <.1            6.7 Limits Exceeded:              0            0        0              0 Month of September:
No. of Samples                4            4        4              4 Average Value:              83            <.1      <.1            8.1 Max. Value                  89            <.1      <.1            8.4 Min. Value                  69            <.1      <.1            7.2 Limits Exceeded:              0            0        0              0 Page 13 of 15
 
J                                                                                                                        *1
                                                                                                                        -I QUARTERLY OPERATIONAL MONITORING' REPORT                                                          ,
    - Georgia Power Company-                                                          - From:        07-01-93            )
                                                                                          .To:        09-30-93        :
                                                                                                                            )
    - Plant E.I. Hatch P ; O '. Box 4545-Atlanta, Georgia    30302                                      Permit Number:                GA0004120 Discharge Location:            02 ~ - Combined Plant Waste Streams Unit Two Frequency of Analysis:        1/ Week                                                  .
Grab.
Type of; Samples:              In Situ          Grab            Grab Parameter:                  Temperature        T.R.C.          F.A.C.                  .pH Limits:                        Degree F          N/A.              N/A=            Min. 6.0 Max. 9.0 Code:                            (11)        (50060)        (50064)                (400)-
Date; a
07-05-93                          93          <.1              <.1                        7.7 07-12-93                          87          <.1              <.1                        7.9 07-19-93                          87          <.1              <.1                        8.3 07-26-93                          91          <.1              <.1                      '8.2-08-03-93                          87          <.1              <.1                        8.3 08-10-93                          84          <.1              <.1                      8.4 08-17-93                          87          <.1              <.1                      7.5 08-24-93                          93          <.1              <.1                      8.3 08-31-93                          89          <.1              <.1                      7.7 06-93                          87          <.1              <.1'                      7.7 82          <.1              <.1                      uB . 3 09-13-93 09-20-93                          89          <.1              <.1                      8.3 09-27-93                          86          <.1              < .1 -                    8.5 Month of Julv:
No. of Samples                        4          4                4                        4-Average Value:                      90          <.1              <.i                      8.0 Max. Value                          93          <.1              <.1                      8 .'3 Min. Value                          87          <.1              <.1                      7.7 Limits Exceeded:                      0          0                0                        0                    ,
    ' Mpnth of Auaust:
No. of Samples                        5          5                5                        5 Average Value:                      88          <.1              <.1-                      8.0 Max. Value                          93          <.1              <.1                      8.4 Min. Value                          84          <.1              <.1                      7.5 0                0                        0
      ' Limits Exceeded:                  0
      . Month of September:
4-                4                        4, No. of Samples                    .4 Average Value:                    86 ,          <.1              <.1                      -8.2 Max. Value                        89 '          <.1              <.1                      8.5 Min. Value                        82            <.1              <.1                      7.7 Limits Exceeded:                    0            0                .0                        0 Page 14 of.15
                            -t--  ,t                        w se        .,    'wy-  4                    .-    fu
 
QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company                                          From:  07-01-93 Plant E.I. Hatch                                                  To:  09-30-93 P.O. Box 4545 Atlanta, Georgia      30302                          Permit Number:  GA0004120 I certify under the penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the pers6n or persons who manage the system, or those persons directly gesponsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.        I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for known violations.
(' '~)  '  (s
    ./ ''44,'0 0 h/VM b1 H. L. Sumner, Jr.
General Manager Nuclear Plant l
J l
Page 15 of 15                                l l
l l
 
QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company                                                    From:    10-01-93 Plant E.I. Hatch                                                          To:    12-31-93 P.O. Box 4545                                                                                      .
Atlanta, Georgia          30302'                          Permit Number:          GA0004120 Discharge Location:            O1G - Low    Volume Waste (Neutralization Tank)
Type of Sample:                            Grab-                        Grab Frequency of Analysis:                    2/ Month                    2/ Month PCS Code:                                  (530)                        (556)
Parameter:                    Suspended Solids mg/l (TSS)        Oil & Grease mg/l ~ (O&G)
Limits:                                Avg.      30                  Avg. 15 Max.      100                  Max. 20 TSS                            O&G Datet                                      liG/_h                          MG/L 10-05-93                                    8.s                          1.0 10-19-93                                  33.5                            3.3 11-0.1-93                                    0.6                          0.4 11-2.            93                          8.8                          1.8 12-06-93                                    1.5                          0.0 12-20-93                                    6.0                          2.9 Month of October No. of Samples:                              2                              2 Average Value:                            20.9                            2.2 Max. Value:                                33.5                            3.3 Min. Value:                                  8.3                            1.0 Limits Exceeded:                              0                              0 Month of November No; of Samples:                              2                              2 Average Value:                              4.7                            1.1 Max, Value:                                  8.8                            1.8 Min, Value                                  0.6                            0.4 Limits Exceeded:                              0.                            O Month of December No. of Samples:                              2                              2 Average.Value:                              3.8                            1.5 Max. Value:                                  6.0                            2.9 Min. Value:                                  1.5                            0.0 Limits' Exceeded:                            0                              0 Page 1 of 15
 
  . ~ . .~ _                  . . . .          ._ _ _
QUARTERLY OPERATIONAL ~ MONITORING REPORT
        ' Georgia Power Company                                                        From:        10-01-93 Plant E . I -. Hatch                                                            To:        12-31-93 P.O. Box 4545 Atlanta, _ Georgia        30302                              Permit Number:              GA0004120 Discharge Location:            01H - Low Volume Waste (Pressure Filters' Backwash)
Type of Sample:                                  Grab                      Grab Frequency of Analysis:                        1/ Quarter                1/ Quarter PCS Code:                                        (530)                      (556)
Parameter:                      Suspended Solids mg/l (TSS)      Oil & Grease mg/l (O&G)
      . Limits:                                      Avg.      30                -Avg.      15 Max.      100                Max.      20 TSS                          O&G Date:                                            MG/L                        MG/L 11~-08-93 (A)                                      <1                          <5 11-08-93 (B)                                          2                        <5 11-08-93 (C)                                      <1                          <5 11-08-93 (D)                                      <1                          <5 Month of October:
No. of Samples:                                      0                              0 Average Value:                                    ---                          ---
Max. Value:                                        ---                          ---
Min, Value:                                        ---                          ---
Limits Exceeded:                                  ---                          ---
Month of Novemb;_r_;;.
r No. of Samples:                                      4                                4 Average Value-                                    <1                            <5 Max. Value:                                          2                          <5 Min. Value                                        <1                            <5 Limits Exceeded:                                      0                                0 Month of December:
No. of Samples:
0                                0 Average Value:                                    ---                          ---
Max Value:                                        ---                          ---
Min. Value:                                        ---                          ---
Limits Exceeded:                                  ---
Page 2 of 15 w si        --r.            __--        -  av--- ,
 
r-l                                                    QUARTERLY: OPERATIONAL MONITORING REPORT-
.              Georgia Power Company                                                                                                                                                                            From.:  10-01-93 Plant E.I. Hatch                                                                                                                                                                                    To:  12-31-93 P.O. Box 4545 Atlanta, Georgia                      30302                                                                                                                Permit Number:                                GA0004120
          ' Discharge Location:                                    01A - Unit One cooling Tower Blowdown Location:                    Blowdown                  Blowdown                  Blowdown                                                                      Tow'er Basin                            Tower Basin fType:                            .Mltpl                    Mltpl                          Mltpl                                                                                      Grab                    Grab Grab                      Grab                            Grab Frequency:                    1/ Week                  1/ Week                    1/ Week                                                                              1/ Quarter                      1/ Quarter Parameter:                      Fac                    Fac max. Total Time TRC                                                                                                      Zinc                Chromium rel & avg.                                                                                              max.                    max.
(mg/1)                    (mg/1)            (min) (mg/1)                                                                                        (mg/1)                      (mg/1)
Limits:                          0.2                    0.5                120                                    N/A                                                              1. 0'                  O.2 PCS Cpde:                      50064                  50064              01400 50060                                                                                            -1092                      1034
                      ~'
Date:
10-04-93                        --                      --                  --                                    --
0.3                    0.0 10-07-93                            0                      0                      0                                      0                                                                --                --
10-14-93                            0                      0                      0                                      0                                                                --                  --
          .10-20-93                              0                      0                      0                                      0                                                                --                --
i                                                                                                                                        0 10-28-93                            0                      0                      0                                                                                                        --                --
11-03-93                            0                      0                      0                                      0                                                                --
31-10-93                            0                      0                      0                                      0                                                                --                --
11-17-93                            0                      0                      0                                      0                                                                --                --
11-24-93                            0                      0                      0                                      0                                                                --                --
12-01-93                            0                      0                      0                                      0                                                                --                --
12-08-93                            0                      0                      0                                      0                                                                --                --
12-15-93                            0                      0                      0                                      0                                                                --
12-22-93                            0                      0                      0                                      0                                                                --                --
12-29-93                            0                      0                      0                                      0                                                                --
Month of October:
No. of Samples: 4                                            4                    4                                      4                                                                    1                  1 Avg. Value:                          0                      0                      0                                      0                                                                0.3                0.0 Max. Value:                          0                      0                      0                                      0                                                                0.3                0.0 Min. Value:                          0                      0                      0                                      0                                                                0.3                0.0  '
Limits Exceeded: 0                                          0                    0                                      0                                                                    0                  0 Month of November:
No. of Samples: 4                                            4                    4                                      4                                                                    0                  0 Avg Value:                            0                      0                    0                                      0                                                                ---                ---
Max. Value:                          0                      0                    0                                      0                                                                ---
Min. Value:                          0                      0                    0                                      0                                                                    --
          -Limits Exceeded: 0                                              0                    0                                      0                                                                ---
Month of December:
No. of Samples:                      5                      5                    5                                      5                                                                    0                  0 Avg. Value:                        .0                        0                      CF                                    0                                                                ----
Max. Value:                          0                      0                    0                                      0                                                                ---
Min. Value:                          0                      0                    0                                      0                                                                ---
Limits Exceeded: 0                                          0                    0                                      0                                                                ---
                                                                                    'Page 3 of 15 i
 
QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company                                                From:  10-01-93 Plant E.I. Hatch                                                      To:  12-31-93 P.O. Box 4545 Atlanta, Georgia- 30302                                  Permit Number:    GA0004120 Discharge Location:        02A - Unit Two Cooling Tower Blowdown Location:      Blowdown      Blowdown        Blowdown    Tower Basin-    Tower Basin Type:          Mltp1        Mitpl            Mltp1          Grab            Grab Grab          Grab            Grab Frequency:    1/ Week      1/ Week        1/ Week      1/ Quarter      1/ Quarter Parameter:      Fac          Fac max. Total Time TRC          Zinc          Chromium rel & avg.          max,            max.
(mg/1)        (mg/l)      (min) (mg/1)      (mg/1)            (mg/1)
Limits:          0.2        0.5        120      N/A      1.0              0.2 PCS Code:
        ~
50064        50064      81400 50060        '
1092            1034 Date:
10-04-93          --          --          --        --
                                                                  .05            0. 0.
  .10-07-93            0          0          0        0      ---            ---
10-14-93            0          0          0        0      ---            ---
10-20-93            0          0          0        0      ---            ---
10-28-93            0          0          0        0      ---            ---
11-03-93            0          0          0        0      ---            ---
11-10-93            0          0          0        0      ---            ---
11-17-93            0          0          0        0      ---            ---
11-24-93            0          0          0        0      ---            ---
12-01-93            0          0          0        0      --                  --
12-08-93            0          0          0        0      --                  --
12-15-93            0          0          0        0      --                  --
12-22-93            0          0          0        0      --                  --
12-29-93            0          0          0        0      --                  --
Month of October:
No. of Samples: 4                4          4        4          1                  1 Avg. Value:          0          0          0        0        .05              0.0 Max. Value:          0          0          0        0        .05              0.0 Min. Value:          0          0          0        0        .05              0.0 Limits Exceeded: 0                0          0        0          0                  0 Month of November:
No. of Samples: 4                4          4        4          0                  0 Avg._Value:          0          0          0        0      ---                ---
Max. Value:          O          O          O        O      ---                ---
Min. Value:          0          0          0        0      ---                ---
Limits Exceeded: 0                0          0        0      ---                ---
Month of December:
No. of Samples:      5          5          5        5          0                  0 Avg. Value:          0          0          0        0      ---                ---
. Max. Value:          0          0          0        0      ---                ---
Min. Value:          0          0          0        0      ---                ---
Limits Exceeded:    0            0          0        0      ---                ---
Page 4 of 15
 
QUAR,TERLY OPERATIONAL MONITORING REPORT                          h Georgia Power Company                                                  From:  10-01-93 Plant E.I. Hatch                                                          To:  12-31-93 P.O. Box 4545 Atlanta, Georgia      30302                                Permit Number:    GA0004120 Discharge Location:          01B - Unit One Cooling Water Overflow Location:      Blowdown        Blowdown      Blowdown      Tower Basin      Tower Basin Type:          Mltpl          Mltpl            Mltpl          Grab              Grab Grab            Grab            Grab Frequency:    1/ Week        1/ Week        1/ Week        1/ Quarter      1/ Quarter Parameter:      Fac            Fac max.' Total Time TRC          Zine          Chromium rel & avg.        max.              max.
(mg/1)          (mg/1)      (min) (mg/1)      (mg/1)            (mg/1)
Limits:          0.2          0.5          120      N/A        1.0              0.2 PCS Code:      50064          50064        81400 50060          1092            1034    ,
pate:~
10-13-93          --                --        --        --
                                                                  .20              0.0 overflow did not occur during period of chlorination.
Month of October:                                                                          3 No. of Samples:      0              0            0      0          1                1    i Avg. Value:      --            --          --      --          .20            0.0 Max. Value:      --            --          --      --          .20            0.0 Min. Value:      --            --          --      --          .20            0. 0.
Limits Exceeded:--              --          --      --
0                0 Month of November:
No. of Samples:      0              0            0      0          0-              0 Avg. Value:      --            --          --      --
Max. Value:      --            --          --
Min. Value:      --            --          --      --
Limits Exceeded:--              --          --      --
Month of December:
No. of Samples:      0              0            0      0          0                0 Avg. Value:      --            --          --      --
Max. Value:                                                      --              --
Min. Value:      --            --          --
Limits Exceeded:--              --          --      --
i 1
i i
1 l
l Page 5 of 15
 
QUARTERLY. OPERATIONAL MONITORING REPORT Georgia-Power Company                                                                          From:                10-01-93 Plant E.I. Hatch                                                                                  To:              12-31  P.O. Box 4545 Atlanta, Georgia                30302                                              Permit Number:                GA0004120 Discharge Location:                  O1I - Unit One Cooling Tower Basin Drains
, Location:            Blowdown              Blowdown          Blowdown            Tower Basin                  Tower Basin Type:                    Mltpl                Mitpl            Mltpl                  Grab                        Grab Grab                  Grab              Grab Frequency:            1/ Week                1/ Week            1/ Week              1/ Quarter                  1/ Quarter Parameter:                Fac                Fac max. Total Time TRC                      Zinc                      Chromium rel & avg.                  max.                        max.
(mg/1)                (mg/1)        (min) (mg/1)              (mg/1)                        (mg/1)
Limits:                    0.2                  0.5          120      N/A                1.0                        0.2 PCS Code:                50064              50064          81400 50060                  1092                        1034 Date?
1 Basins were not drained during this reporting period.
Month of October:
No. of Samples:              0                    0            0        0                  0                            0 Avg. Value:                --                  --          --        --                --                            --
Max. Value:                --                  --          --        --                --                            --
Min. Value:                --                  --          --        --                --                            --
Limits Exceeded:--                              --          --        --                --                            --
i Month of November:
1 No. of Samples:              0                    0            0        0                  0                            0 Avg. Value:                --                  --          --        --                --                            --
Max. Value:                --                  --          --        --                --                            --
Min. Value:                --                  --          --        --                --                            --
i Limits Exceeded:--                              --          --        --                --                            --
Month of December:
No. of Samples:              0                    0            0        0                  0                                0 Avg. Value:                --                  --          --        --                --                              --  ,
Max, Value:                --                  --          --        --                --                              --
l Min. Value:                --                  --          --        --                --                              --
Limits Exceeded:--                              --          --        --                -- -                            --
I a
l l
Page 6 of 15                                                              1 i
 
1                                                      QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power' Company                                                                                                                                                                        From:  10-01-93 Plant E.I. Hatch                                                                                                                                                                                To:  12-31-93 P.O. Box 4545
            - Atlanta, Georgia                        30302                                                              Permit Number:                                                                          GA0004120 Discharge Location:                                01J - Unit One Cooling Tower Basin Overflows to Storm Drains                                                                                                                                  '
Location:                Blowdown                      Blowdown                        Blowdown                  Tower Basin                                                                      Tower Basin Type:                        Mitp1                          M1tpl                        Mitpl                                              Grab                                                      Grab Grab                          Grab                          Grab Frequency:              1/ Week                        1/ Week                          1/ Week                            1/ Quarter                                                            1/ Quarter Parameter:                  Fac                        Fac max. Total Time TRC                                                          .Zine                                                      Chromium rel & avg.                                              max.                                                      max.
(mg/1)                          (mg/1)                    (min) (mg /1)                                      (mg/1)                                                        (mg/1)
Limits:                          0.2                        0.5                      120          N/A                                        1.0                                                    '0.2 PCS Cbde:                    50064                      50064                      81400 50060                                                1092                                                    1034 Date:
10-13-93                          --                        --                        --            --
                                                                                                                                                                .15                                                      0.0 i
Chlorination did not occur during period of overflow.
Month of October:
No. of Samples:                        0                      0                      0                0                                                1                                                  -1 Avg. Value:                          --                    --                    --              --
                                                                                                                                                              .15                                                      0.0 Max..Value:                          --                    --                    --              --
                                                                                                                                                              .15                                                      0.0 Min'. Value:                        --                    --                    --              --
                                                                                                                                                                .15                                                      0.0' l
Limits Exceeded:                    --                    --                    --              --                                            -0                                                        0 Month of November:
No. of Samples:                        0                      0                      0                0                                                0                                                    0
,              Avg. Value:                          --                    --                    --              --                                        - - -
Max. Value:                          --                    --                    --              --                                        --
Min. Value:                          --                    --                    --              --                                        --
Limits Exceeded:                    --                    --                    --              --                                        --
Month of' December:
No.'of Samples:                        0                      0                      0                0                                              0                                                    0 Avg. Value:                          --                    --                    --              --                                        --
            -Max. Value:                            --                    --                    --              --
            - Min. Value:                          --                    --                    --              --                                        --                                                        --
Limits Exceeded: --                                        --                    --              --                                        --
l l                                                                                Page 7 of-15
    .e,--    t  %w      --,,e  -+-w ,  v..--r                    . . .
                                                                                    . - - - >            -s  m e    -  - - - - - - . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
 
                                                  -QUARTERLY OPERATIONAL MONITORING REPORT                                                                              l Georgia. Power Company                                                                                            From:          10-01-93
: Plant.E.I. Hatch                                                                                                    To: :12-31-93                            i
        'P,0.              Box 4545 Atlanta, Georgia                        30302                                                      Permit Number:                GA0004120 i
Discharge Location:                            02B - Unit Two Cooling Water Overflow To Storm                                                                l Drains Location:                      Blowdown          Blowdown                      Blowdown          Tower Basin                  Tower Basin Type:                            Mltpl              Mltpl                            Mltp1                Grab                        Grab Grab              Grab                            Grab Frequency:                    1/ Week            1/ Week                        1/ Week              1/ Quarter                1/ Quarter Parameter:                      Fac              Fac max. Total Time TRC                                Zine                    Chromium rel & avg.                  max.                        max.
(mg/1)            (mg/l)                    (min) (mg/1)                (mg/1)                      (mg/1)
Limits:                            0.2              0.5                      120          N/A          1.0                        0.2 PCS Cbde:                        50064            50064                    81400 50060                  1092                        1034' Date:
10-14-93                              -                -                        -            -
0.07                        0.0 Month of October:
No. of Samples:                        0                0                        0            0            1                          1 Avg. Value:                        ---            ---                      ---          ---
0.07                      0.0 Max. Value:                        ---              ---                      ---          ---
0.07                      0.0 Min.. Value:                      ---              ---                      ---          ---
0.07                      0.0 Limits Exceeded:---                                ---                      ---          ---              0                          0 Mgnth of November No. of Samples:                        0                0                        0              0            0                          0 Avg. Value:                        ---              ---                      ---          ---            --                            --
Max. Value:                        ---              ---                      ---          ---            --                            --
Min. Value:                        ---              ---                      ---          ---            --                            --
Limits Exceeded:---                                ---                      ---          ---            --                            --
Month of December:
No. of Samples:                        0                0                        0              0            0                          0 Avg. Value:                        ---              ---                      ---          ---            ---                        ---
Max, Value:                        ---              ---                      ---          ---            ---                        ---
Min. Value:                        ---              ---                      ---          ---            ---                        ---
Limits Exceeded:---                                  ---                      ---          ---            ---                        ---
i-Discharge occurred during periods of no chlorination.
I b
l l
l' i~
Page 8 of 15 i
fi    _ _ . . _ . ._ - . _ ,                          _        , _ _ _ _
 
QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company                                                                              From:. 10-01-93 Plant E.I. Hatch                                                                                      To:  12-31-93 P.O. Box 4545 Atlanta, Georgia                  30302                                                  Permit Number:    GA0004120 Discharge Locatic.?n :                    02C - Unit Two Cooling Water overflow Location:              Blowdown              Blowdown                Blowdown            Tower Basin      Tower Basin
          . Type:                  Mltpl                Mltpl                    Mitpl                Grab              Grab Grab                  Grab                      Grab Frequency:            1/ Week              1/ Week                  1/ Week              1/ Quarter      1/ Quarter Parameter:            Fac                  Fac max. Total Time TRC                          Zine          Chromium rel & avg.                max.              max.
(mg/1)                (mg/l)              (min) (mg/1)              (mg/1)            (mg/1)
Limits:                  0.2                  0.5                120            N/A        1.0              0.2 PCS Code:              50064                50064              81400 50060                  1092              1034 Date:"
14-93                --                  --                --              --
0.05              .01 Month of 1ctober:
No. of Samples:              0                  0                  0                0          1              1 Avg. Value:              ---                  ---                ---              ---
0.05                .01 Max. Value:              ---                  ---                ---              ---
0.05                .01 Min Value:                ---                ---                ---              ---
0.05                .01 Limits Fxceeded:---                          ---                ---              ---            0              0 Month of November:
No. of Samples:              0                  0
* 0                0        -0                0 Avg. Value:              ---                ---                ---              ---        ---              ---
Max. Value:              ---                ---                ---              ---        ---              ---
Min. Value:              ---                ---                ---              ---        ---              ---
Limits Exceeded:---                          ---                ---              ----        ---              ---
Month of December:
No. of Samples:              0                  0                  0                0            0              0 Avg. Value:              ---                ---                ---              ---        ---              ---
Max. Value:              ---                ---                ---              ---        ---              ---
Min. Value:              ---                ---                ---              ---        ---              ---
i Limits Exceeded:---                          ---                ---              ---        ---              ---
Discharge occurred during period of no chlorination, i
s I
Page 9 of 15
                                                                                                                                  -1
 
E                                                                                                                    ~l QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company                                                                          From:  10-01-93
    = Plant E.I. Hatch                                                                              To:  12-31-93 P.O. Box 4545 Atlanta, Georgia      30302                                            Permit Number:              GA0004120 Discharge Location:          01E - Low Volume Waste (Liquid Radwaste System Unit One)
Type of Sample:    Grab Frequency of Analyrls:          2/ Month PCS Code:          (53C)          (556)
Parameter:          TSS            O&G                    Nitrite (Chill Water) Releases.
mg/l            mg/l                    to discharge-point OSN 01 Limits:          Avg. 30        Avg. 15          Initial      Amount        Dilution              Final Max.100        Max. 20            Conc.        Drained      Flow rate ' Conc.
(ppm)      (gallons)                (gpm)      (ppb)
Date:
10-04          12              1.9                  -          --                    --          --
10-09-93            --              --
80          6140            17000                31 10-10-93            --              --
80          6890            17500                32 10-12-93            --              --
80          6640            16000                33 10-12-93            --              --
80          6890            14000                38 10-13-93            --              --
80          6540            23000                25 l
10-19-93              5            3.8              --              --                  --          --    '
11-01-93              3            1.5              --              --                    --          --
11-15-93              6            0.9              --              --                    --          --
12-07-93              1            3.8              --              --                    --          --
12-26-93            19              1.6              --              --                    --          --
                                                                                                                        )
Mpnth of October:
  -No. of Samples          2                2                5              5                    5            5 Average Value:      8.5            2.9              80          6620          17500                  32        j Max, Value          12              3.8              80          6890          23000                  38        '
Min. Value            5            1.9              80          6140          14000                  25        l Limits Exceeded:      0                0                0              0                0              0        l Month of November-                                                                                          .
No. of Samples        2                2                0              0                    0            0        !
Average Valuct          5            1.2              ---            ---                  ---          ---
Max. Value            6            1.5              ---            ---                  ---          ---
I j
                                                                      ~
Min. Value            3            0.9              ---            ---                  ---          ---
  ' Limits Exceeded:      0                0            ---            ---                  ---          ---
Month of December:
  'No. of Samples        2                2                0              0                    0            0
  , Average Value:      10              2.7              ---            ---                  ---          ---
Max. Value          19              3.8              ---            ---                  ---          ---
Min. Value            1            1.6              ---            ---                  ---          ---
Limits Exceeded:      0                0            ---            ---                  ---          ---
1 1
I i
l I
Page 10 of 15                                                            I I
1 I
                            .m.
                                  .      ~        m.      ,                    #  , - - - -
 
QUARTERLY OPERATIONAL MONITORING REPORT-f Georgia Power Company                                                              From:    10-01-93 Plant E,I. Hatch                                                                    To:    12-31-93 P.O. Box 4545 Atlanta, Georgia      30302                                      Permit Number:          GA0004120
.        Discharge Location:          02E - Low Volume Waste (Liquid Radwaste System Unit Two)
        -Type of Sample:      Grab Frequency of Analysis:        2/ Month PCS Code:          (530)        (556)
Parameter:          TSS        O&G                Nitrite (Chill Water) Releases mg/l .        mg/l                to discharge point OSN 02 Limits:          Avg. 30      Avg. 15      Initial        Amount      Dilution          Final Max.100      Max. 20        Conc.          Drained Flow rate Conc.
(ppm)        (gallons)      (gpm)          (ppb)
Date.:
10-04-93            0.3          0.5            --          --          --                --
10-18-93            0.7          1.0          --            --          --                --
11-01-93              1          1.0          --            --          --                --
11-15-93            1.3          2.0          --            --          --                --
12-06-93            0. 8          0.8          --            --          --                --
12-20-93            4.5          1.6          --            --          --                --
Month of October:
No. of Samples          2            2                0            0                0                0 Average Value:        0.5          0.8          ---          ---            ---              ---
0.7          1.0                                        --- '
Max. Value                                        ---          ---                              ---
Min. Value            0.3          0.5          ---          ---            ---              ---
Limits Exceeded:        0            0            ---          ---            ---              - - -
Month of November:
No. of-Samples          2            2                0            0                0                0 Average Value:        1.2          1.5          ---          ---            ---              ---
Max. Value            1.3          2.0          ---          ---            ---
Min. Value            1.0          1.0          ---          ---            ---              ---
j Limits Exceeded:        0            0            ---          ---            ---
Mont h of DecemlLqr_:,.
No. of Samples          2            2                0            0                0                0 Average Value:        2.7          1.2          ---          ---            ---
Max. Value            4.5          1.6          ---          - - -          ---
Min-.Value            0.8          0.8          ---          ---            ---              ---
Limits Exceeded:        0            0            ---          ---            ---              ---    :
I l
l 1
l 1
l Page 11 of 15 1
1
 
QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From:      '10-01-93 Plant E.I. Hatch                                                                                                                                                      To:        12-31-93 P.O. Box 4545' Atlanta, Georgia                              30302                                                                                      Permit Number:                    GA0004120 Sewage Treatment Plant Sludge Disposal (lbs/ day / month)
October                                                              November                                                                                  December Date'            lbs                                                      Date                                1bs                                                  Date            lbs No sludge removed                                                          No sludge. removed                                                                        12/20            2893 during the month                                                            during the month                                                                          12/21            6300 of October                                                                of November                                                                          12/22            2893 12/23          11576 12/27            7235 12/29          13161 12/30            2481 Total          '48921 l                                                                                                                                                                                                            ,
i                                                                                                                                                                                                              l i
l This sludge was removed for disposal                                                                    as dry active waste.
I i
1 1
i Page 12'of 15-j
        . , _        . _. .,, - - . , . ~ . _ . .
                      .-                                          - . - _ - - _ .        - _ _ , _ _ - _ _ . - ~ _ _ _ . , _ _ _ .                  . _ _ _ . , -._                -. _                _ ., ,
 
QUARTERLY OPERATIONAL MONITORING REPORT.
~
.          Georgia Power Company                                                                                          From:      10-01-93 Plant E.I. Hatch                                                                                                  Tot      12-31-93
.i          P.O. Box 4545 2
Atlanta, Georgia                    30302                                                  Permit Number:                GA0004120 Discharge Location:                          01 - Combined Plant Waste Streams Unit One Frequency of Analysis: 1/ Week Type of Samples:                              In Situ                          Grab            Grab                  Grab Parameter:                                  Temperature                        T.R.C.          F.A.C.                  pH Limits:                                      Degree F                            N/A              N/A              Min. 6.0 Max. 9.0 PCS Code:                                      (11)                        (50060)        (50064)                  (400)
Date:
10-04-93                                            82                        <.1              <.1                    8.3-10-11093                                          80                          <.1              <.1                    8.3
          .10-18-93                                          80                        <.1              c.1                    8.3 10-25-93                                          66                          <.1              <.1                    7.9
.          11-01-93                                          68                        <.1              <.1                      8.2 11-08-93                                          71                        <.1              <.1                    7.1 11-15-93                                          69                        <.1              <.1                      7.4 11-22-93                                          73                          <.1              <.1                      8.1 11-29-93                                          69                        <.1              <.1                      8.2 12-06-93                                          ?$                          <.1              <.1                      8.0 i          12-13-93                                          66                          <.1              <.1                      7.9 12-20-93                                          66                          c.1              c.1                      7.7 7.8 12-27-93                                          53                          <.1              <.1 Month of October:
No. of Samples                                        4                          4                4                      4
)          Average Value:                                    77                          <.1              <.1                      8.2 Max. Value                                        82                          <.1              c.1                      8.3 Min. Value                                        66                          <.1              <.1                      7.9 Limits Exceeded:                                      0                          0                0                      0 Month of November:
i No. of Samples                                        5                          5                5                      5 Average Value:                                    70                          <.1            <.1                      7.8
:          Max. Value                                        73                          <.1            <1                        8.2
          . Min. Value                                      68                          <1              <.1                      7.1 Limits Exceeded:                                  0                              0                0                      0 Month of-December:
:          No. of Samples                                  4                                4                4                      .4 Average Valuei                                  65                            c.1            <.1                      7.8 Max. Value-                                    75                            <.1              <.1                      8.0
!          Min. Value                                      53                            <.1,            <.1                      7.8 Limits Exceeded:                                0                                0                0'                      O l
t Page 13 of 15                              ,
4 ..
      .          , . ~ ,          - . -. ...              -,          ,.  .      . -          , .-          -      . . -            .
 
QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company                                                                                      From:                10-01-93 Plant E,I. - Hatch                                                                                              To:            12-31-93 P.O. Box 4545 Atlanta, Georgia                30302                                                  Permit Number:                          GA0004120 Discharge Location:                    02 - Combined Plant Waste Streams Unit'Two Frequency of Analysis:                  1/ Week Type of Samples:                        In Situ                          Grab            Grab                          Grab-Parameter:                            Temperature                        T.R.C.          F.A.C.                          pH i                    Limits:                                Degree F                            N/A                  N/A                Min. 6.0 Max. 9.0 Code:                                    (11)                          (50060)      (50064)                        (400)
Date:,
10-04-93                                    80                            <.1            <.1                              8.2 10-11-93                                    82                            c.1            <.1                              7.7 10-18-93                                    82                            <.1            <.1                              7.8 10-29-93                                  72                            c.1            <.1                              8.4 11-01-93                                    69                            <.1            <.1                              8.4 11-08-93                                  55                            <.1            <.1                              7.2 11-15-93                                  69                            c.1            <.1                              7.6 11-22-93                                    71                            c.1            <.1                              8.2 11-29-93                                  60                            <.1            <.1                              8.1
                  ,12-06-93                                    69-                            c.1            <.1                              7.7 12-13-93                                    66                            <.1            c.1                              8.0 12-20-93                                    68                            <.1            <.1                              8.0 12-27-93                                    66                            <.1            <.1                              7.9 4
Mqnth of October:
No. of Samples                                  4                            4                  4                        .4 Average Value;                              79                            <.1            <.1                              8.0 Max, Value                                  82                            <.1            <.1                              8.4 Min. Value                                  72                            <.1            <.1                              7.7 Limits Exceeded:                                0                            0                  0                              0 Month of' November:
.                  No. of Samples                                  5                            5                  5                              5 Average Value:    -
65                            <.1            <1                              7. 9 '
Max. Value                                  71                            <.1            <.1                              8.4
;                          mit      E ceeded:                                                    b                  b                              b Month of December:
No. of Samples                              4                                4                4                              4 Average Value:                            67                              c.1            <.1                              7.9 Max.'Value                                69                              <.1            <.1                              8.0 Min. Value            .                  66                              <.1            <.1                              7.7 Limits Exceeded:                            0                                0                0                              0 1
Page 14 of 15
  -          ,              en, ,,.-we      e,-,-r              , - - - - .                  .      -        - - - - - - . - -        -        -      -- a,.,
 
l QUARTERLY OPERATIONAL MONITORING REPORT Georgia. Power Company                                                                From:    10-01-93 Plant E.I. Hatch                                                                        To:    12-31-93 P.O. Box 4545 Atlanta, Georgia          30302                                        Permit Number:        GA0004120
                                                                              .                                        1 I
I  certify      under          the    penalty of      law    that this document and all                  '
I attachments      were' prepared under my direction or supervision in accordance                                    l l
i with    a system designed to assure that qualified personnel properly gather and    evaluate    the      information          submitted.-      Based        on my inquiry of the-            l i
person    or  persons          who    manage        the system,    or    those persons directly responsible      for    gathering the information, the information submitted is, to  the    best of my knowledge and belief, true, accurate, and complete.                              I am' aware      that  there            are    significant      penalties        for  submitting false information,      including the possibility of fine and imprisonment for known violations.                                    ,
f
      -6'M      L  .['79v/dV H. L. Sumner, Jr.
General Manager Nuclear Plant 3
Page 15 of 15 l
4
                        ,,w-,  . , .- ,      ,      . ,              ,      -    .,    .-m.,      +,    .s--, ,
 
r                                                                  -1 ATTACliMENT 3 EDWIN 1. IIATCII NUCLEAR PLANT - UNITS 1 AND 2 1993 FLOW MONITORING AND CIIARACTERIZATION STUDY j
IIL-4537 ENV-94-067 Edeln L llatch Nuclear Plants - Units 1 and 2 NRC DocLets SS 321,50.%6 Operating IJcenses DPR-57, NPF-5 Annual Envin>nmental Surveillance Report                            j l
l I
 
3$5de rN AYe        e AUama, Georg63 30208
'  Telephone 404 526 f,526 Mawg Access Fest o't.ce Oca 4545 A::ama Georgia 30302                                                          L Georgia Power
: 5. D. Holdee                                              the 50at'trn e ect? c 5is'ea Manager                                              ,
Ucens.ng ano comonance          January 6, 1994 NPDES PERMIT REOUIREMENTS Flow Monitoring and Characterization Studies Annual Priority Pollutant Certification Mr. Lawrence W. Hedges Georgia Environmental Protection Division Industrial Wastewater Program 205 Butler Street, S.E., Suite 1070 Atlanta, GA 30334
 
==Dear Mr. Hedges:==
 
As required by the following NPDES Permits, attached are the Flow Monitoring and Characterization Studies for the referenced plants:
Plant Arkwright                          NPDES Permit No. GA0026069 Plant Bowen                              NPDES Permit No. GA0001449 Plant Branch                            NPDES Permit No. GA0026051 Plant Hammond                            NPDES Permit No. GA0001457 Plant      Hatch                        NPDES Permit No. GA0004120 Plant      McDonough/Atkinson          NPDES Permit No. GA0001431 Plant      Mitchell                    NPDES Permit No. GA0001465 Plant      Scherer                      NPDES Permit No. GA0035564 Plant      Vogtle                      NPDES Permit No. GA0026786 Plant      Wansley                      NPDES Permit No. GA0026778 Plant      Yates                        NPDES Permit No. GA0001473 In accordance with the provisions of the following NPDES pcrmits, Georgia Power Company certifies that no priority pollutants, other than chromium or zinc, are present in detectable amounts in the cooling water discharges of the referenced plants.          This certification is based on the manufacturer's certification for their products and applies to pollutants present as a result of their presence in water treatment chemicals added by Georgia Power Company and not their presence in raw water supplies.
Plant      Bowen                        NPDES Permit No. GA0001449 Plant      Hatch                        NPDES Permit No.sGA0004120 Plant      Scherer                      NPDESPermitSofyDA0035564 Plant      Vogtle                        NPDES Permit Nye GA0026786 Plant      Wansley                      NPDES Permit NbJ CA0026778 Plant      Yates                        NPDES Permit No. GA0001473
 
Georgia Power d If you have questions or require additional information, please contact floward Shelnutt at 526-7058.
Sincerely,
                                          ./
S. D. Ilolder hls INIh
 
Page  1 or 9 GEORGIA POWER COMPANY PLANT E.I..HAIGH i
NPDES FLOW CHARACTERIZATION STUDY                                    'I 1993 INTRODUCTION                  ,
This  flow    study was performed in accordance with Par,t III, Section B.9, of the  Georgia Power Company, E.I. Hatch Nuclear Generating Facility, National Pollutant    Discharge  Elimination System,        (HPDES), Permit No. GA 0004120; issued    by    the    State of Georgia, Department of natural Resources, Environmental Protection Division, on December 1,            1992.
BACKGROUND This  study was conducted        on the NPDES permitted waste streams using data collected during the time        period of July 6 to July 19, 1993. A description of the waste streams are as follows:
: 1. NON-CONTACT COOLING This system consisted          of  discharges    from  the Plant Auxiliary Heat Exchangers and the Diesel Generator Cooling.
The Plant Auxiliary cooling Systems consisted                  of  heat exchangers located in the      control,    radwaste,    reactor,  turbine    and waste gas buildings.      This system was supplied by the plant service water system and discharges into the circulating water system (cooling towers) to provide make-up water.            Flow rates were calculated using pump name plate data.
The diesel generator cooling water system was supplied by the plant            ~
service water system and discharges to the discharge structurc mixing chamber via the radwaste discharge line. This system was used for cooling the emergency diesel generators. The' diesel generators for Unit One, (lA and 1C), normally had a continuous flow of cooling water regardless of their operational status. Unit One's diesel generator-(IB)    and Unit Two's diesel generators, (2A and 2C), were supplied with cooling water only    during system operation; which consisted of testing and emergencies.        Flow    rates and measurements were calculated using pump name plate data.
: 2. LOW VOLUME WASTE (NEUTRALIZATION TANK) O1G This      waste stream consisted          of domineralizer      regeneration waste composed of    sulfuric    acid,    sodium  ' hydroxide    and  rinse water. All regenerative    waste  was    collected    in  a sump'and    recirculated    into a 38,000 gallon      aboveground    tank  until  the  pH was  between  6 and  9. The neutralization tank        was. discharged    via  gravity    into  the Unit    one mixing chamber.      The  maximum    flow rate  achievable  was  calculated  using-the volume of the tank and the radius of the discharge pipe.                        The daily average flow rate          was  calculated  by  dividing  the total    volume discharged by the total minutes in the test period. The flow rate measurements of this system were based on its calculated maximum flow rates and discharge duration.
i
 
Page    2 of 9 GEORGIA POWER COMPANY PLANT E.I. HATCH
.                              NPDES FLOW CHARACTERIZATION STUDY 1993
: 3. LOW VOLUME WASTE (PRESSURE FILTER BACKWASH) OlH This vaste stream consisted of backwash water originating from four pressure sand filters that preceded the domineralizer unit. The backwash        waste      gravity        drained into the neutralization tank discharge line.            The maximum flow rate ' achievable was based on thebackwash pump name plate data. The daily average flow rate was calculated by using backwash flow rate data and operating times during the test period. The flow rate measurements of this system were based on flow indicators for each pressure filter.
: 4. COOLING TOWER BLOWDOWN (UNIT ONE) OlA This    waste stream consisted of discharges from the Unit One
        ' closed-loop circulating water system. Make-up water for this system was derived from non-contact auxiliary plant cooling water. The discharge originated at the circulating water pumps discharge and was routed to the Unit One mixing chamber.                    The maximum flow rate achievable was based on the total pumping capacity of the plant service water system.                  The daily average flow rate was calculated using the difference between the Unit One mixing chamber flow rates and the other Unit One waste streams. The flow rate measurements of this system were based on mathematical computations relating this waste stream to all the others that were applicable.
: 5. COOLING TOWER BLOWDOWN (UNIT TWO) 02A This    waste stream consisted of discharges from the Unit Two closed-loop circulating water system. Make-up water for this system was derived from the non-centact auxiliary plant cooling water.                      The discharge originated at the circulating water pumps discharge and was routed to the Unit Two mixing chamber. The maximum flow rate                                    !
achievable was based on the total pumping capacity of the plant service water system.                  The daily average flow rate was calculated using the          difference      between  the Unit Two mixing chamber flow rates                  I and the other Unit Two waste streams. The flow rate measurements of this system were based on mathematical computations relating this waste stream to all the others that were applicable,                                                i
: 6. COOLING WATER OVERFLOW (UNIT ONE) 01B This waste stream consisted of discharges from the closed-loop circulating water system.                  Make-up water for the system originated from the non-contact auxiliary plant cooling water system. The discharge originated at the Unit One cooling tower flume and was routed to the Unit one mixing chamber.                        The maximum flow rate achievable was based on the total pumping capacity of the plant service water system. The daily average flow rate was calculated by dividing the total gallons discharged by the total minutes in the tent period.            The flow rate measurements of this stream were based on    the best conservative estimate at the time of subsequent                                      l discharge.
NOTE: This vaste stream was permitted for use in lieu of outfall                                    1 number OlA.
l
 
      . . . - =        -                    .                        -    ~    .
POge      3 of 9 GEORGIA POWER COMPANY PLANT E.I. HATCH NPDES FLOW CHARACTERIZATION STUDY 1993
: 7. COOLING WATER OVERFLOW TO STORM DRAINS (UNIT ONE) 01J This waste stream. consisted of discharges from the closed-loop circulating water system.                    Make-up water for the system originated from the non-contact auxiliary plant ' cooling water system. The discharge originated at the Unit One cooling tower basins and was routed to storm drains, then to the river. The maximum flow rate achievable          was      based      on the total pumping capacity of the plantservice          water system.            The daily average flow rate was calculated by dividing the total gallons discharged by the total minutes in the test period.                          The flow rate measurements of this stream were          based on      the best conservative estimate at the time of subsequent discharge.
NOTE: This waste stream was permitted for use in lieu of outfall number 01A.
: 8. COOLING TOWER BASIN DRAINS (UNIT ONE) 01I This waste stream consisted of discharges from the closed-loop circulating water system.                    Make-up water for the system originated from      the  non-contact          auxiliary        plant cooling water system. The discharge originated at the Unit One cooling tower basins and was routed to storm drains,                    then to the river. The maximum flow rate achievabic was          bared      on    the total pumping capacity of the plant service water system.                The  daily average flow rate was calculated by dividing the total                gallons      discharged by the total minutes in the test period.            The flow rate measurements of this stream were based on    the best conservative                  estimate at the time of subsequent discharge.
NOTE: This waste stream was permitted for use in lieu of outfall number 01A.
: 9. COOLING WATER OVERFLOW TO STORM DRAINS (UNIT TWO) 02B
:                This      waste stream consisted of discharges from the closed-loop circulating water system.                    Make-up water for the system originated from the non-contact auxiliary plant cooling water system. .The discharge originated at the Unit Two cooling tower basins and was routed to storm drains,                    then to the river.                The maximum flow rate achievable        was    based      on    the    total      pumping          capacity of the plant service water system.                The    daily  average      flow        rate    was calculated by dividing the total                gallons      discharged        by      the    total minutes in the test period.            The flow rate measurements of this stream were based the best conservative estimate at the time of subsequent on discharge.
NOTE: This waste stream was permitted for use in lieu of outfall
,                            number 02A.
I
 
Page    4 of 9 GEORGI A POWER COMPANY PLANT E.I. HATCH NPDES FLOW CHARACTERIZATION STUDY 1993
: 10. COOLING WATER OVERFLOW (UNIT TWO) 02C This waste stream. consisted of discharges from the closed-loop circulating water system                  Make-up water for the system originated from the non-contact            auxiliary                plant cooling water system. The discharge originated            at    the  Unit            Two cooling tower flume and was routed to the Unit              Two    mixing            chamber.                                                The maximum flow rate achievable was based            on    the    total          pumping                                              capacity of the plant service water system.            The    daily        average                flow                                rate    was calculated by dividing the    total      . gallons      discharged                        by                        the          total    minutes in the test period.      The flow rate measurements of this stream were based on    the best conservative                estimate at the time of subsequent discharge.
4 NOTE:  This  waste        stream      was      permitted for use in lieu of outfall-number 02A.
: 11. LOW VOLUME WASTE (LIQUID RADWASTE SYSTEM, UNIT ONE) 01E This waste stream consisted of waste water generated primarily in the reactor and turbine buildings.                                            Examples of the waste water sourens were floor          drains,      laundry          drains,                                              laboratory drains, seal cooling waters and bearing cooling waters.                                                              The            collective waste was filtered and domineralized                then            discharged                                              to    the Unit One mixing chamber    or  reused          in-plant                depending                                                on      the chemical and radiological quality.              the maximum flow rate achievable was derived from the pump name plate data.                                The average daily flow was calculated by dividing the total volume discharged by the total minutes in the test period.                              The flow rate measurements of this stream were based on integrator readings and discharge duration.
: 12. LOW VOLUME WASTE (LIQUID RADWASTE SYSTEM, UNIT TWO) 02E This waste stream consisted of waste water generated primarily in the reactor and turbine buildings.                                            Examples of the waste water sources were floor drains, laboratory drains, seal cooling waters and bearing cooling waters. The collective waste was filtered and demineralized,  then discharged to the Unit Two mixing chamber or reused in-plant depending on the chemical and radiological quality.                                                                              ;
The maximum flow rate achievable was derived from the pump name                                                                                -i plate data.      The average daily flow was calculated by dividing the                                                                          '
total volume discharged by the total minutes in the test period,                                                                                j The flow rate measurements of this stream were based on integrator                                                                              l readings and discharge duration.                                                                                                                l 1
: 13. COMBINED WASTE STREAMS (UNIT ONE) 01                                                                                                            l This waste stream consisted of the total volume of all liquid waste being discharged from Unit One. The maximum flow rate was achieved                                                                              i using the total surface water pumping capacity on plant site. -The                                                                              j daily average discharge was calculated from the Unit One daily discharge flow rates during the test period.                                                                                  The flow rate measurements were based on readings obtained from flow rate strip charts.
l l
 
Page      5 of 9 GEORGIA POWER COMPANY PLANT E.I. HATCH NPDES FLOW CHARACTERIZATION STUDY 1993
: 14. COMBINED WASTE STREAMS (UNIT TWO) 02 This    waste stream consisted of the total volume of all liquid waste being discharged from Unit Two.            The maximum flow rate was achieved using the total surface water pumping capacity on plant site. The daily average discharge was calculated from the Unit Two daily discharge flow rates during the test period.                  The flow rate measurements were. based on readings obtained from flow rate strip charts.
: 15. INTAKE SCREEN BACKWASH 03 This waste stream consisted of river water being used continuously to backwash the plant's traveling water intake screen. The river 4 water used to backwash the intake screen was gravity fed back to the river.          The intake screens are backwashed approximately once per shift    (      dependent on DP ). This flow rate'was estimated using pump plate data.
: 16. INTAKE STRAINER BACKWASH 03A This waste stream consisted of river water being used periodically to backwash the plant's intake pump's strainers.              The river water used to backwash the intake strainers was fed back to the river via the stillwell associated with the intake. The intake strainers are backwashed approximately once per shift ( dependent on DP ). This flow rate was estimated using pump plate data.
17,  2P65 CHILLER WATER BLOWDOWN 04 This vaste stream consisted of discharges from the Unit Two Reactor Building and the Radwaste Building closed-loop circulating water systems.          Make-up water for this system originated from the plant sanitary water system.              The maximum flow rate achievable was calculated using the pump name plate data. The daily average flow rate    was        calculated by dividing the total gallons of water discharged by the total minutes in the test period. The flow rate measurements were based on engineering data reviews.
: 18. SEWAGE TREATMENT EFFLUENT 01F This vaste stream consisted of the plant domestic sewage waste that was created by two aeration package treatment plants.                        Discharge from this facility was routed to the Unit one mixing chamber. The maximum flow rate achievable was calculated using the designed capacity of the aeration plants. The daily average flow rate was calculated by dividing the total gallons of water discharged by the total minutes          in the test period. The flow rate measurements were based on readings obtained from a flow rate strip chart.
1 l
_ _ ~ . _ ___ _ __                    _      __    _    .__            _    .._. _
 
                                                                                ,m Page    6 of 9 GEORGIA POWER COMPANY PLANT E.I. HATCH
  ~
NPDES FLOW CHARACTERIZATION STUDY 1993 TABLE OUTFALL NUMBER AND NAME    .            MAXIMUM (comi_            DAILY / AVG (comi Non-Contact Cooling Water                      3,500                  1,403 (a)
(Diesel Generator Cooling)
Non-Contact Cooling Water                      68,000                  45,000 (1)
(Plant Auxiliary Systems) 01G Low Volume. Waste                          650                    10 (b)-
(Neutralization Tank) 01H Eow Volume Waste 1,050                      2 (c)
(Pressure Filter Backwash) 01A Cooling Tower Blowdown                34,000 (f)                  1,229 (Unit One) 02A Cooling Tower Blowdown                  34,000 (f)                    912 (Unit Two) 01B Cooling Water Overflow                  34,000 (f)                      0 (Unit One) 01J Cooling Water Overflow                  34,000 (f)                      O to Storm Drains (Unit One)
O1I Cooling Tower Basin                    34,000 (f)                      0 Drains (Unit One) 02B Cooling Tower Overflow                  34,000 (f)                      O to Storm Drains (Unit Two) 02C Cooling Water Overflow                  34,000 (f)                        0 (Unit.Two) 01E Low Volume Waste, Liquid                    100                        10 (d)
Radwaste (Unit One) 02E Low Volume Waste, Liquid                    100-                      9 (e)'
Radwaste (Unit Two) 01  Combined Plant Waste                    50,000                        18,643 Streams (Unit One) 02  Combined Plant Waste                    50,000                        12,786-Steams (Unit Two) 4 4
 
Page      7 of 9.
GEORGIA POWER COMPANY PLANT E.I. HATCH NPDES FLOW CHARACTERIZATION STUDY 1993 TAEE MAXIMUM (comi            DAILY /Ayg OUTFALL NUMBER AND NAME    .
                                                                    .(.9El01 500                      412 (g) 03  Intake Screen Backwash 500                      412 (g) 03A Intake' Strainer Backwash 04  2P65 Chiller Water Blowdown              500                          5 (h) 01F Sewage Treatment Plant                    50                          17 x      -.                  .      _. __                _
 
Page    8'of 9 GEORGIA POWER COMPANY PLANT E.I. HATCH NPDES FLOW CHARACTERIZATION STUDY 1993 FOOTNOTES i  '(a)  The daily average flow rate for cooling water for the diesel generators 1,400 gpm.              However, during the flow study test period, the diesels operated only 1.5 hours, (b)  During the          sample  period,      216,000      gallons              were    discharged in 6 batches.
1 (c)  Actual backwash time during the two week period was 40 minutes at a rate of 710 gpm and 40 minutes at a rate.of 250 gpm.
      .(d)  turing    the        sample  period,      231,462      gallons              of  waste    water were discharged from the Unit One mixing chamber in 31 batcaes.
(c)  During    the        sample  period,      236,762      gallons              of  waste    water were discharged from the Unit Two mixing chamber in 26 batches.
(f)  This  figure reflects the total' surface water withdrawal capabilities 9
at  the  plant consisting of service water capacity of 68,000 gpm and residual heat removal (RHR) piping capacity of 16,000 gpm. RHR is used primarily during' plant shutdown.
(g)  Under normal operating
* conditions, the Intake Screen Backwash and Intake Strainer Backwash discharges at a daily average rate of 412 gpm.
(h)  Under    normal. operating conditions, the 2P65 Chiller Water Blowdown discharges at a daily average rate of 5 gpm.
(1)  Under    normal        operating    conditions,        the            Unit    One Plant Auxiliary System uses approximately 22,000 gpm and under normal operating conditions,          the Unit Two plant Auxiliary System uses approximately 21,250 gpm.
4 4
 
b                                                                                                                              j Page  9 of.9 9XO.lG_JA POWER COMPANY PLANT E.I. HAT.Cli NPDES FLOW CllARACTERIZATION STUDY
'                                                                                      1993
                                                      ' WATER TREATMENT CllEMICAL INVENTORY This        is    a      list      of        the          chemicals used at Plant Edwin I. Hatch for the purpose of water treatment:
: 1.        AC 3323 ( scale & corrosion inhibitor )
: 2.        Borax                                                                                          ,
: 3.        Boric Acid
: 4.        Orthophosphate ( Ancool 3213, ALS-34s-220 )
l
: 5.        Calgon 11-64 0
: 6.        Calgon 11-300
: 7.        Sanuril 115 (Calcium liypochlorite)
: 8.        Sodium Hydroxide
: 9.        Sodium liypochlorite ( MLP30 GAL )
                        ' 10 .        Sodium Nitrite                      ( Ancool 3733,3735,3730 )
: 11.          Sodium Pentaborate
: 12.          Sulfuric Acid                      (_SA230 GAL )
1 d
n d
E T f  1"        n--  --m3      . , , , _}}

Revision as of 08:50, 31 March 2020

Annual Environ Surveillance Rept for 1993. W/940323 Ltr
ML20064N966
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/31/1993
From: Beckham J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HL-4537, NUDOCS 9403300193
Download: ML20064N966 (83)


Text